AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE605 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60523R0207

X

2023 JAN 21

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

POST, CAMPS, AND STATIONS

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

1/30/2023

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 4 PAGES

SPE60523R0207 - 0001

This amendment is issued to add Attachment I: Price Data Sheet and to post answers to questions received on or before 30 January 2023:

A. Price Data Sheet “Attachment I” is hereby attached. If your company is experiencing issues with OET: Please contact: Candy.Cross@dla.mil and DLAENERGYFEPAA@dla.mil to utilize the Price Data sheet to submit offers ONLY if your company is experiencing issues with OET. Please reference provisions FAR 52.229-3 FAR 52.229-12, I28.01, I28.02-2, I28.03-1, and K86 for a thorough understanding of taxes, fees, and tax exemption certificates. Offer The deadline to submit Offer Prices remains the same and shall be submitted by 3 February 20233, 10PM Eastern TIme.

B.Responses to Question Submitted on or before 30 January 2023:

1.Question: Vendor is in the process of registering for DIBBS, but due to the multiple steps required to finish registration, may not be able to complete the registration by Feb 3, 2023, Will completing registration as soon as possible be acceptable?

DLA Energy’s Response:

Offerors must be registered in the following systems:

a. System for Award Management (SAM) at https://www.sam.gov

b. Wide Area Workflow (WAWF) at https://wawf.eb.mil/ (which includes MyInvoice)

c. DLA Internet Bid Board System (DIBBS) at https://www.dibbs.bsm.dla.mil

Please reference F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY) (APR 2014)

THIS CONTRACT TEXT ONLY APPLIES TO DLA FUNDED LINE ITEMS.

(a) Contractor Registration. Contractors must register in DIBBS to obtain a login account at https://www.dibbs.bsm.

dla.mil. The login account will allow a contractor to register a primary and alternate email address for notifications. Contractors are strongly encouraged to establish a group email address for the primary email address for the contractor’s authorized point of contacts. The registered email addresses will be the only email used by the government to make notifications.

(b) All contractors must have an active System for Award Management (SAM) account, http://www.sam.gov in order to register for DIBBS.

(c) The Contractor shall use DIBBS to receive orders. DLA Energy will not be using DIBBS receipt of quotes capability.

All quotations, proposals, bids shall be submitted in accordance with the terms and conditions of the solicitation.

(d) Preparation and Transmission of Orders

(1) The Government may issue an order for a specific delivery or a series of deliveries (e.g., several deliveries during a week). The Government may also elect to issue an order covering a longer period (including monthly orders) and make periodic calls against these orders designating specific delivery dates, times, and quantities.

(2) Only a DLA Energy warranted Contracting Officer can issue an order, either orally or in writing, against a contract. An oral order issued by the warranted Contracting Officer shall provide the required advance notice to the Contractor and the following information: Interim order number; contract number; item number; ceiling price; quantity;

delivery location; and the required delivery and/ or service date.

(i) For all product orders, the Contractor will receive an electronically signed written order via DIBBS, within 24 hours or one business day after the warranted Contracting Officer issues an oral order.

(ii) For all service orders, the Contractor will receive an electronically signed written order via DIBBS, within five business days after issuing the oral order.

(iii) Interim order number is subject to change once the electronically signed written order is received by the contractor. The order number on the written order will take precedence over the interim order number, if different.

(iv) Regardless of the unit price cited on the written order, the office designated to make payments on the written order will pay the applicable unit price in effect under the terms and conditions of the contract.

(v) Once the order has been issued, an email will be sent to the Contractor to provide notice that the order is available on the contract-specific web page. The order will also be submitted to the payment office.

(3) Calls against previously issued orders must be confirmed in writing within 24 hours or one business day via email message. The email confirmation will reference the previously issued order number and item number and designate specific delivery location, dates, and quantity to be delivered against that order.

(3) The Contractor’s nonreceipt of a written or electronic confirmation of an oral order or oral call against a written or electronic order does not relieve the Contractor from its obligation to perform in accordance with the oral order or oral call against a written or electronic order. The Contractor should contact the DLA Energy Contracting Officer if problems are experienced with receipt of the electronic or written confirmation.

NOTE: Offerors should be registered in these systems by the closing date of the solicitation. However, if experiencing issues with registration in DIBBS and have not been able to complete DIBBS registration by the time submitting initial offer: Please include a written statement with offer, explaining what issues experiencing and/or where you are in the registration process.

2.Question: Do you have any maximum or minimum fuel per delivery order?

DLA Energy’s Response: Please refer to FAR 52.216-19 (Order Limitations) and F F1.01-1 DELIVERY CONDITIONS FOR TRANSPORT TRUCKS, TRUCKS AND TRAILERS, AND TANK WAGONS (DLA ENERGY March 2022):

FAR 52.216-19 Order Limitations. (Oct 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than the minimum quantity applicable to the method of delivery called for the item(s) as specified in the ‘DELIVERY CONDITIONS FOR TRANSPORT, TRUCKS AND TRAILERS, AND TANK WAGONS’ (Section F) provision/clause, the Government is not

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 3 OF 4 PAGES

SPE60523R0207 - 0001

obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract .

(b) Maximum order. The Contractor is not obligated to honor-

(1) Any order for a single item in excess of NOT APPLICABLE;

(2) Any order for a combination of items in excess of NO MORE THAN ONE ORDER SHALL BE ACTIVE*FOR A PARTICULAR CLIN AT ANY GIVEN TIME or

(3) A series of orders from the same ordering office within _NOT APPLICABLE_ days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within __1___ days after issuance, with written notice stating the Contractor ’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

F1.01-1 DELIVERY CONDITIONS FOR TRANSPORT TRUCKS, TRUCKS AND TRAILERS, AND TANK WAGONS (DLA ENERGY March 2022) IMPORTANT NOTE on EPA TESTING OF UNDERGROUND TANKS. If the "volumetric" method is used for annual EPA testing of underground tanks, the "topping off" of tanks for this test is outside the scope of DLA Energy requirements contracts.

(a) F.O.B. ORIGIN. On items calling for delivery at Contractor's refinery, terminal, or bulk plant f.o.b. transport truck, truck and trailer, or tank wagon—

(1) Supplies ordered hereunder shall be delivered, at Contractor's expense, into equipment specified in the Schedule.

(2) Unless otherwise specified in the Schedule, all deliveries shall be made on the day specified in the delivery order unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that the Contractor shall have received the order at least 48 hours prior to the day so specified.

(b) F.O.B. DESTINATION. On items calling for delivery f.o.b. destination by means of transport truck, truck and trailer, or tank wagon--

(1) Where the Schedule provides for multiple drop deliveries, the Contractor may be required to deliver into more than one storage tank. Where truck and trailer are the method of delivery specified, the Contractor may, at its option, make delivery by transport truck. In the case of deliveries in Alaska, where truck and trailer or transport truck is the method of delivery specified, the Contractor may, at its option, make delivery by tank wagon.

(2) Unless otherwise specified in the Schedule, all deliveries shall be made on the day specified in the delivery order unless otherwise authorized by the receiving activity during normal working hours of such activity, provided that the Contractor shall have received the order at least 48 hours prior to the day so specified.

(3) When delivery is made by tank wagon, such wagon shall be equipped with pump, meter, and a minimum of 100 feet (30 meters) of hose. Where delivery is made by transport truck or truck and trailer, such delivery equipment shall be equipped with a minimum of 15 feet of hose.

(4) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility, the Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.

(5) Unless otherwise provided in the Schedule, free time for unloading trucks, transport trucks, or trucks and trailers shall be unlimited.

(6) When delivery is made by tank wagon, transport truck, or truck and trailer to a Government facility—

(i) The Contractor shall provide properly maintained delivery equipment and properly trained delivery personnel to reasonably assure that delivery can be made without damage to vegetation and asphalt pavement adjacent to storage facilities being filled. The Contractor’s delivery personnel who have not exercised reasonable care and delivery equipment that is poorly maintained may be refused entrance to the installation by the installation Commander.

(ii) The Contractor shall present delivery equipment and product in such condition at destination so as to permit complete off-loading within the prescribed free time.

3.Will the delivery include using a barge?

DLA Energy’s Response: The mode of delivery for each line item is listed in the schedule. For the seven (7) line items listed in the schedule Tank Truck is the mode of delivery; therefore, barge deliveries are non-applicable.

C. All other terms and conditions remain the same.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 4 PAGES

SPE60523R0207 - 0001

SECTION J - LIST OF ATTACHMENTS

List of Attachments

Description File Name ATTACH_Attachment_I_Pri ce_Data_Sheet Attachment I, Price Data

Sheet.pdf

File details come from the government source that posted it. Updated .