ENERGY_QAP_E4_(DEC_2011).pdf

PDF 9 KB Posted

Attached to
SOLICITATION & OFFEROR SUBMISSION PACKAGE - COG 7 (3. 27), POSTS, CAMPS, AND STATIONS (PC&S) PROGRAM Federal contract opportunity
Solicitation number
SPE600-16-R-0206
Issued by
Defense Logistics Agency Energy

About this file

ENERGY QAP E4 INSPECTION (DLA ENERGY DEC 2011)

View the file

Other files for this federal contract opportunity

Other files attached to SOLICITATION & OFFEROR SUBMISSION PACKAGE - COG 7 (3. 27), POSTS, CAMPS, AND STATIONS (PC&S) PROGRAM, newest first.
File Type Posted
SF30_SPE60016R02060003.pdf PDF
Attachment_A_Base_Reference_Price_W_County(1).pdf PDF
SF30_SPE60016R02060002.pdf PDF
AMEND_0001_SPE60016R02060001.pdf PDF
Attachment_A_COG_7__Base_Reference_Price.pdf PDF
Final__COG_7_Clauses_and_Provisions.pdf PDF
SPE60016R0206_SCHEDULE.pdf PDF
Attachment_A_OSP_PRICE_DATA_SHEETS.pdf PDF
Attachment_C_PCS_OET_VendorGuide.pdf PDF
Attachment_B_AMPS_Request_for_Role_Guide.pdf PDF
Final_OSP_COG_7.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENERGY QAP E4 INSPECTION (DLA ENERGY DEC 2011)

(a) This QAP only applies to PC&S deliveries by tanker or barge.

(b) INSPECTION. When Government inspection is required, it will be performed by the Quality Representative assigned responsibility over the location where loading takes place. In order that such inspection can be accomplished, the

Contractor will provide the responsible Inspection Office, upon receipt of an order, with the following information, at least

5 days prior to shipment for domestic items and at least 14 days prior to shipment for overseas items:

(1) Contract number, line item number, and order number;

(2) Nomenclature and specification of product;

(3) Date and time of shipment;

(4) Name and location of facility where loading will take place;

(5) Identity of conveyance and consignee; and

(6) Quantity to be shipped.

NOTE: For overseas shipments, more than 14 days notice may be required for some locations. If so, the responsible inspection office shall notify the Contractor, in writing, how much notice is required at such locations, and the Contractor shall provide that notice for the duration of the contract.

(c) INSPECTION OFFICES. The name and location of the responsible Inspection Office(s) will be furnished to successful offerors. A specific office may be designated for each loading location or a list of inspection offices and their areas of responsibility may be provided.