This document contains a sources sought notice and attached statement of work for the lease of temporary HVAC and exhaust equipment. The Naval Sea Systems Command is seeking sources that can fulfill a lease for a temporary HVAC system and exhaust system at the Portsmouth Naval Shipyard in Kittery, Maine from June 2021 through January 2023. Interested vendors should provide company information, references, typical lead time, and confirm they meet the $8 million small business size standard by April 5, 2021 to Sharon Hall. The attached statement of work and specifications schedule details the equipment needed, including dual coil and triple coil HVAC units, exhaust blowers, chillers, pumps, hoses, elbows, manifolds and adapters. Pricing should not be submitted at this time as this is a sources sought notice only with no solicitation issued.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Component Arrival Date Return Date Extension
Return Date Lease Rate
($/week) Base Cost Ext. Cost
V- 01 Dual Coil HVAC 6/24/21 6/23/22 1/12/23
V- 02 Dual Coil HVAC 6/24/21 6/23/22 1/12/23
V- 03 Triple Coil HVAC 6/24/21 6/23/22 1/12/23
V- 04 Exhaust Blower 6/24/21 6/23/22 1/12/23
V- 05 Exhaust Blower 6/24/21 6/23/22 1/12/23
V- 06 Exhaust Blower 6/24/21 6/23/22 1/12/23
V- 07 Exhaust Blower 6/24/21 6/23/22 1/12/23
V- 08 Exhaust Blower 6/24/21 6/23/22 1/12/23
V- 09 Exhaust Blower 6/24/21 6/23/22 1/12/23
V- 10 230 Ton Chiller 6/21/21 10/25/21 N/A N/A
V- 11 CHW Pump 600 gpm 6/21/21 10/25/21 N/A N/A
V- 12 180 Ton Chiller 6/21/21 10/25/21 N/A N/A
V- 13 CHW Pump 450 gpm 6/21/21 10/25/21 N/A N/A
V- 14 6 IN Dia CHW Hose 6/21/21 10/25/21 N/A N/A
V- 15 6 IN Dia 90° Elbow 6/21/21 10/25/21 N/A N/A
V- 16 4 IN Dia CHW Hose 6/21/21 10/25/21 N/A N/A
V- 17 4 IN Dia 90° Elbow 6/21/21 10/25/21 N/A N/A
V- 18 CHW Y Manifold 6/21/21 10/25/21 N/A N/A
V- 19 CHW Y Manifold 6/21/21 10/25/21 N/A N/A
V- 20 CHW Adapators 6/21/21 10/25/21 N/A N/A
Notes: V‐10 through V‐20 are listed for 2 different cooling seasons. See Page 2 for 2nd cooling season dates
Temporary HVAC Equipment Lease Schedule
PIECE
NO.
Page: 1 of 2
Component Arrival Date Return Date Extension
Return Date Lease Rate
($/week) Base Cost Ext. Cost
V- 10 230 Ton Chiller 4/11/22 N/A 10/17/22 N/A
V- 11 CHW Pump 600 gpm 4/11/22 N/A 10/17/22 N/A
V- 12 180 Ton Chiller 4/11/22 N/A 10/17/22 N/A
V- 13 CHW Pump 450 gpm 4/11/22 N/A 10/17/22 N/A
V- 14 6 IN Dia CHW Hose 4/11/22 N/A 10/17/22 N/A
V- 15 6 IN Dia 90° Elbow 4/11/22 N/A 10/17/22 N/A
V- 16 4 IN Dia CHW Hose 4/11/22 N/A 10/17/22 N/A
V- 17 4 IN Dia 90° Elbow 4/11/22 N/A 10/17/22 N/A
V- 18 CHW Y Manifold 4/11/22 N/A 10/17/22 N/A
V- 19 CHW Y Manifold 4/11/22 N/A 10/17/22 N/A
V- 20 CHW Adapators 4/11/22 N/A 10/17/22 N/A
Shipping
Training N/A
Technical Service
Option:
All equipment rented shall have the option to extend or decrease the lease duration as required by the porject.
Temporary HVAC Equipment Lease Schedule
Second Season Cooling Equipment
PIECE
NO.
Extended Cost:
Total Cost:
Shipping : 6 Transport Dates
Training per Seasons
Equipment Service per week
Origional Cost:
Page: 2 of 2