Specifications_for_Generator_Inspection.docx

DOCX document 25 KB Posted

Attached to
ABPP Prep Center Inspection & Maintenance for Generator
Solicitation number
SRC0000033900
Issued by
Clarke County, Alabama

About this file

This is a Scope of Work specification document for the Alabama Bureau of Pardons and Paroles (ABPP) Prep Center for annual generator inspection, preventive maintenance, and load bank testing services. The solicitation seeks a qualified supplier to service a Cummins Inc. DFEK-5743204 500kW generator (Serial Number A060871093, 24 VDC system) located at 4805 HWY 80 W, Uniontown, AL 36786. Services required include comprehensive annual inspection and preventive maintenance covering the engine, alternator, control panel, cooling system, fuel system, exhaust, battery system, and all associated components; operational testing including start-up under load and automatic transfer switch verification; identification and documentation of deficiencies with repair recommendations; and annual load bank testing at minimum 30%-100% load conducted six months after the annual service. A mandatory pre-bid meeting and site visit is required for all bidders on May 21, 2026 at 10:30 AM Central Time at the ABPP Prep Center, with attendance and sign-in mandatory for bid eligibility. The deadline for submitting questions is May 26, 2026 at 5:00 PM Central Time.

Supplier qualifications include maintenance of a valid business license, current EGSA (Electrical Generating Systems Association) certification for all technicians, preferred factory training and vendor status with Cummins Inc., and completion of a background check administered by ABPP. Suppliers must maintain adequate General Liability and Workers Compensation insurance throughout the agreement term with proof provided prior to work commencement and upon policy renewal. All services must comply with NFPA 70 (National Electrical Code) and NFPA 110 standards. The supplier must provide 24-hour emergency response capability with shorter response times preferred and after-hours/weekend contact methods. Invoicing follows a Net 30 payment schedule paid in arrears after service completion, with detailed itemized invoices submitted to invoices.payables@paroles.alabama.gov including technician names, purchase order numbers, service dates, and for equipment replacement, manufacturer's part costs, contracted markup percentages, and actual labor hours. All quotes for non-standard service trips must be fully itemized with contracted hourly labor rates, technician numbers, manufacturer's part costs, and total estimated project costs provided in advance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page | 2

Specifications for Inspections and Certifications Scope of Work:

The purpose of this solicitation is to identify a qualified supplier for the Alabama Bureau of Pardons and Paroles (ABPP) to provide a yearly inspection and preventive maintenance for the generator at the ABPP Prep Center. The supplier will also provide a yearly load bank test of the unit six months after the yearly inspection and service. The supplier shall provide the service for the following generator:

· Manufacturer: Cummins, Inc.

· Model: DFEK-5743204

· Serial Number: A060871093

· Rating: 500kW

· Voltage: 24 VDC System All services shall comply with applicable code requirements and state standards.

Service Requirements:

A. Annual Inspection & Preventative Maintenance

· Perform comprehensive inspection of generator system including:

· Engine, alternator, control panel, cooling system, fuel system, exhaust, and battery system

· Change oil, filters (oil, fuel, air), coolant testing

· Inspect belts, hoses, connections, and wiring

· Battery testing and cleaning (24 VDC system)

· Verify control panel operation and alarms

· Check fuel quality and levels

· Inspect exhaust system and emissions components B. Operational Testing

· Start-up and run test under load

· Verify automatic transfer switch (ATS) functionality

· Check safety shutdowns and alarms C. Repairs

· Identify and document deficiencies

· Provide repair recommendations and cost estimates

· Perform repairs upon approval by Alabama Bureau of Pardons and Paroles D. Load Bank Testing

· Perform annual load bank test at minimum 30%–100% load

· Conduct 6 months after annual service

· Duration per code

· Provide full test report with readings and compliance confirmation

Supplier Requirements:

The inspections shall be tested and inspected in accordance with NFPA 70- National Electrical Code and NFPA 110 Standard for Emergency and Standby Power Systems.

The generator must be inspected and tested annually in accordance with applicable codes and regulatory requirements.

The supplier shall maintain a valid and current business license throughout the term of this agreement.

All technicians performing inspections and repairs during the term of this agreement shall maintain current certification through the Electrical Generating Systems Association (EGSA). It is preferred that the supplier has factory training with Cummins Inc. and is a preferred vendor.

The supplier must complete a background check administered by ABPP prior to commencing work at the Prep Center.

The supplier shall comply with all applicable federal, state, county, city, and local codes and regulations associated with inspections and equipment/part replacement services.

The supplier shall maintain, at its own expense, adequate insurance coverage, including General Liability and Workers Compensation, throughout the term of the agreement. Proof of insurance shall be provided prior to the commencement of work and upon renewal of policies.

The supplier shall provide priority emergency service for the generator system covered under this agreement. Emergency service shall be defined as any condition that renders the generator inoperable or unreliable. The supplier shall respond within twenty-four hours of notification, with shorter response times preferred. The supplier shall provide a contact method for after-hours and weekend emergency requests.

The supplier shall not perform any services, repairs, or equipment/part replacements outside the scope of this specification without prior written authorization. The supplier will not be compensated for any unauthorized work performed without an approved purchase order issued in advance.

Mandatory Site Visit:

A mandatory site visit will be required for all suppliers intending to submit a bid for this request for Bid (RFB).

· Vendors must sign in during the site visit.

· Only vendors who attend and sign in will be eligible to submit a bid.

· Failure to attend the mandatory site visit or failure to sign in will result in automatic rejection of the bid.

Vendors should come prepared to ask questions related to the requested services, specifications, and requirements during the site visit.

Questions related to the requested services, specifications, and requirements must be asked during the mandatory site visit. Only procedural questions will be accepted outside of the site visit.

Scheduling Requirements:

Upon completion of each service call, the awarded supplier shall provide ABPP with a detailed service report including:

· Description of service work performed

· Date of service

· Any identified deficiencies The report must also include estimated repair or replacement costs for any deficiencies identified.

Any equipment or part replacement work will require an approved purchase order issued in advance.

Quote Requirements:

Supplier quotes shall be provided in advance for any equipment or part replacement requiring a non-standard service trip due to damaged or deficient components.

All quotes must be fully itemized and include:

· Contracted hourly labor rate

· Number of technicians

· Manufacturer’s part cost

· Contracted markup percentage

· Selling price including markup

· Estimated labor hours for replacement

· Total estimated project cost Listed price cost shall be defined as the manufacturer’s cost plus the contracted percentage markup (example: part cost + 5%).

All required cost information must be clearly stated on the quote.

Invoicing/Pay Schedule:

The supplier shall submit all invoices after completion of services to the ABPP Accounts Payable section via email: invoices.payables@paroles.alabama.gov.

Invoices submitted prior to completion of services will not be accepted.

Payment terms shall be Net 30, paid in arrears after completion of services.

All invoices must include:

· ABPP Prep Center name and address

· Technician name(s)

· Current purchase order number

· Date of service Inspection invoices shall be itemized and include the inspection fee. The inspection fee shall include labor and travel costs.

If a non-standard service trip is required for equipment or part replacement, the invoice must include:

· Description of the replacement work performed

· Manufacturer’s part cost

· Contracted markup percentage

· Final selling price

· Technician and technician helper hourly rates

· Actual labor hours worked

· Total cost for parts and labor Facility Information:

Prep Center

4805 HWY 80 W

Uniontown, AL 36786

File details come from the government source that posted it. Updated .