West_Point_Industry_PPC_Briefing.pdf
PDF 519 KB Posted
- Attached to
- Privatization of the Water and Wastewater Utility Systems at U. S. Army Garrison West Point, NY
- Solicitation number
- SPE600-15-R-0810
- Issued by
-
Defense Logistics Agency Energy
About this file
Pre-Proposal Conference Briefing Slides
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Deliver the right solution on time, every timeDeliver the right solution on time, every time
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE
DEFENSE LOGISTICS AGENCY
AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY
DEFENSE LOGISTICS AGENCY
AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY
U.S. Army Garrison- West Point, NY
SPE600-15-R-0807 Electric, Natural Gas, Thermal SPE600-15-R-0810 Water, Wastewater
Industry Pre-Proposal Conference October 19, 2015
Daniel G. Ferry, Contracting Officer Carly A. Dubernas, Contract Specialist Arthur L. Everette, Contract Specialist DLA Energy - Utility Services Division
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 2
Agenda
• Purpose of the RFP(s)
• RFP Contents
• Review Solicitation(s)
• Proposal Submittal
– The Four Proposal Volumes
• Evaluation Factors for Award
• Milestones
• DLA Energy POCs
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 3
Purpose of the RFP(s)
• Privatize the Electric, Natural Gas & Thermal utility systems at U.S.
Army Garrison West Point, NY under SPE600-15-R-0807
• Privatize the Water & Wastewater utility systems at U.S. Army Garrison
West Point, NY under SPE600-15-R-0810
• (If Economical)
• Maximum 50 Year Contract
• Privatization is not a foregone conclusion
• Convey Utility System Infrastructure (separate from RFP)
• Acquire Utility Services Contract (FAR Part 41)
• Provide Right to Access/Easement
Notes:
1. Purchase of the Commodity is not Included in the RFP
2. Selection of Contractor will be Based on Best-Value Tradeoff
Determination
3. Government Reserves the Right Not to Award the Contract
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 4
• Section B - Supplies or Services and Prices/Costs
• Section C - Description/Specs/Work Statement
• Section D - Packaging and Marking – N/A
• Section E - Inspection and Acceptance
• Section F - Deliveries or Performance
• Section G - Contract Administration Data
• Section H - Special Contract Requirements
• Section I - Contract Clauses
• Section J - List of Attachments
• Section K - Representations, Certifications, and other
Statements of Offerors
• Section L - Instructions, Conditions, and Notices to Offerors
• Section M - Evaluation Factors for Award
RFP Contents
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 5
B.2.1 Schedule B-1: Regulated Tariff
• This is one of the two types of Pricing Options available to
Offerors
• Tariff Must be Fully and Independently Regulated (a “State-Wide”
Public Utility Regulatory Authority with Jurisdiction over the Contractor)
• Terms must be no less favorable than those offered to similar customers
• Must provide comprehensive description of the proposed tariffs
• Must describe Regulatory Process
• Must complete Price Data Sheets 1 through 5 (see Section B.3)
Review Solicitation:
Section B – Services and Prices/Costs
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 6
B.2.2 Schedule B-2: Fixed Price w/ Economic Price Adjustment (EPA)
• Fully built up Monthly Utility Service Charge (includes O&M and R&R)
• Prices adjusted annually
• Adjustment based on Bureau of Labor Statistics (BLS) Consumer Price Index Urban Regional
• Adjustments applicable to Monthly Utility Services Charge only
• May submit alternate proposal(s) utilizing different Government published index or multiple indices or take exception to RFP
– Offeror bears risk of unacceptability
• Complete Price Data Sheets 1 through 4, and 6 (see Section B.3)
Review Solicitation:
Section B – Services and Prices/Costs
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 7
C.1 Precedence
FAR 52.215-8: any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
a) The Schedule (excluding the specifications);
b) Representations and other instructions;
c) Contract clauses appearing in the solicitation or contract;
d) Contract clauses incorporated by reference;
e) Other documents, exhibits, and attachments; and
f) The specifications
Review Solicitation:
Section C – Description/
Specifications/Work Statement
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 8
C.3 Requirement
• Contains general requirements applicable to all systems
• Performance Standards – required to adhere to specified industry standards
C.6 Access to the Utility System
• The Government provides a Right to Access/Easement to the
Installation and the utility systems
• May restrict who, when and how many may have access to secure areas of the Installation
• May require background investigations, including security clearances
• Contractor is responsible for actions of its employees, sub-contractors, and agents while on the Installation
Review Solicitation:
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 9
C.7 Response to Service Interruptions/ Contingencies and Catastrophes
• Procedures and provisions for handling service interruptions in the Service Interruption/Contingency and Catastrophic Loss Plan
C.9 Coordination of Work
• Installation Specific Details in Section JA’s: Utility-Specific
Attachments:
‒ SPE600-15-R-0807: Electric, Natural Gas, Thermal – (JA1, JA2, JA5) ‒ SPE600-15-R-0810: Water, Wastewater – (JA3, JA4)
• Types of Service Requests & Response Times
– Emergency – Fire hydrant is hit by a car & water is flowing into the street
– Urgent – Command request or needs
– Routine – Regular maintenance
Review Solicitation:
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 10
C.10 Environmental Compliance
• Comply with all applicable environmental laws and regulations inclusive of all Federal, State, and local laws as well as Installation-specific requirements
Review Solicitation:
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 11
C.11 SDCs/Upgrades/Connections and Renewals and Replacements
• Initial System Deficiency Corrections (ISDCs)/Connection Charges
• Future System Deficiency Corrections/Upgrades
– Investments in utility system resulting from changes in service requirements, laws, or regulations, or implementation of new technology
– Submitted Under Annual System Deficiency Corrections/Upgrades and Renewals and Replacements Plan (5-year plan, initially addressing Years 1 – 5)
– Implementation of future upgrades (other than those required to meet regulatory requirements) is at the discretion of the Government
• Renewals and Replacements
– Investments in the utility system to renew or replace system components that fail or reach the end of their useful life
Review Solicitation:
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 12
C.12 Operations and Maintenance/Quality Management Plan
• Establish and adhere to an Operation and Maintenance/Quality
Management Plan to ensure safe and reliable operation of the system(s)
• Consistent with all applicable laws/regulations and requirements of utility-specific attachments (Section J)
C.13 Operational Transition Plan
• Describes plan for transfer of the utility system(s)
• Ensures continuous service from the Government to new owner
• Contractor proposes performance start date
• Includes detailed joint inventory of facilities, specialized equipment, manuals, and records
Review Solicitation:
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 13
Section E – Inspection and Acceptance
• FAR 52.246-4 - Inspection of Services (Fixed Price)
Section F – Deliveries or Performance
• Utility Services Contract Term – maximum of 50 years
Review Solicitation
Phase I Phase II Transition Period
(Pre-performance) Contract Start Date
(Performance Period) Contractor proposes duration of Transition
Period; Transition Period begins upon execution of contract award unless a later date is specified.
Transition Period ends with the conveyance of the
Utility System Infrastructure and
Performance of the Utility Services Contract begins.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 14
Section G – Contract Administration Data
• Contracting Officer’s Representative (COR)
• Submission & Payment of Invoices – iRAPT (formerly WAWF)
• Price Adjustments
• Accounting Procedures
• Accounting and Appropriation Data
Section H – Special Contract Provisions
• Insurance Requirements
• Government Repurchase Option – non-negotiable
• Hazardous Substances
– Must comply with all applicable laws and regulations
• Contribution in Aid of Construction (CIAC) Tax Liability
• Differing Site Conditions
• Disposition at Contract Expiration
Review Solicitation
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 15
Section I –Clauses in the Solicitation
• FAR Clauses (Section I.2)
• Defense FAR Supplement (DFARS) (Section I.3)
• Utility Services Clauses Incorporated by Reference (IBR)
(Section I.4)
• Clauses IBR for Non-Regulated Utilities and Regulated Utilities
Offering Non-Tariff Rates (Section I.5)
• Clauses Incorporated by Reference: Construction Wage Rates
Requirements (Section I.6)
• Other Clauses (Section I.7)
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 16
Section J – List of Attachments, Exhibits and References
• Utility-Specific Attachments
• SPE600-15-R-0807: Electric, Natrual Gas, Thermal (JA1, JA2, JA5)
• SPE600-15-R-0810: Water, Wastewater (JA3, JA4)
‒ Installation Utility System Description and Inventory ‒ Specific Service Requirements ‒ Current Supply Arrangements ‒ Monthly Submittals ‒ Government Recognized System Deficiencies ‒ Request for Action Process ‒ Points of Demarcation
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 17
Section J (Continued)
• JA38 – Federal Equivalents
• JA39 – Past Performance Information
• JA40 – Example Completion of Schedules for FP-EPA Type
Contracts
• JA41 – Wage Determinations
• JA42 – B Schedules and Price Data Sheets
• JA43 – Reserved
• JA44 – Quality Assurance Surveillance Plan (QASP)
• JA45 – Subcontracting Plan
• JA46 – Sample Contract Table J.1-1
• JR1 – Sample Bill of Sale
• JR2 – Technical Evaluation Categories
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 18
Section K – Representations, Certifications & Other Statements of Offerors
• Identifies NAICS size standards
• System for Award Management (SAM) registration done online
Section L – Instructions, Conditions, and Notices to Offerors
• Site Visits (L.2.1.6)
– Initial Site Visit: Electric, Natural Gas, Thermal – October 20-21, 8:00 AM
– Initial Site Visit: Water, Wastewater – October 21, 2015, 1:00 PM
– Initial Site Visit: Water, Wastewater – October 22, 2015, 8:00 AM
• Offerors may request additional site visits through the Contracting Officer
• Technical Library (L.2.1.7)
– Available on Disk
• Proposal Preparation Instructions (L.3 - L.7)
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 19
Four Proposal Volumes I. Technical……………………Limit 200 Pages (Per System) II. Past Performance…………Limit 50 Pages (Per System)
III. Contract Documentation…No Limit IV. Price………………………….No Limit
• Offeror may propose on one, multiple, or all systems
• Each system must have separate price and technical proposal volumes
• Offeror must clearly identify system(s) and pricing method offered
• Provide 5 disks
‒ Volumes I, III, and IV shall be submitted on a four (4) of the disks
‒ Volume II shall be submitted on a separate disk
• Disks must be certified virus free
• Each volume must be complete and accurate without reference to other volumes
Proposal Submittal (L.3.1)
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 20
• Page limitations from L.3.1 still apply
• If submitting grouped proposals offeror shall submit single consolidated Volume I, II, III, and IV
• If Offeror wants to be considered for the award of a single system in the event their grouped proposal is not acceptable to the Government:
– Provide separate Volume I and Volume IV only addressing the requirements for that system shall also be submitted for review and evaluation.
Grouped Proposal (L.3.2.1)
Number of Volumes Required for Submittal
Volume No.
Single
System Proposal
Grouped System
Proposal
Grouped System and Single System Proposals
I - Technical 1 1 1 Grouped + 1 Per Single System II – Past Performance 1 1 1 Grouped
III – Contract Documentation 1 1 1 Grouped IV - Price 1 1 1 Grouped + 1 Per Single System
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 21
• Primary Focus
– Service Interruption / Contingency and Catastrophic Loss
Plan
– Operations and Maintenance / Quality Management Plan
– Initial System Deficiency Corrections (ISDCs) / Upgrades /
Connections and Renewals and Replacements Plan (R&R)
– Operational Transition Plan
Volume I – Technical Proposal
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 22
Service Interruption/Contingency and Catastrophic Loss Plan
• Purpose: To address capability to respond to outages:
emergency, urgent, and routine service calls; and catastrophic loss
• Common Proposal Shortfalls
– Not complying with response/completion times
– Not complying with installation’s excavation permit process and emergency restoration plan
– Not allowing the installation to reschedule routine outages if they adversely affect mission/operations
Note: Regulated Utilities who have Submitted Similar Documents to their Regulatory Commission may submit those documents in lieu of a Requested Plan, provided that it addresses the requirements in the solicitation.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 23
Operations and Maintenance/Quality Management Plan
• Purpose: To identify your performance standards and O&M policies & procedures
• Common Proposal Shortfalls
– Not addressing service standards for each line Item in Table L-1 of Section L.4.2.1
– Not addressing the procedures you use (tests, inspections, etc.) to ensure compliance with the service standards for each line Item in Table L-1 of Section L.4.2.1
Note: Regulated Utilities who have Submitted Similar Documents to their Regulatory Commission may submit those documents in lieu of a Requested Plan, provided that it addresses the requirements in the solicitation
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 24
Initial System Deficiency Corrections / Upgrades / Connections and Renewals and Replacements Plan
• Purpose: To identify the Initial System Deficiency Corrections and
Renewals & Replacements you intend to accomplish
– Separately show Government identified and Contractor identified deficiencies
• Common Proposal Shortfalls
– Not providing an Initial 5-Year Plan
– Not addressing the Government’s Recognized System
Deficiencies in your 5-Year Plan
– Not providing a year-by-year, 50-year plan for Renewals &
Replacements (R&R)
– Not providing a Price Data Sheet 2 without prices in the technical volume
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 25
Operational Transition Plan
• Purpose: Demonstrate Ability to Provide a “Seamless”
Transition from Government to Contractor Operations
• Common Proposal Shortfalls
– Not Identifying the Person(s) Authorized to Sign for the Transfer of Inventory
– Not Indicating When the Joint Inventory will Occur
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 26
• Past Performance Information (JA39)
• References of at least 2 but not more than 6 of your largest customers of similar complexity and scope within last 5 years for each system offered
• References for proposed major subcontractors
• List of system acquisitions in past 5 years that includes, at a minimum:
– Name of acquisition or project
– Brief description of contract or subcontract
– Total contract value
– Period of performance
– Principal parties involved, phone numbers and e-mail addresses
Volume II – Past Performance
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 27
• Written Statement on Status with Regulatory Authority to Include:
– Name of Authority
– Address/Telephone
– Point of Contact
– Discussion of any violations, penalties, or other enforcement actions over the previous five years
• Common Proposal Shortfalls
– Inability to locate/contact references
• Phone numbers and e-mail addresses are incorrect
– Irrelevant References
• References must be relevant to each specific system and must be provided for each system on which offeror is proposing
Volume II – Past Performance
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 28
• Original Signed and dated SF-33
– Acknowledge all Amendments
• Representations and Certifications
– Completed on-line with copy in Volume III including registration in SAM
• CAS Notices and Certifications (FAR 52.230-1) in
Section K
• Exceptions to Terms and Conditions (Matrix IAW
L.6.2)
• CAS Waiver Applicability
– Include justification in proposal
Volume III – Contract Documentation
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 29
• FAR 31 Deviation Request
– Include in initial proposal
• Other Required Information
– Authorized Personnel / Negotiators
– Subcontracting Plan (Other Than Small Businesses)
– Socioeconomic Plan - All Offerors must submit a Plan and are required to address all 7 criteria
Volume III – Contract Documentation
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 30
• All offerors must submit:
– Schedule B-1 or B-2
• If a grouped offer is submitted, separate price data sheets (Schedule B-1 or B-2 and Price Data Sheets 1, 2, 3, 4, 5, and 6, as appropriate) are required for each utility system
• In a grouped offer, if the privatization of any single system is not cost effective, the entire offer will not be considered for award
• Pricing Assumption Matrix
• Standard Estimating Methodology
Volume IV – Price Proposal
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 31
Schedule B-1 (Regulated Tariff)
• CLIN 0001
– Utility Services Charge: Applicable Tariff
– Monthly Credit as Payment for Purchase Price
• Monthly Credit
• Number of Months
• Interest Rate
– Recoverable Portion of Purchase Price
• Monthly Price
• Number of Months
• Interest Rate
• CLIN 0002
– Initial System Deficiency Corrections / Upgrades / Connection
Charges
• CLIN 0003
– Fixed-Price Lump Sum Payment for Transition Period
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 32
Volume IV – Price Proposal B.2.1 Schedule B-1 Regulated Tariff
Utility System: ________________
CLIN Supplies/Services Qty Unit Unit Price Total 0001 Utility Services Charge Months $ $
FP
The unit price is the Applicable Tariff(s) less the monthly credit as payment for the purchase price plus the recoverable portion of the purchase price.
Applicable Tariff $
Monthly Credit for PP $ # of Months Interest Rate %
Recoverable Portion of PP $ # of Months Interest Rate %
Unit Price $
Initial System Deficiency Corrections/ Upgrades/Connection Charges b
FFP
Transition Period
FP
0002 $ $
0003 Each $ $ a Utility system to be filled in by the Offeror. A Schedule B-1 must be completed for each utility system offered, except as specifically stated in Section L. Utility systems are shown in paragraph B.1, Systems to be Privatized. Offerors shall provide a comprehensive description of proposed tariffs in their Price Proposals.
b CLIN 0002 is required only if the tariff provides for separate identification of initial system deficiency corrections and connection charges. If separate identification is not provided, it will be assumed the tariff rate includes these costs.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 33
Schedule B-2 (Fixed Price with EPA)
• CLIN 0001
– Utility Services Charge (monthly charge for O&M/R&R)
– Monthly Credit as Payment for Purchase Price
• Monthly Credit
• Number of Months
• Interest Rate
– Recoverable Portion of Purchase Price
• Monthly Price
• Number of Months
• Interest Rate
• CLIN 0002
– System Deficiency Corrections / Connection Charges
• CLIN 0003
– Lump Sum Payment for Transition Period
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 34
Utility System: ________________
CLIN Supplies/Services Qty Unit Unit Price Total 0001 Utility Services Charge Months $ $
FPEPA
The unit price is the Utility Services Charge less the monthly credit as payment for the purchase price (PP) plus the recoverable portion of the purchase price.b
Utility Services Charge $
Monthly Credit for PP $ # of Months Interest Rate %
Recoverable Portion of PP $ # of Months Interest Rate %
Unit Price $
Initial System Deficiency Corrections/ Upgrades/ Connection Charges
FFP
Transition Period
FFP
0003 Each $ $ a Utility system to be filled in by the Offeror. A Schedule B-2 must be completed for each utility system offered, except as specifically state in Section L. Utility systems are shown in paragraph B.1, Systems to be Privatized.
b The offeror should enter the Utility Services Charge, as computed in Price Data Sheet 1.
Volume IV – Price Proposal B.2.2 Schedule B-2 Fixed Price with Economic
Price Adjustment
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 35
Price Data Sheet 1 - Utility Service Charge Purpose: To indicate the monthly charge for Operations and Maintenance and for Renewals and Replacements
• Common Proposal Shortfalls
– Not indicating exactly how O&M costs (manpower, materials, transportation, supplies, etc.) were calculated
– Not explaining how the price data shown in the Price Data Sheet 2 was used to mathematically derive the monthly charge for Renewals and Replacements
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 36
B.3.1 Price Data Sheet 1 – Utility Services Charge
Volume IV – Price Proposal
Component Monthly Charge
1. Operations and Maintenance (O&M)
2. Renewals and Replacements (R&R)
Total Utility Service Charge (to be entered into CLIN 0001 for Schedule B-1 (if applicable) and Schedule B-2)
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 37
Price Data Sheet 2 – Renewals and Replacements – 50 Year Schedule
• Purpose: To indicate price & description of the
Renewals and Replacements in each of the 50 years of the contract
• Common Proposal Shortfalls
– Not including each inventory line item (reference the utility specific Section JA: JA1- JA5) in the Price Data Sheet 2
– Not providing a price for the Renewals & Replacements of each Inventory Line Item in each year it is replaced
– Not using attachment JA40 in completing Price Data Sheet 2
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 38
B.3.2 Price Data Sheet 2 – Renewals and Replacements – 50-YEAR Plan Notes: For each inventory component/item listed in the utility specific attachment, clearly show the $ value of the planned R&R (if any) for each year 1-50.
This Plan represents the offeror’s conceptual methodology that will be used for evaluation purposes.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 39
Price Data Sheet 3 - Initial System Deficiency Corrections (ISDCs) / Upgrades / Connection Charges / Transition Period
• Purpose: To indicate prices for each ISDC, each new upgrade, each new connection, and for the transition period
• Common Proposal Shortfalls
– Not including each Government recognized system deficiency that you intend to accomplish
– Not understanding that monthly payments for a specific project will not begin until specific project is complete and in service
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 40
B.3.3 Price Data Sheet 3 – Initial System Deficiency Correction(s) / Upgrade(s) / Connection Charge(s) / Transition Period
Volume IV – Price Proposal
Project Name
Interest Rate
Project Cost
(Current $)
Project Start
Month
First Full Month
Project Will Be In
Service
Amortization Period
(Months)
Monthly Charge
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 41
Price Data Sheet 4 - Recoverable Portion of Purchase Price
• Purpose: To indicate the monthly charge for the recoverable portion of the purchase price
• Common Proposal Shortfalls
– Not realizing the Net Present Value of the recoverable portion of the purchase cannot exceed the Net Present Value of the purchase price
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 42
B.3.4 Price Data Sheet 4 – Recoverable Portion of Purchase Price
Volume IV – Price Proposal
Item Interest Rate Amount Amortization
Period (Months) Monthly Charge
Recoverable Portion of Purchase Price
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 43
Price Data Sheet 5 – Proposal 50-Year Charges to the Government, Applicable Tariff
• Purpose: To Summarize All Prices for the 50-Year Contract a b c d e f g h i j k l m
Contract Year
Applicable Tariff less
FIT
FIT for Applicable
Tariff
Credit for Purchase
Price
Recoverable Portion of Purchase
Price
Subtotal
CLIN 0001
(b+c+d+e)
ISDC
Projects less FIT
FIT for
ISDC
Projects
Subtotal
CLIN 0002
(g+h)
Transition Charges less FIT
FIT for Transition Charges
Subtotal
CLIN 0003
(j+k)
Total Contract
Costs (f+i+l)
Nominal Nominal Nominal Nominal Nominal Nominal Nominal Nominal
1 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 3 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 5 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 6 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 7 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 9 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 11 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 12 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 13 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 14 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 15 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 16 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 17 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 18 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 19 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 21 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 22 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 23 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 24 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 25 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 26 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 27 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 29 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 31 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 32 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 33 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 34 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 35 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 36 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 37 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 38 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 39 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 40 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 41 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 42 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 43 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 44 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 45 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 46 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 47 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 48 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 49 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Totals -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Contract Items
CLIN 0001 - Utility Service Charge CLIN 0002 - Initial System Deficiency Corrections /
Connection Charges
CLIN 0003 - Transition Period Charges
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 44
Price Data Sheet 6 – Proposal 50-Year Charges to the Government, Constant 2018$ (Non-Regulated)
• Purpose: To Summarize All Prices for the 50-Year Contract
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q)
Contract Year
Operations & Maintenance less FIT FIT for O&M Other Costs & Credits, Net
Non Federal Income Taxes
& Fees
Purchase Price
Recovery Purchase
Price Credit
Renewals & Replacements less FIT FIT for R&R Subtotal
CLIN 0001
ISDC Projects Amortization less FIT FIT for ISDC
Projects Subtotal
CLIN 0002
Transition Charges less
FIT
FIT for Transition Charges
Subtotal
CLIN 0003
Total Contract
Costs Real Real Real Real Nominal Nominal Real Real -- Nominal Nominal Nominal Nominal Nominal Nominal --
1 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 3 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 5 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 6 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 7 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 9 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 11 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 12 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 13 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 14 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 15 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 16 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 17 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 18 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 19 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 21 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 22 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 23 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 24 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 25 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 26 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 27 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 29 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 31 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 32 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 33 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 34 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 35 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 36 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 37 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 38 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 39 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 40 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 41 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 42 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 43 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 44 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 45 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 46 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 47 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 48 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 49 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 50 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Totals -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Contract Items
CLIN 0001 - Utility Service Charge CLIN 0002 - Initial System Deficiency Corrections / Connection Charges CLIN 0003 - Transition Period Charges
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 45
Common Proposal Shortfalls:
• Not submitting all applicable Price Data Sheets
• Not submitting proposed prices using dollars for the year of projected award (e.g., If award is projected for 2018, then proposals should be submitted in 2018 dollars)
• Not indicating 50 years of proposed billing to Government in constant (real) dollars
• Not providing MS Excel workbooks with all calculations and logic intact to show how price was developed (L.7.5, L.7.8.1)
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 46
M.1 Basis for Conveyance and Contract Award
• Award will be based on best value tradeoff determination consistent with the evaluation factors
• Government reserves the right to award without discussions
M.2 Evaluation Factors and Subfactors
• Factor 1: Technical Capability
– Subfactor 1: Service Interruption / Contingency and Catastrophic Loss Plan
– Subfactor 2: Operations and Maintenance Plan / Quality Management Plan
– Subfactor 3: Initial System Deficiency Corrections / Upgrades / Connections and Renewals and Replacements Plan
– Subfactor 4: Operational Transition Plan
Section M:
Evaluation Factors for Award
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 47
M. 2 Evaluation Factors and Subfactors (Continued)
• Factor 2: Past Performance
• Factor 3: Risk
– Subfactor 1: Performance Risk
– Subfactor 2: Assurance of Long-Term Price and
Service Stability
– Subfactor 3: Price Risk
– Subfactor 4: Other Possible Long-Term Costs and
Benefits
• Factor 4: Socioeconomic
• Factor 5: Price
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 48
M.2.1 Order of Importance for Evaluating Factors and Subfactors
• Technical Capability, Past Performance, and Risk are approximately equal in importance. Socioeconomic is significantly less important than Technical Capability, Past Performance and Risk. When combined, Technical Capability, Past Performance, Risk, and Socioeconomic are significantly more important than Price.
• Technical Capability and Risk will be evaluated at the Subfactor level.
– Under Technical Capability, all sub-factors are approximately equal importance; however, a less than acceptable rating for any subfactor will result in a less than acceptable rating for the Technical Capability factor.
– Under Risk, all subfactors are approximately equal in importance;
however, a negative rating in any subfactor will result in a negative rating for the Risk factor.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 49
M.3 Conveyance Determination
• Once an offeror is selected, but before an award can be made the
Military Service must determine whether conveyance of the utility system(s) will be made.
• This conveyance decision is distinct and separate from the procurement decision and is not governed by the terms of the FAR or this Solicitation. Rather, the conveyance decision will be made by the Military Service in accordance with 10 U.S.C. § 2688 and OMB, DoD, and Military Service executive policies.
• The Government will attempt to make Military Service specific policies available in the technical library and upon request, however, it is the offeror’s responsibility to conduct due diligence in researching applicable current law and policies.
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 50
Pre-proposal Conference 19 October 15 Initial Site Visit 20-21 October 15 Proposals Due 26 January 16 Contract Award 15 January 18*
*Subject to change
Milestones:
U.S. Army Garrison West Point
SPE600-15-R-0807: Electric, Natural Gas, Thermal
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 51
Pre-proposal Conference 19 October 15 Initial Site Visit 21-22 October 15 Proposals Due 26 January 16 Contract Award 15 January 18*
*Subject to change
Milestones:
U.S. Army Garrison West Point
SPE600-15-R-0810: Water, Wastewater
WARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCEWARFIGHTER FIRST - PEOPLE & CULTURE - STRATEGIC ENGAGEMENT - FINANCIAL STEWARDSHIP - PROCESS EXCELLENCE 52
DLA Energy POCs
Contracting Officer: Phone: (703) 617-1469 Dan Ferry E-mail: daniel.ferry2@dla.mil
Contract Specialist: Phone: (703) 617-1460 Carly Dubernas E-mail: carly.dubernas@dla.mil
Contract Specialist: Phone: (571) 642-1078 Arthur Everette E-mail: arthur.everette@dla.mil
File details come from the government source that posted it. Updated .