Specifications (42).pdf
PDF 1 MB Posted
- Solicitation number
- 26/0293
- Issued by
- Harris County, Texas
About this file
This is a Specifications and Scope of Work document issued by Harris County, Texas, through its Office of the County Engineer (OCE), seeking Statement of Qualifications from multiple professional architectural and/or engineering firms to provide design services for various roadway and mobility infrastructure projects. Harris County intends to award multiple contracts with individual firms after project initiation and successful negotiation. The hypothetical project referenced for qualification purposes is the Garth Road Section 1 & 2 project, a roadway improvement from FM 1942 to Ashbel Cove Drive with an estimated budget of $19,350,000, involving design of a four-lane concrete boulevard with curb and gutter, raised medians, underground storm sewer with detention system, sidewalks, and bridge improvements over an SJRA canal spanning approximately 120 feet. A pre-submittal conference is scheduled for Monday, September 14, 2026, at 10:00 a.m. CST via Microsoft Teams, with attendance encouraged but not mandatory. Respondents must submit questions in writing through the Bonfire platform by the deadline specified in the Events Schedule, and all questions and answers will be released as public notices. Harris County may consider four one-year renewal options renewable on the same terms and conditions as the original year, subject to approval by Commissioners Court.
Qualified firms must be registered with the State of Texas with fully licensed personnel capable of providing comprehensive services including engineering studies, preliminary design, construction administration, topographic and subsurface utility surveys, environmental compliance, geotechnical and hydraulic analysis, traffic studies and signal design, structural design, landscape design, construction cost estimates, and bid document preparation. Harris County is committed to fostering engagement with Minority- and Women-Owned Business Enterprises (M/WBEs) and will assess appropriate M/WBE participation goals upon project scope development. All parties entering into contracts requiring Commissioners Court approval must complete and submit Form 1295 (Certificate of Interested Parties) prior to response submission. Persons with disabilities requiring special accommodations should contact the Office of the Purchasing Agent at least two days prior to the pre-submittal conference.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
SCOPE
Harris County is seeking multiple professional architectural and/or engineering firms with the experience, capabilities, and qualified available staff to provide design services for various roadway and mobility infrastructure projects for the Office of the County Engineer (OCE).
PRE-SUBMITTAL CONFERENCE
A pre-submittal conference will be held Monday, September 14, 2026, at 10:00 a.m. CST via Microsoft Teams.
Attendance is not mandatory; however, all vendor(s) are encouraged to attend in order to have a better understanding of the requirements of this Request for Qualifications (RFQ).
Join the meeting now Meeting ID: 243 564 070 751 491 Passcode: Ur7Kz94k
Or call in (audio only) +1 281-985-1862,, 968962991# United States, Aldine Phone conference ID: 968 962 991#
Persons with disabilities requiring special accommodations should contact the Office of the Purchasing Agent at
(713) 274-4400 at least two (2) days prior to the conference.
It is the responsibility of each vendor to examine the entire RFQ package, seek clarification in writing, and review their submittal for accuracy before submitting. Questions relating to this RFQ must be submitted in writing online within Bonfire at https://harriscountytx.bonfirehub.com. The deadline for submission of questions relating to this RFQ is listed on the Events Schedule within Bonfire. All questions submitted in writing prior to the deadline will be compiled and answered in writing. A copy of all questions and answers will be released as a Public Notice to all firms through Bonfire. The County will not be bound by any information conveyed verbally.
M/WBEs Harris County is committed to fostering meaningful engagement with prime contractors and subcontractors that reflect the diverse business community within the County. We are dedicated to ensuring that Minority- and Women-Owned Business Enterprises (M/WBEs) are afforded fair and equitable opportunities to participate in the County’s procurement process per the County’s M/WBE Policy. As this is a Request for Qualifications (RFQ), the County's focus at this stage is exclusively on evaluating the expertise and qualifications of potential vendors. Upon the development of the project scope, Harris County will carefully review and assess each project to determine the appropriate M/WBE participation goals accordingly.
RENEWAL OPTIONS
Harris County may consider four (4) one-year renewal options, renewable one (1) year at a time, based upon the same terms, conditions and pricing as the original year. Renewal is subject to approval by Harris County Commissioners Court. Once renewal options are exhausted, the contract must be rebid. Harris County reserves the right to rebid at any time as is in its best interest and is not automatically bound to renew.
CERTIFICATE OF INTERESTED PARTIES (FORM 1295)
Texas law requires all parties who enter into any contract with the County which must be approved by its Commissioners Court to disclose all interested parties. Form 1295 must be completed in its entirety at the following website: https://prd.tecprd.ethicsefile.com/TECCertInt/pages/login/certLogin.jsf prior to submitting
Supplemental Professional Architectural and/or Engineering Services to Provide Design Services for the Development and Implementation of Various Roadway & Mobility Infrastructure Projects for Harris
County Office of the County Engineer https://teams.microsoft.com/meet/243564070751491?p=1xnns6BlOPZgtCnuCL https://harriscountytx.bonfirehub.com/ https://prd.tecprd.ethicsefile.com/TECCertInt/pages/login/certLogin.jsf your response. Failure to do so may result in disqualification of your response. A copy of form 1295 must be returned with your response.
DESCRIPTION
Harris County is seeking Statement of Qualifications from qualified firms (hereafter referred to as “Respondent”) to provide engineering design services and construction administration services for various roadway infrastructure projects for the OCE. All Respondents proposing to provide engineering services to the County shall have an established staff or team capable of providing the services indicated in the Scope of Work.
Harris County intends to authorize negotiations with multiple firms, and contracts will be awarded once a project is initiated by OCE and after successful negotiation with the firm.
General services expected from the qualified firm(s) are as follows:
The scope of work shall include engineering study, design services and construction phase services for projects focused on roadway infrastructure. The firm(s) must be registered with the State of Texas, be able to provide fully licensed personnel to provide engineering services, and capable of providing services including but not limited to design of the project including sealing plans, assisting with writing specifications, estimates for bidding purposes, bid documents, submittal review and requests for information (RFI) review.
The services shall, at the sole discretion of Harris County, include but in no way be limited to, any and all of the following:
o Prepare planning studies for infrastructure projects.
o Perform preliminary engineering, design services, and construction phase services for infrastructure construction projects.
o Coordinate, prepare, conduct and verify topographic and Subsurface Utility Engineering (SUE) surveys.
o Develop and present alignment and schematic options.
o Identify utility conflicts and assist in coordinating utility relocations.
o Review Federal and State environmental requirements and complete necessary environmental documents.
o Conduct geotechnical analysis and provide necessary report(s).
o Conduct hydraulic and hydrology analysis and provide drainage design for designated projects.
o Conduct traffic studies and prepare construction traffic control plans for designated projects.
o Design traffic signals and prepare documents for purchase and installation for designated projects.
o Perform structural design and prepare construction plans as required.
o Provide topographic surveys for project design, boundary surveys and property descriptions (metes and bounds) include a survey map for property acquisition.
o Provide landscape design and associated plans.
o Prepare construction cost estimates.
o Prepare documents for project advertisement and project procurement (bidding) including evaluation and recommendations for project award for construction contractors.
o Provide technical support for public meetings including exhibits, presentations, meeting summaries, and meeting attendance.
Offers shall submit Statement of Qualifications referencing the hypothetical project listed below. The project is hypothetical, but Offeror should prepare their qualification submittal as if they were proposing to work on this specific project.
Project Name Garth Road Section 1 & 2 Project Limit Garth Road from FM 1942 to 100' South of Sterling
Summer Drive (Section 1) and from 100’ South of Sterling Summer Drive to Ashbel Cove Drive (Section 2). See Exhibit 1 below for reference
Project Estimated Budget $19,350,000
General Project Scope Design of a standard four (4) lane concrete boulevard with curb and gutter, raised medians (32’ where practical), and underground storm sewer with detention system within 100-ft right of way, Include 5-ft sidewalks on the west side of Garth Rd. from the southern limits of the project to
FM 1942.
Garth Road is currently a (2) lane asphalt roadway that has a nonstandard skewed connection with 1942. One of the project’s objectives is to improve the skewed connection to a perpendicular connection. There is one bridge within the project limits.
The project shall include an improved crossing over the SJRA canal. The existing crossing is located in the middle of the ROW. The consultant shall make a determination whether it is recommended to widen the existing crossing or install a new bridge(s) to span over the canal. The canal span is approximately 120’.
Exhibit 1
| SPECIFICATIONS |
| SCOPE |
| PRE-SUBMITTAL CONFERENCE |
| M/WBEs |
| RENEWAL OPTIONS |
| CERTIFICATE OF INTERESTED PARTIES (FORM 1295) |
| DESCRIPTION |
File details come from the government source that posted it. Updated .