Specifications for Heat Pump for Main Office Area Building 1.docx

DOCX document 15 KB Posted

Attached to
HVAC Roof-Mount Heat Pump Replacement for Main Office Area in Building 1
Solicitation number
12405B24Q0388
Issued by

About this file

This document contains the Specifications for a Heat Pump Replacement for the Main Office Area of Building 1 at the USDA, ARS, SEA, Coastal Plains Soil, Water, Plant Research Center in Florence, SC. The contractor must provide all materials, labor, and equipment to replace the existing roof-mount heat pump with a new ENERGY STAR-qualified or FEMP-designated heat pump (2-ton, R-410a refrigerant, 15 SEER/12.5 EER/8.2 HSPF minimum) with a 208V supply voltage. The new unit must have a 1-year parts and 5-year compressor warranty. The contractor must also provide new duct smoke detectors, programmable thermostats, and electrical disconnects as required. The incumbent unit is a Carrier model #50JZ-024-321TP. The related Federal Contract Opportunity is a Request for Quotation (RFQ) for the HVAC Roof-Mount Heat Pump Replacement, Solicitation #12405B24Q0388, issued by the USDA, ARS, SEA, Coastal Plains Soil, Water, & Plant Research Center. The RFQ is for full and open competition under NAICS code 238220 with a small business size standard of $19.0MM. Quotations are due by August 13, 2024 at 3:00 pm CT and will be evaluated on technical acceptability, past performance, and price to determine best value.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

PROJECT LOCATION:

USDA, ARS, SEA, Coastal Plains Soil, Water, Plant Research Center 2611 West Lucas Street Florence, SC 29501

Heat Pump for Main Office Area Building 1:

Contractor must provide all materials, labor, and equipment to replace a roof-mount heat pump for the Main Office area in Building 1. The new heat pumps must be ENERGY STAR-qualified or FEMP-designated (R-410a refrigerant; 15 SEER/12.5 EER/8.2 HSPF minimum). The supply voltage must be 208V. The new HVAC unit must be the same size and capacity as the exiting units and have a factory warranty of at least 1 year for parts and 5 years for the compressor. The contractor must also provide new duct smoke detectors if required. The heat pump must be replaced with a unit requiring little modification of the existing duct system. The contractor must provide new programmable thermostats (5+2 day) if the existing thermostat isn’t compatible with new units.

Existing electrical disconnect must be removed by the contractor. New electrical disconnects must be provided and installed by the contractor. The contractor may use the existing electrical supply provided it is properly sized for the new unit. Contractor must provide and install all wiring, conduit, disconnects and breakers in accordance with local, state, and national codes.

The existing heat pump unit is a 2-ton roof-mounted Carrier model #50JZ-024-321TP (serial #4705G12279). The contractor may use the existing roof curb if it is compatible with the new unit. The contractor must ensure the level installation of the new heat pump.

The new heat pump must include a 2-stage electrical heat strip. Stage 1 must be 3 KW, stage 2 must be 4.5 KW. Stage 2 must be used only when heat pump is out of operation in normal temperature control mode. Stage 1 is for supplemental heat, stage 2 is for emergency heat.