JA42_AF_B_Schedules_and_Price_Data_Sheets.pdf
PDF 170 KB Posted
- Attached to
- Utility Privatization of the Water Distribution System at Travis Air Force Base, California
- Solicitation number
- SPE600-12-R-0826
- Issued by
-
Defense Logistics Agency Energy
About this file
B Schedules and Price Data Sheets
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B.2.1 Schedule B-1 Regulated Tariff a
Available to offerors proposing regulated rates.
Utility System: Travis AFB Water
CLIN Supplies/Services Qty Unit Unit Price Total
0001 Utility Services Charge 12 Months $10,000.00 $120,000.00
FP
The unit price is the Applicable Tariff(s) less the monthly credit as payment for the purchase price plus the recoverable portion of the purchase price.
Applicable Tariff $ 10,000.00
Monthly Credit for PP $ (2,000.00)
# of Months 240
Interest Rate 4.5%
Recoverable Portion of PP $ 2,000.00
# of Months 240
Interest Rate 4.5%
Unit Price $ 10,000.00
Initial System Deficiency Corrections/
Upgrades/Connection Charges b
FFP
Transition Period
FP
b CLIN 0002 is required only if the tariff provides for separate identification of initial system deficiency corrections and connection charges. If separate identification is not provided, it will be assumed the tariff rate includes these costs.
0003 1 Each $50,000.00 $50,000.00 a Utility system to be filled in by the Offeror. A Schedule B-1 must be completed for each utility system offered. Utility systems are shown in paragraph
B.1, Systems to be Privatized . Offerors shall provide a comprehensive description of proposed tariffs in their Price Proposals.
B.2.2 Schedule B-2 Fixed Price Economic Price Adjustment a
Available to offerors proposing a Fixed Price Economic Price Adjustment (FPEPA)
Utility System: ________________
CLIN Supplies/Services Qty Unit Unit Price Total
0001 Utility Services Charge 12 Months $10,000.00 $120,000.00
FPEPA
The unit price is the Utility Services Charge less the monthly credit as payment for the purchase price (PP) plus the recoverable portion of the purchase price.
Utility Services Charge $ 10,000.00
Monthly Credit for PP $ (2,000.00)
# of Months 240
Interest Rate 4.5%
Recoverable Portion of PP $ 2,000.00
# of Months 240
Interest Rate 4.5%
Unit Price $ 10,000.00
Initial System Deficiency Corrections/ Upgrades/Connection Charges b
FFP
Transition Period
FFP
b The offeror should enter the Utility Services Charge, as computed in Price Data Sheet 1.
0003 1 Each $50,000.00 $50,000.00 a Utility system to be filled in by the Offeror. A Schedule B-2 must be completed for each utility system offered. Utility systems are shown in paragraph
B.1, Systems to be Privatized .
B.3.1 Price Data Sheet 1 – Utility Services Charge Component Monthly Charge
1. Operations and Maintenance (O&M)
2. Renewals and Replacements (R&R)
Total Utility Services Charge
(to be entered into CLIN 0001 for Schedule B-1 (if applicable) and Schedule B-2)
B.3.2 Price Data Sheet 2 – Renewals and Replacements – 50-YEAR Plan Notes: For each inventory component/item listed in the utility specific attachment, clearly show the $ value of the planned R&R (if any) for each year 1-50
This Plan represents the offeror’s conceptual methodology that will be used for evaluation purposes.
Total
New Item
Service LifeItem Size Quantity Unit
Approx Year
Installed
Existing
Unit RCN
Existing
Item Service
Life
First Expected
Replacement
Date New Item
New Unit
Cost RCN
Notes: For each inventory component/item listed in the utility specific attachment, clearly show the $ value of the planned R&R (if any) for each year 1-50
Year 1 (Const
Year XX
(Const $)
Year 50
(Const $)
Residual
Value in Year
50 (Const $)
New Item
RCN
Planned Renewals & Replacements
B.3.3 Price Data Sheet 3 – Initial System Deficiency Correction(s) / Upgrade(s) / Connection Charge(s) / Transition Period
Project
Name
Interest
Rate
Project Cost
(Current $)
Project Start
Month
First Full
Month Project will Be In
Service
Amortization
Period
(Months)
Monthly
Charge
B.3.4 Price Data Sheet 4 – Recoverable Portion of Purchase Price
Item Interest Rate Amount Amortization
Period (Months) Monthly Charge
Recoverable Portion of
Purchase Price
DLA ENERGY UTILITIES PRIVATIZATION
B.7.5 Price Data Sheet 5 – Proposal 50-Year Charges to the Government a b c d e f g h i j k l m n
Contract
Year
Applicable
Tariff less
FIT
FIT for
Applicable
Tariff
Credit for
Purchase
Price
Recoverable
Portion of
Purchase
Price
Subtotal
CLIN 0001
(b+c+d+e)
ISDC
Projects less FIT
FIT for
ISDC
Projects
Subtotal
CLIN 0002
(g+h)
Transition
Charges less FIT
FIT for
Transition
Charges
Subtotal
CLIN 0003
(j+k)
Total
Contract
Costs
(f+i+l)
Assumed
Inflation
Rate (%)
Nominal Nominal Nominal Nominal Nominal Nominal Nominal Nominal
1 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
3 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
5 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
6 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
7 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
9 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
11 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
12 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
13 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
14 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
15 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
16 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
17 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
18 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
19 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
21 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
TRAVIS AFB, CALIFORNIA SPE600-12-R-0826
UTILITIES PRIVATIZATION
Contract Items
CLIN 0001 - Utility Service Charge
CLIN 0002 - Initial System
Deficiency Corrections /
Connection Charges
CLIN 0003 - Transition Period
Charges
22 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
23 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
24 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
25 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
26 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
27 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
29 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
31 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
32 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
33 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
34 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
35 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
36 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
37 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
38 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
39 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
40 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
41 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
42 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
43 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
44 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
45 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
46 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
47 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
48 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
49 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
50 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Totals -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Notes:
1. Regulated offerors shall fill in each contract item for Years 1-50.
3. Column d: Enter the sum of the monthly amortized costs (i.e., principal and interest) of the Credit for Purchase Price associated with the applicable contract year detailed in Schedule 4.
4. Column e: If Recoverable Portion of the Purchase Price is included in the Applicable Tariff less FIT, enter "Column b".
2. The nominal dollar estimates are applicable to the specific years of the Contract and reflect the inflation rate assumption to be provided by the Government..
6. Column g: If the ISDC Project price is included in the Applicable Tariff less FIT, enter "Column b".
7. Column h: If the FIT for ISDC Project price is included in the FIT for Applicable Tariff, enter "Column c".
8. Column i: If the ISDC Project price and FIT for ISDC Project price are included in the Applicable Tariff and Applicable Tariff Less FIT, enter "Columns b & c".
5. Column e: If Recoverable Portion of the Purchase Price is not included in the Applicable Tariff less FIT, enter the sum of the monthly amortized costs (i.e., the principal and interest) in the applicable contract year.
DLA ENERGY UTILITIES PRIVATIZATION
B.7.5 Price Data Sheet 6 – Proposal 50-Year Charges to the Government
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k)
Contract
Year
Operations &
Maintenance less FIT FIT for O&M
Other Costs &
Credits, Net
FIT for Other
Costs &
Credits, Net
Non Federal
Income Taxes &
Fees
Purchase
Price
Recovery
Purchase
Price Credit
Renewals &
Replacements less FIT
FIT for
R&R
Subtotal
CLIN 0001
Real Real Real Real Real Nominal Nominal Real Real --
1 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
2 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
3 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
4 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
5 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
6 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
7 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
8 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
9 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
10 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
11 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
12 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
13 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
14 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
15 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
16 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
17 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
18 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
19 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
20 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
21 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
22 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
23 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
24 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
25 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
26 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
TRAVIS AFB, CALIFORNIA
Contract Items
CLIN 0001 - Utility Service Charge
27 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
28 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
29 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
30 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
31 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
32 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
33 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
34 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
35 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
36 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
37 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
38 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
39 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
40 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
41 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
42 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
43 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
44 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
45 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
46 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
47 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
48 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
49 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
50 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Totals -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
Notes:
6. Column (e) should include all non-federal taxes, such as state income tax, property taxes, any local taxes, etc.
1. Offerors shall fill in each contract item for Years 1-50.
2. The real dollars estimates are applicable to the initial two years of the Contract and exclude the effects of inflation beyond the initial two-year pricing period.
3. The nominal dollars are applicable to the actual contract year in which the credit / charges / amortization will be invoiced under the Contract.
4. Column (b) should include all O&M and G&A related costs expenses including the O&M related profit (if any) and excluding the federal income tax (FIT) related to the O&M related profit (coumn (c).
5. Column (d) should include all other costs and credits on a net basis, including capital credits, etc.
7. Column (f) should equal the sum of the monthly amortized costs (i.e., the principal and interest) associated with the recoverable portion of the purchase price in the applicable contract year detailed in Schedule 4.
8. Column (g) should equal the sum of the monthly amortized costs (i.e., the principal and interest) associated with the purchase price credit in the applicable contract year.
9. The sum of columns (b) through and including column (g) should equal the total operation and maintenance (O&M) costs detailed in Schedule 1. The total O&M costs should include all costs including O&M related profit, income taxes, general and administrative (G&A), other costs and credits, non-federal income taxes, the pruchase price recovery and purchase price credit, etc. necessary to provide the utility service.
10. Column (h) plus column (i) should equal the total levelized R&R component costs detailed in Schedules 1 and 2.
11. Column (j), Subtotal CLIN 0001, should equal the sum of columns (b) through column (i).
13. Column (n) plus column (o) should equal the annual summation of the monthly amortized costs (i.e., the principal and interest) associated with the transition related expenses included in column (p), Subtotal CLIN 0003.
14. Column (c) plus Column (e) plus Column (j) should include all Federal Income taxes included in price proposal, except FIT related to ISDC charges (Column (m)) and/or Transition Charges (Column (o)), and should equal the Federal Income Tax shown on Schedule 1, Item 3
12. Column (k) plus column (l) should equal the annual summation of the monthly amortized costs (i.e., the principal and interest) associated with the ISDC / connection charges in the applicable contract year detailed in Schedule 3. TH sum of which is totalled in Column (m), Subtotal CLIN 0002
(l) (m) (n) (o) (p) (q) (r)
ISDC Projects
Amortization less FIT
FIT for ISDC
Projects
Subtotal CLIN
Transition
Charges less
FIT
FIT for
Transition
Charges
Subtotal CLIN
Total Contract
Costs
Nominal Nominal Nominal Nominal Nominal Nominal --
SPE600-12-R-0826
UTILITIES PRIVATIZATION
Contract Items
CLIN 0002 - Initial System Deficiency
Corrections / Connection Charges CLIN 0003 - Transition Period Charges
6. Column (e) should include all non-federal taxes, such as state income tax, property taxes, any local taxes, etc.
1. Offerors shall fill in each contract item for Years 1-50.
2. The real dollars estimates are applicable to the initial two years of the Contract and exclude the effects of inflation beyond the initial two-year pricing period.
3. The nominal dollars are applicable to the actual contract year in which the credit / charges / amortization will be invoiced under the Contract.
4. Column (b) should include all O&M and G&A related costs expenses including the O&M related profit (if any) and excluding the federal income tax (FIT) related to the O&M related profit (coumn (c).
5. Column (d) should include all other costs and credits on a net basis, including capital credits, etc.
7. Column (f) should equal the sum of the monthly amortized costs (i.e., the principal and interest) associated with the recoverable portion of the purchase price in the applicable contract year detailed in Schedule 4.
8. Column (g) should equal the sum of the monthly amortized costs (i.e., the principal and interest) associated with the purchase price credit in the applicable contract year.
9. The sum of columns (b) through and including column (g) should equal the total operation and maintenance (O&M) costs detailed in Schedule 1. The total O&M costs should include all costs including O&M related profit, income taxes, general and administrative (G&A), other costs and credits, non-federal income taxes, the pruchase price recovery and purchase price credit, etc. necessary to provide the utility service.
10. Column (h) plus column (i) should equal the total levelized R&R component costs detailed in Schedules 1 and 2.
11. Column (j), Subtotal CLIN 0001, should equal the sum of columns (b) through column (i).
13. Column (n) plus column (o) should equal the annual summation of the monthly amortized costs (i.e., the principal and interest) associated with the transition related expenses included in column (p), Subtotal CLIN 0003.
14. Column (c) plus Column (e) plus Column (j) should include all Federal Income taxes included in price proposal, except FIT related to ISDC charges (Column (m)) and/or Transition Charges (Column (o)), and should equal the Federal Income Tax shown on Schedule 1, Item 3
12. Column (k) plus column (l) should equal the annual summation of the monthly amortized costs (i.e., the principal and interest) associated with the ISDC / connection charges in the applicable contract year detailed in Schedule 3. TH sum of which is totalled in Column (m), Subtotal CLIN 0002
File details come from the government source that posted it. Updated .