Specifications.pdf

PDF 781 KB Posted

Attached to
Angell Job Corps Center Site Utilities Rehabilitation
Solicitation number
12441925R0014
Issued by

About this file

This document is a detailed specification for a site utilities rehabilitation project at the Angell Job Corps Civilian Conservation Center in Yachats, Oregon. The project includes eight base items of work: wastewater irrigation field reconstruction, sewer line and manhole repairs, hydrant demolition, DWV pipe replacement, wastewater treatment plant repairs, lift station float and hanger replacement, building ventilation installation, and a solid waste interceptor installation.

The project requires comprehensive site work involving irrigation system upgrades, sewer infrastructure repairs, equipment replacements, and environmental controls. Key specifications include replacing 120 sprinkler heads, repairing sewer lines and manholes, removing existing hydrants, replacing wastewater treatment plant components, installing new lift station controls, and adding a solids interceptor. The work must be performed between 8:00 AM-4:30 PM Monday through Friday, with careful coordination to maintain continuous operation of the wastewater treatment plant and irrigation systems. The project involves complex technical requirements, including NPDES permitting, erosion control, and specific equipment specifications for tanks, sprinklers, floats, and ventilation systems.

View the file

Other files

File Type Posted
Angell Miscellaneous Site Utilities Drawings Changes.docx DOCX document
ANG MiscSiteUtilities Drawings amendment 0002.pdf PDF
Amendment 0002 Signed.pdf PDF
Contractor Questions and Responses.docx DOCX document
Amendment 0001.pdf PDF
Drawings.pdf PDF
Plans.pdf PDF
Davis-Bacon WD OR2040092.pdf PDF
Schedule of Items.pdf PDF
12441925R0014.pdf PDF
Utility Plan.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 1

ANGELL JOB CORPS CCC GENERAL REQUIREMENTS

SECTION 010150

GENERAL REQUIREMENTS

PART 1 – SUMMARY OF WORK

1.1 DESCRIPTION

A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:

1. Base Item No. 1 –Wastewater Irrigation Field Reconstruction (Keynote 1)

2. Base Item No. 2 –Sewer Line and Manholes Repairs and Replacement (Keynotes

3, 4, 6, 7, 9, 11)

3. Base Item No. 3 –Hydrant Demo (Keynote 5)

4. Base Item No. 4 –B2888 and B2083 DWV Pipe Replacement (Keynotes 8 and 10)

5. Base Item No. 5 –Wastewater Treatment Plant Repairs (Keynote 2)

6. Base Item No. 6 –B0704 Lift Station Floats, Hangers, and Alarm (Keynote 12)

7. Base Item No. 7 –B0704 Wastewater Building Ventilation (Keynote 12)

8. Base Item No. 8 –B2889 Gym Solid Waste Interceptor (Keynote 13)

B. Note: Keynote references above are to sheet C1.0 in the drawings. See Schedule of Items (Section 1.10) and other plan sheets for additional information on bid items.

1.2 LOCATION

A. This project is located at the Angell Job Corps Civilian Conservation Center located 4.0 of miles from Yachats, Oregon in Lincoln County. The address is 335 NE Blodgett Rd, Yachats, OR 97498. Driving instructions can be obtained from the Center by calling 541-547-3137.

1.3 WORK HOURS

A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday.

1.4 USE OF PREMISES

A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-to-day operations.

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 2

C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government.

1.5 DEFINITIONS

A. The following terms in any combination relating to the installation of products/materials:

install, furnish, provide, or similar statements; mean that the contractor is responsible for the procurement and installation of the products unless it is specifically designated as either a government furnished item, supply only product, or spare.

1.6 INCIDENTAL CONSTRUCTION

A. Performance of the specific tasks indicated in the plans and specifications may require incidental construction including that is not specifically included in drawings and specification but not limited to: provision of temporary shoring or supports, installation and subsequent removal of temporary access points, removal and reinstallation or relocation of items not designated for replacement as required for work or equipment clearance or as a precautionary protective measure. In all cases the contractor shall be responsible for removal of temporary works, reinstallation of temporarily relocated items, or reconstruction of items selectively demolished for incidental construction purposes in a neat workman like manner, that matches existing finishes, quality standards, and code requirements unless the Contracting Officer specifically authorizes incidental construction to be incorporated into the finished work or items removed for coordination purposes to not be re-installed or reconstructed. The Contractor shall provide turn-key fully operational and finished installations unless the drawings and specifications specifically indicate otherwise.

1.7 STANDARDS AND CODES

A. All contract work shall adhere to the most recent version of:

1. All the International Code Council Family of codes (ICC) e.g. International

Building Code (IBC), International Fire Code (IFC), and International Mechanical Code (IMC).

2. All National Fire Protection Association (NFPA) codes and Standards e.g. , NFPA 70: National Electrical Code (NEC), NFPA 1: Fire Code, and NFPA 101- Life Safety Code.

3. Architectural Barriers Act Standards (ABA or ABAAS).

4. Product Manufacturer’s installation instructions.

1.8 QUALIFICATIONS

A. When applicable to specific contract work items:

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 3

1. Electrical work shall be performed by journey level electricians licensed in the State of contract performance or trainees/apprentices working under the direct supervision of State-licensed electrical supervisors (or State equivalent).

2. Plumbing work shall be performed by journey level plumbers licensed in the State of contract performance or trainees/apprentices working under the direct supervision of State-licensed plumbing supervisors (or State equivalent).

1.9 ELECTRICAL INSPECTIONS

A. This Federal contract is generally exempt from State building permitting requirements.

However, electrical work must be inspected by a third-party Inspector who is either State-licensed or ICC-certified. The Contractor will arrange for the inspection and pay any fees required for the inspection and associated report; arrangement may include completion and submission of load calculations, permit applications, and any other required coordination. The Inspector does not have any jurisdictional authority on Federal projects. The USFS is the jurisdiction having authority. The inspection will be based on the most recent version of the NFPA 70 National Electric Code (NEC) and currently adopted State codes. A list of deficiencies with corresponding code reference is to be provided in a report signed by the inspector. The addressee in the report is to be the Job Corps Center. The Inspector will provide a copy of their current inspection credentials with the inspection report. The Contractor will submit the report to the COR.

The CO will determine which deficiency/violations will be enforced for the Contractor to fix.

1.10 OTHER PERMITS

A. The ground disturbing activities associated with the Wastewater Treatment Plant (WWTP) irrigation field maintenance will exceed 5 acres and will be subject to National Pollution Discharge Elimination System (NPDES) permitting requirements. See Section 013143 for Contractor responsibilities for procuring and adhering to subsequent permit requirements.

1.11 WORK RESTRICTIONS

A. Smoking is permitted on campus only in the designated smoking area.

1.12 SCHEDULE OF ITEMS

A. Schedule of Items:

1. Provide pricing for all items listed in the Schedule of Items.

2. Contract award will be made for all Base Items.

3. Optional Items may or may not be awarded, depending on funding availability.

B. Base Items (BI):

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 4

1. Base Item No. 1 –Wastewater Irrigation Field Reconstruction (Keynote 1)

a. Measurement: This item is measured as a Lump Sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:

i. Replace all sprinkler heads in zones 1, 2, 3, 5, 6 (120 total).

ii. Repair or replace any damaged or missing sprinkler risers.

iii. Replace any missing or rotten posts.

iv. Install and maintain erosion control measures throughout construction until new seed is established, then remove erosion control measures.

v. Acts as governments agent in preparing, applying for (and any associated fees), and implementing the requirements of the NPDES permit throughout the construction contract including any requirements for third party qualified monitoring and reporting.

vi. Remove brush and trees within area indicated on plans.

vii. Forestry mulch/grind vegetation and topsoil layer and grade out area

(approximately 7.85 acres) to facilitate future mowing (or other approved methods).

viii. Seed/mulch disturbed areas.

ix. Coordinate work in zones to ensure continued irrigation operation in adjacent zones.

c. Deficiencies: 135774.

2. Base Item No. 2 –Sewer Line and Manholes Repairs and Replacement (Keynotes

3, 4, 6, 7, 9, 11)

a. Measurement: This item is measured as a Lump Sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:

i. Replace sewer line between existing manholes adjacent to baseball field, including investigative work required to accurately identify, locate, and reconnect existing laterals to new line.

ii. Repair leaks through cracks, connections, and joints on an existing manhole.

iii. Add and reseal risers for several manholes, include soil grading, and lid replacement where indicated.

iv. Repair or replace exterior DWV piping and cleanouts and install marker posts near buildings 2190, 2888, and 0707. Patch/repair to match any pavements or other surfaces removed to perform the work. Where cleanouts are located in pavements, do not install marker post.

v. Provide erosion control for disturbed area and site restoration including finish grading, seeding, and mulching.

c. Deficiencies: n/a.

3. Base Item No. 3 –Hydrant Demo (Keynote 5)

a. Measurement: This item is measured as a Lump Sum quantity.

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 5

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:

i. Demo and remove existing hydrants (6 each) and any associated valves and cap water lines below grade.

c. Deficiencies: 113780.

4. Base Item No. 4 –B2888 and B2083 DWV Pipe Replacement (Keynotes 8 and 10)

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:

i. Replace deteriorated sewer cleanout wye and plug and any failed sanitary piping within the crawlspace of B2083.

ii. Replace deteriorated DWV piping within the crawlspace of B2888.

c. Deficiencies: n/a.

5. Base Item No. 5 –Wastewater Treatment Plant Repairs (Keynote 2)

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:

i. Remove and replace existing housing over blower enclosure, existing enclosure is approximately 60”x60”x42”; Contractor shall verify existing conditions and provide an equipment enclosure that provides coverage of the existing equipment, is constructed of insulated (sound attenuation) UV stabilized fiberglass or aluminum, have access doors of same size or larger than existing on opposite sides to provide service access to the equipment.

The Contractor shall include any required installation, modification/extension of bases or slabs to support new enclosure in shop drawing submittal. Basis of Design manufacturer product line: Hubbell Hot Box product line.

***Note: This enclosure may be a special-order product – verify options and lead times with manufacturer.

ii. Furnish and install ventilation fan in building 0714 chlorination room, including duct, electric branch circuit, and controls.

iii. Furnish and install branch circuit and post mounted GFCI duplex receptacle from building 0714 to exterior pump location currently served by extension cord.

iv. Locate chlorination chamber, pump and dispose of accumulated solids, install riser to ground surface with lockable lid.

v. Replace missing and damaged hangers and hardware within the reactors and clarifiers.

vi. Rehang existing reactor trays in the clarifier tank.

vii. Replace aeration pipe and diffuser in one reactor tank.

viii. Replace missing/damage aeration pipe lateral between cells in one reactor.

ix. Pump and dispose of accumulated solids in all reactor tanks.

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 6

x. Remove root infiltration and seal any gaps allowing the infiltration through riser joints.

xi. Provide pumping, disposal, and/or bypass pumping as required to perform the work in the various tanks while allowing the WWTP to continue operation while providing required treatment prior to irrigation field discharge. Pump and dispose of sludge accumulations in reactors in accordance with Oregon requirements.

c. Deficiencies: 147986 and 147987.

6. Base Item No. 6 –B0704 Lift Station Floats, Hangers, and Alarm (Keynote 12)

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:

i. Replace control floats for lift station.

ii. Replace float hanger bracket.

iii. Install new Government furnished high-level alarm panel, furnish and install signal floats, extend existing building electrical as required to accommodate proposed location.

c. Deficiencies: 113239.

7. Base Item No. 7 –B0704 Wastewater Building Ventilation (Keynote 12)

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:

i. Demo and remove existing exhaust fan, duct, controls, and electrical that will not be re-utilized for new plan or existing light/receptacle circuits to remain.

Patch penetrations to match existing construction (CMU and mortar).

ii. Install new through wall exhaust fan, duct, electrical, and control in location indicated.

c. Deficiencies: 135805.

8. Base Item No. 8 –B2889 Gym Solid Waste Interceptor (Keynote 13)

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor, and incidentals to:

i. Furnish and install solids interceptor serving the arts and crafts sink. Modify cabinet and piping as required for interceptor location.

c. Deficiencies: 135798.

C. Optional Items (OI):

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 7

1. n/a

PART 2 – PROJECT SCHEDULE

2.1 PROJECT SCHEDULE

ITEM* REQUIRED DUE DATE (calendar days)

Pre-Construction Conference

Within 10 days of Award (virtually)

Bonds 10 days after Award

Notice To Proceed (NTP)

Issued after Pre-Construction Conference (insurance and bonds acceptance required prior to NTP)

Action and Informational Submittals

12 days after NTP (CORs have 12 days to return)

Closeout Submittals

Prior to CO acceptance of project

Contract Release form and final pay request

10 days after CO acceptance of project

* All items above must be included in Contractor’s construction schedule

PART 3 – SUBMITTAL PROCEDURES

3.1 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Government approval.

B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements.

3.2 PROCEDURES

A. Contractor Responsibilities

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 8

1. Review each submittal and check for compliance with the Contract Documents.

2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

3. Include the following information on label or cover sheet for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. Date of Contractor’s approval.

i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents.

4. The Government will not review submittals that do not bear Contractor's approval and will return them without action.

5. Unless additional copies are required for final submittal, and unless the

Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

6. Submittals must be submitted in electronic PDF format. Submit to CO via email or electronic file transfer site.

7. Only final submittals with mark indicating action taken by Government are to be used for construction.

8. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

B. Processing Time: Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Government will review initial submittal within 12 calendar days.

Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. Resubmittals: If resubmittal is necessary, it will be resubmitted within 3 calendar days, and reviewed by the Government within 3 calendar days.

3.3 ACTION SUBMITTALS

A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.

B. Collect information into a single submittal for each element of construction and type of product or equipment.

1. Mark up each submittal to show which products and options are applicable.

2. Include the following information, as applicable:

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 9

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

C. Required Action Submittals

1. WWTP Blower Enclosure.

2. Product Data: See Technical Specification Sections

3.4 INFORMATIONAL SUBMITTALS

A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated below:

B. Required Informational Submittals:

1. Accident Prevention Plan.

2. Construction Schedule.

3. Current licensure and/or certifications for individuals indicated in

QUALIFICATIONS paragraph above or as required in individual technical sections.

3.5 CLOSEOUT SUBMITTALS

A. Prepare and submit Closeout Submittals, as follows:

1. See Technical Specification Sections.

2. One-Year Warranty on Entire Project as required by FAR 52.246–21

3. Project Record Documents.

PART 4 – TEMPORARY FACILITIES AND CONTROLS

4.1 USE OF UTILITIES

A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service. The contractor is expected to provide whatever phone service he deems necessary for the duration of the project.

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 10

4.2 SANITARY FACILITIES

A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily.

4.3 STAGING AND STORAGE

A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR).

4.4 CONSTRUCTION WASTE DISPOSAL FACILITIES

A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Use of Government waste containers will not be permitted.

4.5 SAFETY AND ENVIRONMENTAL PROTECTION

A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform personnel, students, and the public of possible hazards.

C. Heritage Resource Protection: If cultural resources are encountered during this project;

the Contractor shall stop ground disturbing work in the area and notify the Contracting Officer. The Contracting Officer will notify the Forest Archaeologist for evaluation and recommendation how to proceed.

D. Fire Protection.

1. Store combustible materials in containers in fire-safe locations.

2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

PART 5 – EXECUTION REQUIREMENTS

5.1 EXAMINATION

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 11

A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

B. Field verify all new and existing dimensions affecting the work of this contract before ordering products.

C. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.

5.2 INSTALLATION

A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction.

B. Make vertical work plumb and make horizontal work level.

C. Install per manufacturer's written instructions and recommendations.

5.3 PROGRESS CLEANING

A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.

1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris.

2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).

B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.

5.4 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion.

5.5 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

PART 6 – CLOSEOUT PROCEDURES

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 12

6.1 SUBSTANTIAL COMPLETION

A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.

B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise the CO of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.

4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities.

5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.

6. Complete startup testing of systems.

7. Submit changeover information related to Government occupancy, use, operation, and maintenance.

8. Complete final cleaning requirements, including touchup painting.

9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final

Completion.

6.2 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 13

of the list shall state that each item has been completed or otherwise resolved for acceptance.

2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspections: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

6.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

6.4 PROJECT RECORD DOCUMENTS

A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.

B. Provide Draft of Project Record Drawings at Substantial Completion. CO will return reviewed copy. Provide Final Project Record Drawings at Final Completion.

C. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.

1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.

a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.

b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.

2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.

MISCELLANEOUS SITE UTILITIES REHAB 010150 – 14

3. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.

4. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets;

bind each set with durable paper cover sheets. Include identification on cover sheets.

6.5 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

2. Remove tools, construction equipment, machinery, and surplus material from Project site.

3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

D. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION 010150

MISCELLANEOUS SITE UTILITIES REHAB 003143 - 1

ANGELL JOB CORPS CCC PERMIT APPLICATION

SECTION 013143 – NPDES PERMITTING

1.1 PERMIT APPLICATION INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of the Bidders' own investigations.

1. Owner: USDA Forest Service, Siuslaw National Forest, 3200SW Jefferson Way, Corvallis, OR 97331.

2. Site Operator: Angell Job Corps Civilian Conservation Center, 335 NE Blodgett Rd.

Yachats, OR 97498.

3. Activity Summary: The existing wastewater treatment plant (WWTP) irrigation field has a rough surface which makes it difficult to maintain the vegetation in accordance with the WWTP’s operating permit. In addition, irrigation sprinkler heads and risers have been damaged or are not functioning correctly. This construction contract will remove woody/brushy vegetation where it has grown up within the irrigation field, mow weed/grass, and regrade the existing surface for a smoother, easier to mow field area and any damaged sprinkler heads, risers, and support posts will be repaired or replaced. Low ground pressure equipment will be utilized to prevent excessive compaction of the irrigation field area. Seeding and mulching of disturbed areas will be performed for site stabilization. Perimeter erosion control measures will be utilized to prevent sedimentation outside of the work area as will Spill Control Measures to prevent contamination to the site. No change to the existing use of the site is planned.

B. Informational Submittals:

1. Copy of permit application and all required supporting documentation.

2. Copy of DEQ approval of the permit and of the approved permit itself.

3. Copy of permit payment receipts.

4. Copy of any permit modifications that occur throughout the course of the contract.

C. Permit Application: Complete NPDES permit application and file with authorities having jurisdiction within 21 days of the Notice of Award.

1. Note on submission timeframes: The Oregon DEQ General Permit, National Pollutant

Discharge Elimination System, Construction Stormwater Permit requires submission of a complete application a minimum of 30 days prior to the start of covered ground disturbing activities with an additional 14-day minimum public review period for ground disturbances exceeding 5 acres. The permit application is expected to be concurrent with other contract activities that are not subject to the permit requirements: e.g. building electrical work, minor plumbing repairs, WWTP maintenance, submittal processes, material procurement.

2. Use of the Contract Specifications and Drawings: Sections of the contract specification and drawings may be utilized by the Contractor or their permit preparer for permit application purposes.

D. Responsible Person: The Contractor’s designee shall act as the responsible person for the duration of the application process and construction period in accordance with the State of Oregon’s NPDES permitting eligibility conditions. The Contractor shall be responsible for:

1. Preparation of the permit application and all required supporting documents, which include but are not limited to:

MISCELLANEOUS SITE UTILITIES REHAB 003143 - 2

ANGELL JOB CORPS CCC PERMIT APPLICATION

a. Application form.

b. Environmental Management Plan (EMP)

c. Erosion and Sediment Control plan for the project area that necessitates the permit coverage.

d. Land Use Compatibility Statement (LUCS).

e. Application fee and annual fee for the first year of permit coverage (and any renewal periods required due to contractor caused delays).

2. Submitting the permit application in the State’s electronic reporting system.

3. Any required permit monitoring and reporting, including 3rd-party monitoring if required.

4. Any required permit closeout required upon completion of the construction activities.

E. Conflicts between contract specifications, drawings, and/or permit requirements: In the event of a conflict between the referenced documents; the most stringent requirement shall apply. Notify the Contracting Officer (CO) and their Designated Representative (COR) in the event of these conflicts.

END OF SECTION 013143

MISCELLANEOUS SITE UTILITIES REHAB

ANGELL JOB CORPS CCC

015000 - 1

TEMPORARY FACILITIES AND CONTROLS

SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

B. Related Requirements:

1. Section 010150 "General Requirements" for work restrictions and limitations on utility interruptions.

1.2 QUALITY ASSURANCE

A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

PART 2 - PRODUCTS

PART 3 - EXECUTION

3.1 TEMPORARY FACILITIES, GENERAL

A. Conservation: Coordinate construction and use of temporary facilities with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste.

1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. See other Sections for disposition of salvaged materials that are designated as Owner's property.

3.2 INSTALLATION, GENERAL

A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

C. Isolation of Work Areas in Occupied Facilities: Prevent dust, fumes, and odors from entering occupied areas.

015000 - 2

TEMPORARY FACILITIES AND CONTROLS

3.3 TEMPORARY UTILITY INSTALLATION

A. General: Install temporary service or connect to existing service.

1. Arrange with utility company, Owner, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.

B. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.

3.4 SUPPORT FACILITIES INSTALLATION

A. Comply with the following:

B. Traffic Controls: Comply with requirements of authorities having jurisdiction.

1. Protect existing site improvements to remain including curbs, pavement, and utilities.

2. Maintain access for fire-fighting equipment and access to fire hydrants.

C. Parking: Use designated areas of Owner's existing parking areas for construction personnel.

D. Storage and Staging: Use areas of Project site approved for use by the Contracting Officer for storage and staging needs.

E. Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction.

Maintain Project site, excavations, and construction free of water.

1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining properties or endanger permanent Work or temporary facilities.

3.5 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Protection of Existing Facilities: Protect existing vegetation, equipment, structures, utilities, and other improvements at Project site and on adjacent properties, except those indicated to be removed or altered. Repair damage to existing facilities.

1. Where access to adjacent properties is required in order to affect protection of existing facilities, obtain written permission from adjacent property owner to access property for that purpose.

B. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

C. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and discharge of soil-bearing water runoff and airborne dust to undisturbed areas and to adjacent properties and walkways, in accordance with Section 311000 “Site Clearing, erosion- and sedimentation-control Drawings, and requirements of EPA Construction General Permit or authorities having jurisdiction, whichever is more stringent.

015000 - 3

TEMPORARY FACILITIES AND CONTROLS

1. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross tree- or plant-protection zones.

2. Inspect, repair, and maintain erosion- and sedimentation-control measures during construction until permanent vegetation has been established.

3. Clean, repair, and restore adjoining properties and roads affected by erosion and sedimentation from Project site during the course of Project.

4. Remove erosion and sedimentation controls and restore and stabilize areas disturbed during removal.

D. Stormwater Control: Comply with requirements of authorities having jurisdiction. Provide barriers in and around excavations and subgrade construction to prevent flooding by runoff of stormwater from heavy rains.

E. Tree and Plant Protection: Comply with requirements specified in Section 015639 "Temporary Tree and Plant Protection."

F. Security Enclosure and Lockup: Install temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security. Lock entrances at end of each workday.

G. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.

H. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

1. Include temporary guardrails systems, fences, barricades, or covers around all excavations exceeding 6’ in depth and around other excavations that are left unattended.

3.6 OPERATION, TERMINATION, AND REMOVAL

A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.

B. Maintenance: Maintain facilities in good operating condition until removal.

1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis where required to achieve indicated results and to avoid possibility of damage.

C. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.

END OF SECTION 015000

015639 - 1

TEMPORARY TREE AND PLANT PROTECTION

SECTION 015639 - TEMPORARY TREE AND PLANT PROTECTION

PART 1 - GENERAL

1.1 SUMMARY

A. The Work of this Section Includes: General protection and pruning of existing trees and plants that are affected by execution of the Work, whether temporary or permanent construction.

1.2 DEFINITIONS

A. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction.

B. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and defined by a circle concentric with each tree with a radius 1.5 times the diameter of the drip line unless otherwise indicated.

1.3 ACTION SUBMITTALS

A. Not Used.

1.4 INFORMATIONAL SUBMITTALS

A. Not Used.

1.5 QUALITY ASSURANCE

A. Arborist Qualifications: Certified Arborist as certified by ISA, licensed arborist in jurisdiction where Project is located, current member of ASCA, or registered Consulting Arborist as designated by ASCA.

1.6 FIELD CONDITIONS

A. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Moving or parking vehicles or equipment.

3. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

015639 - 2

TEMPORARY TREE AND PLANT PROTECTION

PART 2 - PRODUCTS

2.1 MATERIALS

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect tree root systems from damage caused by runoff or spillage of noxious materials while mixing, placing, or storing construction materials. Protect root systems from ponding, eroding, or excessive wetting caused by dewatering operations.

3.2 EXCAVATION

A. General: Excavate at edge of protection zones and for trenches indicated within protection zones in accordance with requirements in Section 312000 "Earth Moving" unless otherwise indicated.

3.3 CROWN PRUNING

A. Prune branches that are affected by temporary and permanent construction. Prune branches as directed by arborist.

1. Prune to remove only injured, broken, dying, or dead branches unless otherwise indicated. Do not prune for shape unless otherwise indicated.

2. Do not remove or reduce living branches to compensate for root loss caused by damaging or cutting root system.

3. Pruning Standards: Prune trees in accordance with ANSI A300 (Part 1).

B. Cut branches with sharp pruning instruments; do not break or chop.

C. Do not paint or apply sealants to wounds.

D. Remove pruned branches and dispose of off-site.

3.4 REGRADING

A. Lowering Grade: Where new finish grade is indicated below existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.

B. Raising Grade: Where new finish grade is indicated above existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.

C. Minor Fill within Protection Zone: Where existing grade is 2 inches or less below elevation of finish grade, fill with backfill soil. Place backfill soil in a single uncompacted layer and hand grade to required finish elevations.

015639 - 3

TEMPORARY TREE AND PLANT PROTECTION

3.5 REPAIR AND REPLACEMENT

A. General: Repair or replace trees, shrubs, and other vegetation indicated to remain or to be relocated that are damaged by construction operations, in a manner approved by Contracting Officer.

1. Perform repairs of damaged trunks, branches, and roots within 24 hours according to arborist's written instructions.

END OF SECTION 015639

MISCELLANEOUS SITE UTILITIES REHAB 017329 - 1

ANGELL JOB CORPS CCC CUTTING AND PATCHING

SECTION 017329 – CUTTING AND PATCHING

PART 1 - GENERAL

1.1 RESPONSIBILITIES

A. If the Project involves a General Construction Contractor, the General Construction Contractor shall be responsible for the cutting of openings with area equal to or greater than thirty-six (36) square inches. The cutting of openings with area less than thirty-six (36) square inches shall be the responsibility of the Separate Prime Contractor whose work requires the cutting. The General Construction Contractor shall be responsible for all patching work, regardless of the size of the opening.

B. If the cutting of openings into newly constructed walls, partitions, floors, or ceilings is required due to lack of coordination between Separate Prime Contractors, or due to ill-timed or defective work by one or more Separate Prime Contractors, the Separate Prime Contractor primarily responsible for the lack of coordination or the ill-timed or defective work shall bear all costs involved in cutting and patching. The Government may direct the General Construction Contractor to actually perform the cutting and patching.

C. If the Project does not involve a General Construction Contractor, cutting and patching shall be the responsibility of the Separate Prime Contractor whose work requires the cutting. The Contractor shall employ competent individuals, approved by the Government, to do the cutting and patching.

1.2 SUBMITTALS

A. When cutting and patching procedures are required to be approved prior to the work, the Contractor shall submit a plan for cutting and patching well in advance of the work. The submittal shall describe the procedures and request approval to proceed. The submittal shall include the following, as applicable and be submitted per 010150 Submittal procedures.

1. A description of the limits of cutting and patching required, how it is to be performed, and why it cannot be avoided.

2. A description of the anticipated results in terms of changes to existing construction, including changes to structural elements and operating components as well as changes in the building's appearance and other significant visual elements.

3. A listing of products to be used and firms or entities that will perform work.

4. Identification of the dates when cutting and patching is to be performed.

5. Identification of any utilities that will be distributed or affected, including those that will be relocated and those that will be temporarily out of service, and an indication of how long service will be disrupted.

6. Where cutting and patching involves addition of reinforcement to structural elements, details and engineering calculations to show how reinforcement is integrated with the original structure.

MISCELLANEOUS SITE UTILITIES REHAB 017329 - 2

B. Approval by the Government to proceed with cutting and patching does not waive the right of the Government to later require complete removal and replacement of any part of the work found to be unsatisfactory.

1.3 MATERIALS

A. Materials used shall be identical to existing materials.

B. If identical materials are not available or cannot be used where exposed surfaces are involved, materials used shall match existing adjacent surfaces to the fullest extent possible with regard to visual effect.

C. All materials used shall have installed performance equal or greater than that of existing materials.

D. All materials used shall be compatible with adjacent existing materials and shall have no deleterious effect on the existing construction.

1.4 INSPECTION

A. Before cutting existing surfaces, the Contractor shall examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed.

B. The Contractor shall avoid any unsafe or unsatisfactory conditions, and if unsafe or unsatisfactory conditions are encountered, corrective action shall be taken before proceeding.

1.5 PREPARATION

A. Work to be cut shall be provided with temporary support.

B. Existing construction shall be protected during cutting and patching to prevent damage by cutting and patching operations.

C. Protection from adverse weather conditions shall be provided for portions of the project that might be exposed during cutting and patching operations.

D. Cutting and patching operations shall be conducted so as to avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

E. The Contractor shall take all precautions necessary to avoid cutting existing pipe, conduit, or ductwork that serve the facility and are scheduled to be removed or relocated, until provisions have been made for bypass installations.

MISCELLANEOUS SITE UTILITIES REHAB 017329 - 3

1.6 PERFORMANCE, GENERAL

A. Skilled workmen shall be employed to perform cutting and patching.

B. Cutting and patching shall be undertaken at the earliest feasible time and completed without delay.

C. Cutting, fitting, and patching for installation of components or the performance of other construction activities shall be performed so as to restore surfaces to their original condition.

D. Openings shall be temporarily covered when not in use.

E. Where excavating and backfilling are required, the Contractor shall comply with requirements of applicable sections of the Technical Specifications.

F. For utility services shown or required to be removed, relocated, or abandoned, the Contractor shall ensure the utility service is shut off or not active prior to performing any work on the system. If the utility service requires continued operation during the Work, the Contractor shall by-pass the service before cutting service pipe or conduit. Any pipe or conduit that is to remain shall be sealed with a cap, valve, or plug to prevent entrance of moisture or other foreign matter.

1.7 PERFORMANCE, CUTTING

A. Cutting of existing construction shall be performed using methods least likely to damage elements to be retained or adjoining construction. Where possible, proposed procedures shall be reviewed with the original installer and shall comply with the original installer's recommendations.

B. Where cutting is required, hand or small power tools designed for sawing or grinding shall be used. Hammering and chopping shall not be done. Holes and slots shall be cut neatly to the size required with minimum disturbance of adjacent surfaces.

C. To avoid marring existing…