SPECIAL Pre-Solicitation Notice - Temp Electrical.pdf
PDF 214 KB Posted
- Solicitation number
- N3904024RCPNSY400T2850
About this file
This document is a Special Pre-Solicitation Notice for a federal contract opportunity to provide ten (10) experienced, skilled and qualified Marine Temp Electrical personnel to assist with the execution of 688 Class and 774 Class Submarine overhaul, modernization and repair work at the Portsmouth Naval Shipyard (PNS) in Kittery, Maine.
The period of performance is estimated to be from September 16, 2024 to April 11, 2025, with an estimated total of 1,835 man-days required (1,668 straight time and 167 overtime). Proposals will be evaluated on a Firm Fixed Price basis, with pricing to be submitted for fully burdened labor rates by category. Offerors must submit proposals electronically via the DoD SAFE system within 14 days of receiving the proposal link from the government. The solicitation is anticipated to be posted between 10-15 days from the date of this notice, and the government intends to evaluate proposals and award without discussions. A draft Performance Work Statement (PWS) is attached, which is subject to revision prior to the formal solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fy 24 SOW - Temp Electrical Standalone.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Special Notice
UPDATE: Highlighted Portsmouth Naval Shipyard (PNS) requires ten (10) experienced, skilled and qualified Marine Temp Electrical personnel to assist with the execution of 688 Class and 774 Class Submarine overhaul, modernization and repair work.
Pre-Solicitation WARNING to prepare all prospective offerors: Solicitation shall be posted for no more than 14 days, once published, the Government intends to evaluate proposals and award without discussions.
Evaluation for this contract, management of this trade and Key Personnel of this trade requirement will be weighed heavily on the content in the individuals resumes. Resumes must demonstrate the ability, qualification and experience required for their designated positions. Resume Limit three (3) pages.
Pricing Evaluation – Firm Fixed Price Evaluation for this contract, pricing – Only - Fully burden rates for each labor category. With ODC break out.
Period of Performance and Level of Effort (subject to change between this notice and solicitation) – The period of performance is 16 September 2024 to 11 April 2025.
Table 1 represents an estimate of man days needed, straight time (ST) and overtime (OT).
Trade POP Start POP End ST MDs
(excluding holidays)
OT MDs Total MDs
Temp Electrical
09/16/2024 04/11/2025 1668 167 1835
Table 1 The Contractor shall provide fully trained and competent personnel necessary to perform the trade outlined in the Performance Work Statement PWS, Place of Performance will be PNS Kittery Maine.
Proposal Electronic Format Submission Requirements no hardcopy.
Electronic Delivery of Proposals via DoD SAFE Utilization of DoD SAFE is one available method to deliver proposal submissions. DoD SAFE supports individual file sizes up to 8GB. When offers are submitted via DoD SAFE, the Government will receive an automated message stating that a file has been “Dropped-Off.” An offer uploaded (“Dropped-Off”) to DoD SAFE is considered to be timely when it is time stamped by the SAFE System prior to the due date and time set for receipt of offers. Late submissions will be treated in accordance with FAR 52.212-1(f) or 52.215-1(c)(3)(ii)(A).
In order to submit a proposal via DoD SAFE:
1. The Contractor shall make sure a request for the link is completed days prior to the due date to the following email addresses brian.c.lee2.civ@us.navy.mil , ina.nason.civ@us.navy.mil, stating its intent to submit a proposal and shall include in that request a valid email address(es). This request will be completed by this office and if no acknowledgement is received follow up in 24 hours. Do not wait till the last minute.
2. Within 2 business days from the date of the request, the Contractor will receive a link via email allowing it to upload/“Drop-Off” a proposal in DoD SAFE. The Contractor has 14 days from receipt of the email to “Drop- Off” its proposal in DoD SAFE. Offerors are reminded to be mindful of the deadline for receipt of proposals.
3. It is recommended that each offeror keep a screen shot of the DoD SAFE page showing that the “Drop-Off” has been completed for its records.
The DoD SAFE site is located here: https://safe.apps.mil/ Additional information on DoD SAFE from the DON CIO: https://www.doncio.navy.mil/ContentView.aspx?ID=12719
PLEASE BE ADVISED This Notice is issued in accordance with FAR 5.203(a) and shall not be construed as a commitment by the Government to issue a solicitation or award a contract. A formal solicitation will be posted electronically on System for Award Management (https://www.SAM.gov)
Attached with this Pre-Solicitation Notice is the PWS. PLEASE BE ADVISED the PWS is in draft status and is subject to revision or additional work items may be added or deleted (the period of performance is also subject to change).
Formal Solicitation is anticipated to be posted between 10-15 days from this Special Notice.
Updated Draft SOW has been uploaded.
File details come from the government source that posted it. Updated .