SPEC WI 15.pdf
PDF 444 KB Posted
- Attached to
- RENEW Interior Deck Covering Systems
- Solicitation number
- 70Z02920QJM896
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW DECK COVERING (INTERIOR WET-DRY) RENEW WORK ITEM 15.docx | DOCX document | |
| Galveston Current Wage Rates 6 2020.txt | TXT text file | |
| Commercial Supplies Services Clauses Provisions 2020 08.docx | DOCX document | |
| SF18 -JM896- Interior Deck Covering Galveston.pdf | ||
| OFF 336.continuation.sheet JM896Galveston.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC HATCHET (WLIC-75D) DOCKSIDE AVAILABILITY FY2021
58 (Rev-0)
S_63410_0718_SWIT
SYY_NNN_63410_AUT_MMYY_HULL#
WORK ITEM 15: Deck Covering (Interior Wet/Dry), Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew deck covering system(s).
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 75D-WAGL 0103-19, Rev B, Booklet of General Plans (75309)
Coast Guard Drawing 75D-WAGL 1101-3, Rev -, Shell Expansion (75309)
Coast Guard Drawing 75D-WAGL 4804-5, Rev -, Freshwater & Waste Piping Plan (75309- 75310)
Coast Guard Drawing 75D-WAGL 4804-6, Rev -, Freshwater & Waste Piping Sections (75309- 75310)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior Deck Covering Systems
OTHER REFERENCES
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
59 (Rev-0)
3.3 Ultrasonic thickness (UT) measurements.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.2 Deck covering installation particulars. The Contractor shall perform all tasks specified in SFLC Std Spec 6341 and herein, to install a new covering system in the location(s) specified in Table 1 below.
NOTES
1. The exposed deck surfaces are prepared and coated in accordance with SFLC Std Spec 6310. Refer to SFLC Std Spec 6341, Para 3.2.1.2 for additional information.
2. Ensure the final surface condition of the deck is made slip resistant in accordance with manufacturer's installation procedures. Refer to SFLC Std Spec 6341, Para A2.1.2.2.
TABLE 1 - DECKING SYSTEM
LOCATION
AREA
(*SQFT)
DECK
MTL
(A/S**)
SYSTEM/
APPENDIX
(SFLC STD
SPEC 6341)
COVE
BASE
SYSTEM
COLOR
UNDERLAYMENT
REQUIREMENT
Galley 1-32-1-Q
250 S
Cosmetic Polymeric Epoxy Resin, Type III (One- Step Epoxy System)/Ap pendix A
Yes: X No:
See paragraph 3.4 (Deck covering color)
Renew existing underlayment.
Crew Head 1-14-2-L
120 S
Cosmetic Polymeric Epoxy Resin, Type III (One- Step Epoxy System)/Ap pendix A
60 (Rev-0)
Passageway 1-25-0-L
120 S
Cosmetic Polymeric Epoxy Resin, Type III (One- Step Epoxy System)/Ap pendix A
*Approximated.
**Note: A = Aluminum; S = Steel.
***See SFLC Std Spec 6341 for definition of cove base.
3.3 Ultrasonic thickness measurement. Upon completion of surface preparation and prior to application of primer coat (see 3.2 (Surface preservation)), the Contractor shall the Contractor shall take a total of 100 UT measurements of deck plating, in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Use Coast Guard Drawing 75D-WAGL 1101-3 as guidance.
Submit a CIR.
3.2.2.1 In addition to the UT measurements, take a total of 25 pit-depth measurements, using a suitable pit depth gauge
3.4 Deck covering color. The Contractor shall submit a deck covering color chart to Coast Guard Inspector, for the purpose of color selection.
4. NOTES
This section is not applicable to this work item.