Specifications 24IFB11737.pdf

PDF 62 KB Posted

Attached to
Base Course Gravel CSP
Solicitation number
24IFB11737
Issued by
Codington County, South Dakota

About this file

This document is a Specification for a state or local government contract opportunity to provide gravel surfacing. The work involves furnishing labor, tools, equipment, and materials to construct gravel surfacing at specified locations. The aggregate for the gravel surfacing must meet detailed gradation requirements outlined in the document. The gravel will be hauled to a CSP gravel pit near the corrals, and the contractor is responsible for obtaining necessary permits and haul agreements. CSP will provide a loader and operator to push the gravel into a pile. Delivery is required between November 1st and December 31st. The contractor must bid two different tonnage amounts, 2,000 tons and 2,500 tons, and CSP will select the appropriate quantity for the project.

The accepted quantities of gravel surfacing will be paid for at the contract price per ton, complete in place. Tonnage weight tickets for the gravel surfacing will be required for this project. No other salient pricing, funding, or contracting information is provided in the document.

View the file

Other files

File Type Posted
Map 24IFB11737.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 02510

BASE COURSE GRAVEL SURFACING

PART 1 - GENERAL

1.1 DESCRIPTION

A. The work shall consist of furnishing all labor, tools, equipment and materials necessary to construct the gravel surfacing at the locations shown on the plans.

PART 2 - MATERIALS

2.1 The aggregate for gravel surfacing shall consist of sound durable particles of gravel and sand, which may include limited amounts of fine soil particles. The gravel surfacing shall conform to the following gradation requirements:

Sieve Size Percent Passing by Weight

1" 100 3/4" 80-100 1/2” 68-91 No. 4 42-70 No. 8 29-58 No. 40 10-35 No. 200 3.0–20.0

Plasticity Index: 0-6

PART 3 - EXECUTION

3.1 Gravel will be hauled to the CSP gravel pit near the corrals. Contractor is responsible for all necessary permits and haul agreements. CSP will provide a loader and operator to push up gravel into a pile. Delivery will be Nov 1st through December 31st.

Gravel needs to be bid in two tonnage amounts for each location.

2,000 ton 2,500 ton CSP will choose which tonnage will work best for the project.

PART 4 - METHOD OF PAYMENT

4.1 The accepted quantities of gravel surfacing shall be paid for at the contract price per ton complete in place.

4.2 Tonnage weight tickets for gravel surfacing will be required on this project.

END OF SECTION

Contact Jayme Severyn 605-280-1811

File details come from the government source that posted it. Updated .