(Amend_1)_R-0404_Att_IV_NE_Schedule_Pages.xlsx
XLSX spreadsheet 26 MB Posted
- Solicitation number
- SPE600-15-R-0404
- Issued by
-
Defense Logistics Agency Energy
About this file
The Attachment IV Schedule Pages will be made available in Microsoft Excel Format.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheets
| Solicitation Schedule Page |
| Line Item Summary |
| SPE600-15-R-0404 |
| Standalone Line Items | Submit a single Winter Adjustment Factor, and a single Summer Adjustment Factor for each Line Item interested in supplying. | ||||
| Line Item | EBS LI | Installation | State | Local Distribution Company (LDC) | |
| or Pipeline | SIP Publication | SIP Location | Total Estimated |
Volume
| (Dths) | Total Summer |
| (Dths) | Summer |
Adjustment Factor
| ($/Dth) | Total Winter |
| (Dths) | Winter |
Adjustment Factor ($/Dth) ERROR:#REF! 0001 ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF!
| Tied-Aggregated Group #1 | All Line Items within Tied-Aggregated Group #1 will be awarded to a single supplier. Submit a single Winter Adjustment Factor, and a single Summer Adjustment Factor for each aggregate within Tied-Aggregated Group #1. | ||||
| Line Item | EBS LI | Installation | State | Local Distribution Company (LDC) | |
| or Pipeline | SIP Publication | SIP Location | Total Estimated |
Volume
| (Dths) | Total Summer |
| (Dths) | Summer |
Adjustment Factor
| ($/Dth) | Total Winter |
| (Dths) | Winter |
Adjustment Factor
| ($/Dth) | 62,046 | 18,774 | 43,272 | ||||||||||
| ERROR:#REF! | 0001 | Fort Myer | VA | Washington Gas Light | INSIDE FERC'S | Henry Hub | 3,368,821 | 1,062,002 | 2,306,819 | 34,702 | 10,592 | 24,110 | |
| ERROR:#REF! | Naval Research Lab, Washington DC | DC | 73,954 | 16,860 | 57,094 | ||||||||
| ERROR:#REF! | Fort McNair | DC | 7,925 | 4,058 | 3,867 | ||||||||
| ERROR:#REF! | National Geospatial Intelligence Agency (NGA) | VA | 24,718 | 3,598 | 21,120 | ||||||||
| ERROR:#REF! | NSWC Carderock | MD | 2,512 | 684 | 1,828 | ||||||||
| ERROR:#REF! | Walter Reed Facility | DC | 64,836 | 25,562 | 39,274 | ||||||||
| ERROR:#REF! | Joint Base Anacostia Bolling | DC | 653,000 | 148,000 | 505,000 | ||||||||
| ERROR:#REF! | Joint Base Andrews AFB | MD | 8,938 | 3,876 | 5,062 | ||||||||
| ERROR:#REF! | US Army Garrison Adelphi Lab Center | MD | 115,122 | 59,468 | 55,654 | ||||||||
| ERROR:#REF! | Fort Detrick | MD | 508,040 | 132,392 | 375,648 | ||||||||
| ERROR:#REF! | Fort Belvoir | VA | 280,504 | 83,212 | 197,292 | ||||||||
| ERROR:#REF! | Washington DC Navy Yard | DC | 7,810 | 2,576 | 5,234 | ||||||||
| ERROR:#REF! | US Naval Observatory | DC | 3,892 | 1,050 | 2,842 | ||||||||
| ERROR:#REF! | Bethesda Naval Hospital | MD | 473,476 | 173,694 | 299,782 | ||||||||
| ERROR:#REF! | National Institute of Health | MD | 11,590 | 2,732 | 8,858 | ||||||||
| ERROR:#REF! | Fort Detrick - Forest Glen | MD | 5,664 | 1,012 | 4,652 | ||||||||
| ERROR:#REF! | Pentagon | VA | 1,928 | 984 | 944 | ||||||||
| ERROR:#REF! | Mark Center | VA | 764,668 | 276,962 | 487,706 | ||||||||
| ERROR:#REF! | NAS Patuxent River | MD | 65,746 | 19,966 | 45,780 | ||||||||
| ERROR:#REF! | USDA Beltsville | MD | 66,000 | 29,200 | 36,800 | ||||||||
| ERROR:#REF! | JFK Center for the Performing Arts | DC | 131,750 | 46,750 | 85,000 | ||||||||
| ERROR:#REF! | U.S. Geological Survey | VA | 3,368,821 | 1,062,002 | 2,306,819 | ||||||||
| ERROR:#REF! | 0002 | Naval Research Lab, Washington DC | DC | Washington Gas Light | INSIDE FERC'S | Henry Hub | 8,752,441 | 3,707,896 | 5,044,545 | 894,254 | 413,766 | 480,488 | |
| ERROR:#REF! | National Geospatial Intelligence Agency (NGA) | VA | 102,157 | 55,680 | 46,477 | ||||||||
| ERROR:#REF! | NSWC Carderock | MD | 97,020 | 7,220 | 89,800 | ||||||||
| ERROR:#REF! | Walter Reed Facility | DC | 309,648 | 162,224 | 147,424 | ||||||||
| ERROR:#REF! | Joint Base Anacostia Bolling | DC | 100,600 | 30,200 | 70,400 | ||||||||
| ERROR:#REF! | US Army Garrison Adelphi Lab Center | MD | 268,750 | 126,850 | 141,900 | ||||||||
| ERROR:#REF! | Fort Detrick | MD | 1,116,000 | 620,000 | 496,000 | ||||||||
| ERROR:#REF! | Washington DC Navy Yard | DC | 317,224 | 72,624 | 244,600 | ||||||||
| ERROR:#REF! | Defense Intelligence Agency | DC | 88,200 | 38,900 | 49,300 | ||||||||
| ERROR:#REF! | Bethesda Naval Hospital | MD | 1,090,000 | 510,000 | 580,000 | ||||||||
| ERROR:#REF! | National Institute of Health | MD | 2,602,000 | 854,000 | 1,748,000 | ||||||||
| ERROR:#REF! | Fort Detrick - Forest Glen | MD | 230,452 | 121,294 | 109,158 | ||||||||
| ERROR:#REF! | Pentagon | VA | 930,000 | 410,000 | 520,000 | ||||||||
| ERROR:#REF! | Pentagon Incinerator | VA | 33,600 | 19,600 | 14,000 | ||||||||
| Year 2015 | Mark Center | VA | 37,342 | 13,734 | 23,608 | ||||||||
| ERROR:#REF! | USDA Beltsville | MD | 535,194 | 251,804 | 283,390 | ||||||||
| 8,752,441 | 3,707,896 | 5,044,545 |
| Solicitation Schedule Page | ||||||||
| Year 2016 | Line Item Summary | |||||||
| SPE600-15-R-0404 | 123,860 | 72,620 | 51,240 | |||||
| 23,160 | 7,120 | 16,040 | ||||||
| Tied-Aggregated Group #2 | All Line Items within Tied-Aggregated Group #2 will be awarded to a single supplier. Submit a single Winter Adjustment Factor, and a single Summer Adjustment Factor for each aggregate within Tied-Aggregated Group #2. | 32,000 | 14,000 | 18,000 | ||||
| Year 2017 | EBS LI | Installation | State | Local Distribution Company (LDC) | ||||
| or Pipeline | SIP Publication | SIP Location | Total Estimated |
Volume
| (Dths) | Total Summer |
| (Dths) | Summer |
Adjustment Factor
| ($/Dth) | Total Winter |
| (Dths) | Winter |
Adjustment Factor
| ($/Dth) | 232,520 | 89,160 | 143,360 | ||||||||||
| 0003 (1 of 6) | 0003 | USCG Curtis Bay | MD | BG&E | INSIDE FERC'S | Henry Hub | 1,281,372 | 419,898 | 861,474 | 163,832 | 52,998 | 110,834 | |
| 0003 (2 of 6) | US Naval Academy | 706,000 | 184,000 | 522,000 | |||||||||
| 0003 (3 of 6) | Maryland Procurement Office | 1,281,372 | 419,898 | 861,474 | |||||||||
| 0003 (4 of 6) | John Hopkins Applied Physics Lab | 215,800 | 32,200 | 183,600 | |||||||||
| 0003 (5 of 6) | Aberdeen Proving Grounds | 683,000 | 227,400 | 455,600 | |||||||||
| 0003 (6 of 6) | Fort George G. Meade | 938,000 | 448,000 | 490,000 | |||||||||
| 0004 (1 of 4) | 0004 | USCG Curtis Bay | MD | BG&E | INSIDE FERC'S | Henry Hub | 2,711,417 | 863,194 | 1,848,223 | 874,617 | 155,594 | 719,023 | |
| 0004 (2 of 4) | US Naval Academy | 2,711,417 | 863,194 | 1,848,223 | |||||||||
| 0004 (3 of 4) | Maryland Procurement Office | 16,114,051 | |||||||||||
| 4/1/15 | Aberdeen Proving Grounds | 16,114,051 |
| Tied-Aggregated Group #3 | All Line Items within Tied-Aggregated Group #3 will be awarded to a single supplier. Submit a single Winter Adjustment Factor, and a single Summer Adjustment Factor for each aggregate within Tied-Aggregated Group #3. | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ||||
| Line Item | EBS LI | Installation | State | Local Distribution Company (LDC) | ||||
| or Pipeline | SIP Publication | SIP Location | Total Estimated |
Volume
| (Dths) | Total Summer |
| (Dths) | Summer |
Adjustment Factor
| ($/Dth) | Total Winter |
| (Dths) | Winter |
Adjustment Factor
| ($/Dth) | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ||||||||||
| ERROR:#REF! | 0007 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | 0008 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | |||||||||
| ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| Summer: April through October |
| Winter November through March |
| Summer : April through October |
| Winter: November through March |
| NOTE: For all Line Items, customer account numbers and/or additional consumption information may be provided upon request |
Source Selection Information -- See FAR 2.101 and 3.104
0001 (1 of 22)
| AL | Agua Dulce Hub | (1) Full Requirements/Utility. | ||||||||||||
| Schedule Page | AK | Algonquin CG | (2) Full Requirements/Pool. | |||||||||||
| AZ | Algonquin Rcpts | (3) Monthly Order Quantities. | ||||||||||||
| By Line Item Detail | AR | Alliance Interstates | (4) Monthly Orders – No Swing. | |||||||||||
| CA | ANR LA | (5) Alternative Fuel or Monthly Priced Accounts. | ||||||||||||
| Fort Myer | CO | ANR ML 7 | ||||||||||||
| CT | ANR OK | |||||||||||||
| Installation Address | DE | Carthage Hub | ||||||||||||
| DC | CenterPoint E | |||||||||||||
| Line Item | 0001 (1 of 22) | FL | Cheyenne Hub | |||||||||||
| Installation | Fort Myer | GA | Chicago CG | |||||||||||
| Address | Directorate of Public Works | HI | CIG Rocky Mtns | |||||||||||
| 102 Custer Road | ID | Col Gas Appal | ||||||||||||
| City | Fort Myer | IL | Col Gulf LA | |||||||||||
| State | VA | IN | Col Gulf Mnline | |||||||||||
| Zip | 22211-0000 | IA | Cons Energy CG | |||||||||||
| Ordering Officer | Invoice Certification | Payment Office | KS | Dawn Ontario | ||||||||||
| Name | Bill Lucas | Bosnok L. Escobar | Manuel Rivera-Figueroa | KY | Dominion N Pt | |||||||||
| Phone | (703) 696-6390 | (703) 696-1224 | (703) 696-7641 | LA | Dominion S Pt | |||||||||
| Ext | (703) 965-6075 (m) | (703) 859-0515 (m) | ME | Dracut MA | ||||||||||
| DSN | MD | El Paso Bondad | ||||||||||||
| Fax | (703) 696-5357 | (703) 696-6422 | MA | El Paso Permian | ||||||||||
| bill.lucas4@us.army.mil | bosnok.l.escobar.civ@mail.mil | manuel.rivera-figueroa@us.army.mil | MI | El Paso S Mainline | ||||||||||
| Location | Directorate of Public Works | Directorate of Public Works | Directorate of Public Works | MN | El Paso SanJuan | |||||||||
| Address | ANMY-EL-O | 106 Stewart Road | 106 Stewart Road | MS | Emerson Viking | |||||||||
| 102 Custer Road, Bldg 203 | Bldg 313 | Bldg 313 | MO | FL Gas Zn1 | ||||||||||
| Attention | Bill Lucas | Bosnok L. Escobar | Manuel Rivera-Figueroa | MT | FL Gas Zn2 | |||||||||
| City | Fort Myer | Fort Myer | Fort Myer | NE | FL Gas Zn3 | |||||||||
| State | VA | VA | VA | NV | Florida CG | |||||||||
| Zip | 22211-0000 | 22211-0000 | 22211-0000 | NH | GTNW Kingsgate | |||||||||
| NJ | Henry Hub | |||||||||||||
| Utility Account Information | NM | Houston ShipChl | ||||||||||||
| NY | Iroquois Recpts | |||||||||||||
| LDC or Pipeline | Washington Gas Light | NC | Iroquois Zn2 | |||||||||||
| ND | Katy | |||||||||||||
| Total Contract Est. Volume (Dths) | 62,046 | Total Summer (Dths) | 18,774 | Total Winter (Dths) | 43,272 | OH | Kern River Dlvd | |||||||
| OK | Kern Rvr Opal | |||||||||||||
| Delivery Point | Telemetered | Rate Class | OR | Leidy Hub | ||||||||||
| City Gate | Yes | 2A | PA | Mich Con CG | ||||||||||
| RI | NGPL Amarillo Rcpt | |||||||||||||
| Alternate Fuel | Type | Percent Load Displaceable | Limits on Use | Notes | SC | NGPL LA | ||||||||
| No | SD | NGPL Midcont | ||||||||||||
| TN | NGPL S TX | |||||||||||||
| Estimated Usage Information | TX | NGPL Texok Zn | ||||||||||||
| UT | Niagara | |||||||||||||
| (All volumes expressed in Dths) | VT | Northern Demarc | ||||||||||||
| Location | City Gate | VA | Nrthrn Ventura | |||||||||||
| WA | NW Can Bd Sumas | |||||||||||||
| Year 2015 | Annual Totals | 18,543 | Summer Totals | 9,387 | Winter Totals | 9,156 | WV | NW S of Grn Rvr | ||||||
| Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | WI | NW WY Pool/Rky | ||||
| 1,293 | 1,667 | 1,481 | 1,250 | 812 | 930 | 1,954 | 4,338 | 4,818 | WY | NYMEX | ||||
| Oneok OK | ||||||||||||||
| Year 2016 | Annual Totals | 31,023 | Summer Totals | 9,387 | Winter Totals | 21,636 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | PG&E CG | ||
| 4,667 | 4,716 | 3,097 | 1,293 | 1,667 | 1,481 | 1,250 | 812 | 930 | 1,954 | 4,338 | 4,818 | PG&E Malin | ||
| PG&E South | ||||||||||||||
| Year 2017 | Annual Totals | 12,480 | Summer Totals | 0 | Winter Totals | 12,480 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | PG&E CG | |||||||||||
| 4,667 | 4,716 | 3,097 | PG&E Malin | |||||||||||
| PG&E South | ||||||||||||||
| Curtailment Days | Questar Rky Mtn | |||||||||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | SoCal Gas | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | SoCal Gas CG | ||
| SoNat LA | ||||||||||||||
| Solicitation Parameters | Stanfield OR | |||||||||||||
| Sth Star TxOkKs | ||||||||||||||
| Period Beginning | Period Ending | Publication | SIP | Delivery Option | Delivery Type | TC Alb AECO-C | ||||||||
| 04/01/15 | 03/31/17 | INSIDE FERC'S | Henry Hub | (2) Full Requirements/Pool. | Firm | Tenn LA 500 Leg | ||||||||
| Adjustment Factor: | Summer: | Winter: | Tenn LA 500/800 AVG | |||||||||||
| Overage & Shortage Volume Pricing | Tenn LA 800 Leg | |||||||||||||
| Publication | Location | Methodology | Include Adj. Factor | Tenn Zn0 | ||||||||||
| Overage Treatment | Tenn Zn6 Dlvd | |||||||||||||
| Summer Volumes | Texas Gas Zn 1 | |||||||||||||
| Winter Volumes | Transco Zn1 | |||||||||||||
| Shortage Treatment | Transco Zn2 | |||||||||||||
| Summer Volumes | Transco Zn3 | |||||||||||||
| Winter Volumes | Transco Zn4 | |||||||||||||
| Transco Zn5 Dlv | ||||||||||||||
| Tied to Other Line Items | Aggregated With Other Line Items | Transco Zn6 NY | ||||||||||||
| Transco Zn6 Non-NY | ||||||||||||||
| Note #1 | For all WGL accounts (Firm/DRV and Interruptible), WGL balancing fees shall be passed through by the contractor to the customer's invoice as a separate line item. | Transwestn Perm | ||||||||||||
| Note #2 | Due to LDC meter read variations throughout the month, this line item will be invoiced by the contractor using the first day of meter read for pricing reference. For example, Meter read dates: |
Nov 5 - Dec 5; Use Nov index price for all volumes invoiced on Nov invoice.
Nov 2 - Dec 2: Use Nov index price for all volumes invoiced on Nov invoice.
| Nov 28 - Dec 28: Use Nov index price for all volumes on Nov invoice. | Trunkline E LA | |||
| Note #3 | The firm requirement represents the Daily Required Volume (DRV) account for Fort Myer. | Trunkline LA | ||
| Note #4 | Each month a Consolidated Detailed NGAS Consumption Summary Sheet will need to be provided for this customer. This will need to be provided along with the corresponding monthly invoice. The summary will need to reflect each of the NGAS accounts activity which falls under the ownership of this customer, for the specific month delivery period. Specific information that will need to be listed, for each NGAS Account: 1. NGAS Account Number; 2. DLA Associated Line Item Number; 3. Customer Name; 4. Customer Address (full address); 5. Delivery Month; 6. Rate Class; 7. Meter Readings (both prior & current dates); 8. Wet Therms; 9. Conversion; 10. Dry Therms; 11. DLA Commodity Bill Rate $/Therms; 12. Balancing Rate (if applicable); 13. Commodity Charge; 14. Balancing Charge; and 15. Total Charge | Trunkline W LA | ||
| Note #5 | Each month an Invoice Summary Cover Sheet will need to be provided. This Invoice Summary Cover Sheet will need to summarize contents listed within the customer invoices that are associated with their corresponding delivery month. The following will need to be included within the Invoice Summary Sheet: 1. Customer Line Item Number; 2. Customer Name; 3. Delivery Month; 4. Delivery Type; 5. Invoice Number; 6. Volume Usage; and 7. Invoice Amounts. | |||
| TX Eastern E TX | ||||
| TX Eastern M1 Kosi | ||||
| TX Eastern M-3 | ||||
| TX Eastern S TX | ||||
| TX Eastern W LA | ||||
| Waha | ||||
| TX Eastern ZnM1 24-in | ||||
| Westcoast Stn 2 |
mailto:charlie.mccoy@dla.mil 0001 (2 of 22)
| AL | Agua Dulce Hub | (1) Full Requirements/Utility. | ||||||||||||
| Schedule Page | AK | Algonquin CG | (2) Full Requirements/Pool. | |||||||||||
| AZ | Algonquin Rcpts | (3) Monthly Order Quantities. | ||||||||||||
| By Line Item Detail | AR | Alliance Interstates | (4) Monthly Orders – No Swing. | |||||||||||
| CA | ANR LA | (5) Alternative Fuel or Monthly Priced Accounts. | ||||||||||||
| Naval Research Lab, Washington DC | CO | ANR ML 7 | ||||||||||||
| CT | ANR OK | |||||||||||||
| Installation Address | DE | Carthage Hub | ||||||||||||
| DC | CenterPoint E | |||||||||||||
| Line Item | 0001 (2 of 22) | FL | Cheyenne Hub | |||||||||||
| Installation | Naval Research Lab, Washington DC | GA | Chicago CG | |||||||||||
| Address | Code 3502, Building 57, Room100 | HI | CIG Rocky Mtns | |||||||||||
| 4555 Overlook Avenue, SW. | ID | Col Gas Appal | ||||||||||||
| City | Washington | IL | Col Gulf LA | |||||||||||
| State | DC | IN | Col Gulf Mnline | |||||||||||
| Zip | IA | Cons Energy CG | ||||||||||||
| Ordering Officer | Invoice Certification | Payment Office | KS | Dawn Ontario | ||||||||||
| Name | Jennifer Cheswick | Denise Quinn | Jennifer Moran | DFAS Columbus Center | KY | Dominion N Pt | ||||||||
| Phone | (202) 404-2035 | (202) 404-4312 | (202) 404-4312 | (800) 756-4571 | LA | Dominion S Pt | ||||||||
| Ext | ME | Dracut MA | ||||||||||||
| DSN | MD | El Paso Bondad | ||||||||||||
| Fax | (202) 404-7350 | (202) 404-7596 | (202) 767-1615 | (866) 313-2340 | MA | El Paso Permian | ||||||||
| jennifer.cheswick@nrl.navy.mil | denise.quinn@nrl.navy.mil | jennifer.moran@nrl.navy.mil | DFAS-CO_LC@DFAS.MIL | MI | El Paso S Mainline | |||||||||
| Location | Naval Research Laboratory | Naval Research Laboratory | Naval Research Laboratory | DFAS Columbus Center | MN | El Paso SanJuan | ||||||||
| Address | 4555 Overlook Avenue | 4555 Overlook Avenue | 4555 Overlook Avenue | PO Box 182317 | MS | Emerson Viking | ||||||||
| Code 3502, Bldg 57 Room 100 | Code 3502, Bldg 57 Room 100 | Code 3502, Bldg 57 Room 100 | MO | FL Gas Zn1 | ||||||||||
| Attention | Jennifer Cheswick | Denise Quinn | Jennifer Moran | DFAS/JAQBAD | MT | FL Gas Zn2 | ||||||||
| City | Washington | Washington | Washington | Columbus | NE | FL Gas Zn3 | ||||||||
| State | DC | DC | DC | OH | NV | Florida CG | ||||||||
| Zip | 20375-5320 | 20375-5320 | 20375-5320 | 43218-2317 | NH | GTNW Kingsgate | ||||||||
| NJ | Henry Hub | |||||||||||||
| Utility Account Information | NM | Houston ShipChl | ||||||||||||
| NY | Iroquois Recpts | |||||||||||||
| LDC or Pipeline | Washington Gas Light | NC | Iroquois Zn2 | |||||||||||
| ND | Katy | |||||||||||||
| Total Contract Est. Volume (Dths) | 34,702 | Total Summer (Dths) | 10,592 | Total Winter (Dths) | 24,110 | OH | Kern River Dlvd | |||||||
| OK | Kern Rvr Opal | |||||||||||||
| Delivery Point | Telemetered | Rate Class | OR | Leidy Hub | ||||||||||
| City Gate | Yes | 2A | PA | Mich Con CG | ||||||||||
| RI | NGPL Amarillo Rcpt | |||||||||||||
| Alternate Fuel | Type | Percent Load Displaceable | Limits on Use | Notes | SC | NGPL LA | ||||||||
| Yes | #2 Oil | Yes | Total allowable Curtailment Days identified within ‘Estimated Usage Information’ section | SD | NGPL Midcont | |||||||||
| TN | NGPL S TX | |||||||||||||
| Estimated Usage Information | TX | NGPL Texok Zn | ||||||||||||
| UT | Niagara | |||||||||||||
| (All volumes expressed in Dths) | VT | Northern Demarc | ||||||||||||
| Location | City Gate | VA | Nrthrn Ventura | |||||||||||
| WA | NW Can Bd Sumas | |||||||||||||
| Year 2015 | Annual Totals | 5,526 | Summer Totals | 5,296 | Winter Totals | 230 | WV | NW S of Grn Rvr | ||||||
| Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | WI | NW WY Pool/Rky | ||||
| 2,532 | 1,212 | 726 | 349 | 194 | 189 | 94 | 43 | 187 | WY | NYMEX | ||||
| Oneok OK | ||||||||||||||
| Year 2016 | Annual Totals | 17,851 | Summer Totals | 5,296 | Winter Totals | 12,555 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | PG&E CG | ||
| 6,410 | 557 | 5,358 | 2,532 | 1,212 | 726 | 349 | 194 | 189 | 94 | 43 | 187 | PG&E Malin | ||
| PG&E South | ||||||||||||||
| Year 2017 | Annual Totals | 11,325 | Summer Totals | 0 | Winter Totals | 11,325 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | PG&E CG | |||||||||||
| 5,410 | 557 | 5,358 | PG&E Malin | |||||||||||
| PG&E South | ||||||||||||||
| Curtailment Days | Questar Rky Mtn | |||||||||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | SoCal Gas | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | SoCal Gas CG | ||
| SoNat LA | ||||||||||||||
| Solicitation Parameters | Stanfield OR | |||||||||||||
| Sth Star TxOkKs | ||||||||||||||
| Period Beginning | Period Ending | Publication | SIP | Delivery Option | Delivery Type | TC Alb AECO-C | ||||||||
| 04/01/15 | 03/31/17 | INSIDE FERC'S | Henry Hub | (2) Full Requirements/Pool. | Firm | Tenn LA 500 Leg | ||||||||
| Adjustment Factor: | Summer: | Winter: | Tenn LA 500/800 AVG | |||||||||||
| Overage & Shortage Volume Pricing | Tenn LA 800 Leg | |||||||||||||
| Publication | Location | Methodology | Include Adj. Factor | Tenn Zn0 | ||||||||||
| Overage Treatment | Tenn Zn6 Dlvd | |||||||||||||
| Summer Volumes | Texas Gas Zn 1 | |||||||||||||
| Winter Volumes | Transco Zn1 | |||||||||||||
| Shortage Treatment | Transco Zn2 | |||||||||||||
| Summer Volumes | Transco Zn3 | |||||||||||||
| Winter Volumes | Transco Zn4 | |||||||||||||
| Transco Zn5 Dlv | ||||||||||||||
| Tied to Other Line Items | Aggregated With Other Line Items | Transco Zn6 NY | ||||||||||||
| Transco Zn6 Non-NY | ||||||||||||||
| Note #1 | For all WGL accounts (Firm/DRV and Interruptible), WGL balancing fees shall be passed through by the contractor to the customer's invoice as a separate line item. | Transwestn Perm | ||||||||||||
| Note #2 | Due to LDC meter read variations throughout the month, this line item will be invoiced by the contractor using the first day of meter read for pricing reference. For example, Meter read dates: |
Nov 5 - Dec 5; Use Nov index price for all volumes invoiced on Nov invoice.
Nov 2 - Dec 2: Use Nov index price for all volumes invoiced on Nov invoice.
| Nov 28 - Dec 28: Use Nov index price for all volumes on Nov invoice. | Trunkline E LA | |||
| Note #3 | The firm requirements represent the Daily Required Volume (DRV) account for Naval Research Lab, Washington DC. | Trunkline LA | ||
| Note #4 | Each month a Consolidated Detailed NGAS Consumption Summary Sheet will need to be provided for this customer. This will need to be provided along with the corresponding monthly invoice. The summary will need to reflect each of the NGAS accounts activity which falls under the ownership of this customer, for the specific month delivery period. Specific information that will need to be listed, for each NGAS Account: 1. NGAS Account Number; 2. DLA Associated Line Item Number; 3. Customer Name; 4. Customer Address (full address); 5. Delivery Month; 6. Rate Class; 7. Meter Readings (both prior & current dates); 8. Wet Therms; 9. Conversion; 10. Dry Therms; 11. DLA Commodity Bill Rate $/Therms; 12. Balancing Rate (if applicable); 13. Commodity Charge; 14. Balancing Charge; and 15. Total Charge | TX Eastern E LA | ||
| Note #5 | Each month an Invoice Summary Cover Sheet will need to be provided. This Invoice Summary Cover Sheet will need to summarize contents listed within the customer invoices that are associated with their corresponding delivery month. The following will need to be included within the Invoice Summary Sheet: 1. Customer Line Item Number; 2. Customer Name; 3. Delivery Month; 4. Delivery Type; 5. Invoice Number; 6. Volume Usage; and 7. Invoice Amounts. | |||
| TX Eastern M1 Kosi | ||||
| TX Eastern M-3 | ||||
| TX Eastern S TX | ||||
| TX Eastern W LA | ||||
| Waha | ||||
| TX Eastern ZnM1 24-in | ||||
| Westcoast Stn 2 |
0001 (3 of 22)
| AL | Agua Dulce Hub | (1) Full Requirements/Utility. | ||||||||||||
| Schedule Page | AK | Algonquin CG | (2) Full Requirements/Pool. | |||||||||||
| AZ | Algonquin Rcpts | (3) Monthly Order Quantities. | ||||||||||||
| By Line Item Detail | AR | Alliance Interstates | (4) Monthly Orders – No Swing. | |||||||||||
| CA | ANR LA | (5) Alternative Fuel or Monthly Priced Accounts. | ||||||||||||
| Fort McNair | CO | ANR ML 7 | ||||||||||||
| CT | ANR OK | |||||||||||||
| Installation Address | DE | Carthage Hub | ||||||||||||
| DC | CenterPoint E | |||||||||||||
| Line Item | 0001 (3 of 22) | FL | Cheyenne Hub | |||||||||||
| Installation | Fort McNair | GA | Chicago CG | |||||||||||
| Address | 4th and P Street, SE. | HI | CIG Rocky Mtns | |||||||||||
| ID | Col Gas Appal | |||||||||||||
| City | Washington | IL | Col Gulf LA | |||||||||||
| State | DC | IN | Col Gulf Mnline | |||||||||||
| Zip | 20024-0000 | IA | Cons Energy CG | |||||||||||
| Ordering Officer | Invoice Certification | Payment Office | KS | Dawn Ontario | ||||||||||
| Name | Bill Lucas | Bosnok L. Escobar | Manuel Rivera-Figueroa | KY | Dominion N Pt | |||||||||
| Phone | (703) 696-6390 | (703) 696-1224 | (703) 696-7641 | LA | Dominion S Pt | |||||||||
| Ext | (703) 965-6075 (m) | (703) 859-0515 (m) | ME | Dracut MA | ||||||||||
| DSN | MD | El Paso Bondad | ||||||||||||
| Fax | (703) 696-5357 | (703) 696-6422 | MA | El Paso Permian | ||||||||||
| bill.lucas4@us.army.mil | bosnok.l.escobar.civ@mail.mil | manuel.rivera-figueroa@us.army.mil | MI | El Paso S Mainline | ||||||||||
| Location | Directorate of Public Works | Directorate of Public Works | Directorate of Public Works | MN | El Paso SanJuan | |||||||||
| Address | ANMY-EL-O | 106 Stewart Road | 106 Stewart Road | MS | Emerson Viking | |||||||||
| 102 Custer Road, Bldg 203 | Bldg 313 | Bldg 313 | MO | FL Gas Zn1 | ||||||||||
| Attention | Bill Lucas | Bosnok L. Escobar | Manuel Rivera-Figueroa | MT | FL Gas Zn2 | |||||||||
| City | Fort Myer | Fort Myer | Fort Myer | NE | FL Gas Zn3 | |||||||||
| State | VA | VA | VA | NV | Florida CG | |||||||||
| Zip | 22211-0000 | 22211-0000 | 22211-0000 | NH | GTNW Kingsgate | |||||||||
| NJ | Henry Hub | |||||||||||||
| Utility Account Information | NM | Houston ShipChl | ||||||||||||
| NY | Iroquois Recpts | |||||||||||||
| LDC or Pipeline | Washington Gas Light | NC | Iroquois Zn2 | |||||||||||
| ND | Katy | |||||||||||||
| Total Contract Est. Volume (Dths) | 73,954 | Total Summer (Dths) | 16,860 | Total Winter (Dths) | 57,094 | OH | Kern River Dlvd | |||||||
| OK | Kern Rvr Opal | |||||||||||||
| Delivery Point | Telemetered | Rate Class | OR | Leidy Hub | ||||||||||
| City Gate | Yes | 2A | PA | Mich Con CG | ||||||||||
| RI | NGPL Amarillo Rcpt | |||||||||||||
| Alternate Fuel | Type | Percent Load Displaceable | Limits on Use | Notes | SC | NGPL LA | ||||||||
| No | SD | NGPL Midcont | ||||||||||||
| TN | NGPL S TX | |||||||||||||
| Estimated Usage Information | TX | NGPL Texok Zn | ||||||||||||
| UT | Niagara | |||||||||||||
| (All volumes expressed in Dths) | VT | Northern Demarc | ||||||||||||
| Location | City Gate | VA | Nrthrn Ventura | |||||||||||
| WA | NW Can Bd Sumas | |||||||||||||
| Year 2015 | Annual Totals | 20,518 | Summer Totals | 8,430 | Winter Totals | 12,088 | WV | NW S of Grn Rvr | ||||||
| Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | WI | NW WY Pool/Rky | ||||
| 2,664 | 1,464 | 1,360 | 261 | 164 | 203 | 2,314 | 5,709 | 6,379 | WY | NYMEX | ||||
| Oneok OK | ||||||||||||||
| Year 2016 | Annual Totals | 36,977 | Summer Totals | 8,430 | Winter Totals | 28,547 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | PG&E CG | ||
| 6,127 | 5,817 | 4,515 | 2,664 | 1,464 | 1,360 | 261 | 164 | 203 | 2,314 | 5,709 | 6,379 | PG&E Malin | ||
| PG&E South | ||||||||||||||
| Year 2017 | Annual Totals | 16,459 | Summer Totals | 0 | Winter Totals | 16,459 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | PG&E CG | |||||||||||
| 6,127 | 5,817 | 4,515 | PG&E Malin | |||||||||||
| PG&E South | ||||||||||||||
| Curtailment Days | Questar Rky Mtn | |||||||||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | SoCal Gas | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | SoCal Gas CG | ||
| SoNat LA | ||||||||||||||
| Solicitation Parameters | Stanfield OR | |||||||||||||
| Sth Star TxOkKs | ||||||||||||||
| Period Beginning | Period Ending | Publication | SIP | Delivery Option | Delivery Type | TC Alb AECO-C | ||||||||
| 04/01/15 | 03/31/17 | INSIDE FERC'S | Henry Hub | (2) Full Requirements/Pool. | Firm | Tenn LA 500 Leg | ||||||||
| Adjustment Factor: | Summer: | Winter: | Tenn LA 500/800 AVG | |||||||||||
| Overage & Shortage Volume Pricing | Tenn LA 800 Leg | |||||||||||||
| Publication | Location | Methodology | Include Adj. Factor | Tenn Zn0 | ||||||||||
| Overage Treatment | Tenn Zn6 Dlvd | |||||||||||||
| Summer Volumes | Texas Gas Zn 1 | |||||||||||||
| Winter Volumes | Transco Zn1 | |||||||||||||
| Shortage Treatment | Transco Zn2 | |||||||||||||
| Summer Volumes | Transco Zn3 | |||||||||||||
| Winter Volumes | Transco Zn4 | |||||||||||||
| Transco Zn5 Dlv | ||||||||||||||
| Tied to Other Line Items | Aggregated With Other Line Items | Transco Zn6 NY | ||||||||||||
| Transco Zn6 Non-NY | ||||||||||||||
| Note #1 | For all WGL accounts (Firm/DRV and Interruptible), WGL balancing fees shall be passed through by the contractor to the customer's invoice as a separate line item. | Transwestn Perm | ||||||||||||
| Note #2 | Due to LDC meter read variations throughout the month, this line item will be invoiced by the contractor using the first day of meter read for pricing reference. For example, Meter read dates: |
Nov 5 - Dec 5; Use Nov index price for all volumes invoiced on Nov invoice.
Nov 2 - Dec 2: Use Nov index price for all volumes invoiced on Nov invoice.
| Nov 28 - Dec 28: Use Nov index price for all volumes on Nov invoice. | Trunkline E LA | |||
| Note #3 | The firm requirement represents the Daily Required Volume (DRV) account for Fort McNair. | Trunkline LA | ||
| Note #4 | Each month a Consolidated Detailed NGAS Consumption Summary Sheet will need to be provided for this customer. This will need to be provided along with the corresponding monthly invoice. The summary will need to reflect each of the NGAS accounts activity which falls under the ownership of this customer, for the specific month delivery period. Specific information that will need to be listed, for each NGAS Account: 1. NGAS Account Number; 2. DLA Associated Line Item Number; 3. Customer Name; 4. Customer Address (full address); 5. Delivery Month; 6. Rate Class; 7. Meter Readings (both prior & current dates); 8. Wet Therms; 9. Conversion; 10. Dry Therms; 11. DLA Commodity Bill Rate $/Therms; 12. Balancing Rate (if applicable); 13. Commodity Charge; 14. Balancing Charge; and 15. Total Charge | TX Eastern E LA | ||
| Note #5 | Each month an Invoice Summary Cover Sheet will need to be provided. This Invoice Summary Cover Sheet will need to summarize contents listed within the customer invoices that are associated with their corresponding delivery month. The following will need to be included within the Invoice Summary Sheet: 1. Customer Line Item Number; 2. Customer Name; 3. Delivery Month; 4. Delivery Type; 5. Invoice Number; 6. Volume Usage; and 7. Invoice Amounts. | TX Eastern E TX | ||
| TX Eastern M-3 | ||||
| TX Eastern S TX | ||||
| TX Eastern W LA | ||||
| Waha | ||||
| TX Eastern ZnM1 24-in | ||||
| Westcoast Stn 2 |
mailto:charlie.mccoy@dla.mil 0001 (4 of 22)
| AL | Agua Dulce Hub | (1) Full Requirements/Utility. | ||||||||||||
| Schedule Page | AK | Algonquin CG | (2) Full Requirements/Pool. | |||||||||||
| AZ | Algonquin Rcpts | (3) Monthly Order Quantities. | ||||||||||||
| By Line Item Detail | AR | Alliance Interstates | (4) Monthly Orders – No Swing. | |||||||||||
| CA | ANR LA | (5) Alternative Fuel or Monthly Priced Accounts. | ||||||||||||
| National Geospatial Intelligence Agency (NGA) | CO | ANR ML 7 | ||||||||||||
| CT | ANR OK | |||||||||||||
| Installation Address | DE | Carthage Hub | ||||||||||||
| DC | CenterPoint E | |||||||||||||
| Line Item | 0001 (4 of 22) | FL | Cheyenne Hub | |||||||||||
| Installation | National Geospatial Intelligence Agency (NGA) | GA | Chicago CG | |||||||||||
| Address | 7500 GEOINT Drive | HI | CIG Rocky Mtns | |||||||||||
| ID | Col Gas Appal | |||||||||||||
| City | Springfield | IL | Col Gulf LA | |||||||||||
| State | VA | IN | Col Gulf Mnline | |||||||||||
| Zip | 22150-7500 | IA | Cons Energy CG | |||||||||||
| Ordering Officer | Invoice Certification | Payment Office | KS | Dawn Ontario | ||||||||||
| Name | Ted Coon | Ted Coon | NGA St. Louis | KY | Dominion N Pt | |||||||||
| Phone | (571) 557-6805 | (571) 557-6805 | LA | Dominion S Pt | ||||||||||
| Ext | ME | Dracut MA | ||||||||||||
| DSN | MD | El Paso Bondad | ||||||||||||
| Fax | (571) 558-3118 | (571) 558-3118 | 855-293-0972 | MA | El Paso Permian | |||||||||
| coontm@nga.mil | coontm@nga.mil | MI | El Paso S Mainline | |||||||||||
| Location | MN | El Paso SanJuan | ||||||||||||
| Address | 7500 GEOINT Drive | 7500 GEOINT Drive | NGA St. Louis | MS | Emerson Viking | |||||||||
| Mailstop N-82 | Mailstop N-82 | 3838 Vogel Road | MO | FL Gas Zn1 | ||||||||||
| Attention | Ted Coon | Ted Coon | MT | FL Gas Zn2 | ||||||||||
| City | Springfield | Springfield | Arnold | NE | FL Gas Zn3 | |||||||||
| State | VA | VA | MO | NV | Florida CG | |||||||||
| Zip | 22150-7500 | 22150-7500 | 63010-6238 | NH | GTNW Kingsgate | |||||||||
| NJ | Henry Hub | |||||||||||||
| Utility Account Information | NM | Houston ShipChl | ||||||||||||
| NY | Iroquois Recpts | |||||||||||||
| LDC or Pipeline | Washington Gas Light | NC | Iroquois Zn2 | |||||||||||
| ND | Katy | |||||||||||||
| Total Contract Est. Volume (Dths) | 7,925 | Total Summer (Dths) | 4,058 | Total Winter (Dths) | 3,867 | OH | Kern River Dlvd | |||||||
| OK | Kern Rvr Opal | |||||||||||||
| Delivery Point | Telemetered | Rate Class | OR | Leidy Hub | ||||||||||
| City Gate | Yes | 2A | PA | Mich Con CG | ||||||||||
| RI | NGPL Amarillo Rcpt | |||||||||||||
| Alternate Fuel | Type | Percent Load Displaceable | Limits on Use | Notes | SC | NGPL LA | ||||||||
| Yes | #2 Oil | Yes | SD | NGPL Midcont | ||||||||||
| TN | NGPL S TX | |||||||||||||
| Estimated Usage Information | TX | NGPL Texok Zn | ||||||||||||
| UT | Niagara | |||||||||||||
| (All volumes expressed in Dths) | VT | Northern Demarc | ||||||||||||
| Location | City Gate | VA | Nrthrn Ventura | |||||||||||
| WA | NW Can Bd Sumas | |||||||||||||
| Year 2015 | Annual Totals | 2,781 | Summer Totals | 2,029 | Winter Totals | 752 | WV | NW S of Grn Rvr | ||||||
| Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | WI | NW WY Pool/Rky | ||||
| 362 | 292 | 289 | 282 | 258 | 268 | 278 | 394 | 358 | WY | NYMEX | ||||
| Oneok OK | ||||||||||||||
| Year 2016 | Annual Totals | 3,946 | Summer Totals | 2,029 | Winter Totals | 1,917 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | PG&E CG | ||
| 409 | 402 | 354 | 362 | 292 | 289 | 282 | 258 | 268 | 278 | 394 | 358 | PG&E Malin | ||
| PG&E South | ||||||||||||||
| Year 2017 | Annual Totals | 1,198 | Summer Totals | 0 | Winter Totals | 1,198 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | PG&E CG | |||||||||||
| 309 | 535 | 354 | PG&E Malin | |||||||||||
| PG&E South | ||||||||||||||
| Curtailment Days | Questar Rky Mtn | |||||||||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | SoCal Gas | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | SoCal Gas CG | ||
| SoNat LA | ||||||||||||||
| Solicitation Parameters | Stanfield OR | |||||||||||||
| Sth Star TxOkKs | ||||||||||||||
| Period Beginning | Period Ending | Publication | SIP | Delivery Option | Delivery Type | TC Alb AECO-C | ||||||||
| 04/01/15 | 03/31/17 | INSIDE FERC'S | Henry Hub | (2) Full Requirements/Pool. | Firm | Tenn LA 500 Leg | ||||||||
| Adjustment Factor: | Summer: | Winter: | Tenn LA 500/800 AVG | |||||||||||
| Overage & Shortage Volume Pricing | Tenn LA 800 Leg | |||||||||||||
| Publication | Location | Methodology | Include Adj. Factor | Tenn Zn0 | ||||||||||
| Overage Treatment | Tenn Zn6 Dlvd | |||||||||||||
| Summer Volumes | Texas Gas Zn 1 | |||||||||||||
| Winter Volumes | Transco Zn1 | |||||||||||||
| Shortage Treatment | Transco Zn2 | |||||||||||||
| Summer Volumes | Transco Zn3 | |||||||||||||
| Winter Volumes | Transco Zn4 | |||||||||||||
| Transco Zn5 Dlv | ||||||||||||||
| Tied to Other Line Items | Aggregated With Other Line Items | Transco Zn6 NY | ||||||||||||
| Transco Zn6 Non-NY | ||||||||||||||
| Note #1 | For all WGL accounts (Firm/DRV and Interruptible), WGL balancing fees shall be passed through by the contractor to the customer's invoice as a separate line item. | Transwestn Perm | ||||||||||||
| Note #2 | Due to LDC meter read variations throughout the month, this line item will be invoiced by the contractor using the first day of meter read for pricing reference. For example, Meter read dates: |
Nov 5 - Dec 5; Use Nov index price for all volumes invoiced on Nov invoice.
Nov 2 - Dec 2: Use Nov index price for all volumes invoiced on Nov invoice.
| Nov 28 - Dec 28: Use Nov index price for all volumes on Nov invoice. | Trunkline E LA | |||
| Note #3 | The firm requirement represents the Daily Required Volume (DRV) account for National Geospatial-Intel (Erksine & Ruth). | Trunkline LA | ||
| Note #4 | Each month a Consolidated Detailed NGAS Consumption Summary Sheet will need to be provided for this customer. This will need to be provided along with the corresponding monthly invoice. The summary will need to reflect each of the NGAS accounts activity which falls under the ownership of this customer, for the specific month delivery period. Specific information that will need to be listed, for each NGAS Account: 1. NGAS Account Number; 2. DLA Associated Line Item Number; 3. Customer Name; 4. Customer Address (full address); 5. Delivery Month; 6. Rate Class; 7. Meter Readings (both prior & current dates); 8. Wet Therms; 9. Conversion; 10. Dry Therms; 11. DLA Commodity Bill Rate $/Therms; 12. Balancing Rate (if applicable); 13. Commodity Charge; 14. Balancing Charge; and 15. Total Charge | TX Eastern E LA | ||
| Note #5 | Each month an Invoice Summary Cover Sheet will need to be provided. This Invoice Summary Cover Sheet will need to summarize contents listed within the customer invoices that are associated with their corresponding delivery month. The following will need to be included within the Invoice Summary Sheet: 1. EBS Customer Line Item Number; 2. Customer Name; 3. Delivery Month; 4. Delivery Type; 5. Invoice Number; 6. Volume Usage; and 7. Invoice Amounts. | |||
| TX Eastern M1 Kosi | ||||
| TX Eastern M-3 | ||||
| TX Eastern S TX | ||||
| TX Eastern W LA | ||||
| Waha | ||||
| TX Eastern ZnM1 24-in | ||||
| Westcoast Stn 2 |
0001 (5 of 22)
| AL | Agua Dulce Hub | (1) Full Requirements/Utility. | ||||||||||||
| Schedule Page | AK | Algonquin CG | (2) Full Requirements/Pool. | |||||||||||
| AZ | Algonquin Rcpts | (3) Monthly Order Quantities. | ||||||||||||
| By Line Item Detail | AR | Alliance Interstates | (4) Monthly Orders – No Swing. | |||||||||||
| CA | ANR LA | (5) Alternative Fuel or Monthly Priced Accounts. | ||||||||||||
| NSWC Carderock | CO | ANR ML 7 | ||||||||||||
| CT | ANR OK | |||||||||||||
| Installation Address | DE | Carthage Hub | ||||||||||||
| DC | CenterPoint E | |||||||||||||
| Line Item | 0001 (5 of 22) | FL | Cheyenne Hub | |||||||||||
| Installation | NSWC Carderock | GA | Chicago CG | |||||||||||
| Address | 9500 MacArthur Blvd | HI | CIG Rocky Mtns | |||||||||||
| Building 6 | ID | Col Gas Appal | ||||||||||||
| City | West Bethesda | IL | Col Gulf LA | |||||||||||
| State | MD | IN | Col Gulf Mnline | |||||||||||
| Zip | IA | Cons Energy CG | ||||||||||||
| Ordering Officer | Invoice Certification | Payment Office | KS | Dawn Ontario | ||||||||||
| Name | David Capozzoli | Doris Boatwright | Denise Jordan | Heartland Energy Partners | KY | Dominion N Pt | ||||||||
| Phone | (202) 685-8600 | (202) 685-8613 | (202) 685-8615 | LA | Dominion S Pt | |||||||||
| Ext | ME | Dracut MA | ||||||||||||
| DSN | MD | El Paso Bondad | ||||||||||||
| Fax | (202) 685-1788 | MA | El Paso Permian | |||||||||||
| David.capozzoli@navy.mil | doris.boatwright@navy.mil | denise.jordan@navy.mil | MI | El Paso S Mainline | ||||||||||
| Location | Washington Navy Yard | Washington Navy Yard | Washington Navy Yard | Utility Invoice Processing Center | MN | El Paso SanJuan | ||||||||
| Address | 1314Harwood St SE | 1314 Harwood St. SE | 1314 Harwood St. SE | Box 159 | MS | Emerson Viking | ||||||||
| Washington Navy Yard | Washington Navy Yard | Washington Navy Yard | 9226 Third Avenue | MO | FL Gas Zn1 | |||||||||
| Attention | Doris Boatwright | Doris Boatwright | MT | FL Gas Zn2 | ||||||||||
| City | Washington | Washington | Washington | Norfolk | NE | FL Gas Zn3 | ||||||||
| State | DC | DC | DC | VA | NV | Florida CG | ||||||||
| Zip | 20374-5150 | 20374-5150 | 20374-5150 | 23511-2313 | NH | GTNW Kingsgate | ||||||||
| NJ | Henry Hub | |||||||||||||
| Utility Account Information | NM | Houston ShipChl | ||||||||||||
| NY | Iroquois Recpts | |||||||||||||
| LDC or Pipeline | Washington Gas Light | NC | Iroquois Zn2 | |||||||||||
| ND | Katy | |||||||||||||
| Total Contract Est. Volume (Dths) | 24,718 | Total Summer (Dths) | 3,598 | Total Winter (Dths) | 21,120 | OH | Kern River Dlvd | |||||||
| OK | Kern Rvr Opal | |||||||||||||
| Delivery Point | Telemetered | Rate Class | OR | Leidy Hub | ||||||||||
| City Gate | Yes | 2A | PA | Mich Con CG | ||||||||||
| RI | NGPL Amarillo Rcpt | |||||||||||||
| Alternate Fuel | Type | Percent Load Displaceable | Limits on Use | Notes | SC | NGPL LA | ||||||||
| Yes | #2 Oil | Yes | SD | NGPL Midcont | ||||||||||
| TN | NGPL S TX | |||||||||||||
| Estimated Usage Information | TX | NGPL Texok Zn | ||||||||||||
| UT | Niagara | |||||||||||||
| (All volumes expressed in Dths) | VT | Northern Demarc | ||||||||||||
| Location | City Gate | VA | Nrthrn Ventura | |||||||||||
| WA | NW Can Bd Sumas | |||||||||||||
| Year 2015 | Annual Totals | 5,928 | Summer Totals | 1,799 | Winter Totals | 4,129 | WV | NW S of Grn Rvr | ||||||
| Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | WI | NW WY Pool/Rky | ||||
| 1,122 | 225 | 105 | 65 | 72 | 89 | 121 | 1,106 | 3,023 | WY | NYMEX | ||||
| Oneok OK | ||||||||||||||
| Year 2016 | Annual Totals | 12,359 | Summer Totals | 1,799 | Winter Totals | 10,560 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | PG&E CG | ||
| 377 | 3,325 | 2,729 | 1,122 | 225 | 105 | 65 | 72 | 89 | 121 | 1,106 | 3,023 | PG&E Malin | ||
| PG&E South | ||||||||||||||
| Year 2017 | Annual Totals | 6,431 | Summer Totals | 0 | Winter Totals | 6,431 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | PG&E CG | |||||||||||
| 377 | 3,325 | 2,729 | PG&E Malin | |||||||||||
| PG&E South | ||||||||||||||
| Curtailment Days | Questar Rky Mtn | |||||||||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | SoCal Gas | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | SoCal Gas CG | ||
| SoNat LA | ||||||||||||||
| Solicitation Parameters | Stanfield OR | |||||||||||||
| Sth Star TxOkKs | ||||||||||||||
| Period Beginning | Period Ending | Publication | SIP | Delivery Option | Delivery Type | TC Alb AECO-C | ||||||||
| 04/01/15 | 03/31/17 | INSIDE FERC'S | Henry Hub | (2) Full Requirements/Pool. | Firm | Tenn LA 500 Leg | ||||||||
| Adjustment Factor: | Summer: | Winter: | Tenn LA 500/800 AVG | |||||||||||
| Overage & Shortage Volume Pricing | Tenn LA 800 Leg | |||||||||||||
| Publication | Location | Methodology | Include Adj. Factor | Tenn Zn0 | ||||||||||
| Overage Treatment | Tenn Zn6 Dlvd | |||||||||||||
| Summer Volumes | Texas Gas Zn 1 | |||||||||||||
| Winter Volumes | Transco Zn1 | |||||||||||||
| Shortage Treatment | Transco Zn2 | |||||||||||||
| Summer Volumes | Transco Zn3 | |||||||||||||
| Winter Volumes | Transco Zn4 | |||||||||||||
| Transco Zn5 Dlv | ||||||||||||||
| Tied to Other Line Items | Aggregated With Other Line Items | Transco Zn6 NY | ||||||||||||
| Transco Zn6 Non-NY | ||||||||||||||
| Note #1 | For all WGL accounts (Firm/DRV and Interruptible), WGL balancing fees shall be passed through by the contractor to the customer's invoice as a separate line item. | Transwestn Perm | ||||||||||||
| Note #2 | Due to LDC meter read variations throughout the month, this line item will be invoiced by the contractor using the first day of meter read for pricing reference. For example, Meter read dates: |
Nov 5 - Dec 5; Use Nov index price for all volumes invoiced on Nov invoice.
Nov 2 - Dec 2: Use Nov index price for all volumes invoiced on Nov invoice.
| Nov 28 - Dec 28: Use Nov index price for all volumes on Nov invoice. | Trunkline E LA | |||
| Note #3 | The firm requirements represent the Daily Required Volume (DRV) account for NSWC Carderock. | Trunkline LA | ||
| Note #4 | Each month a Consolidated Detailed NGAS Consumption Summary Sheet will need to be provided for this customer. This will need to be provided along with the corresponding monthly invoice. The summary will need to reflect each of the NGAS accounts activity which falls under the ownership of this customer, for the specific month delivery period. Specific information that will need to be listed, for each NGAS Account: 1. NGAS Account Number; 2. DLA Associated Line Item Number; 3. Customer Name; 4. Customer Address (full address); 5. Delivery Month; 6. Rate Class; 7. Meter Readings (both prior & current dates); 8. Wet Therms; 9. Conversion; 10. Dry Therms; 11. DLA Commodity Bill Rate $/Therms; 12. Balancing Rate (if applicable); 13. Commodity Charge; 14. Balancing Charge; and 15. Total Charge | TX Eastern E LA | ||
| Note #5 | Each month an Invoice Summary Cover Sheet will need to be provided. This Invoice Summary Cover Sheet will need to summarize contents listed within the customer invoices that are associated with their corresponding delivery month. The following will need to be included within the Invoice Summary Sheet: 1. Customer Line Item Number; 2. Customer Name; 3. Delivery Month; 4. Delivery Type; 5. Invoice Number; 6. Volume Usage; and 7. Invoice Amounts. | TX Eastern E TX | ||
| TX Eastern M-3 | ||||
| TX Eastern S TX | ||||
| TX Eastern W LA | ||||
| Waha | ||||
| TX Eastern ZnM1 24-in | ||||
| Westcoast Stn 2 |
mailto:charlie.mccoy@dla.milmailto:charlie.mccoy@dla.mil 0001 (6 of 22)
| AL | Agua Dulce Hub | (1) Full Requirements/Utility. | ||||||||||||
| Schedule Page | AK | Algonquin CG | (2) Full Requirements/Pool. | |||||||||||
| AZ | Algonquin Rcpts | (3) Monthly Order Quantities. | ||||||||||||
| By Line Item Detail | AR | Alliance Interstates | (4) Monthly Orders – No Swing. | |||||||||||
| CA | ANR LA | (5) Alternative Fuel or Monthly Priced Accounts. | ||||||||||||
| Walter Reed Facility | CO | ANR ML 7 | ||||||||||||
| CT | ANR OK | |||||||||||||
| Installation Address | DE | Carthage Hub | ||||||||||||
| DC | CenterPoint E | |||||||||||||
| Line Item | 0001 (6 of 22) | FL | Cheyenne Hub | |||||||||||
| Installation | Walter Reed Facility | GA | Chicago CG | |||||||||||
| Address | 6900 Georgia Avenue NW | HI | CIG Rocky Mtns | |||||||||||
| ID | Col Gas Appal | |||||||||||||
| City | Washington | IL | Col Gulf LA | |||||||||||
| State | DC | IN | Col Gulf Mnline | |||||||||||
| Zip | 20040-0000 | IA | Cons Energy CG | |||||||||||
| Ordering Officer | Invoice Certification | Payment Office | KS | Dawn Ontario | ||||||||||
| Name | Joe Fromal | Janell Miller | Joe Fromal | KY | Dominion N Pt | |||||||||
| Phone | (202) 782-7886 | (202) 696-7745 | (202) 782-7886 | LA | Dominion S Pt | |||||||||
| Ext | ME | Dracut MA | ||||||||||||
| DSN | MD | El Paso Bondad | ||||||||||||
| Fax | MA | El Paso Permian | ||||||||||||
| joe.fromal@us.army.mil | janell.miller@iapws.com | joe.fromal@us.army.mil | MI | El Paso S Mainline | ||||||||||
| Location | Walter Reed Facility | Walter Reed Facility | Walter Reed Facility | MN | El Paso SanJuan | |||||||||
| Address | 6900 Georgia Avenue NW | P.O. Box 55413 | 6900 Georgia Avenue NW | MS | Emerson Viking | |||||||||
| MO | FL Gas Zn1 | |||||||||||||
| Attention | Joe Fromal | Janell Miller | Joe Fromal | MT | FL Gas Zn2 | |||||||||
| City | Washington | Washington | Washington | NE | FL Gas Zn3 | |||||||||
| State | DC | DC | DC | NV | Florida CG | |||||||||
| Zip | 20040-0000 | 20040-0000 | 20040-0000 | NH | GTNW Kingsgate | |||||||||
| NJ | Henry Hub | |||||||||||||
| Utility Account Information | NM | Houston ShipChl | ||||||||||||
| NY | Iroquois Recpts | |||||||||||||
| LDC or Pipeline | Washington Gas Light | NC | Iroquois Zn2 | |||||||||||
| ND | Katy | |||||||||||||
| Total Contract Est. Volume (Dths) | 2,512 | Total Summer (Dths) | 684 | Total Winter (Dths) | 1,828 | OH | Kern River Dlvd | |||||||
| OK | Kern Rvr Opal | |||||||||||||
| Delivery Point | Telemetered | Rate Class | OR | Leidy Hub | ||||||||||
| City Gate | Yes | 2A | PA | Mich Con CG | ||||||||||
| RI | NGPL Amarillo Rcpt | |||||||||||||
| Alternate Fuel | Type | Percent Load Displaceable | Limits on Use | Notes | SC | NGPL LA | ||||||||
| No | SD | NGPL Midcont | ||||||||||||
| TN | NGPL S TX | |||||||||||||
| Estimated Usage Information | TX | NGPL Texok Zn | ||||||||||||
| UT | Niagara | |||||||||||||
| (All volumes expressed in Dths) | VT | Northern Demarc | ||||||||||||
| Location | City Gate | VA | Nrthrn Ventura | |||||||||||
| WA | NW Can Bd Sumas | |||||||||||||
| Year 2015 | Annual Totals | 630 | Summer Totals | 342 | Winter Totals | 288 | WV | NW S of Grn Rvr | ||||||
| Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | WI | NW WY Pool/Rky | ||||
| 103 | 50 | 50 | 40 | 17 | 18 | 64 | 115 | 173 | WY | NYMEX | ||||
| Oneok OK | ||||||||||||||
| Year 2016 | Annual Totals | 1,256 | Summer Totals | 342 | Winter Totals | 914 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | PG&E CG | ||
| 307 | 169 | 150 | 103 | 50 | 50 | 40 | 17 | 18 | 64 | 115 | 173 | PG&E Malin | ||
| PG&E South | ||||||||||||||
| Year 2017 | Annual Totals | 626 | Summer Totals | 0 | Winter Totals | 626 | Panhandle TX-OK | |||||||
| Jan | Feb | Mar | PG&E CG | |||||||||||
| 307 | 169 | 150 | PG&E Malin | |||||||||||
| PG&E South | ||||||||||||||
| Curtailment Days | Questar Rky Mtn | |||||||||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | SoCal Gas | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | SoCal Gas CG | ||
| SoNat LA | ||||||||||||||
| Solicitation Parameters | Stanfield OR | |||||||||||||
| Sth Star TxOkKs | ||||||||||||||
| Period Beginning | Period Ending | Publication | SIP | Delivery Option | Delivery Type | TC Alb AECO-C | ||||||||
| 04/01/15 | 03/31/17 | INSIDE FERC'S | Henry Hub | (2) Full Requirements/Pool. | Firm | Tenn LA 500 Leg | ||||||||
| Adjustment Factor: | Summer: | Winter: | Tenn LA 500/800 AVG | |||||||||||
| Overage & Shortage Volume Pricing | Tenn LA 800 Leg | |||||||||||||
| Publication | Location | Methodology | Include Adj. Factor | Tenn Zn0 | ||||||||||
| Overage Treatment | Tenn Zn6 Dlvd | |||||||||||||
| Summer Volumes | Texas Gas Zn 1 | |||||||||||||
| Winter Volumes | Transco Zn1 | |||||||||||||
| Shortage Treatment | Transco Zn2 | |||||||||||||
| Summer Volumes | Transco Zn3 | |||||||||||||
| Winter Volumes | Transco Zn4 | |||||||||||||
| Transco Zn5 Dlv | ||||||||||||||
| Tied to Other Line Items | Aggregated With Other Line Items | Transco Zn6 NY | ||||||||||||
| Transco Zn6 Non-NY | ||||||||||||||
| Note #1 | For all WGL accounts (Firm/DRV and Interruptible), WGL balancing fees shall be passed through by the contractor to the customer's invoice as a separate line item. | Transwestn Perm | ||||||||||||
| Note #2 | Due to LDC meter read variations throughout the month, this line item will be invoiced by the contractor using the first day of meter read for pricing reference. For example, Meter read dates: |
Nov 5 - Dec 5; Use Nov index price for all volumes invoiced on Nov invoice.
Nov 2 - Dec 2: Use Nov index price for all volumes invoiced on Nov invoice.
| Nov 28 - Dec 28: Use Nov index price for all volumes on Nov invoice. | Trunkline E LA | |||
| Note #3 | The firm requirements are the Daily Required Volume (DRV) accounts for FWRAMC. | Trunkline LA | ||
| Note #4 | Each month a Consolidated Detailed NGAS Consumption Summary Sheet will need to be provided for this customer. This will need to be provided along with the corresponding monthly invoice. The summary will need to reflect each of the NGAS accounts activity which falls under the ownership of this customer, for the specific month delivery period. Specific information that will need to be listed, for each NGAS Account: 1. NGAS Account Number; 2. DLA Associated Line Item Number; 3. Customer Name; 4. Customer Address (full address); 5. Delivery Month; 6. Rate Class; 7. Meter Readings (both prior & current dates); 8. Wet Therms; 9. Conversion; 10. Dry Therms; 11. DLA Commodity Bill Rate $/Therms; 12. Balancing Rate (if applicable); 13. Commodity Charge; 14. Balancing Charge; and 15. Total Charge | Trunkline W LA | ||
| Note #5 | Each month an Invoice Summary Cover Sheet will need to be provided. This Invoice Summary Cover Sheet will need to summarize contents listed within the customer invoices that are associated with their corresponding delivery month. The following will need to be included within the Invoice Summary Sheet: 1. EBS Customer Line Item Number; 2. Customer Name; 3. Delivery Month; 4. Delivery Type; 5. Invoice Number; 6. Volume Usage; and 7. Invoice Amounts. | |||
| TX Eastern E TX | ||||
| TX Eastern M1 Kosi | ||||
| TX Eastern M-3 | ||||
| TX Eastern S TX | ||||
| TX Eastern W LA | ||||
| Waha | ||||
| TX Eastern ZnM1 24-in | ||||
| Westcoast Stn 2 |
mailto:charlie.mccoy@dla.mil 0001 (7 of 22)
| AL | Agua Dulce Hub | (1) Full Requirements/Utility. | ||||||||||||
| Schedule Page | AK | Algonquin CG | (2) Full Requirements/Pool. | |||||||||||
| AZ | Algonquin Rcpts | (3) Monthly Order Quantities. | ||||||||||||
| By Line Item Detail | AR | Alliance Interstates | (4) Monthly Orders – No Swing. | |||||||||||
| CA | ANR LA | (5) Alternative Fuel or Monthly Priced Accounts. | ||||||||||||
| Joint Base Anacostia Bolling | CO | ANR ML 7 | ||||||||||||
| CT | ANR OK | |||||||||||||
| Installation Address | DE | Carthage Hub | ||||||||||||
| DC | CenterPoint E | |||||||||||||
| Line Item | 0001 (7 of 22) | FL | Cheyenne Hub | |||||||||||
| Installation | Joint Base Anacostia Bolling | GA | Chicago CG | |||||||||||
| Address | 11 CES/CERF | HI | CIG Rocky Mtns | |||||||||||
| 370 Brookley Avenue | ID | Col Gas Appal | ||||||||||||
| City | Bolling AFB | IL | Col Gulf LA | |||||||||||
| State | DC | IN | Col Gulf Mnline | |||||||||||
| Zip | IA | Cons Energy CG | ||||||||||||
| Ordering Officer | Invoice Certification | Payment Office | KS | Dawn Ontario | ||||||||||
| Name | Kenneth Preuitt | Doris Boatwright | Denise Jordan | Heartland Energy Partners | KY | Dominion N Pt | ||||||||
| Phone | (202) 767-4015 | (202) 685-8613 | (202) 685-8615 | LA | Dominion S Pt | |||||||||
| Ext | ME | Dracut MA | ||||||||||||
| DSN | MD | El Paso Bondad | ||||||||||||
| Fax | MA | El Paso Permian | ||||||||||||
| kenneth.preuitt@navy.mil | doris.boatwright@navy.mil | denise.jordan@navy.mil | MI | El Paso S Mainline | ||||||||||
| Location | 11 CES/CEPM | Washington Navy Yard | Washington Navy Yard | Utility Invoice Processing Center | MN | El Paso SanJuan | ||||||||
| Address | 370 Brookley Avenue | 1314 Harwood St. SE | 1314 Harwood St. SE | Box 159 | MS | Emerson Viking | ||||||||
| Bolling AFB | Washington Navy Yard | Washington Navy Yard | 9226 Third Avenue | MO | FL Gas Zn1 | |||||||||
| Attention | Kenneth Preuitt | Doris Boatwright | Doris Boatwright | MT | FL Gas Zn2 | |||||||||
| City | Washington | Washington | Washington | Norfolk | NE | FL Gas Zn3 | ||||||||
| State | DC | DC | DC | VA | NV | Florida CG | ||||||||
| Zip | 20332-0000 | 20374-5150 | 20374-5150 | 23511-2313 | NH | GTNW Kingsgate | ||||||||
| NJ | Henry Hub | |||||||||||||
| Utility Account Information | NM | Houston ShipChl | ||||||||||||
| NY | Iroquois Recpts | |||||||||||||
| LDC or Pipeline | Washington Gas Light | NC | Iroquois Zn2 | |||||||||||
| ND | Katy | |||||||||||||
| Total Contract Est. Volume (Dths) | 64,836 | Total Summer (Dths) | 25,562 | Total Winter (Dths) | 39,274 | OH | Kern River Dlvd | |||||||
| OK | Kern Rvr Opal | |||||||||||||
| Delivery Point | Telemetered | Rate Class | OR | Leidy Hub | ||||||||||
| City Gate | Yes | 2A | PA | Mich Con CG | ||||||||||
| RI | NGPL Amarillo Rcpt | |||||||||||||
| Alternate Fuel | Type | Percent Load Displaceable | Limits on Use | Notes | SC | NGPL LA | ||||||||
| Yes | #2 Oil | Yes | Total allowable Curtailment Days identified within ‘Estimated Usage Information’ section | SD | NGPL Midcont | |||||||||
| TN | NGPL S TX | |||||||||||||
| Estimated Usage Information | TX | NGPL Texok Zn | ||||||||||||
| UT | Niagara | |||||||||||||
| (All volumes expressed in Dths) | VT | Northern Demarc | ||||||||||||
| Location | City Gate | VA | Nrthrn Ventura | |||||||||||
| WA | NW Can Bd Sumas | |||||||||||||
| Year 2015 | Annual Totals | 16,780 | Summer Totals | 12,781 | Winter Totals | 3,999 | WV | NW S of Grn Rvr | ||||||
| Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | WI | NW WY Pool/Rky | ||||
| 4,256 | 2,132 | 1,349 | 1,312 | 1,266 | 980 | 1,486 | 1,944 | 2,055 | WY | NYMEX | ||||
| Oneok OK |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .