This is a consolidated Statement of Objectives (SOO) detailing requirements for delivery of Aviator's Breathing Oxygen (ABO) and Liquid Nitrogen (LN2) to multiple military installations across the northeastern United States. The SOO covers deliveries to 19 locations including Air Force Bases, Air National Guard stations, and Naval Air Stations, with locations in New York, Indiana, Ohio, Kentucky, Michigan, Pennsylvania, Connecticut, Delaware, Maryland, Virginia, West Virginia, and New Jersey.

The requirements include delivery of Type II ABO (NSN 6830-01-644-2463) meeting MIL-PRF-27210 specifications and Type II Grade B LN2 (NSN 6830-01-644-2557) meeting CID A-A-59503 specifications. Standard delivery is required within 7 calendar days of order, with emergency deliveries within 3 days. The contractor must provide all equipment, transportation, and labor for delivery to government-owned storage tanks at each location, with tank capacities ranging from 400 to 6,000 gallons. Additional services include tank hot fills, over-pressure protection assessments, and telemetry systems at some locations. Security requirements specify U.S. citizenship for delivery personnel, background checks, and facility access protocols. The contract period is from July 1, 2025 to June 30, 2030.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A Consolidated Statement of Objectives

STRATTON ANG, NY

TSW – CDSSTRATTO

ODAAC – FP8102

STATEMENT OF OBJECTIVES, 28 Aug 24

Scope: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen to Stratton ANG, NY into Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Stratton ANG.

Product: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

Product Delivery: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

Expedited/Emergency Delivery:

Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

Description of Government Owned ABO Tank: ABO shall be delivered into the following Government owned storage vessel listed below. The storage vessel will be trailer accessible.

Location # of Tanks Capacity-Gallons Max PSIG

Bldg. #700 3 400 GL 55

Method of Measurement: Method of measurement shall be by truck mounted calibrated flow meter.

Inspection and Acceptance: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

Tank Over-Pressure Protection: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

Tank Hot Fill: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

Security Requirements: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks. Driver may also be required to provide proof of insurance and vehicle registration. Most delivery locations will require delivery personnel to pass a background check to gain access to location. Some locations will require delivery drivers be escorted while making deliveries. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.

FORT WAYNE ANG, IN

TSW – CDSFORTWAY DODAAC – FP8074

STATEMENT OF OBJECTIVES, 28 August 2024

SCOPE: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen to Ft.

Wayne ANG, IN using Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Ft. Wayne ANG.

PRODUCT: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into the following Government-owned storage vessel listed below. Tank truck/wagon will need to have a on-board offloading system. The storage vessels will be trailer accessible.

Location Tank Capacity-Gallons MAWP Bldg 310 1 – 3000 GL ABO 55 psig

EXPEDITED / EMERGENCY DELIVERY: Emergency deliveries shall be within three

(3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

METHOD OF MEASUREMENT: Method of measurement shall be by truck mounted calibrated flow meter.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the iRAPT invoice submittal for payment.

TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

HOT FILLS: Occasionally, the Contractor may be required to perform a Hot Fill to cool-down and refill any tank that has gone empty and is warm. The supplier will use the commercial industrial gas standard, converting the liquid product carried to a gas to purge/cool and remove minor constitutes outlined in 27210 prior to pushing liquid into the tank.

SECURITY REQUIREMENTS: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks. Driver may also be required to provide proof of insurance and vehicle registration. Some locations will require delivery personnel be escorted while making deliveries. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.

TOLEDO ANG, OH

TSW – CDSTOLEDOA

DODAAC – FP8119

Scope: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen and Liquid Nitrogen to Toledo ANG, OH into Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Toledo

ANG.

Product: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

Liquid Nitrogen (LN2), Type II, Grade B, NSN 6830-01-644-2557, shall meet the requirements of the most current version of Commercial Item Description (CID) A-A- 59503.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

Product Delivery: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

Expedited/Emergency Delivery:

Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

Method of Measurement: Method of measurement shall be by truck mounted calibrated flow meter.

Inspection and Acceptance: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

Description of Government-Owned ABO & LN2 Tanks: ABO and LN2 shall be delivered into the following Government-owned storage vessels listed below. The storage vessels will be trailer accessible.

Location Product # of Tanks Capacity-Gallons MAWP* Bldg 126 ABO 1 2,000 GL 50 psig Bldg 126 LN2 1 2,000 GL 50 psig

*Maximum Allowable Working Pressure

Tank Over-Pressure Protection: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

Tank Hot Fill: Occasionally, the Contractor may be required to perform a Hot Fill to cool-down and refill any tank that has gone empty and is warm. The supplier will use the commercial industrial gas standard, converting the liquid product carried to a gas to purge/cool and remove minor constitutes outlined in 27210 prior to pushing liquid into the tank.

Security Requirements: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks.

Driver may also be required to provide proof of insurance and vehicle registration. Most delivery locations will require delivery personnel to pass a background check to gain access to location. Some locations will require delivery drivers be escorted while making deliveries. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.

WRIGHT-PATTERSON AFB, OH

TSW – CDSWRIGHTP

DODAAC – FP8041

STATEMENT OF OBJECTIVES, 28 August 2024 products and related services, requires delivery of Aviator’s Breathing Oxygen to Wright-Patterson AFB, OH into Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Wright-Patterson

AFB.

Product: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

Product Delivery: Routine product deliveries shall be made within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

Government – Owned ABO Tanks: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

Location Tank Capacity-Gallons MAWP LOX Facility 2 – 6,000 GL 50 psig

Expedited/Emergency Delivery:

Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

Method of Measurement: Method of measurement shall be by truck mounted calibrated flow meter.

Inspection and Acceptance: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

Tank Over-Pressure Protection: If it is determined during supplier site visits or upon review of Customer tank technical information that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. A subsequent inspection by the Contractor representative may be performed to validate compliance. NOTE: Over-pressure protection devices shall not be installed on Government-owned storage tanks without prior coordination with DLA Energy-FEM and the activity that physically possesses the tank(s).

Hot Fills: Occasionally, the Contractor may be required to perform a Hot Fill to cool-down and refill any tank that has gone empty and is warm. The supplier will use the commercial industrial gas standard, converting the liquid product carried to a gas to purge/cool and remove minor constitutes outlined in 27210 prior to pushing liquid into the tank.

Security Requirements: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks. Driver may also be required to provide proof of insurance and vehicle registration. Most delivery locations will require delivery personnel to pass a background check to gain access to location. Some locations will require delivery drivers be escorted while making deliveries. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.

LOUISVILLE ANG, KY

TSW – CDSLOUIANG

DODAAC – FP8169

STATEMENT OF OBJECTIVES, 28 August 2024

SCOPE: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen to Louisville ANG, KY using Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Louisville ANG.

PRODUCT: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

DESCRIPTION OF GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessel will be trailer accessible.

Location # of Tanks Capacity-Gallons MAWP* Cryo Yard 1 3,000 GL 50 psig

*Maximum Allowable Working Pressure

EXPEDITED/EMERGENCY DELIVERY:

Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

METHOD OF MEASUREMENT: Method of measurement shall be by truck mounted calibrated flow meter.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the iRAPT invoice

TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting Officer, Service Control Point (AFPET), Air Force Life Cycle Management Center (AFLCMC/WNZ), and the activity that physically possesses the tank(s).

HOT FILLS: Occasionally, the Contractor may be required to perform a Hot Fill to cool-down and refill any tank that has gone empty and is warm. The supplier will use the commercial industrial gas standard, converting the liquid product carried to a gas to purge/cool and remove minor constitutes outlined in 27210 prior to pushing liquid into the tank.

SECURITY REQUIREMENTS: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks. Driver may also be required to provide proof of insurance and vehicle registration. Some locations will require delivery personnel be escorted while making

SELFFRIDGE ANGB, MI

TSW – CDSSELFANG

DODAAC – FP8076

products and related services, requires delivery of Aviator’s Breathing Oxygen to Selfridge ANGB, MI into Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Selfridge ANGB.

Product: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

Product Delivery: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

Expedited/Emergency Delivery:

Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

Description of Government-Owned ABO Tanks: ABO shall be delivered into the following Government-owned storage vessels listed below. The storage vessels will be trailer accessible.

Location # of Tanks Capacity-Gallons MAWP* Bldg 195 2 6,000 GL ea 30 psig ea

*Maximum Allowable Working Pressure

Method of Measurement: Method of measurement shall be by truck mounted calibrated flow meter.

Inspection and Acceptance: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

Tank Hot Fill: Occasionally, the Contractor may be required to perform a Hot Fill to cool-down and refill any tank that has gone empty and is warm. The supplier will use the commercial industrial gas standard, converting the liquid product carried to a gas to purge/cool and remove minor constitutes outlined in 27210 prior to pushing liquid into the tank.

Security Requirements: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks.

Driver may also be required to provide proof of insurance and vehicle registration. Most delivery locations will require delivery personnel to pass a background check to gain access to location. Some locations will require delivery drivers be escorted while

YOUNGSTOWN ARS, OH

TSW – CDSYOUNGST

DODAAC – FP8118

STATEMENT OF OBJECTIVES, 29 AUG 24

products and related services, requires delivery of Aviator’s Breathing Oxygen to Youngstown ARS, OH into Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Youngstown ARS.

PRODUCT: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product deliveries shall be made within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

EXPEDITED/EMERGENCY DELIVERY:

Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

DESCRIPTION OF GOVERNMENT-OWNED ABO: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessel will be trailer accessible.

Location Product # of Tanks Capacity-Gallons MAWP* Bldg 420 ABO 2 3,000 GL ea 50 psig ea

METHOD OF MEASUREMENT: Method of measurement shall be by truck mounted calibrated flow meter.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of

TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of Customer tank technical information that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. A subsequent inspection by the Contractor representative may be performed to validate compliance. NOTE: Over-pressure protection devices shall not be installed on Government-owned storage tanks without prior coordination with DLA Energy-FEM and the activity that physically possesses the tank(s).

HOT FILLS: Occasionally, the Contractor may be required to perform a Hot Fill to cool-down and refill any tank that has gone empty and is warm. The supplier will use the commercial industrial gas standard, converting the liquid product carried to a gas to purge/cool and remove minor constitutes outlined in 27210 prior to pushing liquid into the tank.

SECURITY REQUIREMENTS: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks. Driver may also be required to provide proof of insurance and vehicle registration. Most delivery locations will require delivery personnel to pass a background check to gain access to location. Some locations will require delivery drivers be escorted while making deliveries. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.

HARRISBURG ANG, PA

TSW – CDSHARRISB

DODAAC – FP8030

STATEMENT OF OBJECTIVES, 19 December 2024

SCOPE: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen to Harrisburg ANG, PA using Contractor-provided tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Harrisburg ANG.

PRODUCT: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

EXPEDITED / EMERGENCY DELIVERY: Emergency deliveries shall be within three

(3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

DESCRIPTION OF CONTRACTOR-PROVIDED ABO TANK:

The Contractor shall provide the following tank which will be trailer accessible.

# of Tanks Location Capacity 1 Area 72, 83 Olmsted Blvd. 3,000 GL

HOT FILLS: Occasionally, the Contractor may be required to perform a Hot Fill to cool-down and refill any tank that has gone empty and is warm. The supplier will use the commercial industrial gas standard, converting the liquid product carried to a gas to purge/cool and remove minor constitutes outlined in 27210 prior to pushing liquid into the tank.

CONTRACTOR-PROVIDED TANK INSTALLATION: Contractor shall install their Contractor provided tanks and equipment on existing cement pads, within the existing system footprints, no later than 30 calendar days from start of contract performance. The Contractor shall also perform all inspections and maintenance of Contractor provided tanks/equipment to assure systems provide safe and uninterrupted support. Contractor provided tanks may be chilled through initial deliveries, but initial deliveries into Contractor provided tanks shall not qualify as a “Hot Fill” service. The Contractor will coordinate with the current supplier to effect removal of current equipment and installation of new equipment, or to retain the current equipment. The Contractor may be required to provide a temporary system during change out of existing system or tanks to eliminate any delay in supply of product.

CONTRACTOR-PROVIDED EQUIPMENT REMOVAL: Contractor provided tanks/equipment shall be removed by the Contractor within 30 calendar days after contract termination. The Contractor will coordinate with the follow-on supplier to effect removal of current equipment and installation of new equipment.

TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

METHOD OF MEASUREMENT: Method of measurement shall be by truck mounted calibrated flow meter.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the iRAPT invoice submittal for payment.

SECURITY REQUIREMENTS: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to back ground checks. Driver may also be required to provide proof of insurance and vehicle registration. Some locations will require delivery personnel be escorted while making

PITTSBURG ARS, PA

TSW – CDSPITTSBU

DODAAC – FP8027

STATEMENT OF OBJECTIVES, 29 AUG 24

Scope: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen to Pittsburgh ARS, PA into Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Pittsburgh ARS.

Product: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

Product Delivery: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

Expedited/Emergency Delivery:

Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

Description of Government-Owned ABO Tanks: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessel will be trailer accessible.

Location Product # of Tanks Capacity-Gallons MAWP* Bldg 5519 ABO 1 3,000 GL ea 50 psig

*Maximum Allowable Working Pressure

Method of Measurement: Method of measurement shall be by truck mounted calibrated flow meter.

Inspection and Acceptance: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting Officer, Service Control Point (AFPET), Air Force Life Cycle Management Center (AFLCMC/WNZ), and the activity that physically possesses the tank(s).

Tank Hot Fill: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm. The supplier will use the commercial industrial gas standard, converting the liquid product carried to a gas to purge/cool and remove minor constitutes outlined in 27210 prior to pushing liquid into the tank.

Security Requirements: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks.

Driver may also be required to provide proof of insurance and vehicle registration. Most delivery locations will require delivery personnel to pass a background check to gain access to location. Some locations will require delivery drivers be escorted while

CONNECTICUT ANG, CT

TSW – CDSCONNECT

DODAAC – FP8183

STATEMENT OF OBJECTIVES, 5 SEPT 24

SCOPE: The Defense Logistics Agency (DLA) Aerospace Energy Business Unit, as the products and related services, requires delivery of Aviator’s Breathing Oxygen to Connecticut ANG, CT using Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Connecticut ANG.

PRODUCT: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

EXPEDITED/EMERGENCY DELIVERY:

Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

METHOD OF MEASUREMENT: Method of measurement shall be by truck mounted calibrated flow meter.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the iRAPT invoice submittal for payment.

Description of Government-Owned ABO Tanks: ABO shall be delivered into the following Government-owned storage vessels listed below. The storage vessels will be trailer accessible.

Location # of Tanks Capacity-Gallons MAWP* 103 AW LGRF 1 3,000 GL 35 psig 103 AW LGRF 1 500 GL 35 psig

*Maximum Allowable Working Pressure

TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

HOT FILLS: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

SECURITY REQUIREMENTS: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks. Driver may also be required to provide proof of insurance and vehicle registration. Some locations will require delivery personnel be escorted while making

DOVER AFB, DE

TSW – CDSDOVERAF

DODAAC – FP8154

STATEMENT OF OBJECTIVES, 5 Sept 24 products and related services, requires delivery of Aviator’s Breathing Oxygen and Liquid Nitrogen to Dover AFB, DE into Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Dover

AFB.

Product: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

Liquid Nitrogen (LN2), Type II, Grade B, NSN 6830-01-644-2557, shall meet the requirements of the most current version of Commercial Item Description (CID) A-A- 59503.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

Product Delivery: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

Expedited/Emergency Delivery:

Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer. After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

Method of Measurement: Method of measurement shall be by truck mounted calibrated flow meter.

Inspection and Acceptance: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of

Description of Government-Owned ABO & LN2 Tanks: ABO and LN2 shall be storage vessels will be trailer accessible.

Location Product # of Tanks Capacity-Gallons MAWP* Bldg 768 ABO 2 6,000 GL ea 50 psig ea

Bldg 768 LN2 1 6,000 GL ea 50 psig ea

Bldg 768 LN2 2 5,000 GL ea 50 psig ea

*Maximum Allowable Working Pressure AUTOMATIC FILL-UP TELEMETRY: The Contractor shall provide automatic fill-up telemetry capability for the tanks located at building 768. The tanks shall be equipped with a solar powered remote telemetry unit with battery backup and maintained by the Contractor. The telemetry unit shall reliably monitor tank inventory levels and transmit product quantity data to the Supplier. The telemetry unit shall reliably monitor and transmit tank status regarding tank safety limits of current product pressure and temperature. The telemetry system shall be continuously monitored by the supplier who will trigger automatic refills of product when the tank levels reach 30% of capacity.

Accessibility: As part of the auto-fill telemetry system, the Contractor shall provide an internet (Web) based application accessible by the Government. The Contractor shall submit an invoice for no more or less than the total delivered quantity, and each invoice submitted for automatic fill-up deliveries shall be accompanied by a record of the quantity delivered into the tank.

INSTALLATION, MAINTENANCE AND REMOVAL OF CONTRACTOR-PROVIDED

TELEMETRY EQUIPMENT: Contractor shall install their Contractor-provided telemetry equipment no later than 30 calendar days from start of contract performance. The Contractor shall also perform all inspections and maintenance of Contractor-provided equipment to assure system provides safe and uninterrupted support. Contractor-provided equipment shall be removed by the Contractor within 30 calendar days after contract termination. The Contractor will coordinate with the current supplier to effect removal of current equipment and installation of new equipment or to change out of existing system to eliminate any delay in supply of product.

Tank Over-Pressure Protection: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

Tank Hot Fill: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm. The supplier will use the commercial industrial gas standard, converting the liquid product carried to a gas to purge/cool and remove minor constitutes outlined in 27210 prior to pushing liquid into the tank.

Security Requirements: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to back ground checks.

Driver may also be required to provide proof of insurance and vehicle registration. Most delivery locations will require delivery personnel to pass a background check to gain access to location. Some locations will require delivery drivers be escorted while

BARNES ANG, MA

TSW – CDSBARNESA

DODAAC – FP8029

products and related services, requires delivery of Aviator’s Breathing Oxygen to Barnes ANG, MA using Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Barnes ANG.

PRODUCT: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler.

Expedited/Emergency Delivery: Emergency deliveries shall be within three (3) calendar days of request unless otherwise determined with the DLA Contracting Officer.

After emergency delivery order is placed, Contractor shall coordinate delivery time and acceptance of emergency deliveries with customer.

METHOD OF MEASUREMENT: Method of measurement shall be by truck mounted calibrated flow meter.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the iRAPT invoice submittal for payment.

Description of Government-Owned ABO Tanks: ABO shall be delivered into the following Government-owned storage vessels listed below. The storage vessels will be trailer accessible.

Location # of Tanks Capacity-Gallons MAWP* Bldg 37 2 3,000 GL ea 70 psig ea

*Maximum Allowable Working Pressure

TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior coordination with DLA Energy Contracting Officer and the activity that physically possesses the tank(s).

HOT FILLS: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

SECURITY REQUIREMENTS: Delivery personnel shall be U.S. citizens. In addition, delivery personnel must possess a state or federally issued photo ID that displays the driver’s full name and date of birth. Deliveries to Military installations will require delivery personnel provide social security number and be subjected to background checks. Driver may also be required to provide proof of insurance and vehicle registration. Some locations will require delivery personnel be escorted while making deliveries. All delivery vehicles are subject to search by security personnel prior to accessing delivery location and while on each facility.

WESTOVER ARB, MA

TSW – CDSWESTOVE

DODAAC – FP8013

Scope: DLA Energy is seeking the delivery of Aviator’s Breathing Oxygen and Liquid Nitrogen to Westover ARB, MA using Customer-owned tanks. The Contractor shall provide all product, materials, supplies, management, tools, equipment, transportation and labor necessary for the delivery of requested product f.o.b. destination to Westover

ARB.

Product: Aviator’s Breathing Oxygen (ABO), Type II, NSN 6830-01-644-2463, shall meet the requirements of the most current version of MIL-PRF-27210

Liquid Nitrogen (LN2), NSN 6830-01-644-2557, shall meet the requirements of Type II, Grade B, Commercial Item Description A-A 59503C dated 3 Mar 2011, Nitrogen, Technical.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF). In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

Product Delivery: Product deliveries shall be made within 7 days after receipt of an order from the appointed Delivery Scheduler.