RFP_SPE603-19-R-0500.pdf

PDF 1 MB Posted

Attached to
Contractor-Owned Contractor-Operated Fuel Storage Services (Jet-A/ F-24)
Solicitation number
SPE603-19-R-0500
Issued by

About this file

RFP SPE603-19-R-0500

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

0075756045

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER

SPE603-19-R-0500

6. SOLICITATION ISSUE

DATE

2018 OCT 31

a. NAME

Kimberly Ng-Brown DKN0012

b. TELEPHONE NUMBER (No Collect calls)

Phone: 571-767-9335

8. OFFER DUE DATE/

LOCAL TIME

2018 DEC 17

9. ISSUED BY CODE SPE603

DLA ENERGY

BULK PETROLEUM SERVICES

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

USA

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

8 (A)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

NAICS: 493190

SIZE STANDARD: $27,500,000

11. DELIVERYFOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/ CODE

OFFEROR

FACILITY

CODE

TELEPHONE NO.

18a. PAYMENT WILL BE MADE BY CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See Schedule

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED

SEE SCHEDULE

7. FOR SOLICITATION

INFORMATION CALL:

SEE SCHEDULE

09:00 AM

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE ADDENDUM

EDWOSB

32a. QUANTITY IN COLUMN 21 HAS BEEN

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED

COMPLETE PARTIAL FINAL

STANDARD FORM 1449 (REV. 2/2012) BACK

36. PAYMENT

PARTIAL FINAL

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY

42a. RECEIVED BY (Print) 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42b. RECEIVED AT (Location)

SOLICITATION SPE603-19-R-0500

COCO STORAGE PORT EVERGLADES, FL

ADDITIONAL INSTRUCTIONS FOR ALL PROSPECTIVE OFFERORS

Note: See FAR 52.212-1- INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (AUG 2018) and addendum and FAR 52.212-2- EVALUATION – COMMERCIAL ITEMS (OCT 2014) for complete instructions on how to submit a proposal.

A. Attached is Request for Proposal number SPE603-19-R-0500 for the procurement of Contractor-Owned

Contractor-Operated (COCO) fuel storage services within the area of Port Everglades, Florida. In accordance with the Performance Work Statement (PWS), these services include: 1) the receipt of U.S.

Government owned product (Turbine Fuel Aviation, Grade Jet A) via tankers/barges; 2) the storage and quality maintenance of the product; 3) the shipment of product to DoD sponsored customers via tank trucks and tankers/barges; and 4) the injection of additives, as required, for outbound tank truck shipments (grade F24).

B. The NAICS code is 493190 and the threshold is $27.5 million in annual receipts.

C. Questions pertaining to this solicitation (SPE603-19-R-0500) should be submitted via email to Kimberly.Ng-Brown@dla.mil with copy to Alicia.Williams@dla.mil no later than November 20, 2018.

All responses will be posted in https://www.fbo.gov/ (FedBizOpps) through an amendment to the solicitation.

D. Your proposal must be received no later than 9:00 AM local time Fort Belvoir, VA on December 17, 2018. For verification of receipt, contact Kimberly Ng at Kimberly.Ng-Brown@dla.mil.

E. FAXED PROPOSALS ARE NOT AUTHORIZED. Please e-mail your proposal to:

bidcustodian@dla.mil with copy to Kimberly.Ng-Brown@dla.mil. All e-mail proposals MUST include three volumes as outlined below. Late proposals will be processed in accordance with FAR 15.208 – Submission, Modification, Revision, and Withdrawal of Proposals. When submitting a proposal via e-mail, please ensure it is sent within enough time in order for it to be processed through the server.

Offerors’ proposals shall be prepared in three (3) separate volumes and provided in the quantities shown below:

Volume Title No. of Copies Required

Page Limit I Technical Proposal PDF electronic copy 70

II

Offeror Submission Package (OSP) includes Price Proposal

PDF electronic copy of Attachment III – OFFEROR SUBMISSION PACKAGE None

III Past Performance

(PPQ)

PDF electronic copy Note: Has to be submitted from the references directly to bidcustodian@dla.mil with cc. to Kimberly.Ng-Brown@dla.mil

None mailto:Kimberly.Ng-Brown@dla.mil mailto:Alicia.Williams@dla.mil https://www.fbo.gov/ mailto:Kimberly.Ng-Brown@dla.mil mailto:bidcustodian@dla.mil mailto:Kimberly.Ng-Brown@dla.mil mailto:bidcustodian@dla.mil mailto:Kimberly.Ng-Brown@dla.mil

Complete and return the PDF electronic copy of the Offeror Submission Package and the PDF electronic copy of the Technical Proposal with submissions as described in 52.212-1 INSTRUCTIONS TO OFFERS – COMMERCIAL ITEMS (AUG 2018) with addendum (AUG 2018). Your prices must be inserted in Clause B-0001 B34.01 SERVICES TO BE FURNISHED (DLA ENERGY FEB 1991) in the Offeror Submission Package.

F. Unless you specifically state otherwise, your offer is assumed to accept all terms and conditions of this solicitation. Any exceptions to any part of this solicitation must be specifically identified in a cover letter to your proposal.

G. The Government intends to evaluate proposals and award a contract after written or oral discussions with all responsible offerors that submit proposals that are considered competitive. This procurement will use source selection procedures using the lowest price technically acceptable process in accordance with FAR15.101-2. See FAR 52.212-2 EVALUATION - COMMERCIAL ITEMS (OCT 2014) for evaluation factors. The resulting type of contract will be Firm-Fixed-Price.

H. NOTICE REGARDING SUSPENSIONS/DEBARMENT/INELIGIBILITY: Any contract awarded to a contractor who, at the time of award was suspended, debarred, and ineligible for receipt of contract with government agencies or in receipt of a notice of proposed debarment from any government agency, is voidable at the option of the Government.

I. Care should be taken to mail correspondence relating to this solicitation or resulting contract to the appropriate office as indicated in the applicable clauses.

J. Tax Exempt Number: For the Defense Logistics Agency- Energy is: 31-4420477.

K. Pricing of Services:

1. The prices submitted must be inclusive of all direct costs, indirect costs, and profit. Offerors MUST include ALL costs associated with providing the services described herein.

2. The Government SHALL NOT be responsible for compensating the contractor for any cost tied to solicitation requirements but not factored into the proposed prices, either by the contractor’s intention or by mistake.

REMAINDER OF PAGE LEFT BLANK INTENTIONALLY

TABLE OF CONTENTS

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB

1991) 10

SECTION C - SPECIFICATIONS/PWS

THE PERFORMANCE WORK STATEMENT IS HEREBY INCORPORATED BY REFERENCE (IBR)

AS IF FULLY SET FORTH HEREIN. SEE ATTACHMENT I

PWS PERFORMANCE WORK STATEMENT Att. I

C-0001 C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988) 13

C-0002 C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998) 14

SECTION E - INSPECTION AND ACCEPTANCE

THE QUALITY ASSURANCE PROVISIONS (QAP) PROVISIONS LISTED IN THIS SECTION ARE

HEREBY INCORPORATED IN FULL TEXT UNDER ATTACHMENT II OF THIS SOLICITATION

52.246-4 INSPECTION OF SERVICES- FIXED PRICE (AUG 1996) 14

E-0001 ENERGY QAP E1.01 CONTRACTOR RESPONSIBILITY FOR

GOVERNMENT INSPECTION OF SERVICES (DLA ENERGY JAN 2012) Att. II

E-0002 ENERGY QAP E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR

2000) Att. II

E-0003 ENERGY QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM

STORAGE TANKS (DLA ENERGY FEB 2017) Att. II

E-0004 ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY

CONTRACTS (DLA ENERGY APR 2016) Att. II

E-0005 ENERGY QAP E34 TEST FOR SULFIDES IN WATER (DLA ENERGY MAY

1987) Att. II

E-0006 ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA

ENERGY DEC 2011) Att. II

E-0007 ENERGY QAP E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970) Att. II

SECTION F- DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989) 16

F0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA

ENERGY DEC 2017) 16

F0002 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997) 19

F0003 F1.11 DLA INTERNET BID BOARD SYSTEM (DIBBS) (DLA ENERGY APR

2014) 23

F0004 F1.14 DETERMINATION OF QUANTITY (STORAGE) (DLA ENERGY NOV

1997) 24

F0005 F45.01 OPERATION OF CONDUCTIVITY ADDITIVE SYSTEM (DLA

ENERGY JAN 2014) 26

F0006

F45.03 OPERATION OF FUEL SYSTEM ICING INHIBITOR ADDITIVE

SYSTEM CONTRACTOR-OWNER CONTRACTOR-OPERATED (COCO)

(DLA ENERGY JAN 2014)

F0007

F45.04 OPERATION OF CORROSION INHIBITOR/LUBRICITY IMPROVER

ADDITIVE SYSTEM CONTRACTOR-OWNER CONTRACTOR-OPERATED

(COCO) (DLA ENERGY JAN 2014)

F0008 F76 CONTRACT PERIOD/PERFORMANCE REQUIREMENTS (STORAGE)

(DLA ENERGY DEC 1991) 29

SECTION G - CONTRACT ADMINISTRATION DATA

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD

MANAGEMENT (OCT 2018) 29

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING

REPORTS (JUN 2012) 31

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013) 32

G0001 G3 INVOICE NUMBERING REQUIREMENTS (DLA ENERGY AUG 1998) 34

G0002 G9.06 ADDRESS TO WHICH REMITTANCE SHOULD BE MAILED (DLA

ENERGY JAN 2017) 34

G0003 G21 DESIGNATION OF PROPERTY ADMINISTRATOR (DLA ENERGY

MAY 2009) 35

G0004 G22 DESIGNATION OF THE DEFENSE FUEL REGION (DLA ENERGY JUL

1997) 35

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H0001 H9.01 TECHNICAL DIRECTION (DLA ENERGY FEB 1992) 36

H0002 H11 GUARD SERVICE (DLA ENERGY MAR 1982) 36

H0003 H19 REPORTING AND CONTAINING OIL SPILLS (DOMESTIC STORAGE)

(DLA ENERGY JAN 2012) 37

SECTION I - CONTRACT CLAUSES

52.202-1 DEFINITIONS (NOV 2013) 37

52.203-3 GRATUITIES (APR 1984) 37

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (OCT 2010) 38

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017) 42

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER

CONTENT PAPER (MAY 2011) 43

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL

(JAN 2011) 43

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (OCT 2018) 44

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018) 47

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE

(JUL 2016) 49

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION

SYSTEMS (JUN 2016) 50

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017) 51

52.209-6

PROTECTING THE GOVERNMENT’S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,

OR PROPOSED FOR DEBARMENT (OCT 2015)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018) 53

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS (NOV 2015) 54

52.212-4 CONTRACT TERMS AND CONDITIONS- COMMERCIAL ITEMS (OCT

2018) 54

Addendum 1 52.212-4

ADDENDUM 1- CONTRACT TERMS AND CONDITIONS- COMMERCIAL

ITEMS (OCT 2018) References 52.243-1 CHANGES-FIXED PRICE

W/ALTERNATE I (AUG 1987/APR 1984)

Addendum 2 52.212-4

ADDENDUM 2- CONTRACT TERMS AND CONDITIONS- COMMERCIAL

ITEMS (OCT 2018) References 52.215-8 ORDER OF PREEDENCE UNIFORM

CONTRACT (OCT 1997)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS- COMMERCIAL ITEMS (OCT 2018) 61

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) 69

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) 69

52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL

BUSINESS CONCERNS (OCT 2014) 69

52.219-9 Alt. II SMALL BUSINESS SUBCONTRACTING PLAN (AUG 2018) ALTERNATE II

(NOV 2016) (DEVIATION 2018-O0018) (AUG 2018) 71

52.219-16 LIQUIDATED DAMAGES- SUBCONTRACTING PLAN (JAN 1999) 81

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL

2013) 82

52.222-3 CONVICT LABOR (JUNE 2003) 83

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015) 84

52.222-26 EQUAL OPPORTUNITY (SEP 2016) 84

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015) 87

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014) 88

52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016) 88

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010) 89

52.222-41 SERVICE CONTRACT LABOR STANDARDS (AUG 2018) 90

52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) 97

52.222-43

FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR

STANDARDS- PRICE ADJUSTMENT (MULTIPLE YEAR AND OPTION

CONTRACTS) (AUG 2018)

52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) 98

52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015) 105

52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2017) 109

52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013) 115

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING

WHILE DRIVING (AUG 2011) 115

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) 116

52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) 117

52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) 117

52.232-17 INTEREST (MAY 2014) 118

52.232-39 UNENFORECEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013) 119

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (DEC 2013) 120

52.233-1 DISPUTES (MAY 2014) 120

52.233-3 PROTEST AFTER AWARD (AUG 1996) 122

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) 122

52.242-13 BANKRUPTCY (JUL 1995) 123

52.245-1 Alt. I GOVERNMENT PROPERTY (JAN 2017) ALTERNATE I (APR 2012) 123

52.245-9 USE AND CHARGES (APR 2012) 135

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) 137

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) 138

52.253-1 COMPUTER GENERATED FORMS (JAN 1991) 138

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991) 138

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD

OFFICIALS (SEP 2011) 138

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER

RIGHTS (SEP 2013) 139

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012) 139

252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016) 140

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) 140

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER

INCIDENT REPORTING (OCT 2016) 140

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR

LITIGATION SUPPORT (MAY 2016) 145

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT

HOLDERS (DEC 1991) 146

252.209-7004

SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED

BY THE GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF

TERRORISM (OCT 2015)

252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012) 147

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)—

BASIC (APR 2018) 150

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017) 151

252.226-7001

UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED

ECONOMIC ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS

CONCERNS (SEP 2004)

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006) 157

252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR

PERSONNEL (JUN 2013) 157

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991) 158

252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012) 158

252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL

COMPONENTS (DOD CONTRACTS) (JUN 2013) 159

252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED

PROPERTY (APR 2012) 159

252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (DEC 2017) 159

252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION

(APR 2012) 161

252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL (DEC 2017) 162

252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (APR 2014) 166

252.247-7024 NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA (MAR

2000) 169

52.204-9000 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (JUL 2015) 170

52.233-9001 DISPUTES AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION

(ADR) (DEC 2016) 174

I0001 I1.01-4 DEFINITIONS (CONT’D) (STORAGE) (DLA ENERGY JUNE 2009) 174

I0002 I11.01-2 ADMINISTRATIVE COST OF TERMINATION FOR CAUSE –

COMMERCIAL ITEMS (DLA ENERGY FEB 1996) 176

I0003 I116 RESPONSIBILITY FOR GOVERNMENT-OWNED PETROLEUM

PRODUCTS (DLA ENERGY JAN 2012) 177

I0004 I119.04 INVENTORY CONTROL RECORDS AND SYSTEMS OF RECORD

(DLA ENERGY AUG 2017) 178

I0005 I147 DEMURRAGE (DLA ENERGY NOV 1989) 184

I0006 I180.02 ENVIRONMENTAL PROTECTION (STORAGE) (DLA ENERGY JAN

2012) 184

I0007 I291 CONTRACTOR PUBLIC KEY INFRASTRUCTURE (PKI)

IMPLEMENTATION (DLA ENERGY SEP 2009) 184

SECTION J - ATTACHMENTS

PERFORMANCE WORK STATEMENT Att. I DLA ENERGY QUALITY ASSURANCE PROVISIONS Att. II OFFEROR SUBMISSION PACKAGE (OSP) Att. III DEPARTMENT OF LABOR WAGE DETERMINATION Att. IV PAST PERFORMANCE INFORMATION DISCLOSURE CONSENT FORM Att. V PAST PERFORMANCE QUESTIONNAIRE Att. VI SMALL BUSINESS SUBCONTRACTING PLAN Att. VII

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND STATEMENTS

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL

2016) 185

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) 186

52.212-3 Alt. I OFFERORS REPRESENTATIONS AND CERTIFICATIONS- COMMERCIAL

ITEMS (AUG 2018) ALTERNATE I (OCT 2014) 187

52.223-1 BIOBASED PRODUCT CERTIFICATION (MAY 2012) 205

252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD

OFFICIALS (NOV 2011) 205

252.247-7022 REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG

1992) 205

K0001 K15 RELEASE OF PRICES (DLA ENERGY MAR 2009) 206

K0002 K33.01 AUTHORIZED NEGOTIATORS (DLA ENERGY APR 2007) 206

K0003 K150 WIDE AREA WORKFLOW (WAWF) SUPPLEMENTAL INVOICE

SUBMISSION (DLA ENERGY MAY 2014) 206

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016) 207

52.212-1 INSTRUCTIONS TO OFFERORS- COMMERCIAL ITEMS (AUG 2018)

(DEVIATION 2018-O0018) (AUG 2018) 209

Addendum to 52.212-1

ADDENDUM- INSTRUCTIONS TO OFFERORS- COMMERCIAL ITEMS

(AUG 2018) (DEVIATION 2018-O0018) (AUG 2018) 213

52.216-1 TYPE OF CONTRACT (APR 1984) 218

52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE

EVALUATION (FEB 1999) 218

52.233-2 SERVICE OF PROTEST (SEP 2006) 218

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998) 218

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) 218

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) 219

252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE

INFORMATION CONTROLS (OCT 2016) 219

252.215-7008 ONLY ONE OFFER (OCT 2013) 220

L0001 L1.02 PROPOSAL ACCEPTANCE PERIOD (DLA ENERGY NOV 1991) 222

L0002 L2.11-4 E-MAIL PROPOSALS (DLA ENERGY OCT 2010) 222

L0003 L82 WAGE DETERMINATION (DLA ENERGY FEB 2009) 223

L0004 L116.01 DATA REQUIREMENTS (STORAGE) (DLA ENERGY JAN 2013) 223

SECTION M – EVALUATION FACTORS FOR AWARD

52.212-2 EVALUATION- COMMERCIAL ITEMS (OCT 2014) 224

52.217-5 EVALUATION OF OPTIONS (JUL 1990) 230

M0001 M72 EVALUATION OF OFFERS (DLA ENERGY APR 1997) 230

SECTION B - SUPPLIES OR SERVICES AND PRICES OR COSTS

B-0001 B34.01 SERVICES TO BE FURNISHED AND PRICES (DLA ENERGY FEB 1991)

The services to be furnished during the period specified herein and the unit prices are as follows:

LINE ITEM 0001: CONUS COCO Storage Services, V20000403 (FIRM FIXED PRICE):

The Contractor shall provide Contractor-Owned, Contractor-Operated COCO bulk fuel service capabilities in accordance with the Performance Work Statement, Section C, and all other terms and conditions set forth herein, during the base period of June 1, 2019 through May 31, 2023 (4 years).

LINE ITEM 0002 (OPTION 1)1: CONUS COCO Storage Services, V20000403 (FIRM FIXED PRICE):

The Contractor shall provide Contractor-Owned, Contractor-Operated COCO bulk fuel service capabilities in accordance with the Performance Work Statement, Section C, and all other terms and conditions set forth herein, during the option period of June 1, 2023 through May 31, 2028 (5 years).

AREA OF CONSIDERATION: Port Everglades, Florida.

TOTAL OFFERED PRICE

ITEM

NO.

SUPPLIES/

SERVICE QTY UNIT UNIT PRICE AMOUNT

0001 CONUS COCO

Storage Services 48 Month $ $

(Option 1)

CONUS COCO

Storage Services 60 Month $ $

TOTAL2: $__________________

NOTE: In accordance with FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999), the contractor is accepting that prices for the extension(s) not to exceed six months (if required) will remain the same as the prices offered under DLA Energy Contract Provision B-0001-B34.01 SERVICES TO BE FURNISHED AND

PRICES (DLA ENERGY FEB 1991).

The following price breakdown is provided for informational purposes only. In the event of a conflict, the prices in the table above will govern.

1 Only if exercised in accordance with FAR 52.217-9 Option to Extend the Term of the Contract (Mar 2000).

2 The offered total price shall include all costs associated with providing the required services. Cost reimbursable line items will not be allowed or incorporated into the award.

BASE PRICE

The prices for the services and facilities to be provided during the four-year performance period (June 1, 2019 through May 31, 2023), as described in the Performance Work Statement, includes the following:

LINE ITEM 0001:

TANK

PRODUCT

TYPE

SHELL

CAPACITY

(BARRELS)

FILL

CAPACITY

(BARRELS)

CONUS COCO

STORAGE

SERVICES

(MONTHLY USE

COCO CHARGE)3

ANNUAL

STORAGE

USE

CHARGE

TOTAL

PRICE

(4 YEARS)

TOTAL PRICE: $ $ $

OPTION #1 PRICE

The prices for the services and facilities to be provided during the five-year performance period (June 1, 2023 through May 31, 2028), as described in the Performance Work Statement, includes the following:

LINE ITEM 0002Error! Bookmark not defined.:

PRODUCT

TYPE

SHELL

CAPACITY

(BARRELS)

FILL

CAPACITY

(BARRELS)

CONUS COCO

STORAGE

SERVICES

(MONTHLY USE

COCO CHARGE)3

ANNUAL

STORAGE

USE

CHARGE

TOTAL

PRICE

(5 YEARS)

TOTAL PRICE: $ $ $

NOTE: A minimum fill capacity quantity of 120,000 barrels is required. Monthly and annual storage charges shall be based on this quantity. Additionally, monthly usage prices when multiplied by 12 months should equate to the annual storage usage charge as stated in the above chart. All dedicated line fill (if applicable) should be captured on a separate line above notated as “Dedicated Line Fill.” The Government shall have the right to utilize the total fill capacity of above identified tanks at no increase to the offered storage charges.

3Includes initial & final shipment price. In the event of a part month, the monthly price will be prorated.

PRORATED DAILY REDUCTIONS/ADDITIONS (QAP E18)

Base Period- June 1, 2019 through May 31, 2023 Line Item 0001:

In accordance with DLA Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractors expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0001 (CONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:

MONTHLY

CONUS COCO

STORAGE

SERVICE PRICE

ANNUAL

STORAGE USE

CHARGE

DAILY

REDUCTION/ADDITION

PER TANK WHEN

REMOVED

FROM/RETURNED TO

REVENUE IAW E18

NOTE: For each full calendar month a tank is out of service and removed from revenue, line item 0001 shall reflect a reduction to $0.00 for the subject tank, unless an alternate tank is offered under E18 to be utilized when cleaning/inspection occurs. The rates in the above chart will be utilized when subject tank is out of service.

Rates above shall be determined for each tank offered under line item 0001 by utilizing the following formula:

Monthly CONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition 365 Days

Option #1 Period- June 1, 2023 through May 31, 2028 Line Item 0002:

In accordance with DLA Energy QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS (DLA ENERGY FEB 2017), tanks required to be cleaned/inspected at the contractors expense shall be removed from/returned to revenue at a prorated amount. Prorated daily reductions/additions to line item 0002 (CONUS COCO Storage Services) for utilization during the month in which the tank is removed from/returned to revenue for cleaning/inspection for each tank offered should be annotated in the chart below:

MONTHLY

CONUS COCO

STORAGE

SERVICE PRICE

ANNUAL

STORAGE USE

CHARGE

DAILY

REDUCTION/ADDITION

PER TANK WHEN

REMOVED

FROM/RETURNED TO

REVENUE IAW E18

NOTE: For each full calendar month a tank is out of service and removed from revenue, line item 0002 shall reflect a reduction to $0.00 for the subject tank, unless an alternate tank is offered under E18 to be utilized when cleaning/inspection occurs. The rates in the above chart will be utilized when subject tank is out of service.

Rates above shall be determined for each tank offered under line item 0002 by utilizing the following formula:

Monthly CONUS COCO Storage Service Price * 12 Months = Daily Reduction/Addition 365 Days

SECTION C - SPECIFICATIONS/PWS

PERFORMANCE WORK STATEMENT (PWS)

The Performance Work Statement is hereby incorporated by reference as if fully set forth herein. See Attachment I.

C-0001 C19.01 SECURITY AND FIRE PROTECTION (DLA ENERGY AUG 1988)

(a) The entire facility shall be enclosed by a fence suitable to deter unauthorized access. The fence shall be fitted with gates that may be padlocked when not in use.

(b) A method of visitor and entrance control will be in effect. A visitor register shall be maintained.

(c) An internal, self-powered communication system linking all critical points of the facility, capable of serving both as an alarm system and for conduct of terminal operation, will be in use.

(d) A water supply and firefighting equipment conforming to National Fire Protection Association and American Petroleum Institute standards will be maintained. At locations outside the United States, other standards may be used with prior approval of the Contracting Officer.

(e) In the event of an emergency at a CONUS COCO terminal, the Contractor shall seek the assistance of the following as appropriate: local ambulance service; local fire department; local, county, and State police;

regional office of the Federal Bureau of Investigation; Secret Service; U.S. Marshal's Service; and the Federal Emergency Management Agency.

COCO STORAGE PORT EVERGLADES, FL

C-0002 C19.04 REMOVAL OF WATER BOTTOMS (DLA ENERGY FEB 1998)

Storage tanks for DLA Energy use shall be equipped with positive water sumps for removal of all water bottoms. All storage tanks shall be drained of water a minimum of once each week and whenever storage tank gauging indicates water is present. (Weekly water drainage is necessary because the datum plate may not necessarily be the low point in the storage tank. Water could possibly accumulate below the datum plate and not show up in the gauging process.) Additionally, all storage tanks shall be drained of water prior to any transfer of fuel and after a minimum of 4 hours or maximum of 24 hours settling time following each product receipt.

Storage tanks equipped with floating roofs shall be gauged for water after each rain and drained if water is found present. Product and water levels shall be gauged before and after the draining of water. Water gauges of each storage tank shall be taken and recorded each time it is gauged for product. (Each storage tank shall be equipped with a fuel/water separation system for collection of all product or water dispensed from its bottom water drain(s). This system shall have the capability to return separated product back into the same storage tank.)

SECTION E - INSPECTION AND ACCEPTANCE

52.246-4 INSPECTION OF SERVICES- FIXED PRICE (AUG 1996)

(a) Definition: “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may --

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may --

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

(2) Terminate the contract for default.

E-0001 ENERGY QAP E1.01 CONTRACTOR RESPONSIBILITY FOR GOVERNMENT

INSPECTION OF SERVICES (DLA ENERGY JAN 2012)

Quality Assurance Provision E1.01- Contractor Responsibility for Government Inspection of Services (DLA Energy Jan 2012) is hereby incorporated in full text under Attachment II.

E-0002 ENERGY QAP E1.11 QUALITY CONTROL PLAN (DLA ENERGY MAR 2000)

Quality Assurance Provision E1.11- Quality Control Plan (DLA Energy Mar 2000) is hereby incorporated in full text under Attachment II.

E-0003 ENERGY QAP E18 INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE

TANKS (DLA ENERGY FEB 2017)

Quality Assurance Provision E18- Inspection and Cleaning of Bulk Petroleum Storage Tanks (DLA Energy Feb 2017) is hereby incorporated in full text under Attachment II.

E-0004 ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS

(DLA ENERGY APR 2016)

Quality Assurance Provision E22- List of Inspection Offices for DLA Energy Contracts (DLA Energy Apr 2016) is hereby incorporated in full text under Attachment II.

E-0005 ENERGY QAP E34 TEST FOR SULFIDES IN WATER (DLA ENERGY MAY 1987)

Quality Assurance Provision E34- Test for Sulfides in Water (DLA Energy May 1987) is hereby incorporated in full text under Attachment II.

E-0006 ENERGY QAP E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC

2011)

Quality Assurance Provision E35- Nonconforming Supplies and Services (DLA Energy Dec 2011) is hereby incorporated in full text under Attachment II.

E-0007 ENERGY QAP E36 INSPECTION (STORAGE) (DLA ENERGY FEB 1970)

Quality Assurance Provision E36- Inspection (DLA Energy Feb 1970) is hereby incorporated in full text under Attachment II.

SECTION F- DELIVERIES OR PERFORMANCE

52.242-15 STOP-WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either --

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if --

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

F0001 F1.04 GENERAL RECEIVING AND STORING CONDITIONS (DLA ENERGY DEC 2017)

(a) Notice will be furnished to the Contractor of upcoming product receipts. The notice will include the method of receipt, the source, grade, or type of product, and any special instructions.

(b) The Contractor shall transfer and store each grade of product in a manner that preserves the quality of the product and will prevent contamination. The responsibility for preventing contamination rests with the Contractor.

(c) When requested, the Contractor will transfer product between tanks to consolidate like types or grades.

COCO STORAGE PORT EVERGLADES, FL

(d) Whenever a product is to be removed from a tank to accomplish cleaning or repair of the tank, or to change product, or to effect the release of the tank to the Contractor, the Contractor shall strip such tank to preclude loss of recoverable fuel. The Contractor shall provide the Quality Assurance Representative (QAR) with information pertaining to the amount of fuel deemed unrecoverable, the reason why the fuel cannot be recovered, and an analysis of the unrecovered fuel quality. All unrecoverable tank bottoms/line fill quantities will be reported to the Property Administrator for disposition instructions. Contaminated/off-specification product will be reported to the QAR in order to obtain disposition instructions. Tanks out of service for repair shall be removed from revenue until such time as they are returned to Government Service. Tanks out of service for cleaning shall be governed by the INSPECTION AND CLEANING OF BULK PETROLEUM STORAGE TANKS contract provision.

(e) Custody of product received by pipeline, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes the flange connecting the carrier's pipeline and the Contractor's pipeline.

(f) Custody of product received by transport truck, and risk of loss thereof, shall pass from the carrier to the Contractor when the product passes from the transport truck discharge hoses into the Contractor's receiving facilities.

(g) Custody of product received by tank car, and risk of loss thereof, shall pass from the carrier to the Contractor when the tank car comes to rest on the Contractor's siding.

(h) Custody of product received from tanker or barge, and risk of loss thereof, shall pass from the carrier to the Contractor when the fuel passes the vessel’s permanent hose connection.

(i) The Contractor shall be held accountable for demurrage charges arising from delay(s) in receipt by tank cars or transport trucks, except when the delay(s) are caused by reason beyond the control and without the fault or negligence of the Contractor and its subcontractors.

(j) The Contractor will prepare and process the following certificate on bond paper when it is necessary to upgrade or downgrade a product:

I certify that ___________ gallons of _________________ have been upgraded/downgraded (quantity) (product) from ____________________ to ___________________. This action was required because (product) (product)

(enter reason for the action)

Signature of Contractor Representative

[ ] I concur with the Contractor’s certification.

[ ] I do not concur with the Contractor’s certification for the following reasons:

Signature of Quality Representative

(A receipt transaction will be reflected on the monthly stock report for the gain in product, with a shipment being reflected for the losing product.)

(k) The following subparagraphs apply only to barges and tankers.

(1) SCHEDULED ARRIVAL DATE AND BASIC ALLOWED LAYTIME.

(i) The Contractor shall be notified in advance of the scheduled arrival date. Each notice will specify the quantity to be delivered, the cargo number, the name of the vessel, and the scheduled arrival date. For tankers, the notice will also include the size of the vessel and the expected time of arrival. For tankers, the notice of delivery will be furnished at least 72 hours in advance of the scheduled arrival date; for barges, at least 48 hours in advance of the scheduled arrival date. The Government will provide the maximum notice practicable when the anticipated vessel transit time from the loading point is less than the 72/48 hours. Changes in the scheduled arrival date that will provide less than the 48 hours notice for barges and the 72 hours notice for tankers will require the verbal approval of the Contractor. This verbal approval is to be confirmed in writing as soon as practicable.

(ii) The Contractor shall provide a reachable berth, free of charge, where the vessel can be safely moored and afloat with necessary access thereto as soon as possible, but no later than, for barges, within 3 hours after issue of notice of readiness to unload, and, for tankers, within 6 hours after issue of notice of readiness, PROVIDED –

(A) If the vessel is tendered for unloading on a date earlier than the last agreed scheduled arrival date, the Government’s vessel shall be unloaded as soon as possible in its proper turn with other vessels, and laytime shall not commence until the vessel moors alongside or, for barges, 3:00 A.M. local time; for tankers, 6:00 A.M. local time, on the last agreed scheduled arrival date, whichever occurs first.

(B) If the vessel is tendered for unloading later than 12:00 noon of the day following the last scheduled arrival date, the vessel shall be unloaded in its proper turn with other vessels. Laytime shall commence when the vessel moors alongside, provided a good faith effort is made by the Contractor to moor the vessel in its turn with other vessels as loading berths become available.

(iii) Laytime shall commence either (A) at the expiration of the notice period prescribed in subparagraph (ii) above, berth or no berth, or (B) immediately when the vessel moors alongside, with or without notice of readiness, whichever occurs first.

(iv) Laytime, once started, shall continue 24 hours per day, 7 days per week, without interruption, from its commencement until unloading of the barge or tanker is completed and hoses have been disconnected.

(v) Unless otherwise provided in the Schedule, the Contractor shall be allowed and will complete unloading within laytime determined as follows:

(A) FOR BARGES: One hour for each 2,000 barrels of product to be unloaded.

(B) FOR TANKERS: Thirty-six hours of discharge of a full vessel cargo. When partial vessel cargoes are to be unloaded, the 36 hours will be prorated based on quantities discharged in each port.

(vi) Hoses and loading arms for unloading a barge or tanker will be furnished, connected, and disconnected by the Contractor.

(2) INCREASES TO BASIC ALLOWED LAYTIME.

(i) If, after laytime commences, the conditions or facilities of the barge or tanker to be unloaded do not permit unloading, basic allowed laytime shall be increased by the duration of the delay.

(ii) If the vessel is delayed in reaching its berth and the delay is caused by the fault of the vessel, basic allowed laytime shall be increased by the duration of the delay.

(iii) If the vessel owner’s or operator’s regulations prohibit unloading at any time after laytime has commenced, the lost time shall be added to the basic allowed laytime.

(iv) If, for any reason, the Contractor is delayed in unloading the barge or tanker because of actions of a Government representative, acting under the contract, that arise through no fault or negligence on the part of the Contractor or its subcontractors, basic allowed laytime shall be increased by the duration of the delay.

(v) There will be no increase to basic allowed laytime (nor other reductions to any resulting demurrage time) for saved laytime arising out of other loadings/discharges.

(vi) Delays, after commencement of laytime, attributed to causes beyond the control and without the fault or negligence of the Contractor or the U.S. Government will result in increasing the basic allowed laytime by one half of the delay time.

(3) PAYMENT OF DEMURRAGE.

For all hours of laytime which elapse in excess of the basic allowed laytime for unloading provided for by subparagraph (k)(1)(v), or as otherwise provided in the Schedule, the Contractor shall pay demurrage to the Government as follows:

(i) USS, USNS, OR TIME CHARTERED VESSELS. At the demurrage rate for the vessel loaded computed to the nearest whole hour as published by the Military Sealift Command and in effect on the date the loading of the vessel is completed.

(ii) VOYAGE CHARTERED VESSELS. At the demurrage rate cited in the charter, except that the demurrage payable by the Contractor shall in no event exceed the demurrage expense incurred by the Government under the Charter.

F0002 F1.05 GENERAL SHIPPING CONDITIONS (DLA ENERGY OCT 1997)

(a) The Contractor will prepare the inspection and shipment documents covering deliveries made from the terminal in accordance with instructions contained in the Documentation and Product Property Control Plan.

Normally, the document will consist of DD Form 250 for tank car, tank truck, pipeline, and packaged shipments, and DD Form 250-1 and ullage/innage reports in the case of barge and tanker shipments. The Contractor will distribute the DD Forms 250 and the Quality Representative (QR) will distribute the DD Forms 250-1. When the QR is not present for release or shipment of product inspected at these facilities, and the Contractor's quality control program has been approved by the responsible Government Quality Office in accordance with paragraph 246.471 of the DOD FAR Supplement, the Contractor will insert the following certification on the inspector's copy of the shipping documents:

"I certify that the above supplies were (a) in the quantity indicated, (b) taken from Government-owned and approved stocks, and (c) loaded into inspected and approved containers. This shipment was released in accordance with paragraph 246.471-2 of the DoD FAR Supplement under authorization of (NAME and TITLE OF THE

AUTHORIZED REPRESENTATIVE OF THE CONTRACT ADMINISTRATION OFFICE)

in a letter dated (DATE OF AUTHORIZING LETTER). (SIGNATURE AND TITLE OF

CONTRACTOR'S DESIGNATED REPRESENTATIVE)."

(b) Shipment of products hereunder will be made only pursuant to a "release" furnished by the Product Property Administrator or his designated representative. The "release" will indicate the consignees who are authorized to

COCO STORAGE PORT EVERGLADES, FL

issue "calls" or "orders" for shipment of product. Such "release" will be periodically furnished to the Contractor by the cognizant Product Property Administrator.

(c) Conveyances required for shipments shall be furnished or designated by the Government. The Contractor shall inspect all shipping conveyances prior to loading to insure that product loaded will not be lost or contaminated by the condition of the equipment. Tank truck inspection must be performed by qualified Contractor personnel. Delegation of this responsibility shall not be passed to the tank truck operator/driver.

The tank truck operator/driver may be permitted to physically load the tank truck; however, the loading operation must be under the surveillance and direction of Contractor personnel. Equipment found to be unsatisfactory shall be reported as follows: (1) TANKERS AND BARGES. Report immediately by telephone to the QR; if not present, the master of the tanker or barge or to the carrier's agent or general office; (2) TANK CARS. Report to the QR and by wire (Government Rate, Collect) to Commander, Eastern Area, Military Traffic Management Command, ATTN: MTE-INR-O, Brooklyn, NY 11250. Any shortage or overage of tank cars shall be similarly reported; (3) TRANSPORT TRUCKS. Contractor shall expeditiously report to the Traffic Manager of the appropriate Defense Fuel Region, Government QR, and to the carrier's terminal where equipment is domiciled.

(d) Except when loading barges or tankers, or making pipeline deliveries, strainers of 100 mesh or finer shall be utilized in loading aviation fuels and jet lubricating oil and 60 mesh or finer in the case of reciprocating engine oil. Strainers shall be located as near the loading point as practicable. Contractor shall furnish and periodically inspect and clean such strainers and repair same, if necessary, keeping a written record thereof.

(e) Contractor shall affix serially numbered seals to the dome covers of tank cars and all openings in the case of tank trucks in such a manner that entry could only be gained by breaking a seal. Such seals will be furnished by the Contractor. Seal numbers will be indicated on shipping documents.

(f) Placards, as required by 49 CFR 172.506 and 49 CFR 172.508, shall be furnished and affixed to all tank cars and tank trucks by Contractors unless placards are already affixed.

(g) FOR TANK CARS ONLY.

(1) If Government-owned or leased tank cars are furnished, the Contractor will maintain records showing each day a car is received or forwarded by car number and will furnish the information to the Defense Fuel Regional Office upon request.

(2) Bottom outlet gaskets and manway cover gaskets, when required due to deterioration or loss, shall be furnished and applied to tank cars by the Contractor.

(3) The Contractor shall (i) inspect empty Government-owned tank cars located on the Contractor's premises and (ii) ship tank cars located on the Contractor's premises to repair facilities as directed by the Government.

(h) Unless otherwise directed, the Contractor shall prepare and distribute Government bills of lading utilized in shipments. Such bills of lading, routing instructions, and transportation assistance will be furnished by the Defense Fuel Region placing orders.

(i) The Contractor shall comply with routing instructions furnished by the Government. Such instruction will include names, routes, route order numbers, and other pertinent information. The Contractor shall be responsible for scheduling of commercial transport trucks, trucks and trailer, and tank wagons to its plant in

COCO STORAGE PORT EVERGLADES, FL

accordance with such routing instructions and consonant with the applicable order. The Contractor shall provide sufficient advance notice to carriers and schedule the carrier's equipment for loading. The Contractor shall reimburse the Government for any demurrage incurred as a result of improper scheduling.

(j) Custody of product shipped by pipeline, and risk of loss thereof, shall pass from the Contractor to the carrier when the product passes the flange connecting the Contractor's pipeline and the carrier's pipeline.

(k) Custody of product shipped by transport truck, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded transport truck is released for shipment by the Contractor.

(l) Custody of product shipped by tank car, and risk of loss thereof, shall pass from the Contractor to the carrier when the loaded tank car is picked up by the carrier.

(m) Custody of product delivered to tanker or barge, and risk f loss thereof, shall pass from the Contractor to the carrier when the fuel passes the vessel’s permanent hose connection.

(n) The Contractor shall be held accountable for demurrage…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.