Specifications.pdf
PDF 250 KB Posted
- Attached to
- Septic Pump Truck -BRCA
- Solicitation number
- 140P6426Q0080
About this file
This document is a specification sheet for a vacuum septic pump truck procurement by Bryce Canyon National Park under the National Park Service, Interior Regions 6/7/8.
The requirement is for one new, fully assembled, and operational vacuum septic truck suitable for sustained operation in mountainous terrain and rugged climates. The suggested product is a Mack Granite 6x4 with a 4,250-gallon two-compartment aluminum tank, though vendors may propose equivalent models that meet or exceed all specifications. The truck chassis must include a minimum 450 HP diesel engine, 10-14 gear PTO-capable transmission, 64,000 lbs minimum GVWR, air ride driver seat, 80-100 gallon fuel capacity with integrated DEF, air brakes, engine brake, power steering, and an enclosed cab with heating and air conditioning. The tank assembly requires 4,250+ gallon total capacity (3,250+ gallon waste compartment, 1,000+ gallon fresh water compartment), aluminum vacuum-rated construction with minimum 1/4-inch barrel and 5/16-inch head thickness, ASME-rated dished heads, internal baffles, full-length skids, interior protective coating, and exterior corrosion-resistant finish. The vacuum system must be PTO-driven and capable of 940 CFM at 4500 RPM, 15 PSI full vacuum, 4-inch inlet/outlet, and oil-less operation, with integrated moisture trap and silencer. Plumbing includes minimum 4-inch flanged discharge, 3-inch front and rear intake, 3-inch stainless fresh water fill, brass or stainless-steel ball valves, cam-lock fittings, and integrated fresh water fill connected to discharge plumbing. Access and safety features must include minimum 20-inch top and rear manways, ladder access, sight glasses, hose trays, adjustable rear bumper, tool storage, mudflaps, DOT-compliant lighting, backup alarm, and LED work lights. The vehicle must comply with DOT, FMVSS, EPA, OSHA, and ASME standards and include minimum one-year warranty on tank and body plus manufacturer's standard warranty on chassis. Delivery must be FOB Destination to Bryce Canyon National Park, 3200 S Highway 63 Maintenance Yard, Bryce, UT 84764, with vendors contacting the park one week prior to delivery. The period of performance is 180 calendar days after contract award. Award will be made as one lot on a firm fixed-price basis. Offerors must submit company information, point of contact, detailed chassis and tank assembly descriptions, warranty details, production and delivery timeline, itemized pricing, and product literature.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6426Q0080_Amd_0001.pdf | ||
| Price_Schedule.xlsx | XLSX spreadsheet | |
| Sol_140P6426Q0080.pdf | ||
| Price_Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bryce Canyon National Park Bryce Utah
Specifications:
Septic Pump Truck
DATED:
May 19th, 2026
NATIONAL PARK SERVICE
INTERIOR REGIONS 6/7/8
Specifications Septic Pump Truck
Suggested Product: Mack Granite 6x4 or Equal with 4,250-Gallon Two-Compartment Aluminum Tank
Brand Name or “Or Equal” Requirement: Vendor may propose an equivalent model that meets or exceeds all specifications listed below.
GENERAL:
This is a supply-only requirement for one (1) fully assembled, operational Vacuum Septic Truck for Bryce Canyon National Park. All quoted products must meet or exceed the technical specifications listed herein. This requirement includes the complete vacuum truck: chassis, tank, vacuum system, plumbing, valves, safety equipment, and accessories. The vehicle must be suitable for sustained operation in mountainous climates and rugged terrain.
SEPTIC PUMP TRUCK SPECIFICATIONS:
Septic Pump Truck specifications are based on the Mack Granite 6x4 severe-service chassis and a 4,250-gallon aluminum vacuum tank. This is a Brand Name or “Or Equal” Requirement: Vendor may propose an equivalent model that meets or exceeds all specifications listed below.
TRUCK CHASIS REQUIREMENTS:
• 10 to 14 gear transmission with PTO provisions.
• Air ride driver seat.
• 80 to 100 gallons of fuel with integrated DEF.
• Configuration: 6x4.
• GVWR: Minimum 64,000 lbs.
• Diesel Engine: Minimum 450 HP.
• Transmission: Heavy-duty, PTO-capable, automated transmission equivalent to “M-Drive”.
• Air brakes.
• Engine brake (Jake brake or equivalent).
• Power steering.
• Enclosed cab with heating, air conditioning, and standard safety features.
TANK ASSEMBLY REQUIREMENTS:
• Total Capacity: Equal to or greater than 4,250 gallons o Waste compartment: Equal to or greater than 3,250 gallons o Fresh water compartment: Equal to or greater than 1,000 gallons
• Aluminum vacuum-rated construction.
• Barrel thickness: Minimum 1/4 inch.
• Head thickness: Minimum 5/16 inch.
• ASME-rated dished heads.
• Internal ASME-compliant baffles.
• Full-length skids.
• Interior liner or protective coating.
• Exterior corrosion-resistant finish.
VACUUM & DRIVE SYSTEM REQUIREMENTS:
Vacuum and Drive System specifications are based on the NVE 4310 ProMax. This is a Brand Name or “Or Equal” Requirement: Vendor may propose an equivalent model that meets or exceeds all specifications listed below.
• PTO-driven vacuum pump and gearbox
• Must meet or exceed the below performance:
o 940 CFM @ 4500 RPM o 15 PSI at full vacuum o 4” inlet/outlet o Oil-less operation
• Integrated moisture trap and silencer.
• Airline manifold for compartment selection.
• Capable of municipal septic and vault toilet servicing.
PLUMBING & VALVE REQUIRMENTS:
• Discharge: Minimum 4-inch flanged
• Intake: Minimum 3-inch front and rear
• Fresh water fill: Minimum 3-inch stainless or equivalent
• Brass or stainless-steel ball valves
• Cam-lock fittings with dust caps
• Low-point drain on fresh water compartment
• Integrated fresh water fill system connected to discharge plumbing o Fresh water fill system shall be integrated with discharge plumbing, for example: T into discharge pipe after 4" ball valve with 3" ball valves, male 3" camlocks and (2) 22.5-degree elbows to allow easy attachment of 3" hose from discharge line to fresh water fill. Install 2" ball valve vent between 3" ball valve and camlock on fill line to clear the line when finished.
ACCESS & SAFETY REQUIREMENTS:
• Minimum 20-inch top and rear manways with secure covers.
• Ladder access.
• Sight glasses on waste compartment.
• Hose trays and storage systems.
• Adjustable rear bumper.
• Tool storage compartments where available.
• Mudflaps.
• DOT-compliant lighting.
• Backup alarm.
• LED work lights.
• Ground-level PTO and vacuum controls.
COMPLIANCE REQUIREMENTS:
• Vehicle must meet or exceed all applicable federal and state requirements:
o DOT o FMVSS o EPA o OSHA o ASME-rated tank construction
WARRANTY REQUIREMENTS:
• Minimum one-year warranty on tank and body
• Manufacturer’s standard warranty on chassis
• Warranty details must be clearly stated
CONTRACTOR RESPONSIBILITIES:
The Contractor shall:
• Furnish a new, unused, current-production vacuum septic truck
• Provide a fully assembled, fully operational vehicle upon delivery
• Provide all required components, accessories, and safety equipment
• Ensure the unit meets all specifications and regulatory requirements
• Coordinate all delivery logistics
DELIVERY REQUIREMENTS:
• Delivery must be FOB Destination and must be included in pricing.
• Vendor must contact park to make delivery arrangements 1 (one) week prior to delivery.
• Vendor must coordinate delivery logistics and provide estimated lead time
• Truck must be delivered fully operational and ready for immediate use
DELIVERY LOCATION:
Bryce Canyon National Park
3200 S Hwy 63 Maintenance Yard
Bryce, UT 84764
SUBMITTALS:
Offerors must submit the following:
• Company name and address
• Point of contact (name, phone number, email)
• Detailed chassis description.
• Detailed tank assembly and vacuum system description.
• Warranty details (chassis and body).
• Estimated production and delivery timeline.
• Itemized pricing for all components. Award will be based on total amount listed on Price Schedule attached to Solicitation.
• Product literature and specification sheets
PERIOD OF PERFORMANCE:
• 180 calendar days after contract Award effective date.
OTHER REQUIREMENTS:
• Award to be made as ONE LOT to include all information listed in the above characteristics
• Award will be Firm Fixed Price.
File details come from the government source that posted it. Updated .