Attachment_IV_-_Schedule_Pages.pdf
PDF 380 KB Posted
- Attached to
- Direct Supply Natural Gas - US South Region
- Solicitation number
- SPE604-19-R-0400
- Issued by
-
Defense Logistics Agency Energy
About this file
Attachment IV of RFP
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offeror: ________________________________________________________ Standalone Customers Submit a single Winter Adjustment Factor and a single Summer Adjustment Factor for each Line Item offered upon.
Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location
Total Estimated Volume (Dths)
Total Summer (Dths)
Summer Adjustment
Factor ($/Dth)
Total Winter (Dths)
Winter Adjustment
Factor ($/Dth)
0001 Redstone Army Arsenal AL Huntsville Utility Gas INSIDE FERC'S SoNat LA 952,000 414,000 538,000
0002 Little Rock AFB AR CenterPoint Energy, ARKLA INSIDE FERC'S Enable Gas Transmission 489,384 118,634 370,750
0003 VAMC Fayetteville AR Black Hills Energy INSIDE FERC'S Enable Gas Transmission 133,302 63,950 69,352
0004 FDA Jefferson Labs/NCTR AR CenterPoint Energy ARKLA INSIDE FERC'S Enable Gas Transmission 361,000 170,600 190,400
0005 Tyndall AFB FL Peoples Gas (TECO) INSIDE FERC'S FL Gas Zn2 128,940 50,660 78,280
0006 MacDill AFB FL Peoples Gas (TECO) INSIDE FERC'S FL Gas Zn2 48,660 23,440 25,220
0007 Federal Bureau of Prisons, Miami FL Florida City Gas INSIDE FERC'S FL Gas Zn2 33,500 19,520 13,980
0008 Fort Benning GA Liberty Gas INSIDE FERC'S SoNat LA 1,066,000 392,000 674,000
0009 VAMC Shreveport LA Centerpoint Entex INSIDE FERC'S Houston ShipChl 151,200 72,400 78,800
0010 Fort Polk LA Gulf South Pipeline INSIDE FERC'S Henry Hub 415,904 118,686 297,218
0011 Barksdale AFB LA CenterPoint INSIDE FERC'S Henry Hub 381,074 113,922 267,152
0012 Keesler AFB MS Centerpoint Energy INSIDE FERC'S SoNat LA 528,200 261,400 266,800
0013 VAMC Biloxi MS CenterPoint INSIDE FERC'S SoNat LA 149,563 81,454 68,109
0014 Federal Corrections Complex Butner NC PSNC Energy INSIDE FERC'S Transco Zn5 Del South 411,879 167,006 244,873
0015 Fort Bragg NC Piedmont Natural Gas INSIDE FERC'S Transco Zn5 Del. South 2,560,000 964,000 1,596,000
0016 Marine Corps Air Station‐Cherry Point NC Piedmont Natural Gas INSIDE FERC'S Transco Zn5 Del. South 1,265,000 489,000 776,000
0017 Altus Air Force Base OK CenterPoint Energy INSIDE FERC'S Enable Gas East 248,038 42,516 205,522
0018 Fort Sill OK CenterPoint Energy ARKLA INSIDE FERC'S Enable Gas 1,012,000 226,000 786,000
0019 VAMC Oklahoma City OK Oklahoma Natural Gas INSIDE FERC'S Oneok OK 245,300 103,000 142,300
0020 VAMC Muskogee (Jack C. Montgomery) OK Oklahoma Natural Gas INSIDE FERC'S Oneok OK 162,800 76,200 86,600
0021 McAlester AAP OK CenterPoint Energy ARKLA INSIDE FERC'S Enable Gas East 712,000 230,000 482,000
0022 Joint Base Charleston (Air Base) SC South Carolina E&G INSIDE FERC'S SoNat LA 121,920 23,544 98,376
0023 Joint Base Charleston ‐ Weapons Station SC Carolina Gas Transmission Pipeline INSIDE FERC'S SoNat LA 46,272 3,390 42,882
0024 Fort Campbell TN Clarksville Gas & Water INSIDE FERC'S Henry Hub 2,081,208 531,288 1,549,920
0025 VAMC Nashville TN Nashville Gas Company INSIDE FERC'S Tenn LA 500 Leg 220,000 99,000 121,000
0026 VAMC Murfreesboro TN Atmos Energy Corporation INSIDE FERC'S TX Eastern E LA 338,000 172,000 166,000
National Nuclear Security Administration Protection Office
TX Atmos Energy Corporation INSIDE FERC'S Transwestn Perm 854,490 377,890 476,600
0028 DHS Customs and Border Protection TX Centerpoint Entex INSIDE FERC'S Houston ShipChl 53,400 32,360 21,040
0029 VAMC Houston TX Centerpoint Entex INSIDE FERC'S Houston ShipChl 563,000 296,000 267,000
Patrick AFB;
Kennedy Space Center;
Cape Canaveral Air Station
FL Florida City Gas INSIDE FERC'S FL Gas Zn2 519,760 292,320 227,440
NAS Jacksonville;
Naval Station Mayport
FL Peoples Gas System (Emera Inc.) INSIDE FERC'S FL Gas Zn2 732,020 371,040 360,980
Attachment IV ‐ Solicitation Schedule Page Line Item Summary ‐ SPE604‐19‐R‐0400
(Page 1 of 3)
Source Selection Information ‐ See FAR 2.101 and 3.104
Offeror: __________________________________________________________
Tied Group 1: All Line Items within Tied Group #1 will be awarded to a single supplier. Therefore, the offeror must submit pricing on all items to be considered for award
Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location
Total Estimated Volume (Dths)
Total Summer (Dths)
Summer Adjustment
Factor ($/Dth)
Total Winter (Dths)
Winter Adjustment
Factor ($/Dth)
0032 Pine Bluff Arsenal AR CenterPoint Energy ARKLA INSIDE FERC'S Enable Gas Transmission 502,000 193,000 309,000
0033 Red River Army Depot TX Enable Gas Transmission INSIDE FERC'S Enable Gas Transmission 980,000 406,000 574,000
Tied Group 2: All Line Items within Tied Group #2 will be awarded to a single supplier. Therefore, the offeror must submit pricing on all items to be considered for award
Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location
Total Estimated Volume (Dths)
Total Summer (Dths)
Summer Adjustment
Factor ($/Dth)
Total Winter (Dths)
Winter Adjustment
Factor ($/Dth)
0034 NSA Panama City (Main Lab) FL Peoples Gas (TECO) INSIDE FERC'S FL Gas Zn2 40,500 15,640 24,860
0035 NSA Panama City (Dive School) FL Peoples Gas (TECO) INSIDE FERC'S FL Gas Zn2 14,820 5,260 9,560
Tied Group 3: All Line Items within Tied Group #3 will be awarded to a single supplier. Therefore, the offeror must submit pricing on all items to be considered for award
Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location
Total Estimated Volume (Dths)
Total Summer (Dths)
Summer Adjustment
Factor ($/Dth)
Total Winter (Dths)
Winter Adjustment
Factor ($/Dth)
0036 DOE Oak Ridge Operations (ETNG) TN East Tennessee Natural Gas Company (ETNG) INSIDE FERC'S Tenn LA 500 Leg 2,101,410 371,856 1,729,554
0037 DOE Oak Ridge Operations (TGP) TN Tennessee Gas Pipeline INSIDE FERC'S Tenn LA 500 Leg 1,356,564 1,086,600 269,964
Tied Group 4: All Line Items within Tied Group #4 will be awarded to a single supplier. Therefore, the offeror must submit pricing on all items to be considered for award
Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location
Total Estimated Volume (Dths)
Total Summer (Dths)
Summer Adjustment
Factor ($/Dth)
Total Winter (Dths)
Winter Adjustment
Factor ($/Dth)
0038 Sheppard AFB TX Atmos Energy INSIDE FERC'S Waha 704,000 181,600 522,400
0039 Dyess AFB TX Atmos Energy Corp INSIDE FERC'S Waha 300,000 75,200 224,800
Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location
Total Estimated Volume (Dths)
Total Summer (Dths)
Summer Adjustment
Factor ($/Dth)
Total Winter (Dths)
Winter Adjustment
Factor ($/Dth)
Vance AFB;
Federal Aviation Administration, MMAC
OK Oklahoma Natural Gas INSIDE FERC'S Oneok OK 281,150 48,150 233,000
0041 VAMC Tulsa Outpatient Clinic OK Oklahoma Natural Gas INSIDE FERC'S Oneok OK 4,170 815 3,355
0042 Tinker AFB OK Oklahoma Natural Gas Company INSIDE FERC'S Oneok OK 2,405,952 705,376 1,700,576
Attachment IV ‐ Solicitation Schedule Page Line Item Summary ‐ SPE600‐17‐R‐0400
(Page 2 of 3)
Tied Group 5: All Line Items within Tied Group #5 will be awarded to a single supplier. Therefore, the offeror must submit pricing on all items to be considered for award
Offeror: __________________________________________________________
Line Item Installation State Local Distribution Company (LDC) or Pipeline SIP Publication SIP Location
Total Estimated Volume (Dths)
Total Summer (Dths)
Summer Adjustment
Factor ($/Dth)
Total Winter (Dths)
Winter Adjustment
Factor ($/Dth)
Fort Gordon
Moody AFB (Int)
Naval Submarine Base King Bay
Fort Stewart
Hunter Army Airfield
Harry Milton Kandell USARC
SP5 Roy W. Miller, Jr USARC
Dobbins ARB
Forest Park USARC
GA Army National Guard
Athens USARC
Moody AFB (Firm)
Eastpoint USARC
Macon USARC
Thomas H. Glenn USARC
Enclave at Fort Gillem
Statham USARC
Federal Law Enforcement Training Center
0044 GA Atlanta Gas Light INSIDE FERC'S SoNat LA
685,000 249,400 435,600
1,339,302 608,464 730,838
0043 GA Atlanta Gas Light INSIDE FERC'S SoNat LA
Tied Group 6: All Line Items within Tied Group #6 will be awarded to a single supplier. Therefore, the offeror must submit pricing on all items to be considered for award
(Page 3 of 3)
Attachment IV ‐ Solicitation Schedule Page Line Item Summary ‐ SPE600‐17‐R‐0400
Line Item DWCF: No Installation
Address
City State
Zip
Huntsville Utility Gas
952,000 414,000 538,000
Location
242,000 138,000 104,000 Jun Jul Aug Sep Oct Nov Dec
25,000 26,000 26,000 27,000 34,000 44,000 60,000
476,000 207,000 269,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
66,000 50,000 49,000 38,000 31,000 25,000 26,000 26,000 27,000 34,000 44,000 60,000
234,000 69,000 165,000 Jan Feb Mar Apr May
66,000 50,000 49,000 38,000 31,000
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
Note #1 Huntsville Utilities requires a 90 day notice (change of Supplier Agreement) prior to delivery of transportation service. Contractor will invoice LDC metered delivery quantities reported by City of Huntsville.
06/01/19 05/31/21 INSIDE FERC'S SoNat LA (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Meter
Year 2019 Annual Totals Summer Totals Winter Totals
Yes #2 Oil 0% Yes Emergency Operations Only Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes Class 39
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Redstone Arsenal
AL
35898-5340
Schedule Page By Line Item Detail
Redstone Army Arsenal
Installation Address
Redstone Army Arsenal DODAAC /
FEDAAC:Building 4488
Address
City State
Zip
CenterPoint Energy, ARKLA
489,384 118,634 370,750
Location
107,750 35,750 72,000 Jun Jul Aug Sep Oct Nov Dec
6,500 6,200 6,450 6,550 10,050 35,350 36,650
245,044 59,344 185,700 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
38,400 37,750 36,750 13,100 10,500 6,500 6,200 6,465 6,575 10,004 36,000 36,800
136,590 23,540 113,050 Jan Feb Mar Apr May
38,300 38,000 36,750 13,000 10,540
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes Yes
Winter Volumes Yes Shortage Treatment
Summer Volumes Yes Winter Volumes Yes
Note #1
Note #2 Government owns pipeline capacity of 1000 DTHs per day.
Note #3 The Contractor is required to perform contractor consolidated billing in accordance with the statement of work.
The installation will utilize capacity via its transportation agreement with the pipeline directly. The contractor will utilize this capacity and will provide transportation if increased usage necessitates additional capacity.
INSIDE FERC'S Enable Gas Transmission Prompt Month (i.e. following month) INSIDE FERC'S Enable Gas Transmission Prompt Month (i.e. following month)
INSIDE FERC'S Enable Gas Transmission Prompt Month (i.e. following month) INSIDE FERC'S Enable Gas Transmission Prompt Month (i.e. following month)
06/01/19 05/31/21 INSIDE FERC'S Enable Gas Transmission (3) Monthly Order Quantities. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
City Gate
Year 2019 Annual Totals Summer Totals Winter Totals
No None 0% Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes LCS-1
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Little Rock AFB
AR
72099-5000
Schedule Page By Line Item Detail
Little Rock AFB
Installation Address
Little Rock AFB DODAAC /
FEDAAC:
FP4460
528 Thomas Ave
Address
City State
Zip
Black Hills Energy
133,302 63,950 69,352
Location
34,594 21,115 13,479 Jun Jul Aug Sep Oct Nov Dec
4,129 3,922 4,084 4,158 4,822 5,892 7,587
66,651 31,975 34,676 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
8,022 6,686 6,489 5,548 5,312 4,129 3,922 4,084 4,158 4,822 5,892 7,587
32,057 10,860 21,197 Jan Feb Mar Apr May
8,022 6,686 6,489 5,548 5,312
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
06/01/19 05/31/21 INSIDE FERC'S Enable Gas Transmission (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information
(All volumes expressed in Dths) Meter
Year 2019 Annual Totals Summer Totals Winter Totals
No None 0% N/A
City Gate Yes Sch B4 Trans (AR580)
Alternate Fuel Type Percent Load Displaceable Limits on Use Notes
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Delivery Point Telemetered Rate Class
Fayetteville
AR
72703-1944
Schedule Page By Line Item Detail
VAMC Fayetteville
Installation Address
VAMC Fayetteville 1100 N. College Ave
Address
City State
Zip
CenterPoint Energy ARKLA
361,000 170,600 190,400
Location
94,500 59,100 35,400 Jun Jul Aug Sep Oct Nov Dec
11,300 11,600 11,600 11,400 13,200 16,300 19,100
180,500 85,300 95,200 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
22,600 20,200 17,000 13,400 12,800 11,300 11,600 11,600 11,400 13,200 16,300 19,100
86,000 26,200 59,800 Jan Feb Mar Apr May
22,600 20,200 17,000 13,400 12,800
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
Note #1
Note #2
Note #3
Note #4
The installation will utilize capacity via its transportation agreement with the pipeline directly. The contractor will utilize this capacity and will provide transportation if increased usage necessitates additional capacity.
The contractor is required to perform contractor consolidated billing in accordance with the statement of work.
The Government owns pipeline capacity of 850 Dths per day.
Installation has one delivery point, CenterPoint Energy meter number 912410.
06/01/19 05/31/21 INSIDE FERC'S Enable Gas Transmission (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
City Gate
Year 2019 Annual Totals Summer Totals Winter Totals
No None 0% Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes LCS-1 TSO
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Jefferson
AR
72079-9501
Schedule Page By Line Item Detail
FDA Jefferson Labs/NCTR
Installation Address
FDA Jefferson Labs/NCTR DODAAC /
FEDAAC:
FDA0001
3900 NCTR Road
Address
City State
Zip
Peoples Gas (TECO)
128,940 50,660 78,280
Location
27,820 16,110 11,710 Jun Jul Aug Sep Oct Nov Dec
3,700 2,990 2,720 3,220 3,480 4,230 7,480
64,470 25,330 39,140 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
11,420 9,030 6,980 5,550 3,670 3,700 2,990 2,720 3,220 3,480 4,230 7,480
36,650 9,220 27,430 Jan Feb Mar Apr May
11,420 9,030 6,980 5,550 3,670
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
Note #1
Note #2 Multiple meters will require invoice with a separate breakdown of monthly meter quantities and contractor charges.
Natural Choice Transportation Service for multiple accounts/meters on TECO‐Peoples Natural Gas (supplier must adjust for new or closing accounts).
06/01/19 05/31/21 INSIDE FERC'S FL Gas Zn2 (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Meter
Year 2019 Annual Totals Summer Totals Winter Totals
No None 0% Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate No NCTS
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Stop 42 Tyndall AFB
FL
32403-5014
Schedule Page By Line Item Detail
Tyndall AFB
Installation Address
Tyndall AFB DODAAC /
FEDAAC:
FC4819
119 Alabama
Address
City State
Zip
Peoples Gas (TECO)
48,660 23,440 25,220
Location
11,150 7,280 3,870 Jun Jul Aug Sep Oct Nov Dec
1,670 1,580 1,390 1,170 1,470 1,980 1,890
24,330 11,720 12,610 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
3,140 2,840 2,760 2,430 2,010 1,670 1,580 1,390 1,170 1,470 1,980 1,890
13,180 4,440 8,740 Jan Feb Mar Apr May
3,140 2,840 2,760 2,430 2,010
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
Note #1 The natural gas system located on MacDill AFB is privatized. Multiple meters pooled for delivery under the NCTS rate.
06/01/19 05/31/21 INSIDE FERC'S FL Gas Zn2 (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Meter
Year 2019 Annual Totals Summer Totals Winter Totals
Yes #4 Oil 35% Yes Emergency Back-up Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate No NCTS
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
MacDill AFB
FL
33621-5000
Schedule Page By Line Item Detail
MacDill AFB
Installation Address
MacDill AFB DODAAC /
FEDAAC:
FP4814
2606 Pelican Ave
Address
City State
Zip Ordering Officer Invoice Certification Office Payment Office
Name Phone
Ext
DSN
Fax
Email Location Federal Correctional Institution Federal Correctional Institution Federal Correctional Institution Address
Attention City
State Zip
Florida City Gas
33,500 19,520 13,980
Location
9,590 6,830 2,760 Jun Jul Aug Sep Oct Nov Dec
1,370 1,400 1,350 1,300 1,410 1,360 1,400
16,750 9,760 6,990 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1,380 1,360 1,490 1,450 1,480 1,370 1,400 1,350 1,300 1,410 1,360 1,400
7,160 2,930 4,230 Jan Feb Mar Apr May
1,380 1,360 1,490 1,450 1,480
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
06/01/19 05/31/21 INSIDE FERC'S FL Gas Zn2 (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Meter
Year 2019 Annual Totals Summer Totals Winter Totals
No None 0% Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes GS-25K
33177-1297 33177-1297 33177-1297
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Miami Miami Miami
FL FL FL
Magdeline Mirabal Magdeline Mirabal Jackie Luciano mmirabal@bop.gov mmirabal@bop.gov jluciano@bop.gov
15801 SW 137th Ave 15801 SW 137th Ave 15801 SW 137th Ave
(305) 259-2392 (305) 259-2392 (305) 259-2392
Jackie Luciano
(305) 259-2104 (305) 259-2104 (305) 259-2319
Miami
FL
33177-1297
Magdeline Mirabal Magdeline Mirabal
Schedule Page By Line Item Detail
Federal Bureau of Prisons, Miami
Installation Address
Federal Bureau of Prisons, Miami DODAAC /
FEDAAC:
VAMC52
15801 SW 137th Ave
Installation Fort Benning
Address
City State
Zip
Liberty Gas
1,066,000 392,000 674,000
Location
241,000 129,000 112,000 Jun Jul Aug Sep Oct Nov Dec
23,000 23,000 23,000 25,000 35,000 50,000 62,000
533,000 196,000 337,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
93,000 75,000 57,000 37,000 30,000 23,000 23,000 23,000 25,000 35,000 50,000 62,000
292,000 67,000 225,000 Jan Feb Mar Apr May
93,000 75,000 57,000 37,000 30,000
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
06/01/19 05/31/21 INSIDE FERC'S SoNat LA (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
City Gate
Year 2019 Annual Totals Summer Totals Winter Totals
Delivery Point Telemetered Rate Class City Gate Yes
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Attn: IMBE-PWB (Jamieson) Fort Benning
GA
31905-4500
Schedule Page By Line Item Detail
Fort Benning
Installation Address
DODAAC /
FEDAAC:
W909H3 6650 Meloy Drive
Installation DODAAC / FEDAAC: 667
Address
City State
Zip
Centerpoint Entex
151,200 72,400 78,800
Location
40,500 24,800 15,700 Jun Jul Aug Sep Oct Nov Dec
4,800 4,800 4,900 4,700 5,600 6,900 8,800
75,600 36,200 39,400 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
9,700 7,300 6,700 6,400 5,000 4,800 4,800 4,900 4,700 5,600 6,900 8,800
35,100 11,400 23,700 Jan Feb Mar Apr May
9,700 7,300 6,700 6,400 5,000
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
Note #1
Note #2 Contractor Consolidated Billing is required for VAMC Shreveport in accordance with the statement of work.
CenterPoint Energy Entex holds the upstream capacity on CEGT for the customer. The contractor is required to use the capacity for deliveries to VAMC Shreveport. The customer is billed directly from CenterPoint for the pipeline capacity.
06/01/19 05/31/21 INSIDE FERC'S Houston ShipChl (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Meter
Year 2019 Annual Totals Summer Totals Winter Totals
No None Alternate Fuel Type Percent Load Displaceable Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate No LCT-1
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
510 East Stoner Ave
Shreveport
LA
71101-0000
Schedule Page By Line Item Detail
VAMC Shreveport
Installation Address
VAMC Shreveport
Address
City State
Zip
Gulf South Pipeline
415,904 118,686 297,218
Location
93,414 37,254 56,160 Jun Jul Aug Sep Oct Nov Dec
6,385 6,983 7,006 6,810 10,070 22,059 34,101
207,952 59,343 148,609 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
39,134 32,986 20,329 12,745 9,344 6,385 6,983 7,006 6,810 10,070 22,059 34,101
114,538 22,089 92,449 Jan Feb Mar Apr May
39,134 32,986 20,329 12,745 9,344
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes Yes
Winter Volumes Yes Shortage Treatment
Summer Volumes Yes Winter Volumes Yes
Note #1
Note #2
Note #3
Note #4
The contractor shall be required to perform contractor consolidated billing in accordance with the statement of work. Gulf South Pipeline Company, LP, will forward each installation's transportation invoice to the contractor. In return, the contractor will include these transportation costs and its supply costs on the customer invoice. Therefore, Fort Polk will receive one invoice from the contractor, which will include both supply costs and Gulf South Pipeline., LP, transportation costs.
The customer has 8,000 DTHs of capacity in their storage account. The storage account will be managed by the contractor to keep customer's supply balanced and provide additional gas in emergency situations or as needed and directed by the installation. Monthly invoices will have seperate line items documenting the starting balance, amount of gas that is either injected or withdrawn, and the ending balance for the storage account. The invoice will also include a seperate line item to reflect the quantity and the additional price and/or credit for any gas that is either injected or withdrawn from the storage account.
A. The customer owns excess capacity on the pipeline. The customer owns a total of 4,200 DTHs/day of FTS on the pipeline. Any excess capacity utilized by the contractor will be rebated to the customer at a rate of 50% of the nominal rate charged to the installation by Gulf South Pipeline for this capacity. The contractor's monthly invoice will include a seperate line item to reflect any credits due for the utilization of excess capacity.
B. The excess capacity will be handled in accordance with the statement of work, paragraph (L), the contractor shall manage the excess capacity.
A. Fort Polk's total MDQ for Firm (Contract#16106) is 4,200 Dths and its MDQ for No-Notice (Contract #14583) is 800 Dths. Receipt points for Firm and No-Notice for Fort Polk are SLN#0004708 and SLN#0003260 and delivery points are SLN#0002989 and SLN#002990. The term MDQ is not intended to communicate a maximim monthly order quantity.
See clause C700 and 52.216-21.
B. The contractor shall deliver natural gas supplies FOB Burnertip. The contractor's obligation is to deliver gas supplies via Government's owned capacity on the pipeline.
INSIDE FERC'S Henry Hub Prompt Month (i.e. following month) INSIDE FERC'S Henry Hub Prompt Month (i.e. following month)
INSIDE FERC'S Henry Hub Prompt Month (i.e. following month) INSIDE FERC'S Henry Hub Prompt Month (i.e. following month)
06/01/19 05/31/21 INSIDE FERC'S Henry Hub (3) Monthly Order Quantities. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Burner Tip
Year 2019 Annual Totals Summer Totals Winter Totals
No None Alternate Fuel Type Percent Load Displaceable Limits on Use Notes
Delivery Point Telemetered Rate Class Burner Tip Yes
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Bldg 350 Suite 230 Fort Polk
LA
71459-5440
Schedule Page By Line Item Detail
Fort Polk
Installation Address
Fort Polk DODAAC /
FEDAAC:
W42CW1
DPW, BOID (Business Operations Div), 6661 Warrior Trail
Address
City State
Zip
CenterPoint
381,074 113,922 267,152
Location
70,518 34,894 35,624 Jun Jul Aug Sep Oct Nov Dec
8,620 6,615 5,411 7,192 7,056 11,095 24,529
190,537 56,961 133,576 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
36,281 31,764 29,907 12,360 9,707 8,620 6,615 5,411 7,192 7,056 11,095 24,529
120,019 22,067 97,952 Jan Feb Mar Apr May
36,281 31,764 29,907 12,360 9,707
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
06/01/19 05/31/21 INSIDE FERC'S Henry Hub (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information
(All volumes expressed in Dths) Meter
Year 2019 Annual Totals Summer Totals Winter Totals
No Alternate Fuel Type Percent Load Displaceable Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes LCS-1
Utility Account Information
LDC or Pipeline
Total Contract Est. Total Summer (Dths) Total Winter (Dths)
334 Davis Ave West, Ste 308 Barksdale
LA
71110-2078
Schedule Page By Line Item Detail
Barksdale AFB
Installation Address
Barksdale AFB
2d Civil Engineer Sqd
Address
City State
Zip
Centerpoint Energy
528,200 261,400 266,800
Location
141,200 89,600 51,600 Jun Jul Aug Sep Oct Nov Dec
17,200 17,000 17,000 17,600 20,800 23,400 28,200
264,100 130,700 133,400 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
32,200 24,800 24,800 21,700 19,400 17,200 17,000 17,000 17,600 20,800 23,400 28,200
122,900 41,100 81,800 Jan Feb Mar Apr May
32,200 24,800 24,800 21,700 19,400
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
Note #1 Note #2 Load data includes service to Base, Medical Center, Multi-family Housing via master meter.
Contractor Consolidated Billing (CenterPoint LDC) is required for Keesler AFB in accordance with the Statement of Work.
06/01/19 05/31/21 INSIDE FERC'S SoNat LA (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year Two 2020 Annual Totals Summer Totals Winter Totals
Year Three 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Meter
Year One 2019 Annual Totals Summer Totals Winter Totals
No None
City Gate Yes MT-3
Alternate Fuel Type Percent Load Limits on Use Notes
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Delivery Point Telemetered Rate Class
500 Fisher Street, Suite 244 Keesler Air Force Base
MS
39534
Schedule Page By Line Item Detail
Keesler Air Force Base
Installation Address
Keesler Air Force Base DODAAC /
FEDAAC:81st Infrastructure Support Division
Address
City State
Zip
CenterPoint
149,563 81,454 68,109
Location
40,326 27,981 12,345 Jun Jul Aug Sep Oct Nov Dec
5,288 6,042 5,483 5,174 5,994 5,108 7,237
74,877 40,873 34,004 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
8,607 6,178 6,669 6,153 6,232 5,388 6,142 5,583 5,275 6,100 5,210 7,340
34,360 12,600 21,760 Jan Feb Mar Apr May
8,710 6,280 6,770 6,250 6,350
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
06/01/19 05/31/21 INSIDE FERC'S SoNat LA (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information
(All volumes expressed in Dths) Meter
Year 2019 Annual Totals Summer Totals Winter Totals
No
City Gate Yes 49
Alternate Fuel Type Percent Load Displaceable Limits on Use Notes
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Delivery Point Telemetered Rate Class
Biloxi
MS
00003-9531
Schedule Page By Line Item Detail
VAMC Biloxi
Installation Address
VAMC Biloxi 400 Veterans Avenue
Address
City State
Zip
PSNC Energy
411,879 167,006 244,873
Location
87,788 40,959 46,829 Jun Jul Aug Sep Oct Nov Dec
6,358 5,910 6,142 8,774 13,775 20,561 26,268
216,191 94,347 121,844 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
28,937 20,292 23,815 16,686 13,392 11,769 11,500 12,000 12,500 16,500 21,800 27,000
107,900 31,700 76,200 Jan Feb Mar Apr May
29,000 24,200 23,000 16,900 14,800
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
Note #1 Five meters currently serve the Corrections Complex.
06/01/19 05/31/21 INSIDE FERC'S Transco Zn5 Del South (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
City Gate
Year 2019 Annual Totals Summer Totals Winter Totals
Yes #2 Oil 0% Yes Emergency Operations Only Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes 175
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
P.O. Box 999 Butner
NC
27509-0000
Schedule Page By Line Item Detail
Federal Corrections Complex Butner
Installation Address
Federal Corrections Complex Butner DODAAC /
FEDAAC:
154539
Old NC Hwy 75
Address
City State
Zip
Piedmont Natural Gas
2,560,000 964,000 1,596,000
Location
600,000 310,000 290,000 Jun Jul Aug Sep Oct Nov Dec
59,000 55,000 55,000 58,000 83,000 125,000 165,000
1,280,000 482,000 798,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
207,000 152,000 149,000 98,000 74,000 59,000 55,000 55,000 58,000 83,000 125,000 165,000
680,000 172,000 508,000 Jan Feb Mar Apr May
207,000 152,000 149,000 98,000 74,000
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes Yes
Winter Volumes Yes Shortage Treatment
Summer Volumes Yes Winter Volumes Yes
Note #1 The metering includes a housing sub-division (St. Mere Eglise) which is not a part of the contract and at the end of the month the housing consumption is backed out of the Fort Bragg total usage by Piedmont Natural Gas.
GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 16-EOM GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 16-EOM
GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 16-EOM GAS DAILY PRICE GUIDE Transco Zn5 Del. South Simple Average 16-EOM
06/01/19 05/31/21 INSIDE FERC'S Transco Zn5 Del. South
(3) Monthly Order
Quantities.
Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year 2020 Annual Totals Summer Totals Winter Totals
Year 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Meter
Year 2019 Annual Totals Summer Totals Winter Totals
No Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes T-10
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Fort Bragg
NC
28310-5000
Schedule Page By Line Item Detail
Fort Bragg
Installation Address
Fort Bragg DODAAC /
FEDAAC:
GY0632
Directorate of Public Works (MSE-BRG-PWO)
Address
City M30146 State
Zip
Piedmont Natural Gas
1,265,000 489,000 776,000
Location
283,000 157,000 126,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
30,000 30,000 30,000 30,000 37,000 55,000 71,000
632,500 244,500 388,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
91,500 84,000 86,500 51,000 36,500 30,000 30,000 30,000 30,000 37,000 55,000 71,000
349,500 87,500 262,000 Jan Feb Mar Apr May
91,500 84,000 86,500 51,000 36,500
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
06/01/19 05/31/21 INSIDE FERC'S Transco Zn3 (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year Two 2020 Annual Totals Summer Totals Winter Totals
Year Three 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information
(All volumes expressed in Dths) Meter
Year One 2019 Annual Totals Summer Totals Winter Totals
Yes #2 Oil 100% Yes Emergency Only Alternate Fuel Type Percent Load Displaceable Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Cherry Point
NC
28533
Schedule Page By Line Item Detail
Marine Corps Air Station-Cherry Point
Installation Address
Marine Corps Air Station-Cherry Point DODAAC /
FEDAAC:
30000
PSC Box 8005
Address
City State
Zip
CenterPoint Energy
248,038 42,516 205,522
Location
48,657 10,475 38,182 Jun Jul Aug Sep Oct Nov Dec
1,749 1,255 1,225 1,483 4,763 13,279 24,903
124,019 21,258 102,761 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
24,521 22,452 17,606 7,876 2,907 1,749 1,255 1,225 1,483 4,763 13,279 24,903
75,362 10,783 64,579 Jan Feb Mar Apr May
24,521 22,452 17,606 7,876 2,907
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes Yes
Winter Volumes Yes Shortage Treatment
Summer Volumes Yes Winter Volumes Yes
Note #1 There are two meters that will be served under LCS-1 on the contract. The 1866 W River Dr meter location will remain on utility service at a projected load of 500 dth per year.
INSIDE FERC'S Enable Gas Prompt Month (i.e. following month) INSIDE FERC'S Enable Gas Prompt Month (i.e. following month)
INSIDE FERC'S Enable Gas Prompt Month (i.e. following month) INSIDE FERC'S Enable Gas Prompt Month (i.e. following month)
06/01/19 05/31/21 INSIDE FERC'S Enable Gas East (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year Two 2020 Annual Totals Summer Totals Winter Totals
Year Three 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
City Gate
Year One 2019 Annual Totals Summer Totals Winter Totals
No Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes LCS-1
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Altus
OK
75323
Schedule Page By Line Item Detail
Altus Air Force Base
Installation Address
Altus Air Force Base DODAAC /
FEDAAC:
W44DQ1
209 E Sir Dr
Address
City State
Zip
CenterPoint Energy ARKLA
1,012,000 226,000 786,000
Location
203,000 68,000 135,000 Jun Jul Aug Sep Oct Nov Dec
15,000 10,000 11,000 11,000 21,000 47,000 88,000
506,000 113,000 393,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
120,000 90,000 48,000 26,000 19,000 15,000 10,000 11,000 11,000 21,000 47,000 88,000
303,000 45,000 258,000 Jan Feb Mar Apr May
120,000 90,000 48,000 26,000 19,000
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes Yes
Winter Volumes Yes Shortage Treatment
Summer Volumes Yes Winter Volumes Yes
Note #1
Note #2
Note #3
CenterPoint Energy Gas Transmission (CEGT) Pipeline requires the contractor to add additional gas for fuel loss for the gas to be delivered to West Pooling Area 2. The cost for this gas will be included in the adjustment factor.
The Government has a rate rider 1 transport agreement with the LDC which includes a pipeline capacity of 7021 Dths per day with CEGT.
CenterPoint Energy Arkla holds the upstream capacity on CEGT for the customer. The contractor is required to use the capacity for deilveries to Fort Sill. The customer is billed directly by CenterPoint for the pipeline capacity.
INSIDE FERC'S Enable Gas Prompt Month (i.e. following month) INSIDE FERC'S Enable Gas Prompt Month (i.e. following month)
INSIDE FERC'S Enable Gas Prompt Month (i.e. following month) INSIDE FERC'S Enable Gas Prompt Month (i.e. following month)
06/01/19 05/31/21 INSIDE FERC'S Enable Gas
(3) Monthly Order
Quantities.
Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year Two 2020 Annual Totals Summer Totals Winter Totals
Year Three 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
City Gate
Year One 2019 Annual Totals Summer Totals Winter Totals
No Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes LCS-1
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Building 1950 Fort Sill
OK
73503-5100
Schedule Page By Line Item Detail
Fort Sill
Installation Address
Fort Sill DODAAC /
FEDAAC:
W44DQ1
Director Public Works, 1950 Barbour Rd.
Address
City State
Oklahoma Natural Gas
245,300 103,000 142,300
Location
60,000 33,200 26,800 Jun Jul Aug Sep Oct Nov Dec
6,300 6,000 6,100 5,900 8,900 11,000 15,800
122,900 51,500 71,400
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
17,000 14,900 12,200 10,300 8,000 6,300 6,000 6,100 5,900 8,900 11,500 15,800
62,400 18,300 44,100
Jan Feb Mar Apr May
17,000 14,900 12,200 10,300 8,000
Curtailment Days Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes Yes
Winter Volumes Yes Shortage Treatment
Summer Volumes Yes Winter Volumes Yes
INSIDE FERC'S Oneok OK Prompt Month (i.e. following month) INSIDE FERC'S Oneok OK Prompt Month (i.e. following month)
INSIDE FERC'S Oneok OK Prompt Month (i.e. following month) INSIDE FERC'S Oneok OK Prompt Month (i.e. following month)
06/01/19 05/31/21 INSIDE FERC'S Oneok OK
(3) Monthly Order
Quantities.
Firm
Solicitation Parameters
Period Beginning Period Ending SIP Publication SIP Location Delivery Option Delivery Type
Year Two 2020 Annual Totals Summer Totals Winter Totals
Year Three 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Burner Tip
Year One 2019 Annual Totals Summer Totals Winter Totals
No None
City Gate Yes 391-T
Alternate Fuel Type Percent Load Limits on Use Notes
Utility Account Information
LDC or Pipeline
Total Contract Est. Volume (Dths)
Total Summer (Dths) Total Winter (Dths)
Delivery Point Telemetered Rate Class
Oklahoma City
OK
Schedule Page By Line Item Detail
VAMC Oklahoma City
Installation Address VAMC Oklahoma City DODAAC /
FEDAAC:921 NE 13th Street
Address
City State
Zip
Oklahoma Natural Gas
162,800 76,200 86,600
Location
42,300 26,000 16,300 Jun Jul Aug Sep Oct Nov Dec
5,000 5,000 5,000 5,000 6,000 7,500 8,800
81,400 38,100 43,300
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
10,000 9,000 8,000 6,300 5,800 5,000 5,000 5,000 5,000 6,000 7,500 8,800
39,100 12,100 27,000
Jan Feb Mar Apr May
10,000 9,000 8,000 6,300 5,800
Curtailment Days Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing
Publication Location Methodology Include Adj. Factor Overage Treatment
Summer Volumes Yes Winter Volumes Yes
Shortage Treatment Summer Volumes Yes
Winter Volumes Yes INSIDE FERC'S Oneok OK Prompt Month (i.e. following month) INSIDE FERC'S Oneok OK Prompt Month (i.e. following month)
INSIDE FERC'S Oneok OK Prompt Month (i.e. following month) INSIDE FERC'S Oneok OK Prompt Month (i.e. following month)
06/01/19 05/31/21 INSIDE FERC'S Oneok OK (3) Monthly Order Quantities. Firm
Solicitation Parameters
Period Beginning Period Ending SIP Publication SIP Location Delivery Option Delivery Type
Year Two 2020 Annual Totals Summer Totals Winter Totals
Year Three 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Burner Tip
Year One 2019 Annual Totals Summer Totals Winter Totals
Yes #2 Oil 10% Yes Emergency Back-up Only
City Gate Yes 391-T
Alternate Fuel Type Percent Load Limits on Use Notes
Utility Account Information
LDC or Pipeline
Total Contract Est. Volume (Dths)
Total Summer (Dths) Total Winter (Dths)
Delivery Point Telemetered Rate Class
Muskogee
OK
74401-0000
Schedule Page By Line Item Detail
VAMC Muskogee (Jack C. Montgomery)
Installation Address VAMC Muskogee (Jack C. Montgomery) DODAAC /
FEDAAC:1011 Honor Heights Drive
Address
City State
Zip
CenterPoint Energy ARKLA
712,000 230,000 482,000
Location
162,000 70,500 91,500 Jun Jul Aug Sep Oct Nov Dec
14,000 13,000 13,000 13,000 17,500 35,500 56,000
356,000 115,000 241,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
60,000 49,000 40,500 24,500 20,000 14,000 13,000 13,000 13,000 17,500 35,500 56,000
194,000 44,500 149,500 Jan Feb Mar Apr May
60,000 49,000 40,500 24,500 20,000
Curtailment Days
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes Yes
Winter Volumes Yes Shortage Treatment
Summer Volumes Yes Winter Volumes Yes
Note #1 McAlester has pipeline capacity with Enable Gas Transmission LLC. The installation has the capacity necessary to meet contract quantity requirements.
INSIDE FERC'S Enable Gas Prompt Month (i.e. following month) INSIDE FERC'S Enable Gas Prompt Month (i.e. following month)
INSIDE FERC'S Enable Gas Prompt Month (i.e. following month) INSIDE FERC'S Enable Gas Prompt Month (i.e. following month)
06/01/19 05/31/21 INSIDE FERC'S Enable Gas East
(3) Monthly Order
Quantities.
Firm
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option Delivery Type
Year Two 2020 Annual Totals Summer Totals Winter Totals
Year Three 2021 Annual Totals Summer Totals Winter Totals
Estimated Usage Information (All volumes expressed in Dths)
Burner Tip
Year One 2019 Annual Totals Summer Totals Winter Totals
Yes #2 Oil 20% Yes For emergency use only
City Gate Yes LCS-1
Alternate Fuel Type Percent Load Limits on Use Notes
Utility Account Information LDC or Pipeline
Total Contract Est. Volume (Dths)
Total Summer (Dths) Total Winter (Dths)
Delivery Point Telemetered Rate Class
Bldg 6 McAlester
OK
74501-9002
Schedule Page By Line Item Detail
McAlester AAP Installation Address
McAlester AAP DODAAC /
FEDAAC:
W44XMF
1 C-Tree RD
Address
City State
Zip
South Carolina E&G
121,920 23,544 98,376
Location
24,603 6,816 17,787 Jun Jul Aug Sep Oct Nov Dec
1,411 1,159 1,156 1,262 1,828 6,991 10,796
60,960 11,772 49,188 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
11,837 10,910 8,654 3,120 1,836 1,411 1,159 1,156 1,262 1,828 6,991 10,796
36,357 4,956 31,401 Jan Feb Mar Apr May
11,837 10,910 8,654 3,120 1,836
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
8 8 3 3 3 3 3 3 3 3 3 6
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes Yes
Winter Volumes Yes Shortage Treatment
Summer Volumes Yes Winter Volumes Yes
Note #1
210 W. Stewart Ave Joint Base Charleston
SC
29404-4827
Schedule Page By Line Item Detail
Joint Base Charleston (Air Base)
Installation Address
Joint Base Charleston (Air Base) DODAAC /
FEDAAC:
FA3022
628 Civil Engineer SQ
Utility Account Information
LDC or Pipeline
Total Contract Total Summer (Dths) Total Winter (Dths)
Alternate Fuel Type Percent Load Limits on Use Notes
Delivery Point Telemetered Rate Class City Gate Yes 35
Estimated Usage Information (All volumes expressed in Dths)
Meter
Year 2019 Annual Totals Summer Totals Winter Totals
No None 0%
Delivery Type
06/01/19 05/31/21 INSIDE FERC'S SoNat LA
(3) Monthly Order
Quantities.
Limited Interruptible
Year 2020 Annual Totals Summer Totals Winter Totals
Solicitation Parameters
Period Beginning Period Ending Publication SIP Delivery Option
Year 2021 Annual Totals Summer Totals Winter Totals
INSIDE FERC'S SoNat LA Prompt Month (i.e. following month) INSIDE FERC'S SoNat LA Prompt Month (i.e. following month)
INSIDE FERC'S SoNat LA Prompt Month (i.e. following month) INSIDE FERC'S SoNat LA Prompt Month (i.e. following month)
Installation is on Rate Rider 35.
Address
City State
Zip
Carolina Gas Transmission Pipeline
46,272 3,390 42,882
Location
7,184 597 6,587 Jun Jul Aug Sep Oct Nov Dec 92 44 32 32 397 2,087 4,500
23,136 1,695 21,441 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
8,131 3,536 3,187 920 178 92 44 32 32 397 2,087 4,500
15,952 1,098 14,854 Jan Feb Mar Apr May
8,131 3,536 3,187 920 178
Curtailment Days Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
0 0 0 0 0 0 0 0 0 0 0 0
Overage & Shortage Volume Pricing Publication Location Methodology Include Adj. Factor
Overage Treatment Summer Volumes
Winter Volumes Shortage Treatment
Summer Volumes Winter Volumes
Note #1
Note #2
Note #3
The pipeline capacity charges will be passed through to the installation by the use of Contractor conslidated billing services in accordance with the statement of work
The contractor is required to use the customer's firm capacity on SONAT and Carolina Gas Transmission for deliveries to Joint Base Charleston - Weapons Station Northside/Pomflant. Further, the contractor shall be responsible for obtaining additional capacity if required to fullfill the requirements. Customer is directly connected to Carolina Gas Transmission which is fed by SONAT Pipeline. There is no LDC involved.
The customer has 300 DTHs per day of upstream firm pipeline capacity reserved with SONAT with a receipt to Carolina Gas Transmission at Aiken, SC. The customer also has 300 DTHs per day of firm pipeline capacity reserved on Carolina Gas Transmission for delivery to Joint Base Charleston - Weapons Station Northside/Pomflant.
06/01/19 05/31/21 INSIDE FERC'S SoNat LA (2) Full Requirements/Pool. Firm
Solicitation Parameters
Period Beginning Period Ending…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.