Specifications 24IFB10160.pdf
PDF 62 KB Posted
- Attached to
- Base Coures Gravel CSP
- Solicitation number
- IFB 24IFB10160
- Issued by
- Codington County, Columbia City, South Dakota
About this file
This document is a specifications file for a state and local contract opportunity to supply and deliver base course gravel to locations in Custer State Park, South Dakota. The work involves furnishing labor, tools, equipment, and materials to construct gravel surfacing at the specified locations, with a total of 4,000 tons of gravel to be delivered. The gravel must conform to detailed gradation requirements. The contractor is required to use South Dakota state highways or coordinate with the county for alternate routes, and should contact the project coordinator to schedule a site visit. The completion date for the project is June 1, 2024.
The pricing terms and other salient information are not specified in this document. However, it appears to be a standard specifications file outlining the technical requirements for the gravel surfacing work, rather than the full contract solicitation. Additional details regarding pricing, funding, and other contract terms would likely be provided in the complete bid package or contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SDVendorManual_20211221.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE COURSE GRAVEL SURFACING
PART 1 - GENERAL
1.1 DESCRIPTION
A. The work shall consist of furnishing all labor, tools, equipment and materials necessary to construct the gravel surfacing at the location shown on the plans.
PART 2 - MATERIALS
2.1 The aggregate for gravel surfacing shall consist of sound durable particles of gravel and sand, which may include limited amounts of fine soil particles. The gravel surfacing shall conform to the following gradation requirements:
Sieve Size Percent Passing by Weight
1" 100 3/4" 80-100 1/2” 68-91 No. 4 42-70 No. 8 29-58 No. 40 10-35 No. 200 3.0–20.0
Plasticity Index: 0-6
PART 3 - EXECUTION
3.1 Two thousand (2000 tons) will be hauled to CSP Lower French Creek Road and two thousand (2000 tons ) will be hauled to CSP 4 mile road ( total of 4000 tons ). CSP will provide a motor grader to blade gravel as it is placed. Belly Dumps trucks preferred.
Contractor must use SD State Highways or coordinate with county if alternate routes used.
Contact Jayme Severyn at (605)280-1811 to schedule a site visit.
Completion date June 1, 2024.