This Special Provisions document outlines temporary facilities, controls, and water main replacement procedures for the Washington Suburban Sanitary Commission (WSSC) Water's Beaufort Place Water Main Replacement project in Montgomery County, Maryland. The project involves installing approximately 802 feet of 4-inch water main, 6,461 feet of 8-inch water main, 2,476 feet of 10-inch water main, 42 feet of 12-inch water main, 3,358 feet of 20-inch water main, and 6,541 feet of water house connections. The contractor must provide project signs at five specified locations along Rainbow Drive and Hopefield Road near Aylesbury Street and Kings House Road, each positioned approximately 100 feet from the specified intersections. Sealed responses are due via WSSC's eProcurement Portal prior to 2:00 pm on Wednesday, April 1, 2026, with late responses not accepted.
The Special Provisions address critical requirements for handling existing lead service lines (LSL), galvanized requiring replacement (GRR) lines, or unknown material service lines encountered during construction. The contractor must coordinate with the WSSC Contract Manager before construction begins and is prohibited from commencing work on properties with known LSL, GRR, or unknown service line materials until WSSC notifies customers, verifies pipe materials, and arranges service line replacement prior to water main construction. If LSL or GRR lines are unexpectedly encountered during construction, the contractor must immediately cease work on the service line and report to the WSSC Contract Manager before resuming activities.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP-01500-1
SPECIAL PROVISIONS
SECTION 01500
TEMPORARY FACILITIES AND CONTROLS
Follow requirements of Standard Specifications Section 01500 except as specified herein.
PART 1 GENERAL
1.4 PROJECT SIGNS
B. Water Main Replacements, Relocations, and Cleaning and Lining Contracts.
ADD
5. Provide at:
a. Rainbow Drive, approx. 100 ft west of Aylesbury Street, facing west.
b. Rainbow Drive, approx. 100 ft east of Aylesbury Street, facing east.
c. Rainbow Drive, approx. 100 ft west of Kings House Road, facing west.
d. Rainbow Drive, approx. 100 ft east of Kings House Road, facing east.
e. Hopefield Road, approx. 100 ft west of Aylesbury Street, facing west.
SP-02514 April 2024
SPECIAL PROVISION
SECTION 02514
WATER MAIN REPLACEMENT WITH EXISTING LEAD,GRR OR UNKNOWN SERVICE LINE
PART 1 GENERAL
1.1 INTENT
A. It is the intent of this section to provide guidance in the event existing Lead Service Line (LSL), Galvanized Requiring Replacement (GRR) or unknown material service are encountered during watermain replacement located in the public Right of Way.
B. Commission records available may not confirm the presence of LSL,GRR service line within the project limits.
1.2 DESCRIPTION
A. The Contractor shall coordinate with WSSC Contract Manager before the construction begins.
If the construction is known to impact any homes with LSL, Galvanized Requiring Replacement (GRR), or homes with unknown service line material, construction shall not begin until WSSC notifies customers and verifies pipe material and/or coordinates for replacement of the service line prior to water main construction.
B. If the Contractor unexpectedly encounters an LSL or GRR during construction, the Contractor shall immediately cease further activities on the service line and report to WSSC Contract Manager on additional actions before construction resumes.