Specifications - D6 Williamsburg MaintGar_Radiant Heat Replcmt.pdf

PDF 724 KB Posted

Attached to
Radiant Heat System Replacement at the Williamsburg Garage
Solicitation number
645-RFB-2028-2026
Issued by
Jackson County, Iowa

About this file

This is a project specifications document for the Williamsburg Maintenance Garage Radiant Heat Replacement project (BG-1W11) issued by the Iowa Department of Transportation's Purchasing Resources & Acquisitions Bureau and Architectural Services, with a project date of June 2025. The project involves the complete removal and replacement of the existing ceiling-hung radiant heat system within the maintenance garage located at 2507 210th Street in Williamsburg, Iowa. The scope of work includes demolition of existing equipment, installation of a new Co-Ray-Vac gas-fired, vacuum-operated, low-intensity infrared radiant heating system with appropriate controls, piping, electrical connections, and related mechanical and electrical work. The contract is structured as a stipulated price agreement using the standard AIA form, with the contractor responsible for providing all materials, labor, equipment, and supervision necessary for complete system installation and startup. The specifications establish detailed requirements across 29 divisions, including HVAC work (Division 23), electrical work (Division 26), demolition (Division 02), painting (Division 09), and general construction requirements (Division 01), with performance expectations including system testing, operator training, and a one-year warranty period from the date of final acceptance.

The contract requires contractors to maintain compliance with applicable codes and standards including NFPA 54, NFPA 70, and the National Electrical Code, with all work performed during normal Iowa DOT operational hours (7:00 a.m. to 4:00 p.m.) unless alternative arrangements are approved in advance. Contractors must submit schedules of values using AIA G703 forms within 10 days of notice to proceed, with monthly progress payments calculated at 97 percent of completed work value on a net 60-day payment cycle at zero percent interest. Change orders are limited to a maximum 15 percent markup total between subcontractors and general contractor combined, and all changes require a signed AIA G701 document from an authorized Iowa DOT official prior to work commencement. The project anticipates owner occupancy upon substantial completion, requiring coordination to minimize operational disruption; contractors must maintain all emergency building exits open during construction and limit utility outages to one hour at a time with 24 hours advance notice. Comprehensive submittal requirements include shop drawings, product data, operation and maintenance manuals, warranties, start-up reports, and record documents, with all electronic submissions required in PDF format through designated email or web-based systems.

View the file

Other files

File Type Posted
1331564-event.pdf PDF
Plans - 30 APR 2025_WILLAMSBURG GARAGE RADIANT HEAT 2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Williamsburg Maint. Gar. Radiant Heat Replacement

BG-1W11 (013)--80-48

00 01 01 - 1 Project Title Page

SECTION 00 01 01

PROJECT TITLE PAGE

PROJECT MANUAL

WILLIAMSBURG MAINT. GAR. RADIANT HEAT REPLACEMENT

PROJECT NUMBER: BG-1W11 (013)--80-48

2507 210TH ST

WILLIAMSBURG , IOWA

OWNER:

STATE OF IOWA

IOWA DEPARTMENT OF TRANSPORTATION

800 LINCOLN WAY

AMES, IOWA 50010

ISSUED BY:

PURCHASING

RESOURCES & ACQUISITIONS BUREAU

IOWA DEPARTMENT OF TRANSPORTATION

800 LINCOLN WAY

AMES, IOWA 50010

ARCHITECT:

ARCHITECTURAL SERVICES

RESOURCES & ACQUISITIONS BUREAU

IOWA DEPARTMENT OF TRANSPORTATION

800 LINCOLN WAY

AMES, IOWA 50010

DATE: JUNE 2025

END OF SECTION

BG-1W11 (013)--80-48

00 01 07 - 1 Seals Page

SECTION 00 01 07

SEALS PAGE

BG-1W11 (013)--80-48

00 01 10 - 1 Table of Contents

SECTION 00 01 10

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

A. 00 01 01 - Project Title Page B. 00 01 07 - Seals Page C. 00 01 10 - Table of Contents D. 00 01 15 - List of Drawing Sheets

SPECIFICATIONS

2.01 DIVISION 01 -- GENERAL REQUIREMENTS

A. 01 10 00 - Summary B. 01 20 00 - Price and Payment Procedures C. 01 30 00 - Administrative Requirements D. 01 40 00 - Quality Requirements E. 01 60 00 - Product Requirements F. 01 70 00 - Execution and Closeout Requirements G. 01 78 00 - Closeout Submittals

2.02 DIVISION 02 -- EXISTING CONDITIONS

A. 02 41 00 - Demolition

2.03 DIVISION 09 -- FINISHES

A. 09 90 00 - Painting and Coating - Commercial Facility Guide Specification - Sherwin-Williams

2.04 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

A. 23 05 00 - Bsasic HVAC Requirements B. 23 05 05 - HVAC Demolition for Remodeling C. 23 05 29 - Hangers and Supports for HVAC Piping and Equipment D. 23 07 13 - Duct Insulation E. 23 11 23 - Natural-Gas Piping F. 23 55 23 -Gas Fired Radiant Heaters

2.05 DIVISION 26 -- ELECTRICAL

A. 26 05 00 - Basic HVAC Requirements B. 26 05 05 - Selective Demolition for Electrical C. 26 05 13 - Medium-Voltage Cables D. 26 05 26 - Grounding and Bonding for Electrical Systems E. 26 05 27 - Supporting Devices F. 26 05 33 - Conduit and Boxes G. 26 05 53 - Identification for Electrical Systems H. 26 24 19 - Motor-Control I. 26 27 26 - Wiring Devices

BG-1W11 (013)--80-48

00 01 15 - 1 List of Drawing Sheets

SECTION 00 01 15

LIST OF DRAWING SHEETS

A001 COVER / SITE

A701 EXISITNG CO-RAY-VAC SYSTEMS AND OUTSIDE AIR PIPING

A702 NEW CO-RAY-VAC SYSTEMS AND OUTSIDE AIR PIPING

BG-1W11 (013)--80-48

01 10 00 - 1 Summary

SECTION 01 10 00

SUMMARY

PART 1 GENERAL

1.01 PROJECT

A. Project Name: Williamsburg Maint. Gar. Radiant Heat Replacement B. Owner's Name: State of Iowa, Iowa Department of Transportation.

C. Architect's Name: Iowa DOT Architectural Services D. The Project consists of the Removal and replacement of Ceiling hung Radiant Heat system within the Maintenance Garage, with modifications per drawing.

1.02 CONTRACT DESCRIPTION

A. Contract Type: Stipulated Price as described in Standard AIA form of Agreement Between the Contractor and Owner, as provided by Iowa DOT purchasing.

1.03 DESCRIPTION OF ALTERATIONS WORK

A. Scope of demolition and removal work is indicated on drawings and specified in Section 02 41

00.

1.04 OWNER OCCUPANCY

A. Owner intends to occupy the Project upon Substantial Completion.

B. Cooperate with Owner to minimize conflict and to facilitate Owner's operations.

C. Schedule the Work to accommodate Owner occupancy.

1.05 CONTRACTOR USE OF SITE AND PREMISES

A. Arrange use of site and premises to allow:

1. Owner occupancy.

B. Provide access to and from site as required by law and by Owner:

1. Emergency Building Exits During Construction: Keep all exits required by code open during construction period; provide temporary exit signs if exit routes are temporarily altered.

2. Do not obstruct roadways, sidewalks, or other public ways without permit.

C. Existing building spaces may not be used for storage, unless approved in advance through the

IaDOT Project Manager with the Owner D. Time Restrictions:

1. Limit conduct of work to the normal DOT operational hours. Estimated time is 7 a.m. to 4 p.m. unless otherwise arranged with local representative..

2. Facility Operational "Off Hours" extension: Contractor may request, in writing to the IaDOTProject Manager, to perform construction operations during Off Hours. If granted, the Contractor must have a representative present during any Sub-Contractor work.

E. Utility Outages and Shutdown:

1. Limit shutdown of utility services to 1 hour at a time, arranged at least 24 hours in advance with Owner.

2. Prevent accidental disruption of utility services to other facilities.

1.06 SPECIFICATION CONVENTIONS

A. These specifications are written in imperative mood and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise. The words “shall be” are included by inference where a colon (:) is used within sentences or phrases.

B. The following terms are used throughout the specifications and defined as follows:

1. Contractor: General Contractor or contractor responsible for Work of specified section.

2. Owner: Representative of building occupants.

BG-1W11 (013)--80-48

01 10 00 - 2 Summary

3. Architect: Representative of IaDOT Architectural Services.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

BG-1W11 (013)--80-48

01 20 00 - 1 Price and Payment Procedures

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Procedures for preparation and submittal of applications for progress payments.

B. Documentation of changes in Contract Sum and Contract Time.

C. Change procedures.

D. Procedures for preparation and submittal of application for final payment.

1.02 SCHEDULE OF VALUES

A. Use Schedule of Values Form: AIA G703, edition stipulated in the Agreement.

B. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit draft to Architect for approval.

C. Forms filled out by hand will not be accepted.

D. Submit Schedule of Values electronically within 10 days after date established in Notice to

Proceed.

E. Format: Utilize the Table of Contents of this Project Manual. Identify each line item with number and title of the specification section. Identify site mobilization.

F. Revise schedule to list approved Change Orders, with each Application For Payment.

1.03 APPLICATIONS FOR PROGRESS PAYMENTS

A. Payment Period: 30 days or monthly.

B. Use Form AIA G702 and Form AIA G703, edition stipulated in the Agreement.

C. Electronic media printout including equivalent information will be considered in lieu of standard form specified; submit sample to Architect for approval.

D. Forms filled out by hand will not be accepted.

E. For each item, provide a column for listing each of the following:

1. Item Number.

2. Description of work.

3. Scheduled Values.

4. Previous Applications.

5. Work in Place and Stored Materials under this Application.

6. Authorized Change Orders.

7. Total Completed and Stored to Date of Application.

8. Balance to Finish.

9. Retainage.

F. Execute certification by signature of authorized officer.

G. Use data from approved Schedule of Values. Provide dollar value in each column for each line item for portion of work performed and for stored products.

H. List each authorized Change Order as a separate line item, listing Change Order number and dollar amount as for an original item of work.

I. Submit one electronic and no hard-copies of each Application for Payment.

J. Include the following with the application:

1. Transmittal letter as specified for submittals in Section 01 30 00.

2. Construction progress schedule, revised and current as specified in Section 01 30 00.

3. Payment for Off-Site stored materials is not allowed by IaDOT.

BG-1W11 (013)--80-48

01 20 00 - 2 Price and Payment Procedures

K. When Architect requires substantiating information, submit data justifying dollar amounts in question. Provide one copy of data with cover letter for each copy of submittal. Show application number and date, and line item by number and description.

1.04 MODIFICATION PROCEDURES

A. For minor changes not involving an adjustment to the Contract Sum or Contract Time, Architect

(IADOT, Architectural Services | Resources and Acquisitions Bureau, Project Manager) will issue instructions directly to Contractor.

B. For other required changes, Architect will issue an AIA Document G701 change order document signed by Iowa Department of Transportation instructing Contractor to proceed with the change, for subsequent inclusion in a Change Order.

1. The document will describe the required changes and will designate method of determining any change in Contract Sum or Contract Time.

2. Promptly execute the change.

3. Change Orders must be approved by Architect, Contractor and IDOT prior to work beginning. If Contractor performs work before Change Order is approved by all parties, the Contractor will not receive remuneration or will return project to original condition at behest of Architect and at no cost to Owner.

C. For changes for which advance pricing is desired, Architect will issue an AIA Document G709 work change proposal request that includes a detailed description of a proposed change with supplementary or revised drawings and specifications, a change in Contract Time for executing the change with a stipulation of any overtime work required and the period of time during which the requested price will be considered valid. Contractor shall prepare and submit a fixed price quotation within 5 days.

D. Change request/order procedure.

1. Proposal request submitted by DOT project manager to general contractor.

a. Maximum 15% markup total between sub-contractor and general including all overhead, profit, insurance and bonds.

1) I.E. GC 10% and sub 5% on change order.

b. Verbal and written communications are NOT an approval to proceed with any changes to the work. An AIA document G701 Change Order signed by an authorized Iowa DOT official is required prior to proceeding with any changes to the work or deviation from the contract. Any changes to the work performed by the Contractor before a signed AIA G701 Change Order is received is assumed at the Contractor's own risk, liability and expense.

E. Contractor may propose a change by submitting a request for change to Architect, describing the proposed change and its full effect on the work, with a statement describing the reason for the change, and the effect on the Contract Sum and Contract Time with full documentation.

Document any requested substitutions in accordance with Section 01 60 00.

F. Computation of Change in Contract Amount: As specified in the Agreement and Conditions of the Contract.

1. For pre-determined unit prices and quantities, the amount will based on the fixed unit prices.

G. Substantiation of Costs: Provide full information required for evaluation.

1. On request, provide the following data:

a. Quantities of products, labor, and equipment.

b. Taxes, insurance, and bonds.

c. Overhead and profit.

d. Justification for any change in Contract Time.

e. Credit for deletions from Contract, similarly documented.

H. Execution of Change Orders: Architect will issue Change Orders for signatures of parties as provided in the Conditions of the Contract.

BG-1W11 (013)--80-48

01 20 00 - 3 Price and Payment Procedures

I. After execution of Change Order, promptly revise Schedule of Values and Application for Payment forms to record each authorized Change Order as a separate line item and adjust the Contract Sum.

J. Promptly revise progress schedules to reflect any change in Contract Time, revise sub-schedules to adjust times for other items of work affected by the change, and resubmit.

K. Promptly enter changes in Project Record Documents.

1.05 APPLICATION FOR FINAL PAYMENT

A. Prepare Application for Final Payment as specified for progress payments, identifying total adjusted Contract Sum, previous payments, and sum remaining due.

B. Application for Final Payment will not be considered until the following have been accomplished:

1. All closeout procedures specified in Section 01 70 00.

2. All Punch List items have been completed..

BG-1W11 (013)--80-48

01 30 00 - 1 Administrative Requirements

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Preconstruction meeting.

B. Construction progress schedule.

C. Progress photographs.

D. Coordination drawings.

E. Submittals for review, information, and project closeout.

F. Number of copies of submittals.

G. Requests for Interpretation (RFI) procedures.

H. Submittal procedures.

1.02 RELATED REQUIREMENTS

A. Section 01 60 00 - Product Requirements: General product requirements.

B. Section 01 70 00 - Execution and Closeout Requirements: Additional coordination requirements.

C. Section 01 78 00 - Closeout Submittals: Project record documents; operation and maintenance data; warranties and bonds.

1.03 GENERAL ADMINISTRATIVE REQUIREMENTS

A. Comply with requirements of Section 01 70 00 - Execution and Closeout Requirements for coordination of execution of administrative tasks with timing of construction activities.

1.04 PROJECT COORDINATION

A. Project Coordinator: Contractor.

B. Cooperate with the Project Coordinator in allocation of mobilization areas of site; for field offices and sheds, for access, traffic, and parking facilities.

C. During construction, coordinate use of site and facilities through the Project Coordinator.

D. Comply with Project Coordinator's procedures for intra-project communications; submittals, reports and records, schedules, coordination drawings, and recommendations; and resolution of ambiguities and conflicts.

E. Comply with instructions of the Project Coordinator for use of temporary utilities and construction facilities. Responsibility for providing temporary utilities and construction facilities is identified in Section 01 10 00 - Summary.

F. Coordinate field engineering and layout work under instructions of the Project Coordinator.

G. Make the following types of submittals to Architect (IaDOT Architectural Services Project

Manager) through the Project Coordinator:

1. Requests for Interpretation.

2. Requests for substitution.

3. Shop drawings, product data, and samples.

4. Test and inspection reports.

5. Design data.

6. Manufacturer's instructions and field reports.

7. Applications for payment and change order requests.

8. Progress schedules.

9. Coordination drawings.

10. Correction Punch List and Final Correction Punch List for Substantial Completion.

BG-1W11 (013)--80-48

01 30 00 - 2 Administrative Requirements

11. Closeout submittals.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 ELECTRONIC SUBMISSION:

A. All documents transmitted for purposes of administration of the contract are to be in electronic (PDF, MS Word, or MS Excel) format, as appropriate to the document, and transmitted via E-mail of contractor's online document management service.

3.02 PRECONSTRUCTION MEETING

A. IaDOT Architectural Services | Resources and Acquisitions Bureau's Project Manager will schedule a meeting after Notice of Award.

B. Attendance Required:

1. IA DOT local Maintenance Garage Supervisor.

2. IA DOT Architectural Services | Resources and Acquisitions Bureau Project Manager

3. General Contractor.

4. All major Sub-Contractors.

C. Agenda:

1. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.

2. Designation of personnel representing the parties to Contract: IaDOT Architectural

Services Project Manager

3. Review procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.

4. Coordinate commencement of contstruction.

5. Use of premises by Owner and Contractor.

6. Temporary utilities provided by Contractor.

7. Security and housekeeping procedures.

8. Procedures for testing.

9. Procedures for maintaining record documents.

10. Requirements for start-up of equipment.

11. Inspection and acceptance of equipment put into service during construction period.

12. Scheduling.

D. IaDOT Project Manager will record minutes and distribute copies within [three] days after meeting to participants, with copies to the Contractor, Iowa Department of Transportation, all other participants, and those affected by decisions made.

3.03 PROGRESS MEETINGS

A. Schedule and administer meetings throughout progress of the work at maximum bi-weekly intervals.

B. General Contractor will make arrangements for meetings, prepare agenda with copies for participants, preside at meetings, take and distribute minutes..

C. Attendance Required: Job Superintendent, major Subcontractors and suppliers, Owner, Architect/Engineer, as appropriate to agenda topics for each meeting.

1. Contractor.

2. IA DOT local Maintenance Garage Supervisor.

3. IA DOT Architectural Services | Resources and Acquisitions Bureau Project Manager

4. Contractor's superintendent.

5. Major subcontractors.

D. Agenda:

1. Review minutes of previous meetings.

BG-1W11 (013)--80-48

01 30 00 - 3 Administrative Requirements

2. Review of Work progress.

3. Field observations, problems, and decisions.

4. Identification of problems that impede, or will impede, planned progress.

5. Review of submittals schedule and status of submittals.

6. Review of off-site fabrication and delivery schedules.

7. Maintenance of progress schedule.

8. Corrective measures to regain projected schedules.

9. Planned progress during succeeding work period.

10. Coordination of projected progress.

11. Status of Proposal Requests, Change Orders, Architect's Supplemental Instructions and

Requests For Information. Maintenance of quality and work standards.

12. Maintenance of quality and work standards.

13. Effect of proposed changes on progress schedule and coordination.

14. Other business relating to work.

E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Architect, Owner, participants, and those affected by decisions made.

3.04 CONSTRUCTION PROGRESS SCHEDULE

A. If preliminary schedule requires revision after review, submit revised schedule within 5 days.

B. Within 10 days after review of preliminary schedule, submit draft of proposed complete schedule for review.

1. Include written certification that major Subcontractors have reviewed and accepted proposed schedule.

C. Within 5 days after joint review, submit complete schedule.

D. Submit updated schedule with each Application for Payment.

3.05 PROGRESS PHOTOGRAPHS

A. Submit new photographs at least once per week, within 3 days after being taken.

B. Maintain one set of all photographs at project site for reference; same copies as submitted, identified as such.

C. Photography Type: Digital; electronic files.

D. Provide photographs of site and construction throughout progress of work produced by an experienced photographer, acceptable to Architect.

E. In addition to periodic, recurring views, take photographs of each of the following events:

F. Take photographs as evidence of existing project conditions as follows:

G. Views:

1. Provide non-aerial photographs from four cardinal views at each specified time, until date of Substantial Completion.

2. Consult with Architect for instructions on views required.

3. Provide factual presentation.

4. Provide correct exposure and focus, high resolution and sharpness, maximum depth of field, and minimum distortion.

H. Digital Photographs: 24 bit color, minimum resolution of 1024 by 768, in JPG format; provide files unaltered by photo editing software.

1. Delivery Medium: Via email.

2. File Naming: Include project identification, date and time of view, and view identification.

3.06 COORDINATION DRAWINGS

A. Provide information required by Project Coordinator for preparation of coordination drawings.

B. Review drawings prior to submission to Architect.

BG-1W11 (013)--80-48

01 30 00 - 4 Administrative Requirements

3.07 REQUESTS FOR INTERPRETATION (RFI)

A. Definition: A request seeking one of the following:

1. An interpretation, amplification, or clarification of some requirement of Contract Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents.

B. Whenever possible, request clarifications at the next appropriate project progress meeting, with response entered into meeting minutes, rendering unnecessary the issuance of a formal RFI.

C. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of Contract Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.

1. Prepare a separate RFI for each specific item.

a. Review, coordinate, and comment on requests originating with subcontractors and/or materials suppliers.

b. Do not forward requests which solely require internal coordination between subcontractors.

2. Combine RFI and its attachments into a single electronic file. PDF format is preferred.

D. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.

1. Include in each request Contractor's signature attesting to good faith effort to determine from Contract Documents information requiring interpretation.

2. Unacceptable Uses for RFIs: Do not use RFIs to request the following::

a. Approval of submittals (use procedures specified elsewhere in this section).

b. Approval of substitutions (see Section - 01 60 00 - Product Requirements)

c. Changes that entail change in Contract Time and Contract Sum (comply with provisions of the Conditions of the Contract).

d. Different methods of performing work than those indicated in the Contract Drawings and Specifications (comply with provisions of the Conditions of the Contract).

E. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra work or delay the project. If in Contractor's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and follow up with an appropriate Change Order request to Owner.

3.08 SUBMITTALS FOR REVIEW

A. When the following are specified in individual sections, submit them for review:

1. Product data.

2. Shop drawings.

3. Samples for selection.

4. Samples for verification.

B. Submit to Architect for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.

C. Samples will be reviewed for aesthetic, color, or finish selection.

D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01 78 00 - Closeout Submittals.

3.09 SUBMITTALS FOR INFORMATION

A. When the following are specified in individual sections, submit them for information:

1. Design data.

2. Certificates.

3. Test reports.

BG-1W11 (013)--80-48

01 30 00 - 5 Administrative Requirements

4. Inspection reports.

5. Manufacturer's instructions.

6. Other types indicated.

7. Manufacturer's field reports.

8. Other types indicated.

B. Submit for Architect's knowledge as contract administrator or for Iowa Department of Transportation. No action will be taken.

3.10 SUBMITTALS FOR PROJECT CLOSEOUT

A. Submit Correction Punch List for Substantial Completion.

B. Submit Final Correction Punch List for Substantial Completion.

C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 01 78 00 - Closeout Submittals:

1. Project record documents.

2. Operation and maintenance data.

3. Warranties.

4. Bonds.

5. Other types as indicated.

D. Submit for Owner's benefit during and after project completion.

3.11 NUMBER OF COPIES OF SUBMITTALS

A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.

B. Documents for Information: Submit one copy electronically.

C. Samples: Submit the number specified in individual specification sections; one of which will be retained by Architect.

1. After review, produce duplicates.

2. Retained samples will not be returned to Contractor unless specifically so stated.

3.12 SUBMITTAL PROCEDURES

General Requirements:

1. Use a separate transmittal for each item.

2. Transmit using approved form.

3. Sequentially identify each item. For revised submittals use original number and a sequential numerical suffix.

4. Identify: Project; Contractor; subcontractor or supplier; pertinent drawing and detail number; and specification section number and article/paragraph, as appropriate on each copy.

5. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents.

a. Submittals from sources other than the Contractor, or without Contractor's stamp will not be acknowledged, reviewed, or returned.

6. Schedule submittals to expedite the Project, and coordinate submission of related items.

7. Identify variations from Contract Documents and product or system limitations that may be detrimental to successful performance of the completed work.

8. When revised for resubmission, identify all changes made since previous submission.

A. Product Data Procedures:

1. Submit only information required by individual specification sections.

2. Collect required information into a single submittal.

3. Do not submit (Material) Safety Data Sheets for materials or products.

B. Shop Drawing Procedures:

BG-1W11 (013)--80-48

01 30 00 - 6 Administrative Requirements

1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting Contract Documents and coordinating related work.

2. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.

C. Samples Procedures:

1. Transmit related items together as single package.

2. Identify each item to allow review for applicability in relation to shop drawings showing installation locations.

3.13 SUBMITTAL REVIEW

A. Submittals for Review: Architect will review each submittal, and approve, or take other appropriate action.

B. Submittals for Information: Architect will acknowledge receipt and review. See below for actions to be taken.

C. Architect's actions will be reflected by marking each returned submittal using virtual stamp on electronic submittals.

D. Architect's and consultants' actions on items submitted for review:

1. Authorizing purchasing, fabrication, delivery, and installation:

a. "Approved", or language with same legal meaning.

b. "Approved as Noted, Resubmission not required", or language with same legal meaning.

1) At Contractor's option, submit corrected item, with review notations acknowledged and incorporated.

c. "Approved as Noted, Resubmit for Record", or language with same legal meaning.

2. Not Authorizing fabrication, delivery, and installation:

E. Architect's and consultants' actions on items submitted for information:

1. Items for which no action was taken:

a. "Received" - to notify the Contractor that the submittal has been received for record only.

2. Items for which action was taken:

a. "Reviewed" - no further action is required from Contractor.

BG-1W11 (013)--80-48

01 40 00 - 1 Quality Requirements

SECTION 01 40 00

QUALITY REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Submittals.

B. Quality assurance.

C. References and standards.

D. Contractor's design-related professional design services.

E. Control of installation.

F. Tolerances.

G. Manufacturers' field services.

H. Defect Assessment.

1.02 RELATED REQUIREMENTS

A. Section 01 30 00 - Administrative Requirements: Submittal procedures.

B. Section 01 60 00 - Product Requirements: Requirements for material and product quality.

1.03 REFERENCE STANDARDS

A. IAS AC89 - Accreditation Criteria for Testing Laboratories; 2021.

1.04 DEFINITIONS

A. Contractor's Professional Design Services: Design of some aspect or portion of the project by party other than the design professional of record. Provide these services as part of the Contract for Construction.

1. Design Services Types Required:

a. Design-Related: Design services explicitly required to be performed by another design professional due to highly-technical and/or specialized nature of a portion of the project. Services primarily involve engineering analysis, calculations, and design, and are not intended to alter the aesthetic aspects of the design.

B. Design Data: Design-related, signed and sealed drawings, calculations, specifications, certifications, shop drawings and other submittals provided by Contractor, and prepared directly by, or under direct supervision of, appropriately licensed design professional.

1.05 SUBMITTALS

A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.

B. Certificates: When specified in individual specification sections, submit certification by the manufacturer and Contractor or installation/application subcontractor to Architect, in quantities specified for Product Data.

1. Indicate material or product complies with or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

2. Certificates may be recent or previous test results on material or product, but must be acceptable to Architect.

C. Manufacturer's Instructions: When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, for the Iowa Department of Transportation's information. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.

D. Manufacturer's Field Reports: Submit reports for Architect's benefit as contract administrator or for Iowa Department of Transportation.

1. Submit report in duplicate within 30 days of observation to Architect for information.

BG-1W11 (013)--80-48

01 40 00 - 2 Quality Requirements

2. Submit for information for the limited purpose of assessing compliance with information given and the design concept expressed in the Contract Documents.

1.06 REFERENCES AND STANDARDS

A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.

B. Comply with reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.

C. Obtain copies of standards where required by product specification sections.

D. Maintain copy at project site during submittals, planning, and progress of the specific work, until

Substantial Completion.

E. Should specified reference standards conflict with Contract Documents, request clarification from Architect before proceeding.

F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of Architect shall be altered from Contract Documents by mention or inference otherwise in any reference document.

1.07 TESTING AND INSPECTION AGENCIES AND SERVICES

A. Contractor Employed Agency:

1. Testing Equipment: Calibrated at reasonable intervals either by NIST or using an NIST established Measurement Assurance Program, under a laboratory measurement quality assurance program.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from

Architect before proceeding.

D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Have work performed by persons qualified to produce required and specified quality.

F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.

G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.

3.02 TOLERANCES

A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.

Do not permit tolerances to accumulate.

B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Architect before proceeding.

C. Adjust products to appropriate dimensions; position before securing products in place.

3.03 TESTING AND INSPECTION

A. See individual specification sections for testing required.

BG-1W11 (013)--80-48

01 40 00 - 3 Quality Requirements

B. Re-testing required because of non-compliance with specified requirements shall be performed by the same agency on instructions by Architect.

C. Re-testing required because of non-compliance with specified requirements shall be paid for by Contractor.

3.04 MANUFACTURERS' FIELD SERVICES

A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment as applicable, and to initiate instructions when necessary.

B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.

3.05 DEFECT ASSESSMENT

A. Replace Work or portions of the Work not complying with specified requirements.

BG-1W11 (013)--80-48

01 60 00 - 1 Product Requirements

SECTION 01 60 00

PRODUCT REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. General product requirements.

B. Re-use of existing products.

C. Transportation, handling, storage and protection.

D. Product option requirements.

E. Substitution limitations.

F. Procedures for Iowa Department of Transportation-supplied products.

G. Maintenance materials, including extra materials, spare parts, tools, and software.

1.02 RELATED REQUIREMENTS

A. Section 01 10 00 - Summary: Lists of products to be removed from existing building.

B. Section 01 30 00 - Administrative Requirements: Additional Submittals requirements C. Section 01 40 00 - Quality Requirements: Product quality monitoring.

REFERENCE STANDARDS

A. 16 CFR 260.13 - Guides for the Use of Environmental Marketing Claims; Federal Trade

Commission; Recycled Content; Currnent Edition.

NEMA MG 00001 - Motors and Generators; 2024.

B. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

1.03 SUBMITTALS

A. Proposed Products List: Submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.

1. Submit within 15 days after date of Agreement.

2. For products specified only by reference standards, list applicable reference standards.

B. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

C. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

D. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.

PART 2 PRODUCTS

2.01 EXISTING PRODUCTS

A. Do not use materials and equipment removed from existing premises unless specifically required or permitted by Contract Documents.

B. Existing materials and equipment indicated to be removed, but not to be re-used, relocated, reinstalled, delivered to the Owner, or otherwise indicated as to remain the property of the Owner, become the property of the Contractor; remove from site.

2.02 NEW PRODUCTS

BG-1W11 (013)--80-48

01 60 00 - 2 Product Requirements

A. Provide new products unless specifically required or permitted by Contract Documents.

B. DO NOT Use products having any of the following characteristics:

1. Made using or containing CFC's or HCFC's.

2. Containing lead, cadmium, or asbestos.

C. Where other criteria are met, Contractor shall give preference to products that:

If used on interior, have lower emissions, as defined in Section 01 61 16.

If wet-applied, have lower VOC content, as defined in Section 01 61 16.

1. Are extracted, harvested, and/or manufactured closer to the location of the project.

2. Have longer documented life span under normal use.

3. Are made of vegetable materials that are rapidly renewable.

4. Are made of recycled materials.

D. Wiring Terminations: Provide terminal lugs to match branch circuit conductor quantities, sizes, and materials indicated. Size terminal lugs to NFPA 70, include lugs for terminal box.

2.03 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions:

Submit a request for substitution for any manufacturer not named.

2.04 MAINTENANCE MATERIALS

A. Furnish extra materials, spare parts, tools, and software of types and in quantities specified in individual specification sections.

B. Deliver to Project site; obtain receipt prior to final payment.

PART 3 EXECUTION

3.01 SUBSTITUTION PROCEDURES

A. No Pre-Bid Substitutions will be considered B. Post Bid Substitutions will only be considered when a product becomes unavailable through no fault of the Contractor.

C. A request for substitution, during construction, constitutes a representation othat the submitter:

1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.

2. Agrees to provide the same warranty for the substitution as for the specified product.

3. Will coordinate installation and make changes to other Work that may be required for the

Work to be complete with no additional cost to owner.

4. Waives claims for additional costs or time extension that may subsequently become apparent.

5. Will reimburse Iowa Department of Transportation and Architect / Engineer for review or redesign services associated with re-approval by authorities.

D. Substitutions, will not be considered when they are indicated or implied on shop drawing or product data submittals, without seperate written request, or when acceptance will require revision to the Contract Documents.

E. Substitution Submittal Procedure (after contract award)

1. Submit one electronic PDF copy of request for substitution for consideration. Limit each request to one proposed substitution.

2. Submit shop drawings, product data, and certified test results attesting to the proposed product equivalence. Burden of proof is on proposer. Identify differences and deficiencies

BG-1W11 (013)--80-48

01 60 00 - 3 Product Requirements between product proposed and the specification or product identified in the specifications or drawings.

3. Architect will notify Contractor in writing of decision to accept or reject request.

3.02 TRANSPORTATION AND HANDLING

A. Package products for shipment in manner to prevent damage; for equipment, package to avoid loss of factory calibration.

B. If special precautions are required, attach instructions prominently and legibly on outside of packaging.

C. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.

D. Transport and handle products in accordance with manufacturer's instructions.

E. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.

F. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.

G. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage, and to minimize handling.

H. Arrange for the return of packing materials, such as wood pallets, where economically feasible.

3.03 EQUIPMENT ELECTRICAL CHARACTERISTICS AND COMPONENTS

A. Wiring Terminators: Furnish terminal lugs to match branch circuit conductor quantities, sizes, and materials indicated. Include lugs for terminal box.

B. Cord and Plug: Furnish minimum 6 foot cord and plug including grounding connector for connection to electric wiring system. Cord of longer length is specified in individual specfication sections.

3.04 STORAGE AND PROTECTION

A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication. See Section 01 74 19.

B. Store and protect products in accordance with manufacturers' instructions.

C. Store with seals and labels intact and legible.

D. Store sensitive products in weathertight, climate-controlled enclosures in an environment favorable to product.

E. For exterior storage of fabricated products, place on sloped supports above ground.

F. Protect products from damage or deterioration due to construction operations, weather, precipitation, humidity, temperature, sunlight and ultraviolet light, dirt, dust, and other contaminants.

G. Comply with manufacturer's warranty conditions, if any.

H. Do not store products directly on the ground.

I. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

J. Prevent contact with material that may cause corrosion, discoloration, or staining.

K. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

L. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

BG-1W11 (013)--80-48

01 70 00 - 1 Execution and Closeout Requirements

SECTION 01 70 00

EXECUTION AND CLOSEOUT REQUIREMENTS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. Examination, preparation, and general installation procedures.

B. Requirements for alterations work, including selective demolition, except removal, disposal, and/or remediation of hazardous materials and toxic substances.

C. Pre-installation meetings.

D. Cutting and patching.

E. Cleaning and protection.

F. Starting of systems and equipment.

G. Demonstration and instruction of Iowa Department of Transportation personnel.

H. Closeout procedures, including Contractor's Correction Punch List, except payment procedures.

I. General requirements for maintenance service.

1.02 RELATED REQUIREMENTS

A. Section 01 10 00 - Summary: Limitations on working in existing building; continued occupancy;

work sequence; identification of salvaged and relocated materials.

B. Section 01 30 00 - Administrative Requirements: Submittals procedures, Electronic document submittal service.

C. Section 01 40 00 - Quality Requirements: Testing and inspection procedures.

D. Section 01 78 00 - Closeout Submittals: Project record documents, operation and maintenance data, warranties, and bonds.

E. Section 02 41 00 - Demolition: Demolition of whole structures and parts thereof; site utility demolition.

1.03 REFERENCE STANDARDS

A. NFPA 241 - Standard for Safeguarding Construction, Alteration, and Demolition Operations;

2022, with Errata (2021).

1.04 SUBMITTALS

A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.

B. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:

1. Structural integrity of any element of Project.

2. Integrity of weather exposed or moisture resistant element.

3. Visual qualities of sight exposed elements.

C. Project Record Documents: Accurately record actual locations of capped and active utilities.

1.05 PROJECT CONDITIONS

A. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases.

1.06 COORDINATION

A. See Section 01 10 00 for occupancy-related requirements.

B. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.

C. Notify affected utility companies and comply with their requirements.

BG-1W11 (013)--80-48

01 70 00 - 2 Execution and Closeout Requirements

D. Verify that utility requirements and characteristics of new operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to, and placing in service, such equipment.

E. Coordinate space requirements, supports, and installation of mechanical and electrical work that are indicated diagrammatically on drawings. Follow routing indicated for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

F. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.

G. Coordinate completion and clean-up of work of separate sections.

H. After Iowa Department of Transportation occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with Contract Documents, to minimize disruption of Iowa Department of Transportation's activities.

PART 2 PRODUCTS - NOT USED

2.01 PATCHING MATERIALS

A. New Materials: As specified in product sections; match existing products and work for patching and extending work.

B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.

C. Product Substitution: For any proposed change in materials, submit request for substitution described in Section 01 60 00 - Product Requirements.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.

Start of work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.

E. Verify that utility services are available, of the correct characteristics, and in the correct locations.

F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.

3.02 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.

3.03 LAYING OUT THE WORK

A. Establish elevations, lines and levels. Locate and lay out by instrumentation and similar appropriate means:

1. Grid or axis for structures.

2. Building foundation, column locations, ground floor elevations.

BG-1W11 (013)--80-48

01 70 00 - 3 Execution and Closeout Requirements

B. Periodically verify layouts by same means.

3.04 GENERAL INSTALLATION REQUIREMENTS

A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.

B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.

C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.

D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.

E. Make neat transitions between different surfaces, maintaining texture and appearance.

3.05 ALTERATIONS

A. Drawings showing existing construction and utilities are based on casual field observation and existing record documents only.

1. Verify that construction and utility arrangements are as indicated.

2. Report discrepancies to Architect before disturbing existing installation.

3. Beginning of alterations work constitutes acceptance of existing conditions.

B. Remove existing work as indicated and as required to accomplish new work.

1. Remove items indicated on drawings.

2. Relocate items indicated on drawings.

3. Where new surface finishes are to be applied to existing work, perform removals, patch, and prepare existing surfaces as required to receive new finish; remove existing finish if necessary for successful application of new finish.

4. Where new surface finishes are not specified or…

This is the start of the file's text. The full file is on GovTribe.