- Specifications.pdf
PDF 60 KB Posted
- Solicitation number
- 80NSSC22804924Q
View the file
Other files
| File | Type | Posted |
|---|---|---|
| - Specifications v2.pdf | ||
| Drawing.pdf | ||
| Picture.pdf | ||
| Question and Answers.pdf | ||
| Question and Answers.pdf | ||
| Question and Answers.pdf | ||
| RFQ Open Market.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications for Replacement Self Cleaning Filter
The unit shall be designed and fabricated to the latest version of the ASME Section VII Div 1 Boiler and Pressure Vessel Code and have the required U-Stamp
The unit shall come with the following documents Pressure Vessel, Heat Exchanger, & Dewar Design & Fabrication Documentation:
o Photo or Etching of Pressure Vessel Data Plate o Manufacturer’s Data Reports (U-forms for ASME B&PV vessels) o Fabrication Drawings o Repair or Alteration History ( R-forms for ASME B&PV vessels) o Operating History o Design Calculations And Specifications* o Mill Test Reports & Impact Testing Results* o Inspection & NDE Reports* o Hydrostatic or Pneumatic Test Reports* o WPS, PQR, and WPQ*
The vessel shall be designed for cooling tower water usage The vessel shall be designed for a MAWP or 150-psig @ 200F The filter assembly shall have a 100-micron efficiency rating The filter assembly shall have a minimum capacity of 500-gpm The filter assembly will be mounted vertically Inlet and Outlet nozzles shall have 6” Class 150# Raised Face flanges located 34.5” apart (Note, if the nozzles distance dimension is not met then the cost of modifying existing piping will be a contributing factor in the cost decision)
Inlet and Outlet nozzle loads shall be required to support its own water filled weight
File details come from the government source that posted it. Updated .