Specifications.pdf
PDF 1 MB Posted
- Attached to
- FCI Marion - Repair Boiler #4
- Solicitation number
- 15BFA025Q00000243
About this file
This is a Specification document for the Repair Boiler #4 project at the Federal Correctional Institution in Marion, Illinois, dated May 19, 2025. The specification outlines the detailed requirements for replacing boiler tubes in Boiler #4, specifically calling for the removal and disposal of existing tubes and the supply and installation of (72) SA178A 2.5" x 188.75" x .105" tubes in the lower portion of the Cleaver Brooks summer boiler.
The scope of work includes comprehensive tube replacement tasks such as cleaning and preparing tube sheets, removing scale from the boiler's belly, reinstalling handholes with new gaskets, performing hydro testing, and ensuring proper operation of all devices. The contractor will be responsible for providing all labor, equipment, materials, and safety equipment necessary to complete the project. The work is to be performed at the F.C.I. Marion facility located at 4500 Prison Road in Marion, IL, with the U.S. Department of Justice's Federal Bureau of Prisons as the project owner.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IMG_0006.JPG | JPG image | |
| IMG_0005.JPG | JPG image | |
| WD.pdf | ||
| 15BFA025Q00000243.pdf | ||
| IMG_0003.JPG | JPG image | |
| IMG_0007.JPG | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .