Beaufort Place Water Main Replacement
Solicitation number
98581
Issued by
Montgomery County, Barclay Town, Maryland

About this file

This Special Provisions document, issued by the Washington Suburban Sanitary Commission (WSSC) Water in Maryland, establishes temporary facilities, controls, and specific requirements for the Beaufort Place Water Main Replacement project. The project involves installing approximately 12,639 linear feet of new ductile iron water mains in varying diameters (4-inch through 20-inch pipe) and 6,541 feet of water house connections across multiple streets in Silver Spring, Montgomery County, Maryland, including Aylesbury Street, Hopefield Road, Kings House Road, Rainbow Drive, and surrounding areas. Construction must be completed within 446 days from the Notice to Proceed, with working hours restricted to 9:00 a.m. to 3:00 p.m., Monday through Friday, and mandatory full roadway restoration by end of business day. Sealed bids must be submitted electronically via WSSC's eProcurement Portal no later than 2:00 p.m. on Wednesday, April 1, 2026, with a question submission deadline of March 16, 2026.

The Special Provisions require contractors to provide project signs at five designated locations along Rainbow Drive and Hopefield Road. Critical to this project is Special Provision Section 02514, which addresses the discovery and management of Lead Service Lines (LSL), Galvanized Requiring Replacement (GRR) service lines, or unknown service line materials during water main replacement. Contractors must coordinate with the WSSC Contract Manager before construction begins and cease work immediately upon encountering LSL or GRR lines, reporting to the Contract Manager before resuming operations. If construction is known to impact homes with such service lines, WSSC must notify customers and verify pipe materials or coordinate service line replacement prior to water main construction. Liquidated damages are assessed at $1,080.00 per day for delays beyond the contract completion date, and the project is subject to a 20 percent Minority Business Enterprise and Small Local Business Enterprise subcontracting goal, Maryland Prevailing Wage requirements, Maryland Buy American Steel Act compliance, and performance and payment bonds equal to 100 percent of contract value with 5 percent retainage.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP-01500-1

SPECIAL PROVISIONS

SECTION 01500

TEMPORARY FACILITIES AND CONTROLS

Follow requirements of Standard Specifications Section 01500 except as specified herein.

PART 1 GENERAL

1.4 PROJECT SIGNS

B. Water Main Replacements, Relocations, and Cleaning and Lining Contracts.

ADD

5. Provide at:

a. Rainbow Drive, approx. 100 ft west of Aylesbury Street, facing west.

b. Rainbow Drive, approx. 100 ft east of Aylesbury Street, facing east.

c. Rainbow Drive, approx. 100 ft west of Kings House Road, facing west.

d. Rainbow Drive, approx. 100 ft east of Kings House Road, facing east.

e. Hopefield Road, approx. 100 ft west of Aylesbury Street, facing west.

SP-02514 April 2024

SPECIAL PROVISION

SECTION 02514

WATER MAIN REPLACEMENT WITH EXISTING LEAD,GRR OR UNKNOWN SERVICE LINE

PART 1 GENERAL

1.1 INTENT

A. It is the intent of this section to provide guidance in the event existing Lead Service Line (LSL), Galvanized Requiring Replacement (GRR) or unknown material service are encountered during watermain replacement located in the public Right of Way.

B. Commission records available may not confirm the presence of LSL,GRR service line within the project limits.

1.2 DESCRIPTION

A. The Contractor shall coordinate with WSSC Contract Manager before the construction begins.

If the construction is known to impact any homes with LSL, Galvanized Requiring Replacement (GRR), or homes with unknown service line material, construction shall not begin until WSSC notifies customers and verifies pipe material and/or coordinates for replacement of the service line prior to water main construction.

B. If the Contractor unexpectedly encounters an LSL or GRR during construction, the Contractor shall immediately cease further activities on the service line and report to WSSC Contract Manager on additional actions before construction resumes.