special_notice_for_site_visit_2_1.pdf
PDF 254 KB Posted
- Attached to
- Pre-Proposal Site Visit
- Solicitation number
- 140P2026R0084
About this file
This is a presolicitation notice for the Elbee Bend Bank Stabilization project at Knife River Indian Village National Historic Site in Mercer County, North Dakota.
The National Park Service (NPS) is announcing a pre-proposal site visit scheduled for June 17, 2026, at 0900 CST at Knife River Indian Villages Visitor Center (564 39 1/2 Ave SW, Stanton, ND 58571). A full and open request for proposals is anticipated for release on or around July 1, 2026. The project involves stabilizing approximately 1,200 linear feet of riverbank along the Knife River to protect the Elbee Village Archeological Site, County Road 37, utility poles, and fishing access parking from active erosion. The stabilization will be accomplished through installation of self-healing riverbank protection, riprap placement at the base of the approximately 20-foot-high cut bank, compacted filling, and strategic vegetation planting or bioengineering. The anticipated period of performance is 356 calendar days, including potential weather shutdowns and seasonal work stoppages, with winter construction potentially required. Bonding requirements include bid, performance, and payment bonds. The contract is classified under NAICS Code 237990 (Other Heavy and Civil Engineering Construction) with a small business size standard of $45 million. Interested parties must RSVP to stormy_gallagher@ios.doi.gov and kristin_tauber@ios.doi.gov. The project site is located 25–50 miles from nearest suppliers and lodging facilities, presents limited onsite staging, requires protective measures to preserve the surrounding area, and must be structured to minimize visitor impact while the park remains open during construction.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Knife River Indian Village National Historic Site
Elbee Bend Bank Stabilization
140P2026R0084
KNRI/257081
The purpose of this notice is to publicize a pre-proposal site visit for the Elbee Bend Bank Stabilization, Knife River Indian Village National Historic Site, Mercer County, North Dakota Knife River Indian Village
National Historic Site, Mercer County, North Dakota. The solicitation is anticipated to be advertised in early July 2026. The site visit will be held on June 17, 2026, at 0900 CST at Knife River Indian Villages
Visitor Center, 564 39 1/2 Ave SW, Stanton, ND 58571
Additional Information: No proposal package or solicitation is available with this notice. Please RSVP to stormy_gallagher@ios.doi.gov and kristin_tauber@ios.doi.gov.
North American Industry Classification System (NAICS) code: NAICS Code 237990 - Other Heavy and Civil
Engineering Construction.
Small Business Size Standard: $45M
Solicitation: The NPS anticipates issuing a full and open request for proposals on or around July
1, 2026, Bonding: The NPS anticipates bid, performance and payment bonds will be required
Description:
Project Conditions:
The project is located at Knife River Indian Villages, Mercer County, North Dakota.
The surrounding area is urban with limited staging on site.
Unique material delivery requirements:
The construction site is 25 -50 miles from nearest suppliers and lodging facilities.
The Park will remain open during construction, thus contract activities and logistics must be structured and scheduled to minimize visitor impact.
The site requires protective measures to ensure the surrounding area remains undisturbed.
The structure is a natural/cultural resource.
The anticipated period of performance is 356 calendar days and includes any potential weather shutdown. There are seasonal/other shutdowns mandated through the construction season.
Winter construction may be required.
mailto:stormy_gallagher@ios.doi.gov mailto:kristin_tauber@ios.doi.gov
Project Description:
Elbee Bend is in the Knife River Indian Village National Historic Site (park) and contains 64 archeological sites. The Knife River, a tributary to the Missouri River downstream of Garrison Dam, runs the length of the park in Mercer County, North Dakota. The Elbee Bend Site on the Knife River is actively eroding, creating a threat to archeological resources, a utility pole approximately 130 feet from the migrating bend, and County Road 37. The cut bank is approximately 20 feet high. The purpose of this project is to stabilize the Elbee Bend site to protect archeological resources in the park.
Project Scope:
This project will stabilize the Elbee Bend of the Knife River by installing self-healing riverbank protection in combination with strategic planting of vegetation. Riprap will be placed at the base of the steep eroding bank to provide toe protection and to prevent excessive bank contact and scouring of the bend.
Additional material and riprap will be buried in the bank at one or both the ends of the protection structure, forming keys that further prevent water from scouring behind the riverbank. Construction will also include compacted filling along the protection area and up to the full height of the riverbank, which ensures there are no voids or trenches behind the protection structure. Vegetation or other bioengineering will be planted on the stabilization as appropriate.
This project will stabilize approximately 1200 linear feet of bank along the Knife River. The most important measurable result of this stabilization is preventing further destruction and loss of the Elbee
Village Archeological Site. Knife River Indian Villages NHS preserves and protects archeological resources related to the lifestyles of Northern Great Plains Indian peoples, and the preservation Elbee Village is fundamental to maintaining this park purpose.
Stabilizing the riverbank will also protect infrastructure including County Road 37, electric utility poles, parking for fishing access, and park boundary fencing. County Road 37 is the only access for the National
Park Service to the northern portion of the park, and also provides public access to private property. The
USACE estimates that at current rates of erosion, the road will be lost in the next 10 years. Of course, the archeological site and associated resources would be long gone before that time.
The completion of this project will be an important step in the implementation of the Archeological
Resources Management Plan EIS (2018). The EIS defined a process for comprehensive archeological resources management, including a measured and strategic process for riverbank stabilization. The
Elbee Bend has been identified as the highest priority stabilization need for the park and is quickly becoming an emergency. The EIS defined indicators and standards that any more than 0% additional loss would trigger action. That standard has been surpassed and action must be taken. Unpredictable weather events could result in catastrophic loss of resources and infrastructure. Addressing the need for stabilization as soon as possible will avert this outcome and costly emergency actions.
In addition to the protection of resources, preservation of infrastructure, and plan implementation, this stabilization will increase recreational opportunities for visitors. The stabilization itself will become a trail for visitor use along the river. The Stabilization will connect from the Elbee Bend to the fishing hole and then to the Sakakawea stabilization/trail. This will allow visitors to hike, recreate, and fish in a location that they were not previously able to access.
File details come from the government source that posted it. Updated .