Specifications.pdf
PDF 11 MB Posted
- Solicitation number
- W912WJ22B0001
About this file
This document provides details on a federal contract opportunity for dredging services on Great Chebeague Island in Maine. The solicitation number for the opportunity is W912WJ22B0001 and is being issued by the Department of the Army Corps of Engineers Engineering District New England. The opportunity involves improvement dredging on Great Chebeague Island to maintain navigable waterways. No other details are provided on requirements, response dates, or contract terms. An attached Specifications.pdf file contains additional requirements but its content was not disclosed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| W912WJ22B0001.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No.:
W912WJ22B0001
IMPROVEMENT DREDGING
Great Chebeague Island Chebeague Island, Maine
Construction Solicitation and Specifications
November 2021
IMPROVEMENT DREDGING, GREAT CHEBEAGUE ISLAND ISSUE COPY
TOWN OF CHEBEAGUE ISLAND, MAINE NOVEMBER 2021
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 01 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 54 50 DREDGING PLANT AND EQUIPMENT
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 71 23 FIELD ENGINEERING FOR DREDGING
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 MECHANICAL DREDGING
35 20 24 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW -
MONITORING PROFILE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT LOCATION
1.2 PROJECT SUMMARY
1.3 WORK COVERED BY CONTRACT DOCUMENTS
1.4 REFERENCES
1.5 SUBMITTALS
1.6 PROJECT SITE CONDITIONS
1.6.1 Physical Data
1.7 PRE-DREDGING PHOTOGRAPHIC SURVEY
1.8 ENVIRONMENTAL WINDOW
1.9 WORK COMMENCEMENT AND COMPLETION REQUIREMENTS
1.10 WORK SEQUENCING AND SCHEDULING
1.10.1 Work Sequence
1.10.2 Hours of Operations
1.10.3 Scheduling
1.10.3.1 Initial Project Schedule
1.10.3.2 Periodic Schedule Updates
1.10.4 Rate of Progress
1.10.5 Coordination with Harbormaster
1.11 CONTRACTOR'S USE OF UPLAND FACILITIES AND HAULING ROUTES
1.12 SUPERINTENDENCE BY THE CONTRACTOR
1.13 WORK SITE AND CONTRACTOR'S USE OF PREMISES
1.13.1 General
1.13.2 Temporary Staging and Storage Area(s)
1.13.3 Work Limits
1.13.4 Access to Work Site
1.13.5 Protection and Security
1.13.6 Emergency Contacts
1.13.7 Damaged Property
1.13.8 Contractor's Receipt of Supplies
1.13.9 Daily Clean Up
1.13.10 Littering
1.13.11 Government Sanitary Facilities
1.14 QUALITY ASSURANCE
1.15 COORDINATION
1.15.1 Public Notice
1.15.2 Notice to Mariners
1.15.3 Aids to Navigation
1.15.4 Points of Contact
1.16 GENERAL SAFETY REQUIREMENTS
1.16.1 General
1.16.2 Contractor's Project Superintendent
1.17 ENVIRONMENTAL PROTECTION
1.18 DIRECTION OR INSTRUCTIONS DURING CONSTRUCTION
1.19 PRECONSTRUCTION CONFERENCE
PART 2 PRODUCTS
SECTION 01 11 00 Page 1
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 PROJECT LOCATION
The project is on Great Chebeague Island which is located in Casco Bay, Cumberland County, Maine. The Island is located approximately 10 miles northeast of Portland, Maine. The project site is located at the upper northwest side of the island.
Transportation to and from the island is via ferry service and is roughly a 15-minute run from Wharf Road on Cousins Island to the Stone Wharf landing on the north-west side of the island.
1.2 PROJECT SUMMARY
a. This project involves improvement dredging to create a new Federal Navigation Project (FNP) adjacent to Stone Wharf landing at the northwest side of the island (Refer to NOAA Chart 13290 attached at the end of this specification section). The FNP will consist of a 10-foot-deep channel and turning area, and an 8-foot-deep turning basin.
b. The 10-foot-deep channel will be approximately 1685 feet long, with the channel being 100 feet wide for approximately 1285 feet from seaward end to start of the turning area transition (approximately 85 feet of transition), and 150 feet wide for approximately 315 feet from end of transition to start of the 8-foot-deep turning basin. The 8-foot-deep turning basin will be approximately 230 feet long from end of turning area to end of turning basin.
c. The information provided in the project summary is for general information only. The new FNP shall be dredged to the horizontal layout, dimensions, and side slopes as shown in the Contract Drawings.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
a. The Contractor shall perform the work in strict accordance with the Contract Drawings and Specifications and provide all supervision, plant, labor, materials, equipment, safety, and quality control necessary to perform all operations as necessary to accomplish the work, complete. The Contractor is responsible for providing and utilizing appropriate plant and equipment to remove and dispose of the dredged material.
b. The general description of the work described below is general in nature and is only given to indicate the approximate scope of work under this contract. It does not limit the work required under the project contract drawings and specifications.
c. General Description of the Work:
(1) BASE BID ITEMS:
SECTION 01 11 00 Page 2
(a) Perform mobilization and demobilization as necessary to complete all work in accordance with the Contract Drawings and Specifications.
(b) Perform improvement dredging to remove approximately 34,350 cubic yards of ordinary material from within the limits of the new Federal Navigation Project (FNP) to the specified depths and side slopes as specified herein and as shown on the Contract Drawings. Dredge the new 10-foot-deep channel and turning area to a required depth of -10 feet Mean Lower Low Water (MLLW) with a one foot allowable overdepth to -11 feet MLLW, and the 8-foot-deep turning basin to a required depth of -8 feet MLLW with a one foot allowable overdepth to -9 feet deep MLLW.
(c) All material dredged shall be removed by mechanical means, loaded into scows, and transported to and disposed of at the Portland Disposal Site (PDS) as specified in Section 35 20 23 MECHANICAL DREDGING under subparagraph "Designated Disposal Site".
(d) Dredging from the Stone Wharf landing is prohibited. Refer to subpart titled "Safety and Protection of Existing Structures" in Section 35 20 23 MECHANICAL DREDGING.
(e) The Contractor shall be aware that this site relies heavily on ferry and barge traffic. It shall be the responsibility of the Contractor to keep in constant communication with the Town of Chebeague Harbormaster (contact provided below under "Points of Contact") and to coordinate with him on a daily basis to schedule dredging and disposal operations around the Town Landing's (Stone Wharf) navigational traffic.
(2) OPTIONAL BID ITEMS:
Remove each boulder encountered in the turning basin during dredging and transport and dispose of each boulder as specified in Section
01 22 00 MEASUREMENT AND PAYMENT.
d. The project description and requirements are further defined in the Contract Drawings and Specifications.
1.4 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 01 11 00 Page 3
SD-01 Preconstruction Submittals
Initial Project Schedule ; G, RO
In accordance with the contract clauses, the Contractor shall, within 5 days after receipt of Notice to Proceed (NTP) or as otherwise determined by the Contracting Officer, submit for approval a practicable project schedule. When changes are authorized that result in contract time extensions, the Contractor shall submit a revised project schedule for approval by the Contracting Officer.
Pre-Dredging Photographic Survey ; G, RO
The Contractor shall submit a pre-dredging photographic survey as described in this section.
Public Notice ; G, RO
Submit a copy of the proposed wording of the Public Notice to the Contracting Officer for approval.
Notice to Mariners
Submit a copy of Notice to Mariners to the Contracting Officer.
Safe Harbor Plan ; G, RO
The Contractor shall submit a Safe Harbor Plan to the Contracting Officer for approval prior to the start of on-site work. The Safe Harbor Plan shall include a written description of the Contractor's plan to provide for the safety and security of floating plant, equipment, and personnel in the event of a storm or other site emergency. The location for the docking of floating plant and the off-loading of equipment and crews shall be clearly indicated.
Utility Plan
SD-07 Certificates
Periodic Schedule Updates ; G, RO
1.6 PROJECT SITE CONDITIONS
1.6.1 Physical Data
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
a. Site Conditions: The indications of physical conditions on the drawings and in the specifications are the result of site investigations and surveys. The conditions represented prevailed at the time the investigations and surveys were made. Prior to the start of dredging operations a pre-dredge survey of record for the site will be established in accordance with subpart "Survey Types" in Section 01 71 23 FIELD ENGINEERING FOR DREDGING. Prior to commencing work at
SECTION 01 11 00 Page 4 the site, the Contractor shall verify the existing conditions indicated on the drawings and in the specifications. See CONTRACT CLAUSE entitled "SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK".
b. Weather Conditions: Weather conditions for the site may be obtained by the Contractor from the National Oceanic and Atmospheric Administration's National Weather Service; www.NOAA.gov.
c. Tide Conditions: The mean tidal range in area of dredging is 9.1 feet mean higher high water (MHHW) to mean lower low water (MLLW).
Predicted times and heights of tides for each day of the year can be obtained from the National Oceanic and Atmospheric Administration, National Ocean Service, "Tidal Current Tables, Atlantic Coast of North America."
d. Transportation facilities: The Contractor shall make its own investigations on the use of Federal, state, and municipal highways, roads, streets, and bridges.
e. Conditions of Channel: Controlling depth in the wharf approach is currently less than 5 feet. The Town has conducted minor shoal removal in the past to keep ferry access at least in higher tidal stages. Soundings shown on the contract drawings are the results of hydrographic surveys conducted during July 2021.
f. Channel Traffic:
(1) The Stone Wharf landing is used by supply barges and boats, ferries, charter boats, fishing boats, and recreational craft.
(2) The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of applicable regulations. The Contractor shall conduct the work in such a manner as to obstruct navigation as little as possible, and in the event the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, the plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. The Contractor shall coordinate with the Harbormaster daily to obtain a report for each day's channel traffic.
g. Utilities:
The Contractor shall also make its own investigation and conduct utility research concerning utility lines in areas to be dredged.
Submit to the Contracting Officer a Utility Plan showing all utilities found as a result of investigation and utility research.
1.7 PRE-DREDGING PHOTOGRAPHIC SURVEY
The Contractor shall perform a pre-dredging photographic survey at the project site with the Contracting Officer. This pre-dredging photographic survey shall include still photographs and videos in sufficient quantity to fully document the existing condition of all wharfs, piers, docks, fenders, and other shorefront structures and features within and adjacent to areas to be dredged as part of this contract. A written narrative shall be prepared by the Contractor which organizes and summarizes the findings of the pre-dredging survey photographs and videos. The narrative shall separately organize all items by individual owners. The condition
SECTION 01 11 00 Page 5 of each item shall also be documented in writing. The written narrative, together with the photographs and videos, shall constitute a "Pre-Dredging Photographic Survey Report", which shall be submitted to the Contracting Officer for approval. No on-site dredging work shall be performed until this "Pre-Dredging Photographic Survey Report" has been approved. Damage to features caused by the Contractor's operations shall be repaired by the Contractor at no additional expense to the Government.
1.8 ENVIRONMENTAL WINDOW
a. In order to minimize interference with, disturbance to, and damage to particular species of fish, marine mammals, birds, and other aquatic wildlife, an environmental window has been established to allow for the performance of dredging and disposal operations under this contract. The window, as noted in the Water Quality Certificate (WQC) attached at the end of Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS, is as follows:
1 November 2021 to 8 April 2022
b. Dredging and disposal work under this contract will not be permitted outside of this window. An extension to this window will not be permitted.
1.9 WORK COMMENCEMENT AND COMPLETION REQUIREMENTS
a. To ensure immediate readiness to start dredging operations under this contract within 30 calendar days after the date the Contractor receives the Notice to Proceed (NTP), the Contractor shall commence on preliminary contract administrative work by promptly placing all orders, awarding subcontracts, and preparing, processing, and submitting a project schedule and all other required submittals and details.
b. The Government requires that all dredging and disposal work be completed on or before 1 April 2022. The required completion date shall be reflected in the Contractor's initial Progress Schedule, Work Plan, and Progress Schedule updates.
c. The period from 2 April 2022 to 8 April 2022 may be used by the Contractor to perform activities that include receiving Government approval of after dredge survey, cleaning up, removal of dredge plant and equipment, and the complete demobilization from project site.
1.10 WORK SEQUENCING AND SCHEDULING
1.10.1 Work Sequence
There are certain essential criteria relative to the preparation of a work sequence and time schedule which the Contractor will be required to implement and follow during the prosecution of the work. Minor variations in the sequence of the items of work as approved may be made by the Contractor, provided such variations do not conflict with critical elements of the schedule. Proposed minor variations shall be noted on the progress charts submittal required by CONTRACT CLAUSE, entitled "SCHEDULES FOR CONSTRUCTION CONTRACTS." Variations shall be approved by the Contracting Officer prior to implementation.
SECTION 01 11 00 Page 6
1.10.2 Hours of Operations
Operational Hours: The Contractor will be allowed under this contract to perform dredging and disposal work 24 hours a day, 7 days a week, including holidays.
1.10.3 Scheduling
1.10.3.1 Initial Project Schedule
The initial project schedule shall be in the form of a chart graphically indicating the sequence proposed to accomplish each work feature or operation pursuant to FAR Clause 52.236-15 "Schedules for Construction Contracts". The chart shall be prepared to show the starting and completion dates of all work features on a linear horizontal time scale beginning with date of Notice to Proceed and indicating calendar days to completion. The Contractor shall indicate on the chart the important work features or operations that are critical to the timely overall completion of the project. Key dates for such important work features and portions of work features are milestone dates and shall be so indicated on the chart. This schedule will be the medium through which the timeliness of the Contractor's construction effort is appraised. Anticipated adverse weather delay days shall be included and clearly indicated in the schedule. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval.
All work shall be carefully scheduled to prevent delays and any excessive interruptions with channel traffic.
1.10.3.2 Periodic Schedule Updates
An updated schedule showing actual progress shall be submitted monthly and with each pay request. Changes to the base-line schedule shall be outlined in a narrative describing the reason for the change.
1.10.4 Rate of Progress
a. Employ ample personnel and sufficient equipment to accomplish the work of this contract in the least amount of time, within the prosecution period specified in the Special Contract Requirements.
b. Prosecute the work diligently, and maintain a dredge production rate, based on working 24 hours a day, 7 days a week, of not less than 24,000 cubic yards for each 30 calendar day period of actual dredging work at the site.
c. Should the Contractor fail to maintain the required rate of progress, the Contracting Officer may require that additional personnel and equipment be placed on the work and weekend and overtime work be performed, in order that the work be brought up to schedule and maintained. If, after a reasonable amount of time determined by the Contracting Officer, progress has either not been initiated, or has failed to sufficiently bring the work back on schedule to be completed by the scheduled contract period, the contract may be terminated.
1.10.5 Coordination with Harbormaster
All work shall be scheduled with the Harbormaster to prevent delays and any excessive interruptions with navigational traffic.
SECTION 01 11 00 Page 7
1.11 CONTRACTOR'S USE OF UPLAND FACILITIES AND HAULING ROUTES
a. Unless obtained by the Government or specified otherwise in the contract documents, the Contractor shall be responsible for the following:
(1) Locating, coordinating, and obtaining permission to use any land-based water access (docks, piers, ramps, etc.) that the Contractor deems necessary to complete the work.
(2) Determining, if necessary, the trucking and hauling routes and associated restrictions to and from the work, to include the coordination for the use of such routes with local, state, and federal authorities.
(3) Complying with all local, state, and federal regulations and restrictions when using any upland facilities or hauling routes.
b. The Government and its representatives will be allowed the use of the same land-based water access obtained by the Contractor.
1.12 SUPERINTENDENCE BY THE CONTRACTOR
a. At all times during the performance of the contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent project superintendent who is satisfactory to the Contracting Officer and has the authority to act for the Contractor.
b. The qualified superintendent, and competent alternate, shall be capable of reading, writing, and conversing fluently in the English language.
c. The project superintendent must have a minimum of 10 years experience in marine work with at least five of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
d. The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project. The superintendent is required to attend all partnering meetings and quality control meetings.
e. The project superintendent shall maintain a physical presence at the site at all times and be responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.
f. The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion.
SECTION 01 11 00 Page 8
Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
g. The project superintendent may neither serve as the Site Safety and Health Officer (SSHO) nor the Contractor Quality Control (CQC) System Manager.
1.13 WORK SITE AND CONTRACTOR'S USE OF PREMISES
1.13.1 General
All rules, regulations, and requirements covering such items as, but not limited to, general safety, security, sanitary requirements, environmental protection, pollution control, the use of approaches to the work area, and traffic regulations shall be observed by the Contractor.
1.13.2 Temporary Staging and Storage Area(s)
Refer to Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.
1.13.3 Work Limits
The limits of work include the limits of the new Federal Navigation Project (FNP), that is, the channel, turning area, and turning basin and all sides beyond the FNP limits that are required to be dredged to obtain the required depths and side slopes as shown on the Contract Drawings.
1.13.4 Access to Work Site
Prior to the start of work, the Contractor shall ensure that the Government has access from the mainland to the dredge site. Access to the dredge site will be discussed at the Preconstruction Conference.
1.13.5 Protection and Security
a. Protection to Contractor personnel or their equipment cannot be provided at the worksite by the Government.
b. The Contractor shall protect all its personnel, Government personnel, and the general public from injury.
c. The Contractor shall conduct all its work so as to prevent injury or unsafe conditions during construction.
d. The Contractor shall report any vandalism, suspicious activities, or devices to the Contracting Officer and local police as soon as possible.
1.13.6 Emergency Contacts
The Contractor shall provide a list of emergency contacts in the event of an emergency. The list shall include the contact names, addresses, and telephone numbers. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
SECTION 01 11 00 Page 9
1.13.7 Damaged Property
Work shall proceed in a manner which will minimize disturbance or risk of damage to boats, structures, and surrounding lands. The Contractor shall repair such items damaged in the course of carrying out the work at no additional cost to the Government. All repairs shall match similar existing items in all aspects. All replacements shall be in kind.
1.13.8 Contractor's Receipt of Supplies
The Contractor shall be responsible for all arrangements for the receipt of materials and supplies at the job site. Government personnel are not permitted to receive or sign for items delivered to the site.
1.13.9 Daily Clean Up
The Contractor shall at all times keep rubbish from entering surrounding lands and water. Rubbish accumulated at the temporary facilities shall be removed from the premises daily.
1.13.10 Littering
The Contractor shall not litter or discarding of tobacco materials other than into receptacles.
1.13.11 Government Sanitary Facilities
Toilet facilities are not available on site for Contractor's use. The Contractor shall provide portable toilets for its personnel and subcontractors as specified in EM 385-1-1 under Section 2, Sanitation.
1.14 QUALITY ASSURANCE
a. All items of work not addressed in the contract documents shall be completed in strict accordance with the manufacturers’ specifications.
b. The Government is not obligated to inspect the Contractor’s work, or to protect the Contractor from the consequences of its work.
Government inspections are a general examination of the Contractor’s conduct and workmanship and are solely for the purpose of the Government. Government-designated Quality Assurance Representatives (QARs) do not have the authority to accept work, nor is a Government inspection to be construed as conclusive.
c. Government agents including QARs and project engineers are not authorized to change the contract without the written approval of the Contracting Officer; this lack of authority extends to all situations in which the action of these agents could be construed as constituting a change.
d. The quality of workmanship is subject to audit by Government or Government-designated QARs at any time during the contract. The Contractor shall cooperate fully and provide all information necessary for this audit.
e. The Contractor shall submit all requests for changes in writing to the Contracting Officer. Do not proceed with changes without possession of written authorization of the Contracting Officer.
SECTION 01 11 00 Page 10
f. The Contractor shall not conceal any work unless the Contracting Officer has approved all items of work which are to be concealed. The Contractor shall notify the Contracting Officer of its intention to conceal work at least 24 hours in advance of concealment.
1.15 COORDINATION
1.15.1 Public Notice
The public shall be notified of this dredging project not less than 30 days prior to commencement of dredging operations at the site. A brief description of the work to be performed and the intended schedule of dredging and disposal operations shall be published in a newspaper of general circulation in the area adjacent to the dredging and disposal.
The notice shall include the locations where the work is to be performed, the time sequence of events, a map of the haul route to be followed between the dredging areas and the disposal site with reference to the width of the haul lane, the location and limits of the disposal site, and the procedure the Contractor will use to respond to claims for loss of property during the hauling work. The notice shall include the Contractor's point of contact and telephone number.
The Maine Department of Marine Resources (DMR) requires that they be notified prior to the start of construction. The Contractor shall complete a "DMR Notification of Field Work Form" and submit that to DMR at the same time the Public Notice is posted in the newspapers. A copy of the "DMR Notification of Field Work Form" is located at the end of this specification section and shall be submitted to:
Ms. Sarah Cotnoir Maine Department of Marine Resources Sarah.Cotnoir@maine.gov
1.15.2 Notice to Mariners
Prior to the start of dredging operations each year, the Contractor shall coordinate with the U.S. Coast Guard (USCG) to issue a "Notice to Mariners" regarding the work to be performed and the Contractor's proposed operations.
The Corps of Engineers and the USCG have agreed to phraseology when issuing navigational bulletins and notices. The information furnished shall be consistent with USCG Broadcast Notice to Mariners and Local Notice to Mariners. When requesting local USCG offices to issue navigational information for Corps of Engineers work involving marine construction, the following terminology shall be used, as applicable:
For cautionary areas: "Mariners are urged to use extreme caution in the area."
For dredging and work operations: "Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made."
1.15.3 Aids to Navigation
There are no navigational aids at this location and there are no plans to install any new navigational aids under this contract.
SECTION 01 11 00 Page 11
1.15.4 Points of Contact
a. Coast Guard
(1) General Contacts:
Mr. John Mauro Office Telephone: 617-223-8355 email: john.j.mauro@uscg.mil
Mr. Matthew Stuck Office Telephone: 617-223-8365 email: matthew.b.stuck@uscg.mil
(2) Notice to Mariners:
Ms. Mary F. Swanson Office Telephone: 617-223-8356 email: mary.f.swanson@uscg.mil
b. Town Offices of Chebeague Island North Road, Chebeague Island, Maine 04017
(1) Town of Chebeague Harbormaster Mr. Genaro Balzano Telephone: (207) 846-3148 email: harbormaster@townofchebeagueisland.org
(2) Fire and Rescue Department Chief Ralph Munroe, AEMT Telephone: (207) 846-3148 email: chebeaguefr@gmail.com Emergency Number: 911
(3) Public Services Mr. Justin L. Poirier Telephone: (207) 846-3148 email: townadmin@townofchebeagueisland.org
c. Ferry Service to Island
(1) Casco Bay Lines Telephone: (207) 774-7871 Website: https://www.cascobaylines.com/ email: info@cascobaylines.com
(2) Chebeague Transportation Telephone: (207) 846-3700 Website: http://www.chebeaguetrans.com/ email: chebeaguetrans@gmail.com
1.16 GENERAL SAFETY REQUIREMENTS
1.16.1 General
The Contractor shall take all necessary precautions in observing safety regulations in accordance with Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, and shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government property. The
SECTION 01 11 00 Page 12
Contractor shall perform the work in a manner consistent with security and with fire safety regulations especially with regards to ingress and egress. Temporary closures shall not compromise life safety, security or fire safety.
1.16.2 Contractor's Project Superintendent
The Contractor's project superintendent shall take an active role in enforcing the safety requirements by participation in safety conferences, hazard analysis, tool box meetings, walk-through inspections, correction of violations, etc., and including that of any subcontractor's work.
1.17 ENVIRONMENTAL PROTECTION
To provide for control of all environmental pollution arising from construction activities, the Contractor and its subcontractors, in the performance of this contract, shall comply with Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS, and all applicable federal, state, and local laws and regulations concerning environmental protection pollution control and abatement.
1.18 DIRECTION OR INSTRUCTIONS DURING CONSTRUCTION
a. The Contractor shall not take or accept any direction or instructions issued by any person, employed by the Government or otherwise, other than the Contracting Officer that changes the terms and conditions of contract actions, the scope, or any change that impacts the cost, price, or schedule. Changes authorized by the Contracting Officer will be in the form of a written, official, signed modification to the contract action received by the Contractor before the Contractor will act upon those changes. The Contractor will comply with the changes clause of this contract when the Contractor believes direction has been given from persons other than the Government Contracting Officer that equate to a change by notifying the Contracting Officer as directed by the clause. Any direction given by any Government employee or any other person outside their authority must be reported to the Contracting Officer.
b. The Contracting Officer Representative (COR) is limited to the authorities stated in the COR appointment letter. If a COR is appointed under this contract, they will be appointed by written letter from the Contracting Officer to the Contractor and COR specific to this contract only. COR appointment letters from previous contracts are not valid for this contract. See the Contracting Officer’s Representative clause of this contract.
1.19 PRECONSTRUCTION CONFERENCE
The Contracting Officer will conduct a preconstruction conference with key Contractor personnel. The purpose of the conference is to review contract requirements and to establish a working relationship between the Contractor's Staff and the U.S. Army Corps of Engineers (USACE) personnel who will be closely associated with the project. During the conference, the Contracting Officer will inform the Contractor concerning topics such as, but not limited to, job safety, quality control, temporary facilities and storage areas, labor relations, and environmental protection. The Contractor's Project Superintendent, Quality Control Representative, and Site Safety and Health Officer (SSHO) shall attend this conference.
SECTION 01 11 00 Page 13
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 11 00 Page 14
E6COEMG9
Rectangle
E6COEMG9
Text Box
PORTLAND DISPOSAL SITE (SEE DAMOS
SKETCH AT END OF SECTION 35 20 23)
E6COEMG9
Line
E6COEMG9
Line
E6COEMG9
Text Box
PROJECT LOCATION
DMR Notification of Field Work
Project
Dates of field work
Time of day field work will occur
Type of equipment used (specify if towed, hull mounted, submerged, dredge, etc.)
Vessel name and type
Is there a safety zone around the vessel? If so, please describe
Contact info for vessel activity Name:
Telephone: VHF Channel:
Email:
Shoreside contact info for project info, gear loss, etc.
Name:
Telephone:
Email:
Do fishermen need to move fishing gear?
Brief description of field work (location, haul route, etc.)
Other
Insert a map that includes where the field work will be conducted, including the entire route to the survey area in reference to the shoreline that the vessel intends to take, superimposed on an official NOAA Chart
Provide a photo of the vessel, if possible
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.2 UNIT PRICE PAYMENT ITEMS
1.3 BIDDING SCHEDULE - PAYMENT ITEMS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 22 00 Page 1
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
Refer to Section 01 71 23 FIELD ENGINEERING, Subpart "Contractor Surveys" for data submission requirements regarding progress payments.
1.1 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the BIDDING SCHEDULE and described below. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.3 BIDDING SCHEDULE - PAYMENT ITEMS
Payment items for the work of this contract on which the contract progress payments will be based are listed in the BIDDING SCHEDULE and are described below. All costs for items of work, which are not specifically mentioned to be included in a particular Bidding Schedule job or unit price payment item, shall be included in the listed job or unit price item most closely associated with the work involved.
Base Bid Items
a. Item Number 0001, "Mobilization and Demobilization for Dredging and Disposal
Payment will be made for costs associated with mobilization and demobilization for dredging operations and disposal operations as defined in Special Contract Requirements clause "PAYMENT FOR
MOBILIZATION AND DEMOBILIZATION".
Unit of measure: Job.
b. Item Number 0002, "Improvement Dredging with Ocean Disposal at Portland Disposal Site".
The contract price per cubic yard for Payment Item Number 0002 shall
SECTION 01 22 00 Page 2 include all costs for the removal, to the specified depths as indicated on the Contract Drawings, of mechanically dredged materials encountered from the new Federal Navigation Project (FNP) which includes the 10-foot deep channel, 10-foot deep turning area, and an 8-foot deep turning basin, to include all costs associated with the transportation and disposal of the dredged material at the designated ocean disposal site, as specified in Section 35 20 23 MECHANICAL
DREDGING.
The total amount of material removed and paid for under the contract for this Item will be measured by the cubic yard in place by computing the volume between the bottom surface shown by soundings of the last pre-dredge survey made before dredging begins and the bottom surface shown by the soundings of an after-dredge survey made as soon as practicable after the removal of the material. Dredged material will be included that is within the limits of the side slopes and specified overdepths as described in Section 35 20 23 MECHANICAL DREDGING, paragraph "Dredging Limits", less any deductions that may be required for misplaced material described in subparagraph "Disposal In Non-Approved Areas".
The contract drawings are believed to accurately represent conditions existing on the date of the survey shown on the drawings, but the depths and the specific areas to be dredged shown thereon may be verified and corrected by soundings taken by the Government before dredging begins. Determination of quantities removed and the deductions made to determine quantities after having once been made by the Contracting Officer, will not be reopened, except on evidence of collusion, fraud, or obvious error. Refer to Special Contract Requirements, subpart "Contract Drawings and Specifications" for additional information and requirements regarding contract drawings.
Monthly partial payments will be based on approximate quantities determined by Contractor quality control surveys. The pre-dredge survey made immediately before dredging, and the after dredge survey made as soon as practicable after the removal of the material, will be performed by the Government at no cost to the Contractor.
Unit of measure: Cubic Yard (CD).
Option Bid Item
c. Item Number 0003, "Boulder Removal and Disposal".
All costs for labor, equipment, and materials necessary for the removal of each boulder encountered during dredging operations that is 2 feet by 2 feet by 2 feet in size or larger, to include the transportation, and disposal of each boulder offsite (also refer to Note 8 on sheet C-101). Disposal of boulders of this size and larger is allowed at Portland Disosal Site (PDS) under this contract.
The Contractor may choose an alternate upland disposal site of its choosing for boulder disposal under this bid item if the Contractor finds that upland disposal is more economical or feasible with the Contractor's intended means and methods, and equipment. The Contractor shall be responsible for paying any and all necessary tipping/disposal, transportation, and permit fees, as well as acquiring any necessary permits required for transportation to and disposal at the selected alternate disposal location.
SECTION 01 22 00 Page 3
Boulders encountered that are smaller than 2 feet by 2 feet by 2 feet in size shall be considered debris and shall be incidental to the work paid for under Item Number 0002, that includes disposal of boulders smaller than 2 feet by 2 feet by 2 feet at the Portland Disosal Site
(PDS).
Unit of Measure: EA.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 22 00 Page 4
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 MINIMUM INSURANCE REQUIREMENTS
1.2 SUPERVISION
1.3 PRECONSTRUCTION CONFERENCE
1.4 PARTNERING
1.4.1 Initial Partnering Session
1.5 ELECTRONIC MAIL (E-MAIL) ADDRESS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 30 00 Page 1
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by State law.
1.2 SUPERVISION
See Section 01 11 00 SUMMARY OF WORK, Subpart SUPERINTENDENCE BY THE
CONTRACTOR.
1.3 PRECONSTRUCTION CONFERENCE
See Section 01 11 00 SUMMARY OF WORK, Subpart PRECONSTRUCTION CONFERENCE.
1.4 PARTNERING
To most effectively accomplish this contract, the Government requires the formation of a cohesive partnership within the Project Team whose members are from USACE, the prime contractor, sub-contractors, the non-federal Sponsor(s), and any other stakeholders that have a vested interest in and can potentially impact the successful completion of the project. The Partnership will draw on the strength of each organization in an effort to achieve a project that is without any safety mishaps, conforms to the Contract, and stays within budget and on schedule.
The Contracting Officer will provide Information on the Partnering Process and a list of key and optional personnel who should attend the Partnering meeting.
1.4.1 Initial Partnering Session
The Initial Partnering session shall take place prior to the start of work and timely to the Preconstruction Conference. The Contractor shall hire a neutral third party facilitator to manage the process of the Partnering Meetings and shall plan to conduct the meeting at a space that will accommodate all attendees and is located at a location to be approved by the Contracting Officer. An agenda for the meeting shall be developed with and agreed upon by the Contracting Officer or their representative, which shall cover topics including but not limited to: Vessel Traffic Coordination, Safety Precautions and Considerations, the Contractor’s Operational Plan and Schedule, roles and responsibilities of all team members, etc. The Contractor is responsible for all costs associated with the Partnering Meeting.
1.5 ELECTRONIC MAIL (E-MAIL) ADDRESS
Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 days after contract award, SECTION 01 30 00 Page 2 provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats. Multiple email addresses are not allowed.
It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this email address.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 30 00 Page 3
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Submittal Information
1.1.2 Project Type
1.1.3 Submission of Submittals
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
1.2.2 Approving Authority
1.2.3 Work
1.3 SUBMITTALS
1.4 SUBMITTAL CLASSIFICATION
1.4.1 Government Approved (G)
1.4.1.1 Approval Codes
1.4.2 For Information Only
1.5 PREPARATION
1.5.1 Transmittal Form
1.5.2 Submittal Format
1.5.2.1 Format of SD-01 Preconstruction Submittals
1.5.2.2 Format for SD-02 Shop Drawings
1.5.2.2.1 Drawing Identification
1.5.2.3 Format of SD-03 Product Data
1.5.2.3.1 Product Information
1.5.2.3.2 Standards
1.5.2.3.3 Data Submission
1.5.2.4 Format of SD-04 Samples
1.5.2.4.1 Sample Characteristics
1.5.2.4.2 Sample Incorporation
1.5.2.4.3 Comparison Sample
1.5.2.5 Format of SD-05 Design Data
1.5.2.6 Format of SD-06 Test Reports
1.5.2.7 Format of SD-07 Certificates
1.5.2.8 Format of SD-08 Manufacturer's Instructions
1.5.2.8.1 Standards
1.5.2.9 Format of SD-09 Manufacturer's Field Reports
1.5.2.10 Format of SD-10 Operation and Maintenance Data (O&M)
1.5.2.11 Format of SD-11 Closeout Submittals
1.5.3 Source Drawings for Shop Drawings
1.5.3.1 Source Drawings
1.5.3.2 Terms and Conditions
1.5.4 Electronic File Format
1.6 QUANTITY OF SUBMITTALS
1.6.1 Number of Hard Copies for SD-01, SD-02, SD-03, and SD-05 through SD-11
1.6.2 Number of SD-04 Samples
1.7 INFORMATION ONLY SUBMITTALS
1.8 PROJECT SUBMITTAL REGISTER
1.8.1 Submittal Management
SECTION 01 33 00 Page 1
1.8.2 Preconstruction Use of Submittal Register
1.8.3 Contractor Use of Submittal Register
1.8.4 Approving Authority Use of Submittal Register
1.8.5 Action Codes
1.8.5.1 Contractor Action Codes
1.8.6 Delivery of Copies
1.9 VARIATIONS
1.9.1 Considering Variations
1.9.2 Proposing Variations
1.9.3 Warranting that Variations are Compatible
1.9.4 Review Schedule Extension
1.10 SCHEDULING
1.11 GOVERNMENT APPROVING AUTHORITY
1.11.1 Review Notations
1.12 DISAPPROVED SUBMITTALS
1.13 APPROVED SUBMITTALS
1.14 APPROVED SAMPLES
1.15 WITHHOLDING OF PAYMENT
1.16 STAMPS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 33 00 Page 2
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 SUMMARY
1.1.1 Submittal Information
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections. Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
1.1.2 Project Type
The Contractor's Quality Control (CQC) System Manager are to check and approve all items before submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
1.1.3 Submission of Submittals
Schedule and provide submittals requiring Government approval before acquiring the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Safety Data Sheets (SDS) and in compliance with existing laws and regulations.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittal requirements are specified in the technical sections. Examples and descriptions of submittals identified by the Submittal Description (SD) numbers and titles follow:
SD-01 Preconstruction Submittals
Submittals that are required prior to or at the start of construction (work) or the next major phase of the construction on a multiphase contract.
Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.
SECTION 01 33 00 Page 3
Certificates Of Insurance
Surety Bonds
List Of Proposed Subcontractors
List Of Proposed Products
Baseline Network Analysis Schedule (NAS)
Submittal Register
Schedule Of Prices Or Earned Value Report
Accident Prevention Plan
Work Plan
Quality Control (QC) plan
Environmental Protection Plan
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
Design submittals, design substantiation submittals and extensions of design submittals.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports
Daily logs and checklists
Final acceptance test and operational test procedure
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
SECTION 01 33 00 Page 4
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits
Text of posted operating instructions
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
1.2.2 Approving Authority
Office or designated person authorized to approve the submittal.
1.2.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, construction,…