This specification document outlines an Invitation to Bid (ITB) issued by Harris County, Texas, for HVAC and controls upgrades at the Barrett Station Community Center in Harris County Precinct 3 (UPIN 25103MF3NM01). The project scope includes replacing three air handling units and condensing units with outdoor elevated package units for flood mitigation, replacing three fan coil units/air handling units in the mechanical room, providing new ductwork and line sets, installing new electrical and controls systems, and coordinating with Unify Controls for design specifications. A pre-bid conference and mandatory site visit will be held on September 14, 2026, at 10:00 a.m. CST at Barrett Station Community Center, 808 ½ Magnolia Ave., Crosby, TX 77532. Vendors are encouraged to attend to gain a comprehensive understanding of project requirements. All written questions must be submitted through Bonfire at https://harriscountytx.bonfirehub.com/ prior to the established deadline, with answers compiled and released as a public notice to all firms.

Pricing on the BidTable must be all-inclusive, incorporating all labor, materials, equipment, and associated costs with no separate line item rates accepted. The vendor must comply with Texas Government Code Section 2258 regarding prevailing wage rates, submitting certified weekly payroll records, and must comply with Texas Government Code Section 2253.021 requiring performance bonds for projects exceeding $100,000 and payment bonds for projects exceeding $25,000. Payment terms are Net 30 from invoice approval by the Office of the County Engineer. The contractor must also comply with Harris County's Contractor Minimum Wage Policy (currently $21.65/hour) and must pay workers the higher of either the prevailing wage or Harris County minimum wage. Vendors must complete and submit Form 1295 (Certificate of Interested Parties) prior to bid submission, and coordination of the project will be managed through the Harris County Office of the County Engineer with all invoices routed through that department.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

Heating, Ventilation and Air Conditioning (HVAC) and Controls Upgrades at the Barrett Station Community Center for Harris County Precinct 3 – UPIN 25103MF3NM01

SCOPE

Harris County is soliciting bids for heating, ventilation and air conditioning (HVAC) and controls upgrades at the Barrett Station Community Center for Harris County Precinct 3.

PRE-BID CONFERENCE + SITE VISIT

There will be a pre-bid conference on September 14, 2026, 10:00 a.m. CST, to be held at Barrett Station Community Center, 808 1/2 Magnolia Ave., Crosby, TX 77532. Attendance is not mandatory, but vendors are encouraged to attend to gain a better understanding of the requirements listed within this bid. A SITE VISIT for vendors to inspect the work location will immediately follow.

It is the responsibility of each vendor to examine the entire bid package, seek clarification in writing, and review their bid for accuracy before submitting. Questions relating to this bid must be submitted in writing online within Bonfire at https://harriscountytx.bonfirehub.com. The deadline for submission of questions relating to this bid is listed on the Events Schedule within Bonfire. All questions submitted in writing prior to the deadline will be compiled and answered in writing. A copy of all questions and answers will be released as a Public Notice to all firms through Bonfire. The County will not be bound by any information conveyed verbally.

CERTIFICATE OF INTERESTED PARTIES (FORM 1295)

Texas law requires all parties who enter into any contract with the County which must be approved by Commissioners Court to disclose all interested parties. Form 1295 must be completed in its entirety at the following website: https://www.ethics.state.tx.us/filinginfo/1295/ prior to submitting your response.

Failure to do so may result in disqualification of your response.

SPECIAL REQUIREMENTS

Where these special requirements and information as detailed in the attachment titled General Conditions for Roads, Bridges and Related Work, under Supporting Documents inside Bonfire, differ from the attachment titled General Requirements, under Supporting Documents inside Bonfire, for bids within, the specific requirements and General Conditions for Roads, Bridges and Related Work, supersede where applicable.

Coordination of the project will be through the Harris County Office of the County Engineer and all invoices must be routed through their department. All invoices shall include submission requirements stated in the specifications including completed certified payroll records and lien waivers. Payment terms are “Net 30” from date the invoice is approved by the Office of the County Engineer; therefore, payment to the vendor may be up to one (1) month from the date the invoice is approved by the Office of the County Engineer. Payment of material shall be in accordance with the attachment titled Policy for Payment.

In addition, the vendor must comply with Texas Government Code (GC) 2258, Prevailing Wage Rates, and GC 2253.021, Performance and Payment Bonds. Accordingly, GC 2258 requires the vendor to submit a certified payroll record as detailed in the attachment titled Prevailing Wage Rates and compensate any worker employed on a public works not less than as applicable. As well, GC 2253.021, Performance and Payment Bonds, requires the vendor to provide a payment bond on all public works jobs that exceed $25,000, and a performance bond on all public works jobs that exceed $100,000.

https://harriscountytx.bonfirehub.com/ https://www.ethics.state.tx.us/filinginfo/1295/

The rates quoted on the BidTable (bid pricing sheets) within Bonfire must be all-inclusive. “All-inclusive" shall be construed as costs incorporating all charges for labor, material, equipment and any other cost incurred. No separate line item rates or charges will be accepted. Quantities are estimated. Harris County may require more or less. In case of a discrepancy between unit and total pricing, unit pricing governs.

The Extra Work Items section of the BidTable are to be used only on the instructions of the field engineer on the job. No compensation will be received for any part of these items unless they are actually used on the job under the direction of the field engineer. Any additional items required over and above those listed on the BidTable will have to be secured on a change-in-contract and are not to be used until they have been approved by the Harris County Auditor’s Office and Commissioners Court.

It may be required that the vendor submit a sample of specified items on the BidTable for inspection and approval by the Office of the County Engineer prior to order placement.

This bid or Commissioners Court approved award does not obligate Harris County to the eventual purchase of any product/service described, implied or which may be proposed. Progress toward this end is solely at the discretion of Harris County and may be terminated at any time.

NO CONFIDENTIALITY OF BIDS

Once opened, bids are public record. There are no exceptions. When submitting a bid, the vendor must be sure to redact confidential information if the information is needed to address requirements of the bid. If there are any questions concerning confidentiality of information to be submitted, contact Maria Heinzmann immediately at maria.heinzmann@harriscountytx.gov.

ALTERATION OF DOCUMENT

No alterations may be made to this document. Any alterations made may result in the bid being rejected.

The terms and conditions contained within this bid supersede all conflicting terms within any cooperative purchasing contracts associated with this purchase.

TOLL/PARKING FEES

Any and all toll/parking FEES incurred by the vendor during the term of this contract will be the responsibility of the vendor.

DRAWINGS/ADDITIONAL SPECIFICATIONS

Vendors may download the drawings, plans, and/or maps for this project through Bonfire at https://harriscountytx.bonfirehub.com as referenced in the attachments titled General Notices, Notes and Information, and Drawings, under Supporting Documents inside Bonfire. Do NOT include the drawings from this bid package with the bid submittal.

SPECIFICATION

The project will consist of furnishing all labor, supervision, equipment, materials, and incidentals necessary for heating, ventilation and air conditioning (HVAC) and controls upgrades at the Barrett Station Community Center for Precinct 3.

Scope of Work: Replace three (3) air handling units and condensing units with outdoor elevated (for flood mitigation) package units and provide new ductwork and line sets as needed. Replace three (3) fan coil units (FCU)/air handling units (AHAs) and associate items in the mechanical/communication room for ground access. Provide new electrical and controls for these systems. Provide new ductwork (supply and return) for optimal performance. Package units may be raised up to 15”. Coordinate with unify controls for design specifications and installation requirements.

mailto:maria.heinzmann@pur.hctx.net

The above description of scope of work is general in nature and is intended as an overview of the project only. For bidding purposes and to get a better understanding of the requirements of this bid, please refer to the attachment titled General Notices, Notes and Information, under Supporting Documents inside Bonfire.

OFFICE OF THE COUNTY ENGINEER GENERAL CONDITIONS

The vendor must comply with all requirements in the “Harris County General Conditions for Building Construction and Related Work & Roads, Bridges and Related Work.”

PREVAILING WAGES

In accordance with Section 2258 of the Texas Government Code, contractor and any subcontractor hired by contractor for the construction of any project, shall not pay less than the rates set forth in the Schedule of Prevailing Wages attached and incorporated by reference in each Project Manual. Contractor warrants that it and its subcontractors shall comply with all requirements and worker ratios per the applicable Schedule of Prevailing Wages and Texas state law.

In addition to these wage rates, Contractors must separately comply with Harris County’s Minimum Wage Policy [see link] and pay all workers on county projects at least Harris County’s Contractor Minimum Wage (currently $21.65/hour). Every worker on a Harris County construction project will make at least the higher of the Harris County Minimum Wage or their applicable Prevailing Wage.

Contractor shall submit certified payroll of contractor and all subcontractors on a weekly basis. At County’s request, contractor shall make available and shall require its subcontractors to make available, copies of cancelled checks and check stubs for comparisons by the County or its agents.

County reserves the right for its agents to visit the project site and to interview contractor, its subcontractors and employees of each on any date or time, as often as desired during the construction period, without prior notification.

County will ascertain if proper wage rates are being paid to the employees as required by the Project Manual. In the event of a discrepancy between the work performed and the wages paid, County will document same and notify contractor. All initial determinations of the classification of workers or the appropriate prevailing wage shall be made by the Harris County Contract Compliance Officer. Her determinations shall be binding.

If, for any length of time and as determined by the Harris County Contract Compliance Officer, discrepancies appear between the certified payrolls and the actual wage paid, County shall require check stubs to be attached to each weekly certified payroll.

Pursuant to TEX. GOV’T CODE ANN. §2258.051, the County reserves the right to withhold any monies due contractor until such discrepancy is resolved and the necessary adjustment made. Contractor shall also pay a penalty in accordance with TEX. GOV’T CODE ANN. § 2258.023(b), of Sixty and No/Dollars ($60.00) per day per person per incident that such person is underpaid. Contractor shall impose these same obligations upon its Subcontractors. Contractor understands that with monthly certified payrolls, contractor is responsible for any and all penalties that shall accrue during the month, regardless of the fact that any error could not be discovered by the Contract Compliance Officer until the following certified payroll.

https://purchasing.harriscountytx.gov/Services/Procurement-Data-Information

SPECIFICATIONS
SCOPE