SPE60320C5001 w-Attachments.pdf

PDF 8 MB Posted

Attached to
COCO Storage Services in Hachinohe, Japan Federal contract opportunity
Solicitation number
SPE603-20-C-5001
Issued by
Defense Logistics Agency Energy

About this file

This is an award notice for a Contractor-Owned, Contractor-Operated (COCO) fuel storage contract in Hachinohe, Japan. The contract was awarded to COSMO OIL MARKETING CO., LTD. on January 22, 2020 for $5,298,222.48. The contract requires the capability to receive, store, protect, and ship 57,183 barrels of Jet A1 or JP8 fuel from a facility in Hachinohe, Japan. The facility must be equipped to allow receipt and issue operations 24 hours a day, 7 days a week, and have an annual throughput of 600,000 barrels of fuel. The period of performance is February 15, 2020 through February 14, 2024. Pricing is set at a monthly rate of $102,404.12 to provide the required COCO storage services. The Defense Logistics Agency Energy is the awarding agency.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

16. ADMINISTERED BY CODE

7. FOR SOLICITATION

INFORMATION CALL:

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

0077839896

2. CONTRACT NO.

SPE603-20-C-5001

3. AWARD/EFFECTIVE

DATE

2020 JAN 22

4. ORDER NUMBER 5. SOLICITATION NUMBER

SPE603-19-R-0508

6. SOLICITATION ISSUE

DATE

2019 MAY 15

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY CODE SPE603

DLA ENERGY

BULK PETROLEUM SERVICES

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

USA

Local Admin: Micherie Dougherty 1UX Tel: 571-767-3681 Email: Micherie.Dougherty@dla.mil

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

8 (A)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

NAICS: 493190

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

12. DISCOUNT TERMS

Net 30 days

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE SPE603

SEE BLOCK 9

Criticality: C PAS : None

17a. CONTRACTOR/ CODE

OFFEROR

FACILITY

CODE

SDLK2

COSMO OIL MARKETING CO., LTD. DBA

1-1-1, SHIBAURA

HAMAMATSUCHO BLDG.

MINATO-KU 105-0023

JAPAN

TELEPHONE NO. 81-337983155

18a. PAYMENT WILL BE MADE BY CODE SL4701

DEF FIN AND ACCOUNTING SVC

BSM

P O BOX 182317

COLUMBUS OH 43218-2317

USA

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED.

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

25. ACCOUNTING AND APPROPRIATION DATA

AA: 97X4930 5CFX 2034607 001 2520 S33189 $4915397.76

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

$4,915,397.76

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print)

Shane Banks Shane.Banks@dla.mil

31c. DATE SIGNED

2020 JAN 22

1 SPE603-19-R-0508

2019-Nov-05

SEE SCHEDULE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

SEE ADDENDUM

See Schedule

DATED . YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH ,

HEREIN IS ACCEPTED AS TO ITEMS:

EDWOSB

Shane A. Banks, Contracting Officer

January 22, 2020

BANKS.SHANE.A.13

93082808

Digitally signed by

BANKS.SHANE.A.1393082808

Date: 2020.01.22 05:44:55 -05'00'

32a. QUANTITY IN COLUMN 21 HAS BEEN

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED

COMPLETE PARTIAL FINAL

STANDARD FORM 1449 (REV. 2/2012) BACK

36. PAYMENT

PARTIAL FINAL

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY

42a. RECEIVED BY (Print) 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 5 PAGES

SPE603-20-C-5001

CONTINUED ON NEXT PAGE

A. Cosmo Oil Marketing Co. Ltd. offer dated July 1, 2019, as revised by proposal revisions dated August 27, 2019, August 30, 2019, and November 5, 2019 is hereby accepted. Cosmo's offer including all revisions, its representations and certifications including those completed in SAM, and solicitation SPE603-19-R-0508 with amendments 0001, 0002, and 0003 to provide Contractor-Owned Contractor-Operated services in Hachinohe, Japan area is hereby incorporated into this contract.

B. Period of Performance: February 15, 2020 – February 14, 2024 (four-year base period)

C. Award price of $4,915,397.76 is for the four-year (48 months) base period.

D. The OCONUS COCO Storage Services monthly price is $102,404.12 and shall be invoiced under CLIN 0001 in WAWF for the 48 month performance period unless otherwise modified as follows:

The Contract Number Field for CLIN 0001 is "DoD Contract (FAR)."

Contract Number will be listed as "SPE603-19-C-5012" CLIN/Item Number: 0001 The Product/Service ID Field will be listed as "None" Qualifier: "SV" Quantity: "102,404.12" Unit of Measure: "Each" UofM Code: "EA" Unit Price: "$1.00" Amount: "$102,404.12"

E. Cosmos’s requested exceptions are accepted and incorporated into the contract under Section C, and the PWS (Attachment I).

F. The following acronym was used in the award: IBR (Incorporated By Reference).

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 5 PAGES

CONTINUED ON NEXT PAGE

Part 12 Clauses

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) FAR

252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR REPORTED CYBER INCIDENT

INFORMATION (OCT 2016) DFARS

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (OCT 2016) DFARS

252.215-7014 EXCEPTION FROM CERTIFIED COST OR PRICING DATA REQUIREMENTS FOR FOREIGN MILITARY SALES INDIRECT

OFFSETS (JUN 2018) DFARS

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013) FAR

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018) DFARS

As prescribed in 232.7004(b), use the following clause:

(a) Definitions. As used in this clause- “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(Contracting Officer: Insert applicable document type(s).

Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in

WAWF

Pay Official DoDAAC

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 5 OF 5 PAGES

Part 12 Clauses (CONTINUED)

Field Name in WAWF Data to be entered in

WAWF

Issue By DoDAAC Admin DoDAAC

Inspect By DoDAAC Ship To Code

Ship From Code Mark For Code

Service Approver (DoDAAC)

Service Acceptor (DoDAAC)

Accept at Other DoDAAC LPO DoDAAC

DCAA Auditor DoDAAC Other DoDAAC(s)

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

(Contracting Officer: Insert applicable email addresses or “Not applicable.”)

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

52.233-3 PROTEST AFTER AWARD (AUG 1996) FAR

252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2013) DFARS

52.253-1 COMPUTER GENERATED FORMS (JAN 1991) FAR

Attachments

List of Attachments

File Name Description

ATTACH_SPE603_20_C_5

001_Bilateral Tab 42 - Contract Awa

ATTACH_Attachment_I___ Performance_Work_State ment

Tab 42 - Contr

ATTACH_Attachement_II__ _E_QAPs

Tab 42 - Contr

ATTACH_SPE603_20_C_5

001_Award

Tab 42 - Contr

COCO Storage Hachinohe, Japan

Contents

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

SECTION C - SPECIFICATIONS/SOW/SOO/PWS

COSMO’S EXCEPTIONS & WAIVERS TO THE PWS:

C-0001-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)

C-0002-C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)

SECTION E – INSPECTION AND ACCEPTANCE

FAR 52.246-4 INSPECTION OF SERVICES – FIXED-PRICE (AUG 1996)

DLA ENERGY QUALITY ASSURANCE PROVISIONS (QAPS)

SECTION F – DELIVERIES OR PERFORMANCE

FAR 52.242-15 STOP-WORK ORDER (AUG 1989)

F-0001-F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC 2017)

F-0002-F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)

F-0003-F1.11 DLA INTERNET BID BOARDS SYSTEM (DIBBS)(DLA ENERGY APR 2014)

F-0004-F1.14 DETERMINATION OF QUANTITY (STORAGE)(DLA ENERGY NOV 1997)

F-0005 F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE)(DLA ENERGY DEC 1991) 25

SECTION G – CONTRACT ADMINISTRATION DATA

FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT

(OCT 2018)

DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(DEC 2018)

DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

G-0001-G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)

G-0002-G9.07-5 ELECTRONIC TRANSFER OF FUNDS PAYMENTS – FEDERAL RESERVE WIRE TRANSFER

SYSTEM (DLA ENERGY JAN 2012)

G-0003-G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)

G-0004-G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)

SECTION H – SPECIAL CONTRACT REQUIREMENTS

DFARS 252.225-7976 CONTRACTOR PERSONNEL PERFORMING IN JAPAN

(DEVIATION 2018-O0019)(AUG 2018)

H-0001-H9.01 TECHNICAL DIRECTION (DLA ENERGY FEB 1992)

COCO Storage Hachinohe, Japan

H-0002-H11 GUARD SERVICE (DLA ENERGY MAR 1982)

H-0003-H19 REPORTING AND CONTAINING OIL SPILLS (OVERSEAS STORAGE) (DLA ENERGY JAN 1982)

SECTION I – CONTRACT CLAUSES

FAR 52.202-1 DEFINITIONS (NOV 2013)(IBR)

FAR 52.203-3 GRATUITIES (APR 1984)(IBR)

FAR 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006) ALT I (OCT

1995)(IBR)

FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT

2010)(IBR)

FAR 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)

FAR 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR

STATEMENTS (JAN 2017)(IBR)

FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDE ON RECYCLED PAPER (MAY 2011)

FAR 52.204-9 PERSONAL INDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT

2018) (IBR)

FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

FAR 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)

FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUNE

2016)

FAR 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)(IBR)

FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS

(OCT 2018)(IBR)

FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (OCT 2018)

ADDENDUM 1 TO 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS - 52.243-1

CHANGES -- FIXED PRICE (AUG 1987) ALT I (APR 1984)

ADDENDUM 2 TO 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS - 52.215-8

ORDER OF PRECEDENCE – UNIFORM CONTRACT FORMAT (OCT 1997)

FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS – COMMERCIAL ITEMS (OCT 2019)

FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (JAN 2019)

FAR 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING

COCO Storage Hachinohe, Japan

(AUG 2011)(IBR)

FAR 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE 2008)(IBR)

FAR 52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF CONTRACT (FEB 2000)

FAR 52.229-6 TAXES – FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)

FAR 52.232-39 UNENFORECEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

FAR 52.233-1 DISPUTES (MAY 2014)

FAR 52.333-3 PROTEST AFTER AWARD (AUG 1996)

FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)(IBR)

FAR 52.242-13 BANKRUPTCY (JUL 1995)

FAR 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)

FAR 52.245-1 GOVERNMENT PROPERTY (JAN 2017)

FAR 52.245-9 USE AND CHARGES (APR 2012)

FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

DFARS 252.201-7000 CONTRACTING OFFICER’S REPRESENTATIVE (DEC 1991)

DFARS 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011)

DFARS 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)

DFARS 252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)

DFARS 252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)

DFARS 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

DFARS 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING (OCT 2016)

DFARS 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (MAY 2016)

DFARS 252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991)

DFARS 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (MAY 2015)

DFARS 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012)

DFARS 252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)

DFARS 252.225-7041 CORRESPONDENCE IN ENGLISH (JUN 1997)

DFARS 252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS

OUTSIDE THE UNITED STATES (JUN 2015)

DFARS 252.229-7001 TAX RELIEF (SEP 2014)

COCO Storage Hachinohe, Japan

DFARS 252.232-7008 ASSIGNMENT OF CLAIMS (OVERSEAS) (JUN 1997)

DFARS 252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

DFARS 252.233-7001 CHOICE OF LAW (OVERSEAS) (JUN 1997)

DFARS 252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR PERSONNEL

(JUN 2013)

DFARS 252.243-7001 PRICING OF CONTRACT MODIFICATION (DEC 1991)

DFARS 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)

DFARS 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS

(DOD CONTRACTS) (JUN 2013)

DFARS 252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY

(APR 2012)

DFARS 252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (DEC 2017)

DFARS 252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR 2012)

DFARS 252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL (DEC 2017)

DFARS 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA – BASIC (FEB 2019)

DLAD 52.204-9000 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (JUL 2015)

I-0001-I1.01-4 DEFINITIONS (CONT’D)(STORAGE) (DLA ENERGY JUNE 2009)

I-0002-I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS (DLA

ENERGY FEB 1996)

I-0003-I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA ENERGY JAN 2012)

I-0004-I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY AUG 2017)

I-0005-I147 DEMURAGE (DLA ENERGY NOV 1989)

I-0006-I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN 2012)

I-0007-I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) IMPLEMENTATION (SEP 2009)

SECTION J – LIST OF ATTACHMENTS

ATTACHMENT I – PERFORMANCE WORK STATEMENT

ATTACHMENT II – DLA ENERGY QUALITY ASSURANCE PROVISIONS (QAPS)

COCO Storage Hachinohe, Japan

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

The services to be furnished during the period specified herein and the unit prices are as follows:

CONTRACT LINE ITEM 0001 – OCONUS COCO STORAGE SERVICES, V20000404:

(FIRM FIXED PRICE)

The Contractor shall provide Contractor-Owned, Contractor-Operated COCO bulk fuel service capabilities in accordance with the Performance Work Statement (Section C, Attachment I of this award) and all other terms and conditions set forth herein, during the base period of February 15, 2020 through February 14, 2024 (4 years).

AREA(S) OF CONSIDERATION: Hachinohe, Japan area

The prices for the services and facilities to be provided during the FOUR-YEAR performance period February 15, 2020 through February 14, 2024 (4 years), as described in the Performance Work Statement, includes the following:

LINE ITEM 0001 (BASE):

TANK

NO.

PRODUCT

TYPE

SHELL

CAPACITY

(BARRELS)

FILL

CAPACITY

(BARRELS)

OCONUS

COCO

STORAGE

SERVICES

(MONTHLY

USE COCO

CHARGE)1

ANNUAL

STORAGE

USE CHARGE

TOTAL PRICE

(4 YEARS)

311 JP8 or Jet A-1 30,820 30,327 ¥5,919,000

$54,312.72*

¥71,028,000

$651,752.64*

¥284,112,000

$2,607,010.56*

312 JP8 or Jet A-1 8,617 8,046 ¥1,570,000

$14,406.31*

¥ 18,840,000

$172,875.72*

¥75,360,000

$691,502.88*

313 JP8 or Jet A-1 8,365 8,231 ¥1,606,000

$14,736.65*

¥19,272,000

$176,839.80*

¥77,088,000

$707,359.20*

314 JP8 or Jet A-1 5,346 5,260 ¥1,027,000

$9,423.75*

¥12,324,000

$113,085.00*

¥49,296,000

$452,340.00*

315 JP8 or Jet A-1 3,019 2,784 ¥ 543,000

$4,982.57*

¥6,516,000

$59,790.84*

¥26,064,000

$239,163.36*

COCO Storage Hachinohe, Japan

316 JP8 or Jet A-1 2,705 2,535 ¥ 495,000

$4,542.12*

¥5,940,000

$54,505.44*

¥23,760,000

$218,021.76*

Total 58,872 57,183

TOTAL PRICE:

¥ 11,160,000

$102,404.12*

¥133,920,000

$1,228,849.44*

¥535,680,000

$4,915,397.76* 1Includes initial & final shipment price. In the event of a partial month, the monthly price will be prorated.

Prices under CLIN 0001 shall include pricing for all services and requirements included in the Performance Work Statement (PWS).

NOTE*: Conversion Rate (November 6, 2019) of $1.00 = 108.98 Japanese Yen (¥) as published in The Wall Street Journal

NOTE 1: Monthly and Annual Storage Charges shall be based on a fill capacity of 57,183 barrels. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill Capacity of above identified tanks at no increase to the offered storage charges.

NOTE 2: Invoicing for the month of February 2020 will be prorated as follows: February 15, 2020 – February 29, 2020 (15 days on revenue). ¥11,160,000 / 29 days in February 2020 = ¥384,827.59 per day * 15 days = ¥5,772,413.79 for the month of February 2020. The final month of performance (February 1 – 14, 2024) shall be prorated as follows: ¥384,827.59 * 14 days = ¥5,387,586.26.

NOTE 3: For conversion of Japanese Yen to U.S. Dollar for invoicing purposes, Cosmo Oil Co. Ltd.

Must obtain and utilize the TTS rate from MUFG Bank on the 25th of the preceding month.

IAW Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractor’s expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0001 (CONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:

Tank Monthly OCONUS

COCO Storage Service Price

Annual Storage Use Charge

Daily Reduction/Addition Per Tank When Removed

From/Returned To Revenue IAW E18

311 ¥5,919,000 $54,312.72

¥71,028,000 $651,752.64

¥194,597 $1,785.62

312 ¥1,570,000 $14,406.31

¥18,840,000 $172,875.72

¥51,617 $473.63

COCO Storage Hachinohe, Japan

313 ¥1,606,000 $14,736.65

¥19,272,000 $176,839.80

¥52,800 $484.49

314 ¥1,027,000 $9,423.75*

¥12,324,000 $113,085.00

¥33,764 $309.82

315 ¥ 543,000 $4,982.57*

¥6,516,000 $59,790.84

¥17,852 $163.81

316 ¥ 495,000 $4,542.12*

¥5,940,000 $54,505.44

¥16,274 $149.33

SECTION C - SPECIFICATIONS/SOW/SOO/PWS

The Performance Work Statement (PWS) is incorporated by reference as if fully set forth herein. Refer to Attachment I.

Cosmo’s Exceptions & Waivers to the PWS:

The following exceptions, submitted in proposals dated July 1, 2019, August 27, 2019, August 30, 2019 and November 5, 2019 were accepted by DLA Energy:

a) PWS 1.3 Storage Tank Requirements: A fill capacity of 57,183 barrels is accepted.

b) PWS 2.1.1 Dock or Pier Requirements: Exception to draft of 25 feet mean low water is accepted. Reviewed and approved by the Japan regional office and DLA Energy tanker branch to remain in effect until such time the Port of Hachinohe can correct the draft situation. At this time Dredging is planned between April 2020 and March 2021.

c) PWS 2.2 Product Shipping: Cosmo offered a pumping rate of 1,070 bbls per hour vice the 2,000 bbls per hour in PWS is accepted.

C-0001-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)

(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.

(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.

(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.

(d) A water supply and firefighting equipment conforming to National Fire Protection Association and American Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.

(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate: local ambulance service; local fire department; local, COCO Storage Hachinohe, Japan county, and State police; regional office of the Federal Bureau of Investigation; Secret Service;

U.S. Marshal's Service; and the Federal Emergency Management Agency.

C-0002-C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)

Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.)

Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt.

Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)

SECTION E – INSPECTION AND ACCEPTANCE

FAR 52.246-4 INSPECTION OF SERVICES – FIXED-PRICE (AUG 1996)

(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

COCO Storage Hachinohe, Japan

(2) Terminate the contract for default.

(End of clause)

DLA Energy Quality Assurance Provisions (QAPs)

The QAPs listed in this section are hereby incorporated in full text under attachment II of this award.

E-0001-Energy QAP E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT

INSPECTION OF SERVICES (DLA ENERGY JAN 2012)

E-0002-ENERGY QAP E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)

E-0003-ENERGY QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM

STORAGE TANKS (DLA ENERGY) (FEB 2017)

E-0004-ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY

CONTRACTS (DLA ENERGY) (APR 2016)

E-0005-ENERGY QAP E28 CONTRACTOR INSPECTION RESPONSIBILITIES

(STORAGE) (DEC 2011)

E-0006-ENERGY QAP E34 TEST FOR SULFIDES IN WATER (DLA ENERGY MAY 1987)

E-0007-ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA

ENERGY DEC 2011)

E-0008-ENERGY QAP E36 INSPECTION (STORAGE)(DLA ENERGY) (FEB 1970)

SECTION F – DELIVERIES OR PERFORMANCE

FAR 52.242-15 STOP-WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause.

Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either --

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if –

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

(End of Clause)

F-0001-F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC

2017)

(a) Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.

(b) The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor.

(c) When requested, the Contractor will transfer product between tanks to consolidate like types or grades.

(d) Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to effect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property Administrator for disposition instructions. Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government Service. Tanks out of service for cleaning shall be governed by the INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS contract provision.

(e) Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.

COCO Storage Hachinohe, Japan

(f) Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.

(g) Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the Contractor when the tank car comes to rest on the Contractor's siding.

(h) Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the Contractor when the fuel passes the vessel’s permanent hose connection.

(i) The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.

(j) The Contractor will prepare and process the following certificate on bond paper when it is necessary to upgrade or downgrade a product:

I certify that ______________ gallons of _____________________ have been upgraded/downgraded (quantity) (product) from ___________________ to ____________________. This action was required because (product) (product)

(enter reason for the action)

Signature of Contractor Representative

[ ] I concur with the Contractor’s certification.

[ ] I do not concur with the Contractor’s certification for the following reasons:

Signature of Quality Representative

(A receipt transaction will be reflected on the monthly stock report for the gain in product, with a shipment being reflected for the losing product.)

(k) The following subparagraphs apply only to barges and tankers.

(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAY TIME.

(i) The Contractor shall be notified in advance of the scheduled arrival date. Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date; for barges, at least 48 hours in advance of the scheduled arrival date. The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the 72/48 hours. Changes in the scheduled arrival date that will provide less than the 48 hours’ notice for barges and the 72 hours’ notice for

COCO Storage Hachinohe, Japan tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.

(ii) The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, PROVIDED --

(A) If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and lay time shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.

(B) If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Lay time shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.

(iii) Lay time shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.

(iv) Lay time, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.

(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within lay time determined as follows:

(A) FOR BARGES: One hour for each 2,000 barrels of product to be unloaded.

(B) FOR TANKERS: Thirty-six hours of discharge of a full vessel cargo.

When partial vessel cargoes are to be unloaded, the 36 hours will be prorated based on quantities discharged in each port.

(vi) Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the Contractor.

(2) INCREASES TO BASIC ALLOWED LAY TIME.

(i) If, after lay time commences, the conditions or facilities of the barge or tanker to be unloaded do not permit unloading, basic allowed lay time shall be increased by the duration of the delay.

(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed lay time shall be increased by the duration of the delay.

(iii) If the vessel owner’s or operator’s regulations prohibit unloading at any time after lay time has commenced, the lost time shall be added to the basic allowed lay time.

(iv) If, for any reason, the Contractor is delayed in unloading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed lay time shall be increased by the duration of the delay.

(v) There will be no increase to basic allowed lay time (nor other reductions to any resulting demurrage time) for saved lay time arising out of other loadings/discharges.

(vi) Delays, after commencement of lay time, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result

COCO Storage Hachinohe, Japan in increasing the basic allowed lay time by one half of the delay time.

(3) PAYMENT OF DEMURRAGE. For all hours of lay time which elapse in excess of the basic allowed lay time for unloading provided for by subparagraph (k)(1)(v), or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:

(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.

(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.

F-0002-F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)

(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:

"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE

AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION

OFFICE) in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND

TITLE OF CONTRACTOR'S DESIGNATED REPRESENTATIVE)."

(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.

(c) Conveyances required for shipments shall be furnished or designated by the Government.

The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver. The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES.

COCO Storage Hachinohe, Japan

Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.

(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels, jet lubricating oil, and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish, periodically inspect, clean such strainers, and repair same, if necessary, keeping a written record thereof.

(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. The Contractor will furnish such seals. Seal numbers will be indicated on shipping documents.

(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.

(g) FOR TANK CARS ONLY.

(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.

(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.

(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.

(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments. Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.

(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information.

The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.

(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.

(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.

(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.

(m) Custody of product delivered to tanker or barge, and risk of loss thereof, shall pass from the Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.

(n) The Contractor shall be held accountable for demurrage charges arising from delay(s) in shipment by tank cars and transport trucks except when those delays are caused by reasons beyond the control and without the fault or negligence of the Contractor and its subcontractors.

(o) The following subparagraphs only apply to barges and tankers.

(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAY TIME.

(i) Notice shall be furnished to the Contractor in advance of the date on which loading is to be made, which date is hereinafter referred to as the "Scheduled Arrival Date." Each notice will specify the quantity to be loaded, the cargo number, and name of the vessel and the scheduled loading date. For tankers, notice will also include the size of the vessel and the expected time of arrival. Notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date for tankers, and at least 48 hours in advance of the scheduled arrival date for barges. When anticipated vessel transit time to the loading point is less than 72/48 hours, the Government will provide the maximum notice practicable. Any change in the scheduled arrival date of less than 48 hours’ notice for barges and 72 hours’ notice for tankers will require verbal approval of the Contractor, confirmed in writing.

(ii) The Contractor shall provide as soon as possible, but within 3 hours after issue of notice of readiness to load from a barge and within 6 hours after the Contractor receives notice of readiness to load from a tanker, a reachable berth, free of cost to the Government, where the vessel can be safely moored and afloat with necessary access thereto PROVIDED, however --

(A) If the vessel is tendered for loading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be loaded as soon as possible in its proper turn with other vessels, and lay time shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.

(B) If the vessel is tendered for loading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be loaded in its proper turn with other vessels. Lay time shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available. If the vessel is not moored in its proper turn with other vessels, lay time will commence at 6:00 A.M. on the date the Government vessel’s turn occurred.

(iii) Lay time shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.

(iv) Lay time, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until loading of the barge or tanker is completed and hoses have been removed.

(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within lay time determined as follows:

(A) FOR BARGES: One hour for each 2,000 barrels of product to be loaded.

(B) FOR TANKERS: Thirty-six hours for load of full vessel cargo. When partial vessel cargoes are to be loaded, the 36 hours will be prorated based on quantities loaded by each supplier. The 36 hours includes allowances for routine events that occur in the loading process, such as cushioning and topping off of vessel tanks.

(vi) Hoses and loading arms for loading shall be furnished, connected, and disconnected by the Contractor.

(2) INCREASES TO BASIC ALLOWED LAY TIME.

(i) If, after lay time commences, the conditions or facilities of the barge or tanker to be loaded do not permit loading, basic allowed lay time shall be increased by the duration of the…

This is the start of the file's text. The full file is on GovTribe.