Specifications.pdf
PDF 4 MB Posted
- Attached to
- CSD Baseyard - Mezzanine Office Remodel
- Solicitation number
- B27000239
- Issued by
- Hawaii
About this file
This specifications document details a state contract issued by the Hawaii Department of Accounting and General Services (DAGS), Central Services Division, for the remodel of mezzanine office space at the CSD Baseyard in Building 1. The project encompasses furnishing and installing modular furniture, demolishing specified walls, disposing of existing furniture, installing electrical and communication wiring for modular panels, stripping and waxing floors, painting walls, and installing rubber wall cove bases. The scope of work references detailed architectural drawings and furniture plans (Attachment 1) that specify furniture placement, quantities, types, and finishes across multiple work areas including hoteling stations, individual offices (Joanne, Ian, Katie, and Char), a collaboration space, microzone, and backup storage. Work must be completed within 120 calendar days from the written notice to proceed, with the contractor coordinating schedules with the Contract Administrator James Kurata prior to commencement.
Bid prices must include all labor, equipment, supplies, applicable taxes including Hawaii General Excise Tax, and all other expenses to complete the work. The contractor is responsible for procuring all furniture, tools, and equipment at contractor expense, with specifications requiring quality levels as detailed in the architectural drawings or approved substitutes. Paint specifications include Sherwin-Williams primers and finish coats in designated colors (SW 6112 Biscuit, SW 6217 Topsail, SW 7045 Intellectual Gray), with Armstrong rubber wall cove base trim in Greige. The contractor must adhere to all Federal, State, and Local OSHA, HIOSH, and ANSI standards, maintain site safety protocols including closure of overhead work areas and marking of ground-level equipment, and is responsible for all damages caused by the contractor or its personnel. Any additional work not covered under the contract requires separate proposal submission and approval by the Contract Administrator.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Offer Form B.xlsx | XLSX spreadsheet | |
| IRS Form W9.pdf | ||
| Special Provisions.pdf | ||
| Qualification Form A.pdf | ||
| Offer Form A.pdf | ||
| AG-008 103D General Conditions (1.10.23).pdf | ||
| Wage Certificate.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS S-1 CSD-26-033-O
SPECIFICATIONS
CSD Baseyard - Mezzanine Office Remodel
CSD-26-033-O
DEPARTMENT OF ACCOUNTING AND GENERAL SERVICES
CENTRAL SERVICES DIVISION
SCOPE OF WORK
The Department of Accounting and General Services – Central Services Division is seeking bids for the remodel of its Mezzanine office space.
The Contractor shall provide all labor, materials, parts, tools, components, equipment, accessories, transportation, and supervision necessary to complete the remodel of the CSD - Mezzanine office.
The itemized scope of work is as follows:
1. Provide (furnish and install) furniture (see Attachment 1) – (brand or approve substitute)
2. Disposal of existing furniture
3. Demolish specific walls (see Attachment 1)
4. Electrical and communication wiring as required to wire modular furniture panels (see Attachment 1)
5. Strip & Wax floors
6. Paint all walls noted (see Attachment 1)
7. Install rubber wall cove bases (see Attachment 1)
8. Attachment 1 locates the area of work.
QUALITY OF WORK
The Contractor shall procure, at the Contractor’s expense, all furniture, tools and equipment necessary to perform the Services during the Term. The Contractor shall acquire furniture at the quality specified in Attachment 1 or approved substitute.
However, if any such replacement components are required because of Contractor’s failure to perform its obligations under this Agreement, then Contractor shall procure replacement components at Contractor’s expense. To the extent available, Contractor will file warranty claims on behalf of Owner for any replacement component remaining under warranty.
SPECIFICATIONS S-2 CSD-26-033-O
SAFETY
The Contractor shall close off area(s) and post signs indicating the area(s) are closed to pedestrian traffic when working overhead. Equipment, apparatus, or rope coils on the ground level shall be marked off with cones and signs warning pedestrian traffic. The Contractor shall provide all safety cones or barriers and signs.
Contractor’s personnel shall be capable of performing in accordance with these specifications and industry standards. All work shall strictly adhere to all provisions performed in compliance with all Federal, State, Local OSHA, HIOSH and ANSI laws and codes. OSHA Standards 29 CFR 1910 Subpart D is made aware of and acknowledged by the Contractor.
REPORTING DAMAGES
Any damage that is discovered prior to the start of work shall be reported to the Contract Administrator.
Any damage to building exteriors, structures, vehicles, plants, and other items in the area, as well as adjoining properties caused by the Contractor or any of its personnel shall be repaired and/or replaced by the Contractor at their own expense and to the satisfaction of the contracting officer or his designated representative and any injured party.
SCHEDULING
Work shall be performed within 120 calendar days from a written notice to proceed.
Contractor will coordinate with the Contract Administrator or their designated representative on the work schedule prior to the issuance of the Notice to Proceed.
Schedules of work may change or be adjusted at any time, upon mutual agreement by both parties.
BID SUBMITTALS
Bid Prices shall include all costs for all labor, equipment, supplies, applicable taxes (including the current Hawaii General Excise Tax) and any other expenses incurred to provide all the specified work, complete and in-place.
EXTRA WORK
The Contractor shall submit a separate Proposal for all work items not covered by the contract. This work is additional to the Contract and is subject to review and approval by the Contract Administrator. If the Proposal is found acceptable, and without further solicitation of other Bidders, the Contract Administrator shall authorize
SPECIFICATIONS S-3 CSD-26-033-O
the work. Payment for extra authorized work will be by Purchase Order and/or Purchasing Card.
CONTRACT ADMINISTRATOR
Contract Administrator shall be James Kurata, DAGS/CSD, or designee, Central Services Administrator. He may be contacted by e-mail at james.kurata@hawaii.gov. For any questions or assistance, contact Dixon Park at dixon.j.park@hawaii.gov mailto:james.kurata@hawaii.gov
A
C
FI
-D -C
SL
ID
IN
G
D O
O R
PO
SI
TIO
N
TB
/7
3.
/3
H D
C /4
2/
LH
PR
IN
TE
R
POWER POLE
CEILING IN-LAY
O H
/5 0.
/1
VI
C
TO
R
POWER POLE
CEILING IN-LAY
M
BF
/2 3/
C
SERIES2
PM
S/
/P
M
EXISTING IT
EQUIPMENT
INSTALLED ABOVE
WALL HEIGHT (6'8")
OFFSET
H.A.D. 4"
M
BF
/2 3/
C
KATIE'S
OFFICE
MAIN ENTRANCE
FROM STAIRS
MICROZONE
M O
VE
SE
R
IE
S2
OVERALL CEILING
HEIGHT: 8'8"H
PBHD-RH
HOTEL SPACE
24/52/70/24/EXT-UP
HDC/42/RH
C
BR
/P
KG
23/58/EXT-UP
/5
8/
EX
T- U
P
/8
SE
R
IE
S2
MBF/23/C
24/60/48/24
STAY CLEAR
WALKWAY PATH TO
HDC/42/LH
CRX
STAY CLEAR
WALKWAY PATH TO SERIES2
/5
/7
C
BR
/P
KG
IAN'S
OFFICE
C
FI
-D -C
SE
R
IE
S2
CFI-D-C
JOANNE'S
OFFICE
LF/4/36
H D
C /4
2/ R
H
32/60.0000
ENEA LOTTUS
M O
VE
/5
2.
/6
3.
/2
3/
EX
T- U
P
EXISTING SHELVES
CONFIRM IF
REMOVING
/5
8/
EX
T- U
P
M O
VE
CFI-D-C
C
FI
-D -C
C
AN
T
PB
H
D -L
H
SW_1 Lounge
M O
VE
14/26
ENEA LOTTUS
C R
X
COLLAB
SPACE
H D
C /4
2/ R
H
PB
H
D -R
H
CBR/PKG4
CHAR'S
OFFICE
C
FI
-D -C
C
FI
-D -C
M O
VE
ENEA LOTTUS
SE
R
IE
S2
14/26
M O
VE
LEAVE 7"
CLEARANCE
C
FI
-D -C
O H
/5 0.
/1
SE
R
IE
S2
LAG/LL3LH
ENEA LOTTUS
HDC/42/LH
CBR/PKG4
/7
6/
EX
T- U
P
SE
R
IE
S2
23/58/EXT-UP
/6
0/
EX
T- U
P
FF/2/23
SC
/2
8/
LF
/2
/3
C
BR
/P
KG
D
LD
C
BR
/P
KG
C
BR
/P
KG
/6
C
AN
T
H/20
FM
B
PL
R C
/5
CRX
CRX
CRX
C R
X
C
BR
/P
KG
C
BR
/P
KG
CRX
CRX
PB
H
D -R
H
PBHD-LH
BL
/4
BL
/4
LF/4/36LF/4/36
LF
/5
/3
SC/65-1/2/36
BC
/4
/3
PMS/42/PM
SH
/3
SH
/3
5' -7-1/4"
12' -1"
3' -0"
2' -3"
10' -0"
11' -3"
6' -0"
6' -0
3'
-3 -1
/4
4"
7- 1/
2" (6
'8 " W
AL
L
H
EI
G H
T)
4' -1-1/2"
7' -0
4' -7-1/4"
9' -0-3/4"
(6'8" WALL HEIGHT)
8' -4
W
AL
L
M O
U N
T O
VE
R
H
EA
D S
3' -10-1/4"
3' -6
7' -1-3/4"
3' -6
-1 /2
3' -0"
4' -1-3/4"
6' -0"
3' -3-3/4" 5' -8-1/4"
9' -1
-1 /2
(6
'8 " W
AL
L
H
EI
G H
T)
81"
12' -2"
44"
12' -6-1/4"
(6'8" WALL HEIGHT)
3' -9
-3 /4
3' -6
4' -8
-1 /2
9' -9-3/4"
8' -8
1' -0"
7"
12' -6-3/4"
(6'8" WALL HEIGHT)
3' -4"
CFI-D-C
CFI-D-C
CBR/PKG4
CFI-D-C
SERIES2
23/58/EXT-UP
SERIES2
SERIES2
23/58/EXT-UP
23/58/EXT-UP
CBR/PKG4
CBR/PKG4
BACKUP
C R
X C
R X
C R
X
58"
Scale1/4" = 1'
D A
G S-
C
EN
TR
A
L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
1/13
KA
KO
I S T, H O
N O
LU
LU
, H I 9
4/
/2 m
:\d ra w in gs \N ew
D
AG
S C en tra l S er vi ce s M ez za ni ne
L ev el \C
ET
\D
AG
S
DAGS - CENTRAL SERVICES
MEZZANINE LEVEL
FURNITURE PLAN
FU
RN
ITU
RE
P
LA
N
7" X
1"
PAGE NO:
Pr in t D at e:
Attachment 1
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
D A
G S-
C
EN
TR
A
L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
m :\d ra w in gs
\N ew
D
AG
S
C en tra l S er vi ce s
M ez za ni ne L ev el
\C
ET
\D
AG
S
2/13
4/
/2
KA
KO
I S T, H O
N O
LU
LU
, H I 9
DAGS - CENTRAL SERVICES
MEZZANINE LEVEL
FURNITURE PLAN
FU
RN
ITU
RE
P
LA
N
7" X
1"
PAGE NO:
Pr in t D at
BACKUP
58"
SERIES2
23/58/EXT-UP
SERIES2
SERIES2
23/58/EXT-UP
23/58/EXT-UP
CFI-D-C
CBR/PKG4
CBR/PKG4
CFI-D-C
CFI-D-C
CBR/PKG4
C R
X C
R X
C R
X
A
CA
CA
12 1 2
POWER POLE
CEILING IN-LAY
KATIE'S
OFFICE
MICROZONE
STAY CLEAR
WALKWAY PATH TO
IAN'S
OFFICE
COLLAB
SPACE
CHAR'S
OFFICE
5' -7-1/4"
3' -0"
2' -3"
10' -0"6' -0"
6' -0
3'
-3 -1
/4
4"
11' -3"
4' -1-1/2"
7' -0
7- 1/
2" (6
'8 " W
AL
L
H
EI
G H
T) 3' -10-1/4"
3' -6
7' -1-3/4"
3' -0"
3' -6
-1 /2
4' -1-3/4"
6' -0"
5' -8-1/4"
81"
44"
3' -9
-3 /4
3' -6
8' -8
1' -0"
C
FI
-D -C
D D
E66
SL
ID
IN
G
D O
O R
PO
SI
TIO
N
E
TB
/7
3.
/3
H D
C /4
2/
LH
36/66
PR
IN
TE
R
POWER POLE
CEILING IN-LAY
PK/36
C
FI
-D -C
O H
/5 0.
/1
C
/6
6D
/6
PK/36
VI
C
TO
R
E6
D
36/66
M
BF
/2 3/
C
E
SERIES2
PM
S/
/P
M
24/66
/6
E5
E
OFFSET
H.A.D. 4"
M
BF
/2 3/
C
30/54s
PK
/3
MAIN ENTRANCE
FROM STAIRS
/6
M O
VE
SE
R
IE
S2
/6
PK/42
E6
E6
H
FS
F
PBHD-RH
HOTEL SPACE
24/52/70/24/EXT-UP
F
C
HDC/42/RH
C
BR
/P
KG
24/48-24
T66
E6
23/58/EXT-UP
/5
8/
EX
T- U
P
E
/8
T66
36/66
PK
/2
E
SE
R
IE
S2
PK/24
MBF/23/C
42/66
36/66
STAY CLEAR
WALKWAY PATH TO
HFS24
HDC/42/LH
E78
CRX
24/66
SERIES2
/5
/7
C
BR
/P
KG
E
C
FI
-D -C
D
G
SE
R
IE
S2
D
C
AN
T
CFI-D-C
PK/36
JOANNE'S
OFFICE
SE
R
IE
S2
LF/4/36
MPI
HFS24
E78
H D
C /4
2/ R
H
32/60.0000
M O
VE
D
ENEA LOTTUS
/5
2.
/6
3.
/2
3/
EX
T- U
P
EE
24/60/48/24
LAG/LL3LH
F
PK
/4
EXISTING SHELVES
CONFIRM IF
REMOVING
/5
8/
EX
T- U
P
D
B
D
E
/6
D
HDC/42/LH
D
PK
/3
H
SW_1 Lounge
M O
VE
EXISTING IT
EQUIPMENT
INSTALLED ABOVE
WALL HEIGHT (6'8")
14/26
D
ENEA LOTTUS
D
C R
X
24/48-24
D
H D
C /4
2/ R
H
C
/6
PK/36
/6
CBR/PKG4
D
C
FI
-D -C
B
D
PK/24
F
E66
PK/42
E66
ENEA LOTTUS
W S7
CBR/PKG4
D
14/26
M O
VE
O H
/5 0.
/1
LEAVE 7"
CLEARANCE
C
FI
-D -C
PK
/3
E66
SE
R
IE
S2
D
D
H
/6
OVERALL CEILING
HEIGHT: 8'8"H
ENEA LOTTUS
M O
VE
E
D
M O
VE
C
FI
-D -C
/7
PK/36
C
/7
6/
EX
T- U
P
SE
R
IE
S2
23/58/EXT-UP
/6
CFI-D-C
PB
H
D -L
H
G
/6
0/
EX
T- U
P
/6
PB
H
D -R
H
FF/2/23
SC
/2
8/
LF
/2
/3
C
BR
/P
KG
D
LD
C
BR
/P
KG
C
BR
/P
KG
/6
C
AN
T
H/20
FM
B
PL
R C
/5
CRX
CRX
C R
X
CRX
C
BR
/P
KG
C
BR
/P
KG
CRX
CRX
PB
H
D -R
H
PBHD-LH
BL
/4
BL
/4
LF/4/36LF/4/36
LF
/5
/3
SC/65-1/2/36
BC
/4
/3
42/66
L66
I6
L66
I66
I6
I6
L6
MPI
I6
36/66
I66 I66
I66
I6
L66
36/66 36/66
I6
I66
PMS/42/PM
/4
8-
I48
L72-72-B17
WS72
L72-54-B16
/8
7/
R W
S7
/7
/7
I7
/7
I7
SH
/3
SH
/3
12' -1"
4' -7-1/4"
9' -0-3/4"
(6'8" WALL HEIGHT)
8' -4
W
AL
L
M O
U N
T O
VE
R
H
EA
D S
3' -3-3/4"
9' -1
-1 /2
(6
'8 " W
AL
L
H
EI
G H
T)
12' -2"
12' -6-1/4"
(6'8" WALL HEIGHT)
4' -8
-1 /2
9' -9-3/4"
7"
12' -6-3/4"
(6'8" WALL HEIGHT)
3' -4"
Scale1/4" = 1' m :\d ra w in gs
\N ew
D
AG
S
C en tra l S er vi ce s
M ez za ni ne L ev el
\C
ET
\D
AG
S
KA
KO
I S T, H O
N O
LU
LU
, H I 9
DAGS - CENTRAL SERVICES
MEZZANINE LEVEL
FURNITURE PLAN
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
09. BACKUP
08. EXTRA
STORAGE
07. KATIE'S OFFICE
06. CHAR'S OFFICE
05. COLLAB SPACE
04. MICROZONE
03. IAN'S STATION
02. JOANNE
STATION
01. HOTELING
STATIONS
TagColor General Markings
D A
G S-
C
EN
TR
A
L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
3/13
4/
/2
PAGE NO:
FU
RN
ITU
RE
P
LA
N
7" X
1"
Pr in t D at e:
7.
B Qty: 2
H:66 W:24
C Qty: 4
H:66 W:24
D Qty: 8
H:66 W:36
E Qty: 8
H:66 W:36
F Qty: 4
H:66 W:42
G Qty: 2
H:66 W:42
Frame Side Types
D Qty: 4
H:66 W:36
E Qty: 2
H:66 W:36
H Qty: 2
H:66 W:48
Frame Side Types
D Qty: 8
H:66 W:36
Frame Side Types
General Markings : 01. HOTELING STATIONS
General Markings : 02. JOANNE STATION General Markings : 03. IAN'S STATION
TK/36
TK/60
TK/36
SG/24
SG/24 TK/60
P420
SG/24
P420
P420
P420 P420
P420
6530P420
TK/60
TK/60
P420
P420
P420
TK/60
TK/36
TK/36
SG/24
SG/24
TK/36
Finish Code LegendFinish Code Legend
5H20 5H20: PEWTER
6530 6530: FROSTED
P420 P420: SAND
Commodity Code LegendCommodity Code Legend SG Single Pane Glass Window TK Tackable Acoustical
A
CA
CA
12 1 2
D
D
E66
SL
ID
IN
G
D O
O R
PO
SI
TIO
N
E
36/66
PR
IN
TE
R
POWER POLE
CEILING IN-LAY
PK/36
C
/6
6D
/6
PK/36
POWER POLE
CEILING IN-LAY
E6
D 36/66
E
24/66
/6
E5
E
OFFSET
H.A.D. 4"
KATIE'S
OFFICE
30/54s
PK
/3
MAIN ENTRANCE
FROM STAIRS
MICROZONE
/6
/6
PK/42
E6
E6
H
FS
F
HOTEL SPACE
F
C
24/48-24
T66
E6
E
T66
36/66
PK
/2
E
PK/24
42/66
36/66
STAY CLEAR
WALKWAY PATH TO
HFS24
E78
24/66
STAY CLEAR
WALKWAY PATH TO
E
IAN'S
OFFICE
D
G
/6
D
PK/36
JOANNE'S
OFFICE
HFS24
/6
MPI
E78
EXISTING IT
EQUIPMENT
INSTALLED ABOVE
WALL HEIGHT (6'8")
D
EE
CF
PK
/4
EXISTING SHELVES
CONFIRM IF
REMOVING
D
B
D
D
/6
D
PK
/3
H
D
D D
24/48-24
COLLAB
SPACE
C
PK/36
/6
D
D
CHAR'S
OFFICE
B
PK/24
F
E66
PK/42
E66
W S7
D
LEAVE 7"
CLEARANCE
PK
/3
E66
D
D
H
/6
OVERALL CEILING
E
D
E
PK/36
/7
G
/6
42/66
L66
I6
L66
I66
I6
I6
L6
MPI
I6
36/66
I66
I6
L66
36/66 36/66
I6
I66
I66
I66
/4
8-
I48
L72-72-B17
WS72
L72-54-B16
/8
7/
R W
S7
/7
/7
/7
I7
I7
Scale1/4" = 1'
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
DAGS - CENTRAL SERVICES
MEZZANINE LEVEL
PANELS ONLY
m :\d ra w in gs
\N ew
D
AG
S
C en tra l S er vi ce s
M ez za ni ne L ev el
\C
ET
\D
AG
S
4/13
KA
KO
I S T, H O
N O
LU
LU
, H I 9
D A
G S-
C
EN
TR
A
L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
PAGE NO:
Pr in t D
CA
12 1 2
D
E66
SL
ID
IN
G
D O
O R
E
C
FI
-D -C
H D
C /4
2/
LH
36/66
PR
IN
TE
R
POWER POLE
CEILING IN-LAY
PK/36
C
FI
-D -C
C
G
/6
/6
VI
C
TO
R
POWER POLE
CEILING IN-LAY
C R
X
36/66
H D
C /4
2/ R
H
EXISTING PANELS
(NON STC)
C
/6
E
SERIES2
24/66
/6
E5
B
E
KATIE'S
30/54s
PK/36
PK
/3
D
H
/6
E
PK/42
E6
H
E6
H
FS
F
HOTEL SPACE
24/52/70/24/EXT-UP
F
C
HDC/42/RH 24/48-24
T66
CBR/PKG4
23/58/EXT-UP
/5
8/
EX
T- U
P
E
T66
36/66
PK
/2
E
PK/24
CFI-D-C
MBF/23/C
42/66
E
STAY CLEAR
WALKWAY PATH TO
HFS24
CRX
24/66
STAY CLEAR
WALKWAY PATH TO SERIES2
E
PK/36
D
G
SE
R
IE
S2
D CFI-D-C
PK/36
JOANNE'S
OFFICE
PK/24
MPI
H D
C /4
2/ R
H
PK
/4
D
C
E
SW_1 Lounge
D
24/48-24
D
CBR/PKG4
HFS24
C
FI
-D -C
SE
R
IE
S2
D
F
E66
FPK/42
E66
PK
/3
PK/36
D
14/26
E
ENEA LOTTUS
/5
8/
EX
T- U
P
PK
/3
SE
R
IE
S2
HDC/42/LH
ENEA LOTTUS
C
BR
/P
KG
D
B
PBHD-RH
C
BR
/P
KG
E66
23/58/EXT-UP
MICROZONE
/6
PB
H
D -R
H
/6
/6
PB
H
D -L
H
C
BR
/P
KG
C R
X
CRX
CRX
PB
H
D -R
H
PBHD-LH
SC/65-1/2/36
42/66 L66
I66
I6
I6
L6
MPI
I6
I66
I6
36/6636/66
I66
36/66
I66
L66
I66
/4
8-
I48
L72-72-B17
WS72
L72-54-B16
6' -0
6' -0"
7' -0
24' -6"
9' -0-3/4"
(6'8" WALL HEIGHT)
11' -3"
3' -10-1/4"
3' -6
7' -1-3/4"4' -1-3/4"
6' -0"
5' -8-1/4" 3' -3-3/4"
3' -4"
Scale1/4" = 1'
FEATURES
- (4) 23"D X 58"W HEIGHT ADJ. DESKS W/ DUAL MONITOR ARMS
- (4) 42"H HIGH DENSITY STORAGE
- (4) SERIES 2 TASK CHAIRS, 3D MICROKNIT BACK AND UPH SEAT
- 66"H PANELS WITH POWER AND 24"HGLASS WINDOWS
- CEILING ACCESS POWER POLE
KA
KO
I S T, H O
N O
LU
LU
, H I 9
5/13 m :\d ra w in gs
\N ew
D
AG
S
C en tra l S er vi ce s
M ez za ni ne L ev el
\C
ET
\D
AG
S D
A G
S- C
EN
TR
A L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
DAGS - CENTRAL SERVICES
HOTEL SPACE
4/
/2
Pr in t D at
PAGE NO:
CA
MBF/23/C
E
SL
ID
IN
G
D O
O R
PO
SI
TIO
N
/6
PR
IN
TE
R
PK
/3
D
PK/36
POWER POLE
CEILING IN-LAY
JOANNE'S
OFFICE
D
36/66
H D
C /4
2/ R
H
M O
VE
E
PB
H D
-R H
WALL MOUNT
/6
D
C
E
PK
/3
/6
C
FI
-D -C
E66
IAN'S
OFFICE
M O
VE
C
FI
-D -C
E66
H
E
24/52/70/24/EXT-UP
C
BR
/P
KG
D
E78
/7
W S7
/6
H
PK/36
E6
PK/24
/5
8/
EX
T- U
P
E
D
E
E78
36/66
SE
R
IE
S2
C
BR
/P
KG
C
AN
T
CRX
CRX
PB
H
D -R
H
BC
/4
/3
MPI
L66 I6
L66
I66
I6
/8
7/
R I7
/7
/7
I7
6' -0"
7' -0
3' -10-1/4"
3' -0"
3' -6
-1 /2
3' -3-3/4"
(6 '8
" W
AL
L H
EI
G
H T)
3' -9
-3 /4
Scale3/8" = 1'
KA
KO
I S T, H O
N O
LU
LU
, H I 9
6/13
DAGS - CENTRAL SERVICES
JOANNE'S OFFICE
4/
/2
FEATURES
- (1) L-SHAPED HEIGHT ADJ. DESK W/ DUAL MONITOR ARMS
- (1) 42"H HIGH DENSITY STORAGE
- (1) MOBILE PED W/ CUSHION TOP
- 66" H PANELS WITH POWER AND 24H GLASS WINDOWS
- CEILING ACCESS POWER POLE
- (1) SERIES 2 TASK CHAIR, 3D MICROKNIT BACK AND UPH SEAT D
A G
S- C
EN
TR
A L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
m
:\d ra w in gs \N ew
D
AG
S C en tra l S er vi ce s M ez za ni ne
L ev el \C
ET
\D
AG
S
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
PR
O
JE
C
T N
O
D
ES
IG
N
D
A
TE
SA
LE
S:
PAGE NO:
Pr in t D
CA
1 MBF/23/C
D
D36/66
OFFSET
H.A.D. 4"
ENEA LOTTUS
PK
/3
D36 /6
SE
R
IE
S2
/6
/6
C
FI
-D -C
IAN'S
OFFICE
E
D
E
D
24/52/70/24/EXT-UPENEA LOTTUS
D
D
M
BF
/2 3/
C 36/66 36/66
C
AN
T
/7
/6
E66
D E6
PK/36
E6
C
FI
-D -C
D
PM
S/
/P
M
/5
2.
/6
3.
/2
3/
EX
T- U
P
PK/36
C
BR
/P
KG
R C
/5
C
AN
T
C
BR
/P
KG
C
BR
/P
KG
CRX
BC
/4
/3
MPI
I6
L66
L66
I6
I66
PMS/42/PM
/7
SH
/3
SH
/3
12"
8' -9"
4"
3' -0"
6' -0" 3' -10-1/4"
9' -1
-1 /2
(6
'8 " W
AL
L
H
EI
G H
T)
3' -9
-3 /4
3' -6
3' -3
Scale1/2" = 1'
4/
/2
D
A G
S- C
EN
TR
A L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
DAGS - CENTRAL SERVICES
IAN'S OFFICE
KA
KO
I S T, H O
N O
LU
LU
, H I 9 m :\d ra w in gs
\N ew
D
AG
S
C en tra l S er vi ce s
M ez za ni ne L ev el
\C
ET
\D
AG
S
FEATURES
- (1) L-SHAPED HEIGHT ADJ. DESK W/ DUAL MONITOR ARMS & PRIVACY SCREEN
- (1) 18"D X72"W WORKSURFACE
- (1) MOBILE PED W/ CUSHION TOP
- (1) 36W X 66.5H BOOKSHELF
- (1) SERIES 2 TASK CHAIR, 3D MICROKNIT BACK AND UPH SEAT
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
7/13
FU
RN
ITU
RE
P
LA
N
7" X
1"
PAGE NO:
Pr in t D
EXISTING SHELVES
CONFIRM IF
REMOVING
D
ENEA LOTTUS
D
ENEA LOTTUS
M
BF
/2 3/
C
D
/6
MICROZONE
HDC/42/LH
LEAVE 7"
CLEARANCE
D
E66
IAN'S
OFFICE
14/26
C
FI
-D -C
D
ENEA LOTTUS
C
AN
T
32/60.0000
ENEA LOTTUS
LAG/LL3LH
D
36/66
TB
/7
3.
/3
D
D
/7
/6
/6
C
BR
/P
KG
R C
/5
C
AN
TLF
/5
/3
BC
/4
/3
L66
I6
I6
SH
/3
SH
/3
3' -3
-1 /4
2' -3"
4' -1-1/2"
7- 1/
2" (6
'8 " W
AL
L
H
EI
G H
T)
3' -10-1/4"
1' -0"
Scale1/2" = 1'
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
KA
KO
I S T, H O
N O
LU
LU
, H I 9
8/13
D A
G S-
C
EN
TR
A
L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
DAGS - CENTRAL SERVICES
MIRCOZONE
4/
/2 m
:\d ra w in gs \N ew
D
AG
S C en tra l S er vi ce s M ez za ni ne
L ev el \C
ET
\D
AG
S
FEATURES
- (1) 32"D X 60"W BAR HEIGHT TABLE
- (1) 30"W LATERAL FILES (5 HIGH) 4 DRAWERS + 1 LIFT DOOR
- (1) LAGUNITAS SOFA WITH C END TABLE, LAMINATE
- (4) BARSTOOLS, PLASTIC FRAME AND UPH SEAT
Pr in t D at
OPTION 2 - 78H PANELS
6' -8
-3 /4
2' -0
A
CA
MBF/23/C
SL
ID
IN
G
D O
O R
PO
SI
TIO
N
M O
VE
E78
D
M O
VE
POWER POLE
CEILING IN-LAY
36/66
LF/4/36
M
O
VE
WALL MOUNT
D
WALL MOUNT
24/48-24
COLLAB
SPACE
O H
/5 0.
/1
PK/36
M O
VE
W S7
M O
VE
24/52/70/24/EXT-UP
EXISTING IT
EQUIPMENT
INSTALLED ABOVE
WALL HEIGHT (6'8")
/7
E78
E6
/8
HFS24
M O
VE
SE
R
IE
S2
C
BR
/P
KG
PL
LF/4/36LF/4/36
MPI
I66
WS72
/8 7/
R
W S7
/7
/7
/7
I7
I7
10' -0"6' -0"
W
AL
L M
O U
N T
O
VE
R H
EA
D
S
3' -6
-1 /2
12' -6-1/4"
(6'8" WALL HEIGHT)
81"
44"
12' -2"
7"
Scale3/8" = 1'
FEATURES
- (3) 36"W LATERAL FILES, 4
DRAWERS (52"H)
- (4) GUEST CHAIRS, PLASTIC BACK
AND UPH SEAT
- VERLAY MEETING TABLE (84" X 42")
NO POWER
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
4/
/2
KA
KO
I S T, H O
N O
LU
LU
, H I 9
9/13
DAGS CENTRAL SERVICES
COLLAB SPACE - OPTION 2
78H PANELS
m :\d ra w in gs
\N ew
D
AG
S
C en tra l S er vi ce s
M ez za ni ne L ev el
\C
ET
\D
AG
S D
A G
S- C
EN
TR
A L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
FU
RN
ITU
RE
P
LA
N
7" X
1"
PAGE NO:
Pr in t D at e:
OPTION 1:
- 78H ANSWER PANELS, WALL MOUNTED WALL TO WALL
- 24H FRAMED FROSTED WINDOW GLASS
- SLIDING DOORS WITH TRANSLUCENT INSERT, LOCKABLE
CA
24/60/48/24
O H
/5 0.
/1
PK/36
D
/5
O H
/5 0.
/1
SE
R
IE
S2
W S7
836/66
CHAR'S
OFFICE
PM
S/
/P
M
C
FI
-D -C
/6
0/
EX
T- U
P
E6
FF/2/23
LF
/2
/3
PL
C
BR
/P
KG
FM
B
D
LDCRX
BL
/4
BL
/4
MPI
I66
5' -7-1/4"
12"
12' -1"
4"
8' -4
W
AL
L
M O
U N
T O
VE
R
H
EA
D S
3' -0"
3' -6
-1 /2
9' -1
-1 /2
(6
'8 " W
AL
L
H
EI
G H
T)
12' -6-1/4"
(6'8" WALL HEIGHT)
81" 3'
-3
9' -9-3/4"
8' -8
Scale1/2" = 1'
FEATURES
- (1) 23"D X 60"W HEIGHT ADJ. DESK W/ DUAL MONITOR ARMS & PRIVACY SCREEN
- (1) CORNER WORKSURFACE
- (1) STRAIGHT 24X54 WORKSURFACE
- (1) FIXED BBF PEDESTAL AND (1) 30"W LATERAL FILE
- (2) 50"W OVERHEAD OPEN SHELVING
- (1) SERIES 2 TASK CHAIR, 3D MICROKNIT AND UPH SEAT
DAGS - CENTRAL SERVICES
CHAR'S OFFICE
KA
KO
I S T, H O
N O
LU
LU
, H I 9 m :\d ra w in gs
\N ew
D
AG
S
C en tra l S er vi ce s
M ez za ni ne L ev el
\C
ET
\D
AG
S
10/13
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
D A
G S-
C
EN
TR
A
L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
FU
RN
ITU
RE
P
LA
N
7" X
1"
PAGE NO:
Pr in t D
EXISTING SHELVES
C
FI
-D -C
SE
R
IE
S2
OVERALL CEILING
KATIE'S
OFFICE
M
BF
/2 3/
C
MAIN ENTRANCE
FROM STAIRS
MICROZONE
HDC/42/LH
/7 6/
EX
T-
U P
SW_1 Lounge
TB
/7
3.
/3
14/26
SC
/2
8/
C
BR
/P
KG
/6
H/20
CRX
LF
/5
/3
SC/65-1/2/36
2' -3"
7- 1/
2" (6
'8 " W
AL
L
H
EI
G H
T)
8' -7-1/4"
9' -0-3/4"
(6'8" WALL HEIGHT)
2"
4' -8
-1 /2
Scale1/2" = 1'
D A
G S-
C
EN
TR
A
L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
DAGS - CENTRAL SERVICES
KATIE'S OFFICE
11/13 m :\d ra w in gs
\N ew
D
AG
S
C en tra l S er vi ce s
M ez za ni ne L ev el
\C
ET
\D
AG
S
FEATURES
- (1) 30"D X 76"W HEIGHT ADJ. DESK W/ DUAL MONITOR ARMS
- (1) 24"D X 66"W WOKRSURFACE W/ 30"W STORAGE CABINET
- (1) SKATER SIDE TABLE
- (1) 36"H X 76"W TACKABOARD ABOVE DESK
- (1) SERIES 1 TASK CHAIR, 3D MICROKNIT BACK AND UPH SEAT
- (1) SW_1 LOUNGE CHAIR
4/
/2
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
KA
KO
I S T, H O
N O
LU
LU
, H I 9
Pr in t D at
SERIES2
23/58/EXT-UP
SERIES2
SERIES2
23/58/EXT-UP
23/58/EXT-UP
CBR/PKG4
CBR/PKG4
CFI-D-C
CFI-D-C
BACKUP
CBR/PKG4
CFI-D-C
C R
X C
R X
C R
X
58"
Scale1/2" = 1'
4/
/2
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
12/13
FEATURES
- (1) 23"D X 58"W HEIGHT ADJ. DESK W/ CABLE RISER & BRACKETS
INCLUDES DUAL MONITOR ARMS
- (3) SERIES 1 TASK CHAIR, 3D MICROKNIT BACK AND UPH SEAT
D A
G S-
C
EN
TR
A
L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
DAGS - CENTRAL SERVICES
BACKUP FURNITURE
KA
KO
I S T, H O
N O
LU
LU
, H I 9 m :\d ra w in gs
\N ew
D
AG
S
C en tra l S er vi ce s
M ez za ni ne L ev el
\C
ET
\D
AG
S Pr in t D at
STOOL FRAME
0425: OLIVE
STOOL SEAT
5888: OREGANO
MICROZONE SOFA
5H25: STORM CLOUD
VINYL-SEAT
5748: JUNIPER
SW_KNIT
5KG4: IVORY
TRIM
4242: MILK SMOOTH
CUSHION FABRIC
5EU4: STORM CLOUD
GLASS
6530: FROSTED
FABRIC SKIN
P420: SAND
KATIE-CUSHION FABRIC
5F08: NAVY
PAINT STORAGE
4242: MILK SMOOTH
KATIE - LOUNGE
5876: NAVY
PLASTIC-FRAME
6337: ELEMENT
STORAGE
4242: MILK SMOOTH
FRAME
6053: SEAGULL
GLASS
6530: FROSTED
INTERIOR HIGH DENSITY
4239: CLAY
DESKS
2L84: MILK (LPL)
TRIM
4242: MILK SMOOTH
HIGH DENSITY AND TABLES
2LWB: PLANKED WALNUT (LPL)
SEAT-FABRIC
1 - HEATHER - MOSS
3D MICROKNIT
5T31: SEAGULL
FABRIC SKIN
P420: SAND
O M
IZ
U
A
RC
HI
TE
C
TU
RE
, I
N C
D
A G
S C
EN
TR
A L
SE
RV
IC
ES
COLLAB CHAIRS
SERIES 2 TASK CHAIRS
MOBILE PEDESTAL
D A
G S-
C
EN
TR
A
L
SE
RV
IC
ES
-M
EZ
ZA
N
IN
E
LE
V
EL
KA
KO
I S T, H O
N O
LU
LU
, H I 9
LAMINATES
PANELS
COLLAB - PANELS
4/
/2 m
:\d ra w in gs \N ew
D
AG
S C en tra l S er vi ce s M ez za ni ne
L ev el \C
ET
\D
AG
S
LOUNGE SEATING FABRIC/VINYL
FINISHES
PAINTS
13/13
PAGE NO:
Pr in t D
PAINT INSTRUCTIONS S-1 CSD-26-033-O
Paint Instructions
Colors
Main color: SW 6112 Biscuit
Accent: SW 6217 Topsail
Door frame: SW 7045 Intellectual Gray
Rubber wall cove base: R48GR Armstrong Greige
Product requirements Contractor shall repair minor wall imperfections, apply prime coat, and finish paint coat to the interior wall surfaces as noted.
Primer: Sherwin-Williams Extreme Block Alkyd Primer (or approved substitute).
Finish (Walls): Sherwin-Williams SuperPaint Interior Acrylic Latex, Satin finish (or approved substitute).
Finish (Trim/Frames): Sherwin-Williams SuperPaint Interior Acrylic Latex, Semi-Gloss finish (or approved substitute).
Contractor shall provide Armstrong rubber wall cove base trims. Substitutions must provide manufacturer data sheets proving equivalent or better grade.
| Specifications |
| Attachment 1_CSD Mezzanine Remodel Plans Details |
| Attachment 1_Mezzanine Remodel Architect Drawings.pdf |
| Ref_Remodel Paint Instructions.pdf |
File details come from the government source that posted it. Updated .