SPE60126R0303 0001.pdf
PDF 13 KB Posted
- Attached to
- SPE60126R0303-0001 9. 1C MIDWEST REGION
- Solicitation number
- SPE60126R0303
- Issued by
-
Defense Logistics Agency Energy
About this file
This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by DLA Energy Aerospace on March 17, 2026. The amendment extends the closing date for solicitation SPE60126R0303 to March 25, 2026, with all other terms and conditions of the original solicitation remaining unchanged. The solicitation is administered by DLA Energy Aerospace Energy-DLAE-M, located at Building 5730, 1525 Wurtsmith Street, JBSA Lackland, Texas 78236, under Code SPE601. Offerors must acknowledge receipt of this amendment prior to the extended deadline by completing Items 8 and 15 and returning one copy of the amendment, by acknowledging receipt on each copy of the offer submitted, or by separate letter or telegram that includes a reference to both the solicitation and amendment numbers.
The amendment includes 12 attachments to the solicitation: Statements of Objectives, Quality Assurance Plans, MIL-PRF-27210J specification, AA-59503E specification, Contractor Performance Data Sheet, Transport Equipment Delay Certificate, Vendor Technical Proposal template, Schedule of Supplies Pricing Form Worksheet, and four addenda to FAR clauses (52.212-1, 52.212-2, and 52.212-4), plus an Energy QAP E33.10 document. Offerors are required to acknowledge receipt of this amendment; failure to do so prior to the specified hour and date may result in rejection of the offer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPE60126R0303 9.1C MIDWEST REGION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE601 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60126R0303
X
2026 MAR 17
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY AEROSPACE ENRGY-DLAE-M
BLDG 5730
1525 WURTSMITH STREET
JBSA LACKLAND TX 78236
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 3 PAGES
SPE60126R0303 -
NOTICE TO OFFERORS:
The purpose of this amendment is to extend the closing date of solicitation SPE60126R0303 to 25 March 2026.
All other terms and conditions of the solicitation remain the same.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES
SPE60126R0303 -
Attachments
List of Attachments
Description File Name ATTACH_Attachment_A_S
OOs Attachment A SOOs.pdf
ATTACH_Attachment_B__ QAPs
Attachment B_ QAPs.pdf
ATTACH_Attachment_C__
MIL_PRF_27210J_ABO
Attachment C - MIL- PRF-27210J.pdf
ATTACH_Attachment_D__ A_A_59503E
Attachment D_ A- A-59503E.pdf
ATTACH_Attachment_E__ Contractor_Performance_D ata_Sheet
Attachment E_ Contractor Perform Data Sheet.pdf
ATTACH_Attachment_F__ Transport_Equip_Delay_C ert
Attachment F_ Transport Equip Delay Cert.pdf
ATTACH_Attachment_G__ Vendor_Technical_Propos al
Attachment G_ Vendor Technical
Proposal_SPE60126R0303 .pdf
ATTACH_Attachment_H__ Schedule_of_Supplies_Pric ing__Form_Worksheet
Attachment H_ Schedule of Supplies Pricing Form
Worksheet.xlsx ATTACH_Attachment_I_A
DDENDUM_FAR_52_212_
Attachment I_ ADDENDUM FAR 52.212-1.pdf
ATTACH_Attachment_J_A
DDENDUM_FAR_52_212_
Attachment J_
ADDENDUM FAR
52.212-2.pdf ATTACH_Attachment_K_A
DDENDUM_FAR_52_212_
Attachment K_
ADDENDUM TO FAR
52.212-4.pdf ATTACH_Attachment_L_E nergy_QAP_33_10_SPE60
126R0303
Attachment L ENERGY
QAP E33.10
SPE60126R0303.pdf
File details come from the government source that posted it. Updated .