Special_Conditions_2026.pdf
PDF 153 KB Posted
- Attached to
- JOB ORDER CONTRACT BID # PW2603
- Solicitation number
- 0000041001
- Issued by
- Los Angeles County, Oakland City, California
About this file
This file contains Special Conditions for Job Order Contract (JOC) PW2603 issued by California State University, Northridge for construction services at its campus located at 18111 Nordhoff Street, Northridge, California. The contract establishes a maximum value of $2,000,000, with an option for the University to increase it to $3,000,000, with no guaranteed minimum value. Individual job orders are subject to CSU Minor Capital Outlay project limitations. The contract term is twelve months from the date of the Notice to Proceed (NTP) of the first job order or upon reaching the maximum contract value, whichever occurs first. Contractors must submit proposals within ten business days of receiving a Request for Proposal (RFP) and may be required to submit revised proposals within two business days following University review. The University reserves the right to award a second Job Order Contract to the second lowest, responsive, and responsible bidder from the same bid (PW2508).
Prevailing wage rates established by the California Department of Industrial Relations apply to all work, with contractors submitting certified payroll records electronically through www.LCPTracker.com. Contractors must bid three adjustment factors for Normal Working Hours (7 a.m. to 11 p.m., Monday-Friday), Other Than Normal Working Hours (11 p.m. to 7 a.m., Monday-Friday, and 7 a.m. to 11 p.m. Saturday), and Premium Working Hours, with anticipated work distribution of approximately 40% and 60% respectively. The contract includes a 15% self-performance requirement based on cost, mandatory key personnel approval, a maximum of ten active job orders per project manager, and comprehensive safety requirements including submission of an Injury and Illness Prevention Program within ten business days of award. For federally funded projects, contractors must comply with the Copeland Anti-Kickback Act and achieve a minimum 3% Disabled Veteran Business Enterprise (DVBE) participation goal, with quarterly reports due to CSUN Purchasing Department on March 31, June 30, September 30, and December 31. Contractors must also possess basic computer competency, maintain high-speed internet access, utilize the Gordian system for project processing, and transition to Smartsheet-based construction management upon completion of University-provided training.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice_to_Contractors_Rev._1.pdf | ||
| JOC_Supplemental_Specifications_-_PW2603.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Margin
Special Conditions
JOB ORDER CONTRACT (JOC)
PW2603
SPECIAL CONDITIONS
for
Bid #PW2603
JOB ORDER CONTRACT
California State University, Northridge
18111 Nordhoff Street Northridge, CA 91330
The following special conditions apply to this contract:
1.0 VALUE OF THE CONTRACT
1.1 MAXIMUM – The maximum value of work that can be ordered during the term of this contract is two million dollars ($2,000,000.00), with the option of the University to increase to three million dollars ($3,000,000.00).
1.2 MINIMUM – There is no guaranteed minimum value of work during the term of this contract.
1.3 There is NO minimum value for individual job orders issued under this contract.
There is a maximum value for individual job orders issued under this contract as defined by the CSU Minor Capital Outlay project limitation. Which is subject to change periodically.
2.0 TERM OF THE CONTRACT AND OPTIONS TO EXTEND
2.1 The term of this contract is twelve (12) months from the date of the NTP of the first job order or the point at which the maximum value of the contract is reached, whichever occurs first. The University may not extend the contract performance period beyond these limits. Therefore, if during the twelve (12) months of the contract the maximum contract amount is not attained, the contract will still terminate. Work ordered, but not completed, prior to expiration of the term of the contract shall be completed with all provisions of the contract in force and effect.
2.2 The University reserves the right to award a second Job Order Contract from said Bid (PW2508) to the second lowest, responsive, and responsible bidder.
3.0 WAGES
3.1 Attention is directed to the schedule of prevailing rates of pay for each craft based on the type of workman needed to execute the work as set forth in the published Prevailing Wage Rates and made a part of the contract documents. Said wage scale contains the minimum rates of pay established by the Director of the California Department of Industrial Relations in pursuance of the provisions of the Labor Code
PW2603
of the State of California, which requires the establishment of such rates for the locality in which the work is to be performed.
3.2 The University will not recognize any claim for additional compensation because of the payment by the Contractor of any wage rate in excess of the prevailing wage rate set forth in the contract. The possibility of wage increases is one of the elements to be considered by the Contractor in determining their bid, and will not under any circumstance be considered as the basis of a claim against the University on the contract.
3.3 In accordance with Labor Code Section 17717.7, the Trustees have established a labor compliance program for all contracts that commence on or after April 1m 2003, that are partially or wholly funded by the Kindergarten-University Public Education Facilities Bond Act of 2002 or 2004. For these projects only, the Trustees have been empowered to assume the role of the Labor Commissioner in the Department of Industrial Relations. Any questions regarding payment of prevailing wages, or enforcement thereof, should be directed to the Trustee’s Chief of Construction Management at the CSU Chancellor’s Office, Capital Planning Design and Construction, 401 Golden Shore, Long Beach, CA 90802-4210.
3.4 Contractor shall submit all certified payroll records along with the following documents described and contained in the Labor Compliance Checklist form CSU-LC- 00: a signed Certification/Acknowledgement of Checklist, Statements of Compliance, Authorization to Certify, Fringe Benefits Statements, Non-Performance Payroll Reports, Employee Deduction Authorization Forms, Public Works Contract Award Information (DAS 140), Request for Dispatch of an Apprentice (DAS 142), California Apprenticeship Council-Training Fund Contributions (CAC 2). Contactor shall also submit the Hourly Labor Rate Worksheets and any other Trustees-requested documentation for its workers and those of all subcontractors. Contractor shall electronically submit these records to the Trustees at www.LCPTracker.com, or as otherwise instructed by the Trustees. Additionally, Contractor shall submit a copy of the Hourly Labor Rate Worksheet for its workers and those of all subcontractors to the Construction Administrator.
4.0 ADJUSTMENT FACTORS AND HOURS OF WORK
4.1 In accordance with the General Conditions for Job Order Contracts, each bidder must bid three adjustment factors to be applied to the established unit prices. The first adjustment factor will apply to Normal Working Hours, the second Adjustment Factor will apply to Other Than Normal Working Hours, and the third Adjustment Factor will apply to Premium Working Hours at CSU Northridge as defined below:
4.1.1 Normal Working Hours: standard shifts between 7am to 11pm, Monday through Friday, except holidays.
PW2603
4.1.2 Other Than Normal Working Hours: work shifts between 11pm-7am, Monday through Friday, and 7am-11pm Saturdays, except holidays.
4.1.3 Premium Working Hours: All times not covered under the Normal or Other Than Normal Working Hours listed above.
4.1.4 For the purposes of defining work hours, “Holidays” are: New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving, and Christmas Day.
4.2 No adjustment factor may be less than the Normal Working Hours Adjustment Factor. The Other Than Normal Working Hours and Premium Working Hours Adjustment Factors must be greater than or equal to the Normal Working Hours Adjustment Factor.
4.3 For bidding purposes it is anticipated that approximately 40% of work ordered under this contract will require accomplishment during Normal Working Hours and approximately 60% of work ordered under this contract will require accomplishment during Other Than Normal Working Hours.
5.0 SELF PERFORMANCE
5.1 Where possible, the Contractor shall aim to self-perform with their own organization and trade labor forces employed by the Contractor fifteen percent (15%) of the total amount of the actual work performed under this contract, computed on the basis of cost. Contractor overhead, standard General Condition costs (ie. site clean-up, traffic control, site maintenance), superintendent, and administrative costs or material purchased for use on the work by others will not be considered towards the self-performance goal.
6.0 KEY PERSONNEL
6.1 The contractor will submit the Prequalification Package, which will contain a Project Staff Organizational Chart, which includes the names and resumes of employees in key positions who the Contractor proposed to work on this contract. All employees in key positions may be interviewed by the University, and MUST be approved by the University. The name and resume of a back-up project manager and superintendent are required.
6.2 If any key personnel furnished by the Contractor for the project in accordance with the Key Personnel provisions is unable to continue the performance of assigned duties, the Contractor must promptly notify the University in writing, explaining the circumstances. Acceptable reasons for changes to key personnel include: death, disability, or termination only. Changes in the assignment of key personnel due to commitments unrelated to this contract are prohibited without prior University approval.
6.3 The Contractor shall furnish to the University within five (5) working days the name and resume of the person substituting for the individual unable to continue. Upon
PW2603
approval by the University, the substitute personnel shall be assigned to the contract. If the University rejects the substitute, the Contractor shall have five (5) working days thereafter to resubmit a new substitute person. Such process shall be repeated for a reasonable period until a proposed replacement has been approved by the University.
6.4 In the event that the University decides, based on the performance of personnel of the Contractor assigned to this contract, that their performance is unacceptable, such personnel shall return to the Contractor immediately. The Contractor shall then furnish to the University, the name of a substitute person or persons in accordance with the provisions in section 6.3 of this document. Absence of acceptable key personnel for the work shall constitute an event of default.
6.5 The Contractor is obligated to staff the work under this contract so that key personnel are not assigned responsibility for more than ten (10) active job orders at any time. A job order is considered “active” from the time that a joint scope meeting invitation has been sent to the Contractor until a Notice of Completion is issued by the University. A project manager may not work on any other JOC contracts for any other University Department if the cumulative total of active job orders exceeds ten (10) for all departments or other public agencies regardless of which agency holds the contract.
7.0 PROPOSAL TIME REQUIREMENTS
7.1 Proposal submission: Contractor shall submit the proposal for the project on or before the due date stated in the Request for Proposal (RFP). This shall be ten (10) business days maximum, unless otherwise specified.
7.2 Request for Information (RFI) submission: Contractor shall make a thorough analysis of each job order and submit all RFI’s within five (5) business days after the issuance of any RFP. Submission of RFI’s shall in no way extend the proposal due date unless deemed necessary by the University’s project manager.
7.3 Proposal Review: Upon submission the University will review the Contractor’s proposal, remove any inappropriate line items, and adjust quantities as needed.
Contractor shall resubmit their revised proposal within two (2) business days based on the clarified scope and quantities. If an additional revision is needed the University will contact the Contractor via email or telephone to arrange for a meeting within one (1) business day to discuss any discrepancies. The Contractor shall make the discussed revisions and resubmit the final proposal for approval by the University.
7.4 Subcontractor Listing: A subcontractor listing with their appropriate DVBE information must be included for every proposal submitted in Gordian. Any changes to the subcontractor listing must be submitted in writing to the University for their approval prior to proceeding with any work.
PW2603
7.5 Proposals for Emergency Work/ Emergency Changes: Unless otherwise stated in the RFP, the Contractor shall submit a proposal within two (2) working days for all emergency work.
7.6 Enforcement: Section 7.0 will be strictly enforced. Failure to comply may result in the Contract being deemed non-responsive and could result in the cancellation of the contract. The University may also deem the Contractor to be non-responsive in regard to any future JOC contracts.
8.0 COMPUTER AND COMMUNICATIONS EQUIPMENT REQUIREMENTS
8.1 Contractor personnel shall be competent in basic computer operations. The computer system is required to have high-speed internet access, and approved communication software to provide customer support. The computer system is considered overhead cost to the Contractor and should be included in the adjustment factors. See section 05.07 in the CSU Contract General Conditions for Job Order Contracts.
8.2 All JOC projects will be processed through Gordian.
8.3 The University is in the process of transitioning to a Smartsheet based method of managing construction projects. Software training will be required and provided by the University. The Contractor shall be required to use the Smartsheet construction management platform once training has been completed.
9.0 FEDERALLY FUNDED PROJECTS: If any project is funded wholly or in part from Federal sources, the Contractor must agree to the following provisions:
9.1 Copeland “Anti-Kickback” Act: All work performed as part of the project shall conform to the provisions of the Copeland Act (18 USC 874), as implemented in the Depart of Labor regulations.
9.2 Provide access to the University, the Federal Emergency Management Agency (FEMA), the State of California Office of Emergency Services, auditors from the State of California, the United States Comptroller General, or their authorized agents for the purposes of audit and examination of any and all records, documents, and related information from both primary contractors and subcontractors. Contractor agrees to retain all contract documents and records for a period of three (3) years after the date of the final FEMA settlement of the University’s claim. The Contractor explicitly acknowledges that it may be several years before the University’s claim in the matter may be settled. The Contractor may elect to transfer all original contract and project documents required to be retained under this section to the University in lieu of it’s own retention. Failure of the Contractor to retain or transfer to the University all original documents as provided under this section shall result in the Contractor paying liquidated damages to the University in an amount equal to the amount of any University claim which FEMA disallows or denies based on unavailable records.
PW2603
9.3 Contractor shall take all necessary affirmative steps to assure that minority firms, women’s business enterprises, and labor surplus area firms are used when possible.
Contractor shall take the following affirmative steps to increase use of these businesses:
9.3.1 Placing qualified small, minority, and women’s businesses on solicitation lists.
9.3.2 Assuring that small, minority, and women’s businesses are solicited whenever they are potential sources.
9.3.3 Dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by small, minority, and women’s businesses.
9.3.4 Establishing delivery schedules, where requirements permit, which encourage participation by small, minority, and women’s businesses.
9.3.5 Using the assistance of the Small Business Administration and the Minority Business Development Agency of the Department of Commerce.
9.3.6 The Contractor is responsible for using DVBE subcontractors for a minimum of 3% of the total contract value. Contractor shall submit a quarterly report to Jenni Cox, CSUN Purchasing Department, at jenni.cox@csun.edu. Reports are due: March 31, June 30, September 30, and December 31 of each year.
10.0 CONSTRUCTION SAFETY REQUIREMENTS
10.01 The Contractor shall adhere to the standards outlined/referenced in the General Conditions, all applicable Federal and California Occupational Health and Safety Environmental regulations, and all local and project-specific safety requirements
10.02 The Contractor shall submit their Injury and Illness Prevention Program (IIPP) within ten (10) business days of the award of a contract.
10.03 The University reserves the right to remove anyone from campus who violates established safety and health requirements. Failure of the Contractor to consistently comply with established safety and health requirements may result in the delay, withholding, or reduction of progress payments. The University and its representatives reserve the right, at any time, to conduct worksite safety compliance evaluations.
10.04 In accordance with CSUN Contract Specifications, the Contractor is exclusively responsible for the safety and health of its employees, subcontractors, vendors, suppliers, agents (and their employees), and any other persons on the worksite.
The Contractor is responsible for the protection of the general public, student body, faculty, staff, and all other visitors and/or guests to the work site, as well as the area immediately surrounding the work site.
10.05 The Contractor is responsible at all times for securing the work site and all materials, equipment, and dumpsters on the work site.
PW2603
10.06 A project-specific Injury and Illness Prevention Program (IIPP) that covers the complete scope of work to be performed by the Contractor and their subcontractors may be required at the discretion of the University project manager. This will include the following:
10.06.1 Name and resume for each on-site Safety Representative.
10.06.2 The emergency contact numbers of the Contractor’s site management. Work site management must be available at those numbers 24 hours a day.
10.06.3 A project-specific work plan and hazard analysis. The hazards analysis must identify potential hazards and mitigation of the hazards for specific hazardous work involving or requiring, but not limited to:
10.06.3.1 Excavating, trenching, fixed scaffolds, moveable scaffolds, suspended scaffolds, underground structures, electrical circuits, welding, cutting, hazardous materials work, cranes, heavy equipment, earthmovers, manlifts, fall protections, confined spaces, power tools, power actuated tools, material hoists, personnel hoists, steel erection, concrete pours, pipelines, tunnels, shafts, demolition, underpinning, ladders, explosives, flammable gasses and liquids, floor openings, road building, conveyors, boilers, pile driving, respiratory protection, asbestos abatement, lead based paint abatement, and motor vehicles.
10.06.4 This may include specific actions to protect nearby pedestrians with disabilities such as hearing impairments, sight impairments, and mobility impairments, including:
10.06.4.1 Providing flagmen to supplement back-up alarms for
backing motor vehicles.
10.06.4.2 Fencing construction sites and excavations.
10.06.4.3 Securing construction site entrances and exits.
10.06.5 A list of “Competent Persons”, as defined by the Federal and California Occupational Safety and Health Administrations for activities such as, but not limited to: trenching, excavating, scaffolding, and confined space work.
10.06.6 Samples of forms and procedures used to document the
investigation of incidents/accidents.
10.06.7 Listing of work site staff trained in emergency first aid and CPR.
10.06.8 An Emergency Action Plan that includes:
10.06.8.1 Escape routes and assembly areas.
10.06.8.2 Alarms and accounting for employees after evacuation.
10.06.8.3 Means of reporting emergencies and getting assistance from off-site responders.
PW2603
10.06.8.4 Names and specific duties of persons responsible for implementing the Emergency Action plan.
10.06.9 A Fire Protection Plan that includes:
10.06.9.1 Identification of fire hazards and procedures for storing flammable and combustible materials, controlling potential ignition sources, and the type of fire protection equipment/suppression needed to control fires.
10.06.9.2 Prevention of accumulation of flammable and combustible waste materials.
10.06.9.3 Names and specific duties of persons responsible for implementing the Fire Protection plan.
10.06.10 Environmental compliance signs, plans and procedures, if required by the scope, including:
10.06.10.1 Proposition 65 Warning sign to employees and visitors.
10.06.10.2 Community Right to Know Business Plan for hazardous materials.
10.06.10.3 Procedures for storage and handling of hazardous
materials and waste.
10.07 Work Site Safety Representative: The Contractor shall designate a competent
Work Site Safety Representative whose duties shall include the protection of persons and property and the administration of the IIPP. The Contractor shall submit resumes detailing the qualifications of these representatives. A personal interview with the CSUN Environmental Health and Safety (EH&S) Manager may be required. The Contractor’s designee shall not be replaced without prior approval by the CSUN Contracting Officer. If work is accomplished using multiple shifts or periods of more than forty (40) hours per week, the Contractor shall identify the on-site Safety Representatives for extended periods of time. The Work Site Safety Representative must have:
10.07.1 Documented safety training.
10.07.2 Two or more years of pertinent construction safety experience.
10.07.3 The ability to implement the Contractor's IIPP.
10.07.4 Knowledge of all regulatory requirements.
10.07.5 The authority to stop work at any time due to safety concerns.
10.08 Prior to the start of any work site activities, the Contractor must provide all its employees and subcontracted employees a safety orientation. The CSUN Inspector of Record (IOR) must be invited to this meeting, and sign-in sheets are required to be submitted by the Contractor to the CSUN project manager (PM).
10.08.1 Tailgate Safety Meetings must be held weekly. The CSUN IOR must be invited to this meeting, and will attend at their sole discretion.
Sign-in sheets, along with the topic for discussion, must be provided to the CSUN IOR and PM on a weekly basis.
PW2603
10.09 The Contractor shall provide all necessary protective equipment as required by each specific construction activity.
10.10 The Contractor shall safeguard the construction area by means that may include, but are not limited to: signs, atmospheric monitoring, barricades, warning lights, back-up alarms, fencing, and guards.
10.11 The Contractor shall immediately notify CSUN Environmental Health and Safety of any visits regarding regulatory compliance representatives of agencies that include, but are not limited to: Cal OSHA, South Coast Air Quality Management District, Environmental Protection Agency, Los Angeles County District Attorney, and the Los Angeles City Fire Department. The Contractor must also submit a complete copy of any Federal and/or California OSHA correspondence, report, warning, citation, directive, or notice within twenty-four (24) hours following receipt. The Contractor shall also provide a copy of any response from the Contractor to the above agencies.
10.12 In the event of any accident that results in an injury or illness requiring medical treatment, other than basic on-site first aid, the Contractor shall:
10.12.1 Notify CSUN EH&S immediately after providing or obtaining any needed assistance and securing the accident scene.
10.12.2 Complete and submit a copy of the CSUN Accident Investigation Report form and a copy of the Cal OSHA Employer’s Report of Occupational Injury or Illness form within 1 working day to the CSUN
E&HS.
10.13 The Contractor shall provide the CSUN EH&S Manager a monthly safety report that includes:
10.13.1 The cumulative number or person hours worked by the
Contractor.
10.13.2 The cumulative number of person hours worked by its
subcontractors on a subcontractor by subcontractor basis.
10.13.3 The cumulative total number of Contactor non-lost day and lost day accidents.
10.13.4 The cumulative number of its subcontractor, non-lost day and lost day accidents on a subcontractor by subcontractor basis.
10.14 The Contractor shall interpret the above provisions in the broadest sense for the protection of persons and property. No act, error, or omission by CSUN, CSUN representatives, consultants, sub-consultants, as well as their subcontractors, vendors, suppliers, agents, or representatives shall relieve the Contractor of any of its obligations, duties, or responsibilities for safety.
10.15 The Contractor shall be required to participate in the CSUN JOC Special Campus Accommodation process. This includes three steps:
10.15.1 Initiation of the SCA by providing the SCA Part One form within twenty-one (21) days of the issuance of the Notice to Proceed.
PW2603
10.15.2 Coordination with the CSUN Project Manager, Contractor, Subcontractors, and CSUN PPM representatives to develop a Method of Procedure document (MOP) and meet to review the document and process at least fourteen (14) days prior to the anticipated shutdown.
10.15.3 Finalization and submission of the SCA Part Two form, which must be fully executed forty-eight (48) hours in advance of the anticipated shutdown.
11.0 MANAGEMENT PLAN
11.1 The Contractor shall within ten (10) working days following receipt of a contract, submit to the University a Management Plan. The Management Plan must present the Contractor’s overall approach to managing the contract and shall include the following:
11.1.1 Key personnel with an organizational chart, list of duties, and contact information.
11.1.2 Plan for supervising and coordinating subcontracts.
11.1.3 Quality control/assurance procedures to be followed.
11.1.4 Record keeping requirements.
11.1.5 Communication flow among project participants.
12.0 DIVISION ONE REQUIREMENTS
12.1 The Contractor is responsible for compliance with CSU Division One requirements on each project as applicable and/or as directed by the University.
13.0 DISABLED VETERAN BUSINESS ENTERPRISE (DVBE) REQUIREMENTS
13.1 The Contractor's proposal shall include compliance with the DVBE participation requirement, which is to achieve a goal of a minimum of three percent (3%) participation for DVBEs. No additional incentive will be provided for a higher percentage of DVBE participation. This document supersedes the information in the Contract General Conditions for Job Order Contracts noted in section 02.11.II.
13.2 Documentation Requirements: The successful Contractor must document its satisfaction of the 3% DVBE participation requirements. Final determination of DVBE Participation Goal Attainment by the Contractor shall be at the Trustees’ sole discretion. The DVBE documentation forms that must be completed are as follows, and instructions for completing the required forms correctly are included to assist the bidder.
13.2.1 DVBE Transmittal Form: Contractors must fill out and attach the DVBE Transmittal Form as a cover sheet to the required documents and submit it and the additional required documentation, along with all other required submissions in the proposal packages for each Job Order.
Alternatively, they may be submitted through Gordian.
PW2603
13.2.2 Summary of Disabled Veteran Business Enterprise Participation: This must be completed, showing the type of work and company proposed for DVBE participation and their subcontractors. Complete the form providing the information as follows:
13.2.2.1 DVBE company name. If the prime Contractor is DVBE, its name must also be listed to receive participation credit.
13.2.2.2 Nature of work. Identify proposed work or services to be provided.
13.2.2.3 Contracting with. List the name of the department or company with which the company is contracting.
13.2.2.4 Tiers. The contracting tier should be indicated with the following level designations: 0 = Prime contractor, 1 = First tier subcontractor/supplier, 2 = Second tier subcontractor/supplier of first tier subcontractor/supplier, 3 = Third tier subcontractor/supplier of second tier subcontractor/supplier
13.2.2.5 Claimed DVBE value. The total dollar amount claimed by a
DVBE.
13.2.2.6 Percentage of Contract. Compute the percentage (%) of the total claimed DVBE value of the total Job Order dollar amount.
13.2.2.7 DVBE Certification. The Contractor must include one copy of the DVBE certification letter from the Small Business and DVBE Services for each DVBE firm listed on the Summary of DVBE Participation.
13.2.3 The Contractor must sign and include the DVBE Certification, certifying that each firm listed on the Summary complies with the legal definition of
DVBE.
13.2.4 Time frame: The DVBE participation documentation must be submitted with each discrete Job Order, throughout the life of the contract.
13.3 Substitution of a DVBE Subcontractor: If the Job Order is awarded the Contractor must use the DVBE subcontractor and/or suppliers listed in its proposal must be used. If substitution is required the Contractor must request a substitution in writing to the Trustees, and the Trustees must approve of the substitution in writing before the commencement of any work in compliance with the Subletting and Subcontracting Fair Practices Act. The substitution request must include at least the following:
13.3.1 An explanation of the reason for the substitution.
13.3.2 A written description of the business enterprise to be substituted, including its business status as a sole proprietorship, partnership, corporation, or other entity, and the DVBE certification status of the firm, if any.
PW2603
13.3.3 The Contractor must substitute a DVBE with another DVBE. If the DVBE substitution cannot occur, the Contractor must include a written justification and the steps that were taken to try to acquire a new DVBE subcontractor and how that portion of the contract will be fulfilled.
13.3.4 A description of the work to be performed, identified both as a task(s) and as a dollar amount or percentage of the overall contract that the substituted business will perform.
The request for substitution of a DVBE and the Trustees’ approval or disapproval cannot be used as an excuse for noncompliance with any other provision of law, including, but not limited to the Subletting and Subcontracting Fair Practices Act (Sections 4100 et seq., Public Contract Code) or any other contract requirements relating to the substitution of subcontractors.
End of Special Conditions.