SPE603-19-R-0503_Solicitation.pdf
PDF 1 MB Posted
- Solicitation number
- SPE60319R0503
- Issued by
-
Defense Logistics Agency Energy
About this file
Solicitation SPE60319R0503 to COCO fuel storage services in the San Francisco Bay, CA area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
RFQ IFB RFP
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NAICS:
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8 (A)
EDWOSB
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
74991170 217
SPE603-19-R-0503
Micherie M. Dougherty (571) 767-3681
SPE603
See Schedule RFP/OSP Section B: Supplies/Services and Prices/Cost
See Block 9
Defense Finance & Accounting Service - Columbus Center Fuels Payment Division, Services Commodity/JAQBAD P.O Box 182317 Columbus, OH 43218-2317 Fax: (614)693-2360
See Schedule DLA Energy Contract Provision B-0001-
B34.01 SERVICES TO BE FURNISHED AND PRICES
546,000 bbls JET A & 502,000 bbls JP5 Storage San Francisco Bay Area, CA
Period of Performance: 07 May 2019 - 06 May 2023 Option: 07 May 2023 - 06 May 2028
SHANE A. BANKS
493190
$27,500,000.00
12/20/2018
02/04/2019 1:00 P.M.
DLA Energy - FESBB 8725 John J. Kingman Road, Suite 2945 Fort Belvoir, VA 22060-6222 Buyer/Office: Micherie M. Dougherty/micherie.
dougherty@dla.mil
SL4701
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
SOLICITATION SPE603-19-R-0503
COCO Storage San Francisco Bay Area, CA
ADDITIONAL INSTRUCTIONS FOR ALL PROSPECTIVE OFFERORS
NOTE: See FAR 52.212-1- INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (AUG 2018) and Addendum and FAR 52.212-2- EVALUATION – COMMERCIAL ITEMS (OCT 2014) for complete instructions on how to submit a proposal.
A. Attached is the Request for Proposal Number SPE603-19-R-0503 for fuel storage and handling facilities capable of receiving, storing, protecting, maintaining, and issuing 546,000 barrels of military grade Jet A and 502,000 barrels military grade JP-5 in the San Francisco Bay Area, CA.
B. The NAICS code is 493190 and the threshold is $27.5 million in annual receipts.
C. DLA ENERGY-FESBB is the designated office for receipt of offers. Your proposal must be received no later than 1:00 PM local Fort Belvoir, VA (EST) time on February 4, 2019. All offerors shall clearly mark all envelopes/packages sent in response to this solicitation with the words: "OFFERED UNDER SOLICITATION SPE603-19-R-0503.” Mailed offers should be mailed to the following address:
US Post Office/US Post Office Express Mail offer only: Hand Carried/Courier Delivery Service only:
ATTN: DLA Energy-FESBB Bid Custodian Room 2945 ATTN: DLA Energy-FESBB Bid Custodian Room Defense Logistics Agency Energy Mrs. Micherie Dougherty / Telephone 571-767-3681 8725 John J. Kingman Road, Suite 2945 Defense Logistics Agency Energy Fort Belvoir, VA 22060-6222 8725 John J. Kingman Road, Suite 4950 Fort Belvoir, VA 22060-6222
FOR VERIFICATION OF RECEIPT: Contact Micherie Dougherty at (571)-767-3681.
D. FAXED PROPOSALS ARE NOT AUTHORIZED. Please e-mail your proposal to bidcustodian@dla.mil with copy to micherie.dougherty@dla.mil and shane.banks@dla.mil. All e-mail proposals MUST be followed-up with the hard copy (consisting of three volumes as outlined below) NO LATER THAN (5) business days after solicitation closing. Late proposals will be processed in accordance with FAR 15.208 – Submission, Modification, Revision, and Withdrawal of Proposals. When submitting a proposal via e-mail, please ensure it is sent within enough time in order for it to be processed through the server. Offerors’ proposals shall be prepared in three (3) separate volumes and provided in the quantities shown below:
THIS SPACE INTENTIONALLY LEFT BLANK.
mailto:bidcustodian@dla.mil mailto:shane.banks@dla.mil
COCO Storage San Francisco Bay Area, CA
Volume Title No. of Copies Required Page Limit
I Technical Proposal
1 original and 1 PDF electronic copy
II Offeror Submission Package (OSP) includes Price Proposal
1 original and 1 PDF electronic copy of Attachment II –
OFFEROR SUBMISSION
PACKAGE
None
III Past Performance
(PPQ)
I PDF electronic copy None
Complete and return one original, and one PDF electronic copy of the Offeror Submission Package and one original and one PDF electronic copy of the Technical Proposal submissions as described in 52.212-1 INSTRUCTIONS TO OFFERS – COMMERCIAL ITEMS (JAN 2017) with Addendum (AUG 2018). Your prices must be inserted in DLA Energy Contract Text B-0001 B34.01 SERVICES TO BE FURNISHED (DLA ENERGY FEB 1991) in the Offeror Submission Package.
E. Unless you specifically state otherwise, your offer is assumed to accept all terms and conditions of this solicitation. Any exceptions to any part of this solicitation must be specifically identified in a cover letter to your proposal.
F. The Government intends to evaluate proposals and award with discussions with offerors.
However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. This procurement is issued using the Lowest Price Technically Acceptable process IAW FAR15.101-2. See FAR 52.212-2 EVALUATION - COMMERCIAL ITEMS (Oct 2014) for evaluation factors. The resulting type of contract will be Firm-Fixed-Price.
G. A pre-proposal teleconference is scheduled for January 9, 2019. (See DLA Energy contract text L-0005 L198 PRE-PROPOSAL CONFERENCE (SERVICES) (DLA ENERGY FEB 2009) for details and directions). Interested parties planning to attend should submit names, phone numbers, email addresses and the firm being represented to Micherie Dougherty via email at Micherie.Dougherty@dla.mil and Shane Banks at shane.banks@dla.mil no later than January 3, 2019 by 3:00 PM local time (Ft. Belvoir, VA). Questions should also be submitted via email and all responses will be posted in an Amendment to the solicitation on FedBizOpps. Confirmed participates will receive the conference number and passcode prior to the conference.
Prospective offerors are requested to submit questions regarding the solicitation in writing via e-mail to the above e-mail address five (5) days in advance of the conference to allow their inclusion in the agenda. Questions will be considered at any time prior to or during the conference; however, offerors will be asked to confirm verbal questions in writing.
The Government will not be liable for expenses incurred by an offeror prior to contract award.
COCO Storage San Francisco Bay Area, CA
Offerors are cautioned that remarks and explanations provided at the conference shall not change the terms of this solicitation unless the solicitation is amended in writing. Offerors may obtain a copy of the conference minutes from the Contracting Officer.
NOTE: The Government reserves the right to cancel the preproposal conference if confirmation of attendance is not received by two or more potential offerors.
H. NOTICE REGARDING SUSPENSION/DEBARMENT/INELIGIBILITY: Any contract awarded to a Contractor who, at the time of award was suspended, debarred, or ineligible for receipt of contract with Government Agencies or in receipt of a notice of proposed debarment from any Government Agency, is voidable at the option of the Government.
I. Care should be taken to mail correspondence relating to this solicitation or resulting contract to the appropriate office as indicated in the applicable clauses.
J. TAX EXEMPT NUMBER: For the Defense Logistics Agency-Energy is 31-4420477.
K. Pricing of Services:
1. The prices submitted must be inclusive of all direct costs, indirect costs, and profit.
Offerors MUST include ALL costs associated with providing the services described herein.
2. The Government SHALL NOT be responsible for compensating the Contractor for any cost tied to solicitation requirements but not factored into the proposed prices, either by the Contractor’s intention or by mistake.
L. QUESTIONS RELATING TO THIS SOLICITATION: Must be emailed to Micherie Dougherty at micherie.dougherty@dla.mil or Shane Banks, at shane.banks@dla.mil no later than 2:00 P.M. local time (Fort Belvoir, VA) on Thursday, January 24, 2019. Please reference the Solicitation Number in the SUBJECT LINE of your email. All responses will be provided via an amendment to the solicitation.
mailto:micherie.dougherty@dla.mil
COCO Storage San Francisco Bay Area, CA
Contents
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
SECTION C - SPECIFICATIONS/SOW/SOO/PWS
C-0001-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)
C-0002-C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)
SECTION E – INSPECTION AND ACCEPTANCE
FAR 52.246-4 INSPECTION OF SERVICES – FIXED-PRICE (AUG 1996)
DLA ENERGY QUALITY ASSURANCE PROVISIONS (QAPS)
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.242-15 STOP-WORK ORDER (AUG 1989)
F-0001-F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC 2017)
F-0002-F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)
F-0003-F1.11 DLA INTERNET BID BOARDS SYSTEM (DIBBS)(DLA ENERGY APR 2014)
F-0004-F1.14 DETERMINATION OF QUANTITY (STORAGE)(DLA ENERGY NOV 1997)
F-0005-F45.01 OPERATION OF CONDUCTIVITY ADDITIVE SYSTEM (DLE ENERGY JAN 2014)
F-0006-F45.03 OPERATION OF FUEL SYSTEM ICING INHIBITOR ADDITIVE SYSTEM CONTRACTOR-
OWNER CONTRACTOR-OPERATED (COCO)(DLA ENERGY JAN 2014)
F-0007-F45.04 OPERATION OF CORROSION INHIBITOR/LUBRICITY IMPROVER ADDITIVE SYSTEM, CONTRACTOR-OWNED CONTRACTOR-OPERATED (COCO) (DLA ENERGY JAN 2014)
F-0008-F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE)(DLA ENERGY DEC 1991) 33
SECTION G – CONTRACT ADMINISTRATION DATA
FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT
(OCT 2018)
DFARS 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(JUN 2012)
DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
G-0001-G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998)
G-0002-G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA ENERGY JAN 2017)
G-0003-G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY MAY 2009)
G-0004-G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL 1997)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H-0001-H9.01 TECHNICAL DIRECTION (DLA ENERGY FEB 1992)
H-0002-H11 GUARD SERVICE (DLA ENERGY MAR 1982)
COCO Storage San Francisco Bay Area, CA
H-0003-H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE) (DLA ENERGY JAN 2012)
SECTION I – CONTRACT CLAUSES
FAR 52.202-1 DEFINITIONS (NOV 2013)(IBR)
FAR 52.203-3 GRATUITIES (APR 1984)(IBR)
FAR 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006) ALT I (OCT
1995)(IBR)
FAR 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT
2010)(IBR)
FAR 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR
STATEMENTS (JAN 2017)(IBR)
FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDE ON RECYCLED PAPER (MAY 2011)
FAR 52.204-9 PERSONAL INDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
FAR 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT
2018) (IBR)
FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
FAR 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUNE
2016)
FAR 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)(IBR)
FAR 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS
(OCT 2018)(IBR)
FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015)
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (OCT 2018)
ADDENDUM 1 TO 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS - 52.243-1
CHANGES -- FIXED PRICE (AUG 1987) ALT I (APR 1984)
ADDENDUM 2 TO 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS - 52.215-8
ORDER OF PRECEDENCE – UNIFORM CONTRACT FORMAT (OCT 1997)
FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS – COMMERCIAL ITEMS (OCT 2018)
FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
FAR 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS
(OCT 2014) (IBR)
FAR 52.219-8 UTILIZATION OF SMALL BUSINESS CONERNS (OCT 2018)(IBR)
COCO Storage San Francisco Bay Area, CA
FAR 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2018)(DEVIATION 2018-O0018)(IBR).. 67
FAR 52.219-16 LIQUIDATED DAMAGES – SUBCONTRACTING PLAN (JAN 1999)(IBR)
FAR 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)(IBR)
FAR 52.222-3 CONVICT LABOR (JUNE 2003)(IBR)
FAR 52.222-17 NONDISPLACEMENT OF QUALIFIED WORKERS (MAY 2014)(IBR)
FAR 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015) (IBR)
FAR 52.222-26 EQUAL OPPORTUNITY (SEPT 2016)(IBR)
FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)(IBR)
FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)(IBR)
FAR 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016) (IBR)
FAR 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT
(DEC 2010)(IBR)
FAR 52.222-41 SERVICE CONTRACT LABOR STANDARDS (AUG 2018)(IBR)
FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)
FAR 52.222-43 FAIR LABOR STANDARD ACT AND SERVICE CONTRACT LABOR STANDARDS – PRICE
ADJUSTMENT (MULTIPLE YEAR AND OPTION CONTRACT(S) (AUG 2018) (IBR)
FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)
FAR 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)(IBR)
FAR 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017)(IBR)
FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONTRUCTION CONTRACTS (SEPT 2013)
FAR 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING
(AUG 2011)(IBR)
FAR 52.225-13 RESTRICTIONS ON CERTAIN FOREING PURCHASES (JUN 2008)
FAR 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
FAR 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
FAR 52.232-17 INTEREST (MAY 2014)
FAR 52.232-39 UNENFORECEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)
FAR 52.233-1 DISPUTES (MAY 2014)
FAR 52.333-3 PROTEST AFTER AWARD (AUG 1996) (IBR)
FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)(IBR)
FAR 52.242-13 BANKRUPTCY (JUL 1995)
FAR 52.245-1 GOVERNMENT PROPERTY (JAN 2017)
COCO Storage San Francisco Bay Area, CA
FAR 52.245-9 USE AND CHARGES (APR 2012)
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
DFARS 252.201-7000 CONTRACTING OFFICER’S REPRESENTATIVE (DEC 1991)
DFARS 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011)
DFARS 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP 2013)
DFARS 252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)
DFARS 252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016)
DFARS 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
DFARS 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (OCT 2016)
DFARS 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (MAY 2016)
DFARS 252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC 1991)
DFARS 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (OCT 2015)
DFARS 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012)
DFARS 252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)—BASIC(APRIL 2018)
DFARS 252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)
DFARS 252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC
ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (SEP 2004)
DFARS 252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
DFARS 252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR PERSONNEL
(JUN 2013)
DFARS 252.243-7001 PRICING OF CONTRACT MODIFICATION (DEC 1991)
DFARS 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
DFARS 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS
(DOD CONTRACTS) (JUN 2013)
DFARS 252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY
(APR 2012)
DFARS 252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (DEC 2017)
DFARS 252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR 2012)
DFARS 252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL (DEC 2017)
COCO Storage San Francisco Bay Area, CA
DFARS 252.246-7004 SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY
OPERATIONS (OCT 2010)
DFARS 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA—BASIC (APR 2014)
DFARS 252.247-7024 NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA (MAR 2000)
DLAD 52.204-9000 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (JUL 2015)
DLAD 52.233-9001 DISPUTES-AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (DEC 2016) 137
I-0001-I1.01-4 DEFINITIONS (CONT’D)(STORAGE) (DLA ENERGY JUNE 2009)
I-0002-I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE – COMMERCIAL ITEMS (DLA
ENERGY FEB 1996)
I-0003-I102.02 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT – PAYROLL TAX
ADJUSTMENT(DLA ENERGY JAN 2012)
I-0004-I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM PRODUCTS (DLA ENERGY JAN 2012)
I-0005-I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD (DLA ENERGY AUG 2017)
I-0006-I147 DEMURAGE (DLA ENERGY NOV 1989)
I-0007-I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN 2012)
I-0008-I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI) IMPLEMENTATION (SEP 2009)
SECTION J – LIST OF ATTACHMENTS
ATTACHMENT I – PERFORMANCE WORK STATEMENT
ATTACHMENT II – OFFEROR’S SUBMISSION PACKAGE (OSP)
ATTACHMENT III – DEPARTMENT OF LABOR WAGE DETERMINATION
ATTACHMENT IV – DLA ENERGY QUALITY ASSURANCE PROVISIONS (QAPS)
ATTACHMENT V – PAST PERFORMANCE INFORMATION DISCLOSURE CONSENT FORM
ATTACHMENT VI – PAST PERFORMANCE QUESTIONNAIRE
ATTACHMENT VII – SMALL BUSINESS SUBCONTRACTING PLAN
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS
FAR 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)
FAR 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (SEPT 2007)
FAR 52.203-18 PROHIBITION ON CONTRACTING WITH ENTITITES THAT REQUIRE CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS – REPRESENTATION (JAN 2017)
FAR 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2016)
FAR 52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JULY 2016)
FAR 52.204-20 PREDECESSOR OF OFFEROR (JULY 2016)
COCO Storage San Francisco Bay Area, CA
FAR 52.209-2 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS –
REPRESENTATION (NOV 2015)
FAR 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)
FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
FAR 52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OF A
FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)
FAR 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS (OCT 2018)
ALTERNATE I (OCT 2014)
FAR 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) ALTERNATE I (SEPT 2015) 180
FAR 52.222-56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN (MAR 2015)
FAR 52.223-1 BIOBASED PRODUCT CERTIFICATION (MAY 2012)
DFARS 252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(NOV 2011)
DFARS 252.225-7050 DISCLOSURE OF OWNWERSHIP OR CONTROL BY THE GOVERNMENT OF A
COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (JAN 2018)
DFARS 252.247-7022 REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG 1992)
K-0001-K15 RELEASE OF PRICES (DLA ENERGY MAR 2009)
K-0002-K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007)
K-0003-K150 WIDE AREA WORKFLOW (WAWF) SUPPLEMENTAL INVOICE SUBMISSION (DLA ENERGY
MAY 2014)
SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (AUG 2018) (DEVIATION 2018- O0018)
ADDENDUM TO 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS
FAR 52.216-1 TYPE OF CONTRACT (APR 1984)
FAR 52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (FEB 1999) .. 201
FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)
FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
DFARS 252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION
CONTROLS (OCT 2016)
DFARS 252.215-7008 ONLY ONE OFFER (OCT 2013)
L-0001-L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991)
L-0002-L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010)
COCO Storage San Francisco Bay Area, CA
L-0003-L82 WAGE DETERMINATION (DLA ENERGY FEB 2009)
L-0004-L116.01 DATA REQUIREMENTS (STORAGE) (DLA ENERGY JAN 2013)
L-0005-L198 PREPROPOSAL CONFERENCE (SERVICES) (DLA ENERGY JUL 2018)
SECTION M – EVALUATION FACTORS FOR AWARD
FAR 52.212-2 EVALUATION – COMMERCIAL ITEMS (OCT 2014)
ADDENDUM TO 52.212-2 TO FAR 52.212-2 EVALUATION – COMMERCIAL ITEMS
FAR 52.217-5 EVALUATION OF OPTIONS (JULY 1990)
M-0001-M7 SOCIOECONOMIC EVALUATION (DLA ENERGY FEB 2005)
M-0002-M43.01 EVALUATION OF OPTIONS (DLA ENERGY MAR 2009)
M-0003-M72 EVALUATION OF OFFERS (EXCEPTIONS/DEVIATIONS) (DLA ENERGY APR 1997)
COCO Storage San Francisco Bay Area, CA
SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS
B-0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)
The services to be furnished during the period specified herein and the unit prices are as follows:
BASE
CONTRACT LINE ITEM 0001 – CONUS COCO STORAGE SERVICES, V20000034:
(FIRM FIXED PRICE)
The Contractor shall provide Contractor-Owned, Contractor-Operated COCO bulk fuel service capabilities in accordance with the Performance Work Statement, Section C, and all other terms and conditions set forth herein, during the base period of May 7, 2019 through May 6, 2023 (4 years) (Period of performance is subject to change based on date of award).
AREA(S) OF CONSIDERATION: San Francisco Bay Area, CA
The prices for the services and facilities to be provided during the four-year performance period (May 7, 2019 through May 6, 2023) (Period of performance is subject to change based on date of award), as described in the Performance Work Statement, includes the following:
LINE ITEM 0001:
TANK
NO.
PRODUCT
TYPE
SHELL
CAPACITY
(BARRELS)
FILL
CAPACITY
(BARRELS)
CONUS
COCO
STORAGE
SERVICES
(MONTHLY
USE COCO
CHARGE)1
ANNUAL
STORAGE
USE
CHARGE
TOTAL
PRICE
(4
YEARS)
Dedicated Line Fill
TOTALS $ $ $
NOTE1: A fill capacity quantity of 1,048,000 barrels is required. Monthly and Annual Storage
1Includes initial & final shipment price. In the event of a part month, the monthly price will be prorated.
COCO Storage San Francisco Bay Area, CA
Charges shall be based on this quantity. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart.
All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill Capacity of above identified tanks at no increase to the offered storage charges.
NOTE: For evaluation purposes: EXTP will be evaluated at 100,000 barrels. The price offered for EXTP will be added to the Offeror’s total price. The EXTP per barrel price is: ___________
NOTE: For evaluation purposes: Any interface/transmix generated during pipeline issue/receipt will be evaluated at 100,000 US Gallons. The price offered for interface/transmix will be added to the Offeror’s total price. The interface/transmix per barrel price is:
IAW Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractors expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0001 (CONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:
Tank Monthly CONUS
COCO Storage Service Price
Annual Storage Use Charge
Daily Reduction/Addition Per Tank When Removed From/Returned To Revenue IAW E18
NOTE: For each full calendar month a tank is out of service and removed from revenue, line item 0001 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage was not offered under E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under line item 0001 by utilizing the following formula:
Monthly CONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition 365 Days
NOTE: If alternate tankage is offered IAW QAP E18, please include shell/fill capacities in the offer.
COCO Storage San Francisco Bay Area, CA
OPTION 1
CONTRACT LINE ITEM 0002 – CONUS COCO STORAGE SERVICES, V20000034:
(FIRM FIXED PRICE)
The Contractor shall provide Contractor-Owned, Contractor-Operated COCO bulk fuel service capabilities in accordance with the Performance Work Statement, Section C, and all other terms and conditions set forth herein, during the base period of May 7, 2023 through May 6, 2028 (5 years) (Period of performance is subject to change based on date of award).
AREA(S) OF CONSIDERATION: San Francisco Bay Area, CA
The prices for the services and facilities to be provided during the five-year performance period (May 7, 2023 through May 6, 2028) (Period of performance is subject to change based on date of award), as described in the Performance Work Statement, includes the following:
LINE ITEM 0002:
TANK
NO.
PRODUCT
TYPE
SHELL
CAPACITY
(BARRELS)
FILL
CAPACITY
(BARRELS)
CONUS
COCO
STORAGE
SERVICES
(MONTHLY
USE COCO
CHARGE)2
ANNUAL
STORAGE
USE
CHARGE
TOTAL
PRICE
(5 YEARS)
Dedicated Line Fill
TOTALS $ $ $
NOTE2: A fill capacity quantity of 1,048,000 barrels is required. Monthly and Annual Storage Charges shall be based on this quantity. Additionally, Monthly Usage prices when multiplied by 12 months should equate to the Annual Storage Usage Charge as stated in the above chart.
All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total Fill Capacity of above identified tanks at no increase to the offered storage charges.
2Includes initial & final shipment price. In the event of a part month, the monthly price will be prorated.
COCO Storage San Francisco Bay Area, CA
NOTE: For evaluation purposes: EXTP will be evaluated at 100,000 barrels. The price offered for EXTP will be added to the Offeror’s total price. The EXTP per barrel price is: ___________
NOTE: For evaluation purposes: Any interface/transmix generated during pipeline issue/receipt will be evaluated at 100,000 US Gallons. The price offered for interface/transmix will be added to the Offeror’s total price. The interface/transmix per barrel price is:
NOTE: In accordance with (IAW) FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999), the contractor is accepting that prices for the extension(s) not to exceed six months (if required) will remain the same as the offered prices under DLA Energy Contract Provision B-
0001-B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991).
IAW Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractors expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0002 (CONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:
Tank Monthly CONUS
COCO Storage Service Price
Annual Storage Use Charge
Daily Reduction/Addition Per Tank When Removed From/Returned To Revenue IAW E18
NOTE: For each full calendar month a tank is out of service and removed from revenue, line item 0001 shall reflect a reduction to $0.00 for the subject tank. If alternate tankage was not offered under E18 and will not be utilized when cleaning/inspection occurs, the rates in the above chart will be utilized when subject tank is out of service. Rates above shall be determined for each tank offered under line item 0002 by utilizing the following formula:
Monthly CONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition 365 Days
NOTE: If alternate tankage is offered IAW QAP E18, please include shell/fill capacities in the offer.
COCO Storage
SECTION C - SPECIFICATIONS/SOW/SOO/PWS
The Performance Work Statement (PWS) is incorporated by reference as if fully set forth herein. Refer to Attachment I.
C-0001-C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)
(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.
(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.
(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.
(d) A water supply and firefighting equipment conforming to National Fire Protection Association and American Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.
(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate: local ambulance service; local fire department; local, county, and State police; regional office of the Federal Bureau of Investigation; Secret Service;
U.S. Marshal's Service; and the Federal Emergency Management Agency.
C-0002-C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)
Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.)
Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt.
Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)
THIS SPACE IS INTENTIONALLY LEFT BLANK.
COCO Storage
SECTION E – INSPECTION AND ACCEPTANCE
FAR 52.246-4 INSPECTION OF SERVICES – FIXED-PRICE (AUG 1996)
(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—
(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(2) Reduce the contract price to reflect the reduced value of the services performed.
(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—
(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
(2) Terminate the contract for default.
(End of clause)
DLA Energy Quality Assurance Provisions (QAPs)
The below referenced QAPs are hereby incorporated by reference as if fully set forth herein. Full QAP texts are in Attachment IV.
E-0001-Energy QAP E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT
INSPECTION OF SERVICES (DLA ENERGY JAN 2012)
E-0002-ENERGY QAP E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)
E-0003-ENERGY QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM
STORAGE TANKS (DLA ENERGY) (FEB 2017)
E-0004-ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY
CONTRACTS (DLA ENERGY) (APR 2016)
COCO Storage
E-0005-ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA
ENERGY DEC 2011)
E-0006-ENERGY QAP E36 INSPECTION (STORAGE)(DLA ENERGY) (FEB 1970)
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.242-15 STOP-WORK ORDER (AUG 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause.
Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either --
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if –
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
(End of Clause)
COCO Storage San Francisco Bay Area, CA
F-0001-F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC
2017)
(a) Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.
(b) The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor.
(c) When requested, the Contractor will transfer product between tanks to consolidate like types or grades.
(d) Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to effect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property Administrator for disposition instructions. Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government Service. Tanks out of service for cleaning shall be governed by the INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS contract provision.
(e) Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.
(f) Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.
(g) Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the Contractor when the tank car comes to rest on the Contractor's siding.
(h) Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the Contractor when the fuel passes the vessel’s permanent hose connection.
(i) The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.
(j) The Contractor will prepare and process the following certificate on bond paper when it is necessary to upgrade or downgrade a product:
I certify that ______________ gallons of _____________________ have been upgraded/downgraded (quantity) (product) from ___________________ to ____________________. This action was required because (product) (product)
(enter reason for the action)
COCO Storage
Signature of Contractor Representative
[ ] I concur with the Contractor’s certification.
[ ] I do not concur with the Contractor’s certification for the following reasons:
Signature of Quality Representative
(A receipt transaction will be reflected on the monthly stock report for the gain in product, with a shipment being reflected for the losing product.)
(k) The following subparagraphs apply only to barges and tankers.
(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAY TIME.
(i) The Contractor shall be notified in advance of the scheduled arrival date. Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date; for barges, at least 48 hours in advance of the scheduled arrival date. The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the 72/48 hours. Changes in the scheduled arrival date that will provide less than the 48 hours’ notice for barges and the 72 hours’ notice for tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.
(ii) The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, PROVIDED --
(A) If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and lay time shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.
(B) If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Lay time shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.
(iii) Lay time shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.
(iv) Lay time, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.
COCO Storage San Francisco Bay Area, CA
(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within lay time determined as follows:
(A) FOR BARGES: One hour for each 2,000 barrels of product to be unloaded.
(B) FOR TANKERS: Thirty-six hours of discharge of a full vessel cargo.
When partial vessel cargoes are to be unloaded, the 36 hours will be prorated based on quantities discharged in each port.
(vi) Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the Contractor.
(2) INCREASES TO BASIC ALLOWED LAY TIME.
(i) If, after lay time commences, the conditions or facilities of the barge or tanker to be unloaded do not permit unloading, basic allowed lay time shall be increased by the duration of the delay.
(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed lay time shall be increased by the duration of the delay.
(iii) If the vessel owner’s or operator’s regulations prohibit unloading at any time after lay time has commenced, the lost time shall be added to the basic allowed lay time.
(iv) If, for any reason, the Contractor is delayed in unloading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed lay time shall be increased by the duration of the delay.
(v) There will be no increase to basic allowed lay time (nor other reductions to any resulting demurrage time) for saved lay time arising out of other loadings/discharges.
(vi) Delays, after commencement of lay time, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed lay time by one half of the delay time.
(3) PAYMENT OF DEMURRAGE. For all hours of lay time which elapse in excess of the basic allowed lay time for unloading provided for by subparagraph (k)(1)(v), or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:
(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.
(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.
F-0002-F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)
(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan. Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the
COCO Storage San Francisco Bay Area, CA following certification on the inspector's copy of the shipping documents:
"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE
AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION
OFFICE) in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND
TITLE OF CONTRACTOR'S DESIGNATED REPRESENTATIVE)."
(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.
(c) Conveyances required for shipments shall be furnished or designated by the Government.
The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.