Attachment IV - Argonne Requirements and Schedule Sheet.docx
DOCX document 31 KB Posted
- Attached to
- PJM 2020
- Solicitation number
- SPE60420R0408
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPE60420R0408_0008.pdf | ||
| Attachment I - PJM_2020 IDS_0008.xlsx | XLSX spreadsheet | |
| SPE60420R0408_0007.pdf | ||
| Attachment I - PJM_2020 IDS_0007.xlsx | XLSX spreadsheet | |
| Attachment I - PJM_2020 IDS_0006.xlsx | XLSX spreadsheet | |
| SPE60420R0408_0006.pdf | ||
| SPE60420R0408_0005.pdf | ||
| Attachment I - PJM_2020 IDS_0004.xlsx | XLSX spreadsheet | |
| SPE60420R0408_0004.pdf | ||
| Attachment I - PJM_2020 IDS_0003.xlsx | XLSX spreadsheet | |
| SPE60420R0408_0003.pdf | ||
| SPE60420R0408_A0002.pdf | ||
| Attachment I - PJM_2020 IDS_0002.xlsx | XLSX spreadsheet | |
| Attachment I - PJM_2020 IDS_0001.xlsx | XLSX spreadsheet | |
| SF30 SPE60420R0408_0001.pdf | ||
| Solicitation SPE60420R0408_0001.pdf | ||
| PJM SPE60420R0408.pdf | ||
| Attachment III - Small Business Subcontracting Plan.pdf | ||
| Attachment II - Experience with End Users.pdf | ||
| Attachment I - Installation Date Sheet.xlsx | XLSX spreadsheet | |
| Attachment IV - Argonne Req and Schedule.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation # ANL Pricing Submittal
ARGONNE NATIONAL LABORATORY
PRICING SHEET - Fixed Price
Revised July 8, 2020
Local Distribution Company: Commonwealth Edison Company (“ComEd”)
Contract Term: 24-Month period from the meter read date occurring in the month of December 2020 through the meter read date occurring in the month of December 2022.
Historical Annual Usage
Peak and off-peak hours are based on Commonwealth Edison Company’s (“ComEd’s”) definition of Retail Peak Period and Retail Off-Peak Period in its terms and conditions.
Fixed Price Components
| A. | Fixed Peak Price: | _______ cents per kWh |
| B. Fixed Off-Peak Price: | _______ cents per kWh |
The Fixed Energy Prices are to be based on ComEd peak and off-peak periods and must include ALL PJM ancillary service and ISO related costs not identified in the pass-through components.
Defined peak and off-peak hours are based on ComEd’s definition of Retail Peak Period and Retail Off-Peak Period in its terms and conditions. Retail Peak Period is defined as 9 AM to 10 PM, Monday through Friday, except on days designated as holidays by the NERC. Retail Off-Peak Period is defined as all hours other than those included in the Retail Peak Period.
Pass-Through Components
1. PJM Transmission Costs: Direct pass-through of PJM Network Integration Transmission Service Rate (“NITS”) for Commonwealth Edison Company based on Argonne’s Network Service PLC.
Formula:
Argonne Network PLC x Annual NITS 366 Days = Daily Price Current Cost: 51.667 MW x $33,116.34 per MW per year 366 = $4,674.92 per day
PJM NITS subject to change each June 1 and Argonne’s PLC subject to change each January 1. Monthly costs should be prorated when costs change during a mid-month billing cycle.
All other transmission related costs, including enhancement charges, must be included in the Fixed Energy Price.
Monthly invoice price should be pro-rated if transmission rate or ANL PLC changes during a billing period.
2. PJM Capacity Costs: Direct pass-through of PJM Capacity Rate for Commonwealth Edison Company based on Argonne’s Capacity PLC. Daily charge will be assessed during monthly billing period based on the PJM Locational Reliability Charge and Argonne’s Capacity PLC assigned by ComEd.
Formula:
| Current Argonne’s Capacity PLC MW | 35.10 MW |
| Zonal Scaling Factor Adjustment | x 1.1404 |
| FPR Pool Requirement Adjustment | x 1.0895 |
| Adjusted Capacity MW: | = 43.61 MW |
| June 1, 2019 PJM Auction Price : | $192.56 per MW day |
| Current Daily Capacity Cost: | = $8,397.65 per day |
All other capaity related costs must be included in the Fixed Energy Price.
PJM capacity price, scaling factors, pooling requirements, and Argonne PLC subject to change each June 1. Monthly costs should be prorated when costs change during a mid-month billing cycle.
3. Loss Factors: Direct pass-through of distribution and transmission losses.
4. Direct Pass-Through Reliability Must Run and FERC Order 745:
Direct pass-through of these charges.
APPENDIX I
EXPECTED INVOICE COMPONENTS AND FORMAT
image1.emf image2.emf