SPE1C1-20-R-0063 Air Force Long Sleeve Dress Shirts Combined Synopsis Solcitation.pdf
PDF 818 KB Posted
- Attached to
- Men's Air Force Long Sleeve Dress Shirt
- Solicitation number
- SPE1C1-20-R-0063
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis & Solicitation
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued.
A. Pursuant to FAR 12.603, the following information is provided:
1. Solicitation Number: _SPE1C1-20-R-0063__. The solicitation is issued as a request for proposal
(RFP).
2. All proposed unit prices shall be submitted in United States Currency: U.S. Dollars
3. The solicitation is issued as a Small Business Set Aside.
B. Responses to the solicitation shall be made in writing to the contracting officer by 3:00
PM Eastern Standard Time on February 20, 2020. Submissions by electronic correspondence are accepted and can be sent to the following email address:
Randall.mcarthur@dla.mil
CAUTION NOTICES
BERRY AMENDMEND COMPLIANCE
Offerors are cautioned that all components must be of domestic origin in compliance with DFARS clause 252.225-7012, Preference for Certain Domestic Commodities (Dec 2017), as contained in Section I of this solicitation.
Section 833 of the National Defense Authorization Act for Fiscal Year 2007 added language to 10 U.S.C. 2533a requiring that all articles or items of "clothing", including the materials and components thereof, purchased by the Department of Defense be grown, reprocessed, reused, or produced in the United States, other than sensors, electronics, or other items added to, and not normally associated with, clothing (and the materials and components thereof).
ELECTRONIC INVOICING AND ADVANCED SHIPMENT
NOTIFICATIONS (ASN)
The Directorate of Clothing and Textiles (C&T) requires electronic invoicing on all contracts unless another method is mutually agreed to by the Contractor, the Contracting Officer, the contract administration office, and the payment office.
Utilization of Wide Area Workflow - Receipts and Acceptance (WAWF-RA) in conjunction with DFARS 252.232-7003, ELECTRONIC SUBMISSION OF PAYMENT REQUESTS
AND RECEIVING REPORTS (JUN
2012).
The Directorate of Clothing and Textiles utilizes VIM-ASAP, which is short for DLA Virtual Item Manager ARN Supply-Chain Automated Processing, to transmit data to WAWF-RA. VIM-http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/12.htm#P295_49271
ASAP is the only authorized method to electronically process requests for payment to WAWF- RA for the Directorate of Clothing and Textiles. VIM-ASAP will give you visibility of contract information, track production status and print labels. VIM-ASAP pre-populates contract data on your invoices, such as unit price, contract numbers, item numbers, addresses, and many other fields that will save you labor and time.
Advanced Shipment Notifications (ASNs) associated with DFARS clause 252.211-7006, PASSIVE RADIO FREQUENCY IDENTIFICATION (MAR 2018) are sent via VIM-ASAP to WAWF-RA processes.
Please contact the VIM-ASAP help desk at 888-940-7348 to get started today!
For questions about sending Electronic Data Interchange invoices (810-invoice transactions), contact Mr. Bud Wellens at 1-215-737-2778
For questions about invoice preparation, just call the DFAS Customer Service Resource Center at 1-800-756-4571, or Call DSCP DFAS liaisons listed below for assistance: Camille Conaway 1-215-737-4406
Check out these resources:
http://www.dfas.mil/money/vendor/ …. the DFAS Contract Payment Booklet… an excellent desk reference for contractor Accounts Receivable personnel, as well as the status of outstanding invoices.
http://www.dfas.mil/ …. information regarding bill paying process and additional points of contact
E-VERIFY
Pursuant to FAR clause 52.222-54 vendors are required to enroll in the E-Verify program within thirty days after the date of a contract award and comply with all terms of the clause. In addition, vendors are required to provide evidence of their enrollment in the E-verify program to the contracting officer within 30 days after the date of a contract award.
LATE BIDS
It is the Offerors responsibility to ensure that offers reach the Government office designated in the solicitation on time.
TECHNICAL DOCUMENT REQUESTS
DLA-Troop Support has developed a web-based system that allows manufacturers the ability to request specifications, patterns and drawings on our contracting page. To request technical data for DLA Troop Support Clothing and Textiles (C&T) solicitations, use the following link to the DLA-Troop Support C&T Technical Data Repository area at https://www.dla.mil/TroopSupport/ClothingandTextiles/SpecRequest.aspx
PATIENT PROTECTION AND AFFORDABLE HEALTH CARE ACT
Please note that the Patient Protection and Affordable Health Care Act ("the Act"), 124 Stat. 119, imposes duties upon employers concerning the provision of health care to their employees. Health http://www.dfas.mil/money/vendor/ http://www.dfas.mil/ https://www.dla.mil/TroopSupport/ClothingandTextiles/SpecRequest.aspx insurance costs, including any costs associated with compliance with changes in the applicable law, are the sole responsibility of the offeror. Offerors are advised that their proposals should include any costs associated with the implementation of the Act. Any changes in health coverage costs and/or costs associated with compliance, occurring after award of a contract pursuant to this solicitation will not form the basis for an equitable adjustment of the contract price.
FIRST ARTICLE TEST
Production Demonstration Models (PDMs) are not required for this acquisition; However, first article submissions of the below items may be required after award. Note that the first articles will be evaluated using the patterns and specifications provided in this solicitation. All previous versions and variations of patterns and specifications for this item are irrelevant.
It is preferred that the materials used to manufacture the First Articles be in accordance with any specifications defined in this solicitation. However, if the offeror uses alternate materials to manufacture the First Articles a letter must be supplied with them stating (i) which materials depart from the end item specification and (ii) that, although the materials used in producing the First Articles differ from those specified, the materials required by the specification will be utilized under the resultant contract.
Note: The use of alternate materials will not affect the rating of First Articles, either favorably or negatively when the use of the alternate materials is identified in accordance with the requirements of this section. However, the Government reserves the right to give a negative rating to (a) First Article that is (are) made with materials that depart from the end item specification and the use of those alternate materials was not identified in accordance with the requirements of this section. Accordingly, to preclude a negative assessment of a First Articles that is comprised of materials that are not in accordance with the specification(s), it is in the offeror's best interest to identify any and all alternate materials that have been used.
Although the offeror is permitted to use alternate materials to construct the First Articles, the offeror is not permitted to utilize alternate manufacturing operations or change the construction/design of the First Articles. The First Articles must be manufactured (i) at the same facility as the production quantity and (ii) must be in accordance with applicable specifications, including the placement of the labels, unless otherwise identified. However, labels need not be printed for the purpose of the First Articles but there must be an indication as to the size of the First Article, when applicable. Therefore, prospective vendors must identify the facility or facilities were the First Articles were manufactured.
RFID NOTICE TO DLA SUPPLIERS
This solicitation contains DFARS clause 252.211-7006, PASSIVE RADIO FREQUENCY
IDENTIFICATION (MAR 2018)
This clause requires the successful awardee(s) to affix passive RFID tags, at the case and palletized unit load levels. The successful awardee(s) is also required to electronically submit advance shipment notices to DOD, to permit association of the passive RFID tag data with the corresponding shipment.
Advance shipment notice. The Contractor shall use Wide Area Work Flow (WAWF), as required by DFARS 252.232-7003 (JUN 2012), Electronic Submission of Payment Requests, to electronically submit advance shipment notice(s) with the RFID tag ID(s) (specified in paragraph
(d) of this clause) in advance of the shipment in accordance with the procedures at https://wawf.eb.mil/.
Procurement Technical Assistance Centers (PTACS) are available to deliver passive RFID assistance to DOD suppliers. See http://www.dla.mil/db/procurem.htm to identify your local PTAC and obtain information on upcoming workshops and other training/outreach services.
NOTE: Tagging is also required at the item level. Each shirt will need to have an RFID Tag. Cost of implementing the item level RFID tagging must be included in the offered price.
RFID HANGTAG:
An RFID inlay shall be added to the barcode paper hang tag attached to each item. Where the use of self-adhesive bar- code labels are authorized, the RFID inlay may be added to the self-adhesive label in lieu of a paper hang tag. All other contract barcode and hang tag requirements still apply.
The RFID inlay should be passive Gen2 with a frequency range between 860 and 960 MHz. The RFID antenna should be Avery/Dennison AD222 or comparable with ISO/IEC 18000-C EPC global C1G2 Protocol and an EPC memory allocation containing a 96 bit EPC Number. The data linking the EPC number to the NSN and quantity unit pack must be exportable to VIM/ASAP.
The bar code of the EPC Number must be printed at the bottom of the tag along with the human readable version below the bar code.
In addition to defects applicable to the paper tag and barcoding element, the RFID tag shall be examined for the defects listed below:
RFID Inlay omitted RFID Inlay not secure RFID Inlay not readable with RFID scanner RFID Inlay or configuration not as specified
The manual document “Item-Level Passive RFID Technology Manufacturer's Information Guide" provides guidance and is available from the Contracting Officer.
SYSTEM FOR AWARD MANAGEMENT (SAM)
The System for Award Management (SAM) is combining federal procurement systems and the Catalog of Federal Domestic Assistance into one new system. This consolidation is being done in phases. The first phase of SAM includes the functionality from the following systems:
* Central Contractor Registry (CCR)
* Federal Agency Registration (Fedreg)
* Online Representations and Certifications Application
* Excluded Parties List System (EPLS)
All Contractors must register on the SAM website: https://www.sam.gov/portal/public/SAM/ in order to be considered for award.
Offerors are reminded to complete all applicable representations and certifications appearing in http://www.dla.mil/db/procurem.htm http://www.sam.gov/portal/public/SAM/ this solicitation. Failure to complete all representations and certifications may result in the offer being removed from award consideration for failure to comply with all terms and conditions of the solicitation.
Stop shipment delays and rejections!
For deliveries to New Cumberland depot, ensure your Government or Commercial Bills of Lading are correctly annotated with the following information in the description of articles:
Weight Pieces National Stock Number(s) (NSNs) Contract Number Shipment Number Door #s 113-134 - Mission Delivery (storage)
-- or --
Door #s 135-168 - Container Consolidation Point (CCP) Delivery (OCONUS)
(whichever applies to your freight)
Your truckers/dispatchers/ brokers/etc. should have this information readily available when they phone 717.770.6969 for a delivery appointment to Pre-Lodge.
Don't let the following common invoicing errors delay your payments any longer:
□ Missing or Erroneous Contract Number
□ Missing Call/Delivery Order Number
□ Missing or Erroneous Shipment Number
□ Failure to Mark DD250 as an Original Invoice
□ Failure to Distribute a Copy of the DD250 to the Contract Administration Office Terminal
□ Contract Line Item Number (CLIN) is Omitted, Incorrect or Does Not Match that Appearing in the Contract
□ Missing or Erroneous Unit of Issue
□ Quantity and Price are Incorrect
□ Wrong Pay Office on Invoice
Here are three things you can do to speed your invoice payments:
□ Be sure your original invoice is properly completed and legible.
□ Submit your invoices electronically using the Web Invoicing System (WInS). It's fast, accurate, and costs you nothing! Learn more at the WInS Home Page, at:
https://www.ecweb.dfas.mil/notes/,and start using WInS with your next invoice! Or
□ If you currently receive delivery orders electronically, you could benefit by using an
810- invoice transaction.
Web Invoicing eliminates postage, snail mail, and much paperwork, and gets the invoice/voucher into the DFAS system usually within 24 hours. Web Invoicing is free to vendors doing business with the Government. You just enter the appropriate information and send your invoice to DFAS electronically. It provides help text and pull-down menus in many fields. For more specific http://www.ecweb.dfas.mil/notes/%2Cand questions, contact Janice Hockman (703) 607-5111, Kirsten Larco (703) 607-4920 or
Debra Jones (703) 607-2082.
For questions about sending Electronic Data Interchange invoices (810-invoice transactions), contact Mr. Bud Wellens at (215) 737-2778
For questions about paper invoice preparation, just call the DFAS Customer Service Resource Center at 1-800 756-4571, or
Call DLA Troop Support DFAS liaisons listed below for assistance:
Camille Conaway (215) 737-4406
Check out these resources:
□ http://www.dfas.mil/money/vendor the DFAS Contract Payment Booklet… an excellent desk reference for contractor Accounts Receivable personnel, as well as the status of outstanding invoices.
□ http://www.dfas.mil/ information regarding bill paying process and additional points of contact.
QUALITY INSPECTION
Quality will be assured with the inclusion of DLA Troop Support Clothing and Textiles Additional Quality Assurance Requirements (formerly 4155.3) along with quality requirements of the end item specification.
SUPPLIES AND PRICES
There are two lots for this solicitation. The Government intends to award one contract per lot, making awards based upon an integrated assessment of technical factors and price resulting in the best value to the Government. The intent is to have different contractors for each of the separate contracts that will be awarded under this solicitation. However, the Government reserves the right to make awards of multiple lots to the same contractor if the government deems that it is in the Government's best interest. Orders will be issued under each separate contract without notice to, or consideration of, any other contract/contractor. The fair opportunity provisions of FAR 16.505(b) will not be applicable to orders under the resulting contracts. The lot structure for this solicitation is shown in Items and Quantities below. Offerors are reminded that under the authority of FAR 6.202, the Government may exclude an offeror from receiving more than one award under this solicitation.
http://www.dfas.mil/money/vendor http://www.dfas.mil/
Men’s Air Force Long Sleeve Poly/Cotton Shae AF Blue 1550 NSN: 8405-01-212-7428(s)
PGC: 01906
*Prices are all to be based on FOB Destination only
LOT 0001
Item Quantity Estimated Monthly Quantity
Unit Price Special Measurement
Unit Price Item 0001: Men’s Air Force Long
Sleeve Shirt
Aggregate (Combined)Minimum for both items:
42,000
6,000 shirts per month
Item 0002: Men’s Air Force Long
Sleeve Shirt (New Fabric)
Delivery Schedule: 90 DAY PRODUCTION LEAD TIME AFTER AWARD
MAXIMUM CONTRACT LIMITATIONS: NOT TO EXCEED $4,900,000.00
NOTE: Delivery of Item 0002 is expected to start August 2020. Item 0001 and Item 0002 will not have scheduled deliveries the same month.
The ordering period of the base term is from the effective date of award through 364 days thereafter. The Government may issue delivery orders during this timeframe and not to exceed the contract maximum dollar amount.
LOT 0002
Men’s Air Force Long Sleeve Poly/Cotton Shae AF Blue 1550 (New Fabric) NSN: 8405-01-681-8935(s)
PGC: 00146
*Prices are all to be based on FOB Destination only
LOT 0002
Item Quantity Estimated
Monthly Quantity
Unit Price Special Measurement
Unit Price Item 0001: Men’s Air Force Long
Sleeve Shirt
Aggregate (Combined)Minimum for both items:
17,500
2,500 shirts per month
Item 0002: Men’s Air Force Long
Sleeve Shirt (New Fabric)
Delivery Schedule: 90 DAY PRODUCTION LEAD TIME AFTER AWARD
MAXIMUM CONTRACT LIMITATIONS: NOT TO EXCEED $2,100,000.00
NOTE: Delivery of Item 0002 is expected to start August 2020. Item 0001 and Item 0002 will not have scheduled deliveries the same month.
The ordering period of the base term is from the effective date of award through 364 days thereafter. The Government may issue delivery orders during this timeframe and not to exceed the contract maximum dollar amount.
*The Contracting Officer reserves the right to request First Articles for the Men’s Air Force Dress Shirts. If the awardee has recent successful history of producing the shirts the First Article test MAY be waived.
If the Contracting Officer requests First Articles, Item 0001 is due within 15 days after date of award and Item 0002 is due within 45 days after date of award:
Submit First Articles to:
DLA Troop Support 700 Robbins Ave.
Philadelphia, PA 19111 Attn: Randall McArthur Bldg. 3 / WK Station 3A4041
Delivery Destination: (All items except Special Measurements):
VSTZ:
Travis Association For The Blind AF & MC 3PL -Distribution Services 4512 South Pleasant Valley Road Austin, Texas 78744
TECH DATA
PGC 01906 Men’s Long Sleeve Air Force Shirt
SHIRT, MAN'S LONG SLEEVE, POLYESTER/COTTON, BLUE 1550 SHALL BE MADE IN
ACCORDANCE WITH MIL-S-87214B DATED 20 NOVEMBER 1992
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE
MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT
INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
PATTERN DATE: 3 FEBRUARY 1988
STANDARD SAMPLE OF CLOTH, BROADCLOTH, POLYESTER/
COTTON, DURABLE PRESS, CLASS 4, BLUE SHADE 1550,
IS AVAILABLE AND APPLICABLE FOR SHADE ONLY - ROLL NO. 13-01 APPLIES.
INTERIM SPECIFICATION CHANGES TO MIL-S-87214B:
PAGE 2, PARA. 1.2.1, UNDER "SCHEDULE OF SIZES
(TYPES I AND II) AND SLEEVE LENGTHS (TYPE I)",
UNDER THE APPROPRIATE COLUMNS, ADD THE
FOLLOWING:
"18-1/2 X 33; 18-1/2 X 34; 18-1/2 X 35; 19; 19 X 34; 19 X 35;
19 X 36; 19 X 37; 20 X 36; 20 X 37."
PAGE 3, PARA. 2.1.1, UNDER "SPECIFICATIONS",
"FEDERAL", DELETE "A-A-56021 - PLASTIC SHEET,
POLYETHYLENE TEREPHTHALATE" IN ITS ENTIRETY.
PAGE 5, AFTER PARA. 3.3.2, ADD NEW PARA. AS
FOLLOWS: "3.3.2.1 COLLARSTAND (AUTOMATIC
CREASEBAND CONSTRUCTION) FUSIBLE (ALTERNATE
METHOD). THE FUSIBLE FOR THE COLLARSTAND SHALL
BE 100 PERCENT COTTON WITH A MINIMUM
WEIGHT OF 1.8 OUNCES PER SQUARE YARD AND 44 WARP
YARNS PER INCH MINIMUM AND 34 FILLING YARNS PER
INCH MINIMUM. THE FUSIBLE SHALL BE TREATED WITH
POLYVINYL COPOLYMER THERMOPLASTIC ADHESIVE ON
EACH SIDE AND BE TRANSITORY IN NATURE SUCH THAT
THE ADHESIVE WILL WASH OUT AFTER TWO LAUNDERINGS
IN ACCORDANCE WITH THE LABELED INSTRUCTIONS.
THE BASE FUSIBLE SHALL BE WHITE AND SHRINK
RESISTANT AS NOT TO EXCEED 2.0 PERCENT SHRINKAGE
IN EITHER THE WARP OR FILLING DIRECTION
(SEE 6.6)."
PAGE 5, PARA. 3.3.3, DELETE THE FIRST SENTENCE
AND SUBSTITUTE "THE COLLAR STAYS SHALL BE MADE
FROM POLYETHYLENE TEREPHTHALATE PLASTIC SHEET,
WITH A THICKNESS OF 0.014 +/-0.001 INCH, AND THE
COLOR SHALL BE NATURAL (CLEAR OR OPAQUE)."
PAGE 5, PAR. 3.3.4, LINE 2, DELETE "TICKET NO.
70" AND SUBSTITUTE "TEX 31-35"; DELETE "TICKET
NO. 100" AND SUBSTITUTE "TEX 25-30".
PAGE 6, PARA. 3.3.6.2, DELETE AND SUBSTITUTE THE
FOLLOWING: "3.3.6.2 IDENTIFICATION LABEL. THE
IDENTIFICATION LABEL SHALL CONFORM TO TYPE IV,
CLASS 1."
PAGE 7, PARA. 3.3.6.4, LINE 4, DELETE "3.3.6.2
AND".
PAGE 7, ADD NEW PARAGRAPH: "3.3.6.5 LABEL/TAG.
EACH ITEM SHALL BE INDIVIDUALLY BAR CODED WITH
A PAPER TAG FOR PERSONAL CLOTHING ITEMS. THE
PAPER USED FOR THE TAGS SHALL BE STANDARD
BLEACHED SULFATE HAVING A BASIS WEIGHT OF 100
POUNDS WITH A SMOOTH FINISH TO ACCEPT THERMAL
TRANSFER AND DIRECT PRINTING. THE TAGS SHALL
HAVE A HOLE AND SHALL BE ATTACHED TO EACH ITEM
BY A FASTENER, CLEARLY LEGIBLE AND READABLE BY
SCANNER. THE BAR CODING ELEMENT SHALL BE A 13
DIGIT NATIONAL STOCK NUMBER (NSN). THERE SHALL
BE A 12 DIGIT UNIVERSAL PRODUCT CODE (UPC)
ASSIGNED FOR ALL NSN'S BY THE GOVERNMENT. THE
INITIALS "UPC" MUST APPEAR BENEATH THE CODE.
THE BAR CODES FOR NSN AND UPC SHALL BE A MEDIUM
TO HIGH DENSITY AND SHALL BE LOCATED SO THAT
THEY ARE COMPLETELY VISIBLE ON THE ITEM WHEN IT
IS FOLDED AND OR PACKAGED AS SPECIFIED. THE
LABEL'S LOCATION SHALL CAUSE NO DAMAGE TO THE
ITEM."
PAGE 7, PARA. 3.4, LINE 7, AFTER "CONVERTIBLE
CUFFS WITH" DELETE REMAINDER OF SENTENCE AND
SUBSTITUTE "A BUTTONHOLE ON EACH END OF CUFFS
AND TWO BUTTONS ON THE BACK OF EACH CUFF FOR
ADJUSTMENT SO CUFFS CAN EITHER BE BUTTONED OR
FASTENED WITH CUFF LINKS."
PAGE 8, PARA. 3.5.1, TABLE I, INTERLINING CLOTH,
AFTER "COLLARSTAND INTERLINING" INSERT "2/" AND
AFTER FOOTNOTE 1/ ADD "2/ WHEN AUTOMATIC
CREASEBAND METHOD IS USED, CUT 2 COLLARSTAND
INTERLININGS."
PAGE 10, PARA. 3.6.3, BEFORE THE FIRST SENTENCE,
ADD "UNLESS OTHERWISE SPECIFIED IN THE CONTRACT
OR THE TABLE OF MANUFACTURING OPERATIONS,".
PAGE 16, OPER. 6.B, DELETE IN ITS ENTIRETY.
PAGE 20, TABLE II, AFTER OPER. 9(D) INSERT
"E. AS AN ALTERNATE TO OPERS. 9(A), 9(B), 9(C),
AND 9(D) AUTOMATIC CREASEBAND CONSTRUCTION MAY
BE USED WHICH FOLDS THE EDGES OF THE COLLARSTAND
AND INTERLINING SIMULTANEOUSLY AND ARE HELD IN
PLACE BY THE ACTIVATED ADHESIVE OF THE FUSIBLE
INTERLINING."
PAGE 22, TABLE II, OPER. 11(B), LINE 4, INSERT
THE FOLLOWING IN THE APPROPRIATE COLUMNS:
"OR 503 OR 504 AND" 8-10 70-2 70-2".
PAGE 23, TABLE II, OPER. 11(B) (CONT'D), LINE 1,
INSERT THE FOLLOWING IN THE APPROPRIATE COLUMNS:
"301 EFA-1 12-14 70-2 70-2".
PAGE 24, OPER. 12.B, DELETE IN ITS ENTIRETY.
PAGE 28, TABLE II, OPER. 19, LINES 10-12, DELETE
"IN THE SAME DIRECTION AS TURNED AT THE CUFF"
AND SUBSTITUTE "TOWARDS THE BACK OF THE SHIRT".
PAGE 29, OPER. 21(A), DELETE THE SECOND SENTENCE
IN ITS ENTIRETY AND SUBSTITUTE "THE FACING SHALL
FINISH 1-7/8 (+/- 1/4) INCHES WIDE FOR TYPE I
AND II SHIRT."
PAGE 32, TABLE II, OPERATION 23(C), DELETE
OPERATION IN ITS ENTIRETY AND SUBSTITUTE THE
FOLLOWING: "C. SEW TWO BUTTONS ON BACK END OF
EACH CUFF, ONE BUTTON ON EACH END OF BUTTONHOLE
AND BUTTONS FINISHING (1) INCH APART FOR TYPE
I SHIRT."
PAGE 34, PARA. 3.9, TABLE III FINISHED
MEASUREMENTS (INCHES), UNDER COLUMN E, TYPE II
SLEEVE LENGTH, DELETE "6-7/8" FOR ALL SIZES AND
SUBSTITUTE "6-1/4" FOR ALL SIZES. UNDER
COLUMN E, "TOLERANCE", DELETE "+1/4, -1/8" AND
SUBSTITUTE "+1/4".
PAGE 34, PARA. 3.9, TABLE III, UNDER THE
APPROPRIATE COLUMNS ADD THE FOLLOWING:
"SIZE: 18-1/2; COLLAR: 19; 1/2 CHEST: 28-3/4;
BACK LENGTH: 32-1/4; TYPE II SLEEVE
LENGTH: 6-1/4; 1/2 WAIST: 26; CROSS BACK (LOWER
YOKE SEAM): 21.
SIZE: 19: COLLAR: 19-1/2; 1/2 CHEST: 29-3/4;
BACK LENGTH: 32-3/8; TYPE II SLEEVE
LENGTH: 6-1/4; 1/2 WAIST: 27; CROSS BACK (LOWER
YOKE SEAM): 21-1/2".
SIZE 19-1/2: COLLAR: 20; 1/2 CHEST: 30-3/4;
BACK LENGTH: 32-1/2; TYPE II SLEEVE LENGTH: 6-1/4;
1/2 WAIST: 28; CROSS BACK (LOWER YOKE SEAM): 22".
SIZE 20: COLLAR: 20-1/2; 1/2 CHEST: 31-3/4;
BACK LENGTH: 32-5/8; TYPE II SLEEVE LENGTH: 6-1/4;
1/2 WAIST: 29; CROSS BACK (LOWER YOKE SEAM): 22-1/2".
PAGE 22, TABLE II, OPERATION 11, DELETE THE SECTION REGARDING "FLAPS AND POCKETS" AND
SUBSTITUTE THE FOLLOWING:
"FLAPS:
SIZES 13 TO 14-1/2:
TOP WIDTH: 4-3/4 INCHES
CENTER LENGTH: 2-1/8 INCHES
SIZES 15 TO 18-1/2:
TOP WIDTH: 5-1/4 INCHES
CENTER LENGTH: 2-1/8 INCHES
SIZES 19 TO 20:
TOP WIDTH: 5-3/4 INCHES
CENTER LENGTH: 2-1/8 INCHES
FLAPS:
SIZES 13 TO 14-1/2:
WIDTH: 4-1/2 INCHES
DEPTH: 5-1/4 INCHES
SIZES 15 TO 18-1/2:
WIDTH: 5 INCHES
DEPTH: 5-3/4 INCHES
SIZES 19 TO 20:
WIDTH: 5-1/2 INCHES
DEPTH: 6-1/4 INCHES
PAGE 38, PARA. 5.2.2, LINES 3 & 4, DELETE
"WEATHER RESISTANT" AND SUBSTITUTE "DOMESTIC,
STYLE RSC-L".
PAGE 39, AFTER PARA. 5.4, ADD THE FOLLOWING:
"5.5 UNIVERSAL PRODUCT CODE. THE GOVERNMENT
ASSIGNED UNIVERSAL PRODUCT CODE (UPC) MUST BE
PLACED ON ALL SHIPPING CARTONS ON WHICH THE NSN
APPEARS."
PAGE 41, AFTER PARA. 6.5, INSERT A NEW PARA. AS
FOLLOWS: "6.6 USE OF AUTOMATED APPAREL
EQUIPMENT. AUTOMATED CREASEBAND CONSTRUCTION IS
THE CREASE AND TACK PROCESS FROM FACEMATE
CORPORATION."
PAGE 41, RE-NUMBER PARA. 6.6 AS PARA. 6.7;
RE-NUMBER PARA. 6.7 AS PARA. 6.8; RE-NUMBER
PARA. 6.8 AS PARA. 6.9."
INCLUDE T1721 OBJECT TEXT ID ST
ADDITIONAL INFORMATION FOR V-B-871: NO ADDITIONAL INFORMATION FOLLOWS.
ADDITIONAL INFORMATION FOR A-A-52094A THREAD, COTTON
NO ADDITIONAL INFORMATION
ADDITIONAL INFORMATION FOR A-A-50083:
INTERIM CHANGES:
PAGE 1, AFTER PARA. 1.1 DESIGN AND CONSTRUCTION, INSERT THE FOLLOWING PARAGRAPH:
"PARA.1.2 MATERIAL. THE PLASTIC BAGS SHALL BE FABRICATED FROM CLEAR POLYOLEFIN
MATERIAL CONFORMING TO L-P-378. THE THICKNESS OF THE MATERIAL SHALL BE 0.0010 TO
0.0090 INCHES IN ACCORDANCE WITH L-P-378.".
PAGE 1, PARA 1.2. DELETE SECOND SENTENCE ENTIRELY, AND SUBSTITUTE "THE THICKNESS OF
THE MATERIAL SHALL BE 0.0010 TO 0.0090 INCHES IN ACCORDANCE WITH A-A-3174.
RENUMBER PARA. 1.2 FIT AND SIZE AS PARA.1.3 FIT AND SIZE.
RENUMBER PARA. 1.3 CLOSURE AS PARA.1.4 CLOSURE
"MIL-DTL-32075: LABEL FOR CLOTHING, EQUIPAGE,
AND TENTAGE, GENERAL USE REPLACES DDD-L-20
INTERIM SPECIFICATION CHANGES TO MIL-DTL-32075:
PAGE 6, TABLE I, "PHYSICAL REQUIREMENTS OF THE
TYPE VI FINISHED LABEL." UNDER "TEARING
STRENGTH" DELETE: "(LB.) MINIMUM" AND
SUBSTITUTE: "(GNS) MINIMUM."
PAGE 12, PARA 3.3.2.17, AFTER "NSN" ADD
"AND THE UNIVERSAL PRODUCT CODE (UPC)
SUPPLIED BY THE GOVERNMENT, FOR ALL NSNs."
ADDITIONAL INFORMATION FOR PPP-B-636:
FEDERAL SPECIFICATION PPP-B-636 DATED JULY 12, 1981, INCLUDING INTERIM FEDERAL
SPECIFICATION PPP-B-636L DATED JANUARY 1, 1991, IS HEREBY CANCELLED, AND REPLACED WITH ASTM-D-5118, STANDARD PRACTICE FOR FABRICATION OF FIBERBOARD SHIPPING BOXES, AND ASTM- D-1974, STANDARD PRACTICE FOR METHOD OF CLOSING, SEALING AND REINFORCING FIBERBOARD
SHIPPING CONTAINERS.
ADDITIONAL INFORMATION FOR A-A-50135:
INTERIM SPECIFICATION CHANGES TO A-A-50135:
PARAGRAPH 2.1: DELETE AND SUBSTITUTE:
"2.1 CERTIFICATION. THE CONTRACTOR SHALL
CERTIFY AND MAINTAIN SUBSTANTIATING EVIDENCE
THAT THE PRODUCT OFFERED MEETS THE SALIENT
CHARACTERISTICS AND REQUIREMENTS OF THIS
COMMERCIAL ITEM DESCRIPTION AND THAT THE
PRODUCT CONFORMS TO THE PRODUCER'S OWN
DRAWINGS, SPECIFICATIONS, STANDARDS AND
QUALITY ASSURANCE PRACTICES. THE GOVERNMENT
RESERVES THE RIGHT TO REQUIRE PROOF OF SUCH
CONFORMANCE PRIOR TO FIRST DELIVERY AND
THEREAFTER AS MAY BE OTHERWISE PROVIDED
FOR UNDER THE PROVISIONS OF THE CONTRACT.
PARA. 2.2 VISUAL EXAMINATION. LOTS OF CLOTH
SHALL BE INSPECTED IN ACCORDANCE WITH MIL-STD
-105. THE INSPECTION LEVEL SHALL BE II. THE LOT
SIZE SHALL BE EXPRESSED IN UNITS OF YARDS. THE
SAMPLE SIZE SHALL BE ONE LINEAR YARD. THE CLOTH
SHALL BE EXAMINED ON THE FACE SIDE FOR THE
FOLLOWING DEFECTS: HOLE, TEAR, RUN OR DROPPED
STITCH; END OUT; MEND; THIN OR UNEVEN AREA;
SLUB, SLUG OR GOUT; PERMANENT CREASE IN CLOTH;
SHADE BAR; STREAK, SPOT OR STAIN; WEIGHT NOT AS
SPECIFIED.
PARA. 2.3 LENGTH EXAMINATION . DURING THE YARD-
BY-YARD EXAMINATION EACH ROLL IN THE SAMPLE
SHALL BE EXAMINED FOR LENGTH AND WEIGHT. ANY
LENGTH FOUND TO BE LESS THAN THE MINIMUM
SPECIFIED OR MORE THAN 2 YARDS LESS THAN THE
LENGTH MARKED ON THE ROLL TICKET SHALL BE
CONSIDERED A LENGTH DEFECT. IF THE TOTAL OF THE
ACTUAL LENGTHS OF THE ROLLS IS LESS THAN THE
TOTAL OF THE LENGTHS MARKED ON THE ROLL TICKETS,
THE LOT SHALL BE REJECTED."
ADDITIONAL INFORMATION FOR MIL-L-10547:
MIL-L-10547 CANCELLED WITH NO REPLACEMENT.
NOTICE 1 DATED 6/3/96.
ADDITIONAL INFORMATION FOR MIL-T-43624:
STANDARD SAMPLE FOR CAMOUFLAGE GREEN 483 IS
IDENTIFIED AS ROLL NO. 3523, REFERENCED FOR
SHADE ONLY.
STANDARD SAMPLE FOR FOLIAGE GREEN 504 IS
MIL-C-44436, ROLL #3729 (THE FOLIAGE GREEN 502
AREA OF THE PATTERN), AND REFERENCED FOR SHADE
ONLY.
ADDITIONAL INFORMATION FOR MIL-DTL-43992:
STANDARD SAMPLE FOR SHADE 415, CLASS 5 IS
IDENTIFIED AS ROLL NO. 3540 AND REFERENCED FOR
SHADE, COLORFASTNESS AND APPEARANCE.
STANDARD SAMPLE FOR BLUE SHADE 1550, CLASS 4
IS IDENTIFIED AS ROLL NO. 88-2 AND REFERENCED
FOR SHADE AND COLORFASTNESS.
ADDITIONAL INFORMATION FOR FED-STD-191:
FED-STD-191A NOTICE 7, DATED AUGUST 9, 2000 IS HEREBY INACTIVE FOR NEW DESIGN. WHEN NOT USING FED-STD-191, SEE INTERIM CHANGES TO END ITEM SPECIFICATION FOR REPLACEMENT
ASTM.
INTERIM CHANGES TO FED-STD-191A:
TEST METHOD 5202, PARA. 5.3, DELETE FIRST SENTENCE AND SUBSTITUTE: "THE SPECIMEN
SHALL BE CLAMPED FIRMLY, WITH ONE END FLUSH WITH THE OUTER EDGE OF THE VISE, SUCH THAT ONE INCH OF SPECIMEN LIES WITHIN THE CLAMP AND ONE INCH OF THE SPECIMEN EXTENDS BEYOND THE CENTER OF ROTATION (FACE OF THE VISE), AND WITH THE LONG EDGE PARALLEL TO THE FACE
OF THE DIAL PLATE".
TEST METHOD 5309.1 ABRASION RESISTANT OF TEXTILE WEBBING. PAGE 1, PARA 4.1.2,LINE 4:
DELETE "B-97" AND SUBSTITUTE "B-91".
THE FOLLOWING METHODS ARE IDENTIFIED AS SPECIFYING OZONE DEPLETING SUBSTANCES: 1100, 1200, 1240, 1400, 1410, 1500, 1510,1520,1530, 1540, AND 1550. PARA 5.1 OF THESE TEST
METHODS REQUIRE THE USE OF 1,1,1- TRICHLOROETHANE, ALCOHOL OR ETHER. 1,1,1-
TRICHLORETHANE IS AN OZONE DEPLETING SUBSTANCE (METHYL CHLOROFORM) AND IS THEREFORE PROHIBITED. THE USE OF EITHER ALCOHOL OR ETHER IS REQUIRED WHEN THESE METHODS ARE IN
BASIC OR ANY REFERENCED DOCUMENT.
METHOD 5202, STIFFNESS OF CLOTH, DIRECTIONAL; CANTILEVER BENDING METHOD. PAGE 2,
PARA. 5.3 DELETE FIRST SENTENCE AND SUBSTITUTE WITH THE FOLLOWING: "THE SPECIMEN SHALL BE CLAMPED FIRMLY, WITH 1 END FLUSH WITH THE OUTER EDGE OF THE VISE, SUCH THAT 1" OF THE SPECIMEN LIES WITHIN THE CLAMP AND 1" OF THE SPECIMEN EXTENDS BEYOND THE CENTER OF ROTATION (INNER FACE OF THE VISE) AND WITH THE LONG EDGE PARALLEL TO THE FACE OF THE
DIAL PLATE."
METHOD 5556.1, MOBILE LAUNDRY EVALUATION FOR TEXTILE MATERIALS, PAGE 5, PARA. 5.2.2, LINE 8: DELETE SENTENCE BEGINNING WITH "THE SPECIMENS AND BALLAST" IN ITS ENTIRETY AND SUBSTITUTE WITH THE FOLLOWING: "THE SPECIMENS AND BALLAST SHALL BE SEPARATED, OPENED TO FULL WIDTH AND PLACED IN A PRE-HEATED DRYER HAVING A STACK TEMPERATURE OF 140-180 DEG. F. THIS TEMPERATURE RANGE CORRESPONDS TO A SETTING OF "HIGH" ON THE TEMPERATURE INDICATOR ON THE DRYER. DRYING SHALL CONTINUE FOR 45-60 MINUTES OR UNTILSAMPLES ARE
DRY IN A ROTATING TUMBLE DRYER."
PAGE 5, PARA. 5.2.3, LINE 8: DELETE SENTENCE BEGINNING WITH "THE SPECIMENS AND
BALLAST" IN ITS ENTIRETY AND SUBSTITUTE WITH THEFOLLOWING: "THE SPECIMENS AND BALLAST SHALL BE SEPARATED, OPENED TO FULL WIDTH AND PLACED IN A PRE-HEATED DRYER HAVING A STACKTEMPERATURE OF 140-180 DEG. F. THIS TEMPERATURE RANGE CORRESPONDS TO A SETTING OF "HIGH" ON THE TEMPERATURE INDICATOR ON THE DRYER. DRYING SHALL CONTINUE FOR 35-40
MINUTES OR UNTIL SAMPLES ARE DRY."
METHOD 5931, ELECTROSTATIC DECAY OF FABRICS; DETERMINATION OF PAGE 1, PARA. 3: AFTER NUMBER OF DETERMINATIONS ADD "PER SAMPLE UNIT". PAGE 1, PARA. 4: DELETE "APPARTUS"
AND SUBSTITUTE "APPARATUS". PAGE 1, PARA. 5.1, LINE 3: AFTER "AT"
DELETE"APPROXIMATELY".
PAGE 2, PARA. 5.2, LINES 2, AND 5: AFTER "OF" ADD "+-". LINE 6: AFTER "TO" ADD "+-".
PAGE 2, PARA. 5.3: DELETE IN ITS ENTIRETY AND SUBSTITUTE WITH THE FOLLOWING:"5.3 MOUNT A SPECIMEN TIGHTLY ACROSS THE ELECTRODES, CENTERING IT OVER THE SENSOR OPENING. THE SURFACE OF THE TEST SPECIMEN (BACK OR FRONT) SHALL FACE THE SENSOR. RECORD (OPTIONAL) THE RESIDUAL CHARGE LEVEL ON THE SAMPLE AS SEEN BY THE SENSOR, INCLUDING POLARITY.
NOTE THAT TEST SAMPLES WITH THE RESIDUAL CHARGE LEVELS OF LESS +500 VOLTS YIELD THE BEST RESULTS. APPLY +5000 VOLTS TO THEELECTRODES FOR A PERIOD OF 20 SECS. AT THE END OF THE 20 SECOND PERIOD, THE HIGH VOLTAGE (5000 VOLTS) SHALL BE TURNED OFF ANDTHE SPECIMENS IMMEDIATELY GROUNDED. THE VOLTAGE BEHAVIOR OF THE SPECIMEN WITH RESPECT TO TIME SHALL BE PLOTTED ON THE RECORDER. NOTE: IN SOME CASES, THE TEST EQUIPMENT WILL DISPLAY VOLTAGE AND DECAY TIME INFORMATION AND A CHART RECORDER IS NOT NECESSARY."
PAGE 2, PARA. 5.4, LINE 3: DELETE SENTENCE BEGINNING WITH "IF THE SPECIMEN DID" IN ITS
ENTIRETY.
PAGE 2, PARA. 5.5: DELETE PARAGRAPH IN ITS ENTIRETY AND SUBSTITUTE WITH THE FOLLOWING:
"RECORD THE MAXIMUM VOLTAGE LEVEL(INCLUDING POLARITY) AND DECAY TIME TO 10% OF THE
MAXIMUM VOLTAGE LEVEL ACHIEVED."
PAGE 2, PARA. 5.6, LINE 1: ADD THE FOLLOWING PRIOR TO 1ST SENTENCE: "REVERSE VOLTAGE
POLARITY REPEAT MEASUREMENT, ANDRECORD RESULTS."
PAGE 3, PARA. 6.6: DELETE PARAGRAPH IN ITS ENTIRETY AND SUBSTITUTE WITH THE FOLLOWING:
"THE AVERAGE TIME TO DECAY TO 10%OF THE MAX VOLTAGE SHALL BE INCLUDED FOR EACH OF THE WARP & FILLING DIRECTIONS, AS WELL AS THE OVERALL AVERAGE, FOR EACHFABRIC TESTED.
THESE WILL BE OBTAINED BY AVERAGING THE TEST RESULTS (ABSOLUTE VALUE OF) TOGETHER FOR BOTH VOLTAGEPOLARITIES. UNLESS OTHERWISE STATED IN THE REQUIREMENTS DOCUMENT, THE
FABRIC SHALL BE CONSIDERED ACCEPTABLE IF THEAVERAGE MAXIMUM VOLTAGE IN BOTH THE WARP AND FILLING DIRECTIONS IS LESS THAN 4000 VOLTS, AND THE AVERAGE DECAY TIME (TO 10% MAXVOLTAGE) IS GREATER THAN 0.5 SECONDS IN BOTH THE WARP AND FILLING DIRECTIONS. IT
SHALL BE INDICATED WHETHER THE FABRIC ISACCEPTABLE OR NON-ACCEPTABLE."
PAGE 3, PARA. 7.1, SECOND COLUMN, LINE 2: DELETE 406C AND SUBSTITUTE WITH "406D".
AFTER PARA. 7.1, ADD THE FOLLOWING: "7.2 NOTE: IF THE MODEL 406D STATIC DECAY METER, OR EQUIVALENT, IS USED, A CHART RECORDER ISNOT MANDATORY FOR THE TEST."
ADDITIONAL INFORMATION: FED-STD-751 HAS BEEN
CANCELLED AND REPLACED BY ASTM-D-6193, 4/98
STANDARD PRACTICES FOR STITCHES AND SEAMS.
THIS STANDARD SHOULD BE USED IN PREFERENCE
TO FED-STD-751.
INSPECTION OF SUPPLIES SHALL BE IN ACCORDANCE WITH FAR PART 52.246-2 STANDARD
INSPECTION.
ADDITIONAL INFORMATION FOR MIL-STD-105E:
MIL-STD-105E, dated 10 May 1989, is hereby canceled.
Future acquisitions may refer to: MIL-STD-1916, "DoD Preferred Methods for Acceptance of Product," or ANSI/ASQ Z1.4, "Sampling Procedures and Tables for Inspection by Attributes."
Users are cautioned to evaluate these documents for their particular application before citing it as a replacement document.
(Copies of MIL-STD-1916 are available online at http://assist.daps.dla.mil or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094.)
(Copies of ANSI/ASQ Z1.4 are available online at www.asq.org or ASQ Distribution Center, 5131 S. Third Street, Milwaukee, Wisconsin 53207-6028.)
MIL-STD-129R - DEPARTMENT OF DEFENSE STANDARD PRACTICE
MILITARY MARKING FOR SHIPMENT AND STORAGE
DATED 18 FEBRUARY 2014
INTERIM CHANGES:
OMISSION OF MARKINGS ON EXTERIOR SHIPPING CONTAINERS OF ITEMS
IN THE DLA TROOP SUPPORT CLOTHING AND TEXTILE (C&T) DIRECTORATE:
THE NOMENCLATURE AND MANUFACTURER'S NAME (WHEN THE NAME IDENTIFIES THE MATERIAL) SHALL
BE OMITTED FROM ALL EXTERIOR SHIPPING CONTAINERS OF DLA TROOP SUPPORT C&T ITEMS,
REGARDLESS OF MODE OF SHIPMENT.
IF THE MANUFACTURER'S NAME DOES NOT IDENTIFY THE MATERIAL AS BEING CLOTHING, IT MAY REMAIN. NSNS SHALL BE SHOWN ON ALL SHIPPING CONTAINERS OF C&T ITEMS, THE PACKING LIST SHALL BE PLACED INSIDE THE LAST CONTAINER TO BE LOADED FOR EACH SHIPMENT. THE WORDS
"PACKING LIST HERE" SHALL BE STENCILED, NOT HAND LETTERED, ON THE CONTAINER.
MIL-STD-147E
w/CHANGE 1 23 December 2013
SUPERSEDING
MIL-STD-147E
16 May 2008
DEPARTMENT OF DEFENSE
STANDARD PRACTICE
PALLETIZED UNIT LOADS
ADDITIONAL INFORMATION FOR MIL-STD-1492C:
MIL-STD-1492C, PAGES 7-8, TABLE II, DELETE IN
ITS ENTIRETY AND SUBSTITUTE: "TABLE II
SAMPLING PROVISIONS FOR END ITEM VISUAL
EXAMINATION OF SEMI-DRESS (SD) SHIRTS
NORMAL INSPECTION
LOT SZ SAMP SZ MAX ACCP PT VALUES
. 3&2 PT 3,2,1 PT
. DEFECTS DEFECTS
UP THRU 500 50 5 10
501-1200 80 7 14 1201-3200 125 10 20 3201-10,000 200 14 29 10,001-35,000 315 20 42
35,001 & OVER 500 30 62
TIGHTENED INSPECTION
UP THRU 500 50 3 7
501-1200 80 5 11 1201-3200 125 7 15 3201-10,000 200 11 23 10,001-35,000 315 17 34
35,001 & 0VER 500 25 52
REDUCED INSPECTION
LOT SZ SAMP SZ MAX ACCP PT VALUES
. 3&2 PT 3,2,1 PT
. DFCTS 1/ DEFECTS
UP THRU 1200 32 3-7 11
1201-3200 50 5-9 14 3201-10,000 80 7-11 19 10,001-35,000 125 10-14 24
35,001 & OVER 200 14-18 34
1/ IF THE FIRST VALUE IS EXCEEDED BUT THE SECOND
VALUE HAS NOT BEEN EXCEEDED, ACCEPT THE LOT BUT
REINSTATE NORMAL INSPECTION (SEE 5.5.4B). THE
SECOND VALUE IS THE MAXIMUM ACCEPTABLE POINT
VALUE."
ADDITIONAL INFORMATION FOR MIL-STD-2073-1:
NO ADDITIONAL INFORMATION FOLLOWS
PACKAGING
PRES/PACK LEVELS: A/B TO MIL-S-87214
SHIPPING CONTAINER QUANTITY:60 SHIRTS/BOX
MARKING IAW MIL-STD-129 & MIL-HDBK-129
GOV'T ASSIGNED UPC SHALL BE PLACED ON ALL
SHIPPING CARTONS ON WHICH THE NSN APPEARS
SIGNIFICANT NOTE - "PALLETIZATION IS REQUIRED FOR THESE SUPPLIES".
NOTE: THE FOLLOWING APPLIES TO ALL NON-MANUFACTURED WOOD PACKAGING MATERIALS:
"All Wood Packaging Material (WPM) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures (ISPM) 15, "Guidelines for Regulating Wood Packaging Materials in International Trade." DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo, or when wood is being acquired by DLA for future use as packaging material. WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD). All WPM shall comply with one of the following official quality control programs:
Heat Treatment (HT) or Kiln Dried Heat Treatment (KD HT) in accordance with American Lumber Standard Committee, Incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/; or
All WPM shall include certification/quality markings in accordance with the ALSC or NWPCA standards, as applicable. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible.
All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government."
PALLET SHALL BE 4 WAY ENTRY, WINGED TYPE. PALLETIZED LOAD DIMENSIONS SHALL NOT EXCEED
43 INCHES IN LENGTH, 52 INCHES IN WIDTH, AND 54 INCHES IN HEIGHT (INCLUDING THE
PALLET).
THE PALLETIZED LOAD SHALL BE BONDED USING APPROVED COMMERCIAL BONDING MATERIALS. THE
USE OF METAL BANDING, IN SECURING BOXES TO PALLETS, IS DISCOURAGED. PALLET LOADS
SHALL CONTAIN THE SAME NUMBER OF CARTONS, OF IDENTICAL QUANTITIES, OF ONE NSN, TO THE
MAXIMUM EXTENT POSSIBLE.
PALLET LOADS CONTAINING MORE THAN ONE NSN SHALL BE CLEARLY MARKED TO LIST ALL THE NSN'S CONTAINED IN THE LOAD. NO CARTON SHALL HAVE MORE THAN ONE NSN. AT THE END OF A SIZE RUN, NO MORE THAN ONE CARTON PER NSN MAY BE SHORT OR OVER THE SPECIFIED QUANTITY.
SAID CARTON SHALL BE CLEARLY MARKED "SHORT" OR "OVER".
MIL-STD-147 IS REFERENCED FOR PALLETIZED LOADS.
IN ADDITION TO REQUIREMENTS SPECIFIED ABOVE THE FOLLOWING CLAUSE ALSO APPLIES:
52.247-9012 - REQUIREMENTS FOR TREATEMENT OF WOOD PACKAGING MATERIALS (WPM) - (JULY 2006)
TECH DATA
PGC 00146 Men’s Long Sleeve Air Force Shirt(New)
SHIRT, MAN'S: SERVICE DRESS, LONG SLEEVE (TYPE I), SHALL BE MADE IN ACCORDANCE WITH PD
WNU 15-05B DATED 17 DECEMBER 2018
PATTERN DATE: 17 DECEMBER 2018
STANDARD SAMPLE OF CLOTH, POLYESTER/COTTON, UNDER GL PD 11-05, AIR FORCE
BLUE SHADE 1664, IS AVAILABLE FOR SHADE AND APPEARANCE - ROLL NUMBER 18-
04 APPLIES.
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS:
A. THIS SOLICITATION/AWARD CONSISTS OF THE FOLLOWING DOCUMENTS,
EXHIBITS, AND OTHER ATTACHMENTS.
B. DLA TROOP SUPPORT CLOTHING AND TEXTILES ADDITIONAL
QUALITY ASSURANCE REQUIREMENTS DATED OCTOBER 2018, SUPERSEDES
DSCP 4155.3 QUALITY SYSTEMS REQUIREMENTS DATED NOVEMBER 3, 1997
ADDITIONAL INFORMATION FOR "DLA TROOP SUPPORT CLOTHING AND TEXTILES ADDITIONAL QUALITY
ASSURANCE REQUIREMENTS DATED OCTOBER 2018"
Page 10 of 38, par. 2.1, line 4, after "(DCMA QAS)" add ", or Supplier's Source Sampling Representative, as applicable" Page 11 of 38, par. 2.3, line 2, delete "to the source QAS". Line 4, delete "source QAS" and replace with "Supplier's Source Sampling Representative". Page 12, par 2.3 (continued), delete "source QAS" and replace with "Supplier's Source Sampling Representative".
Page 12 of 38, par. 2.4, line 5, delete "as required" and replace with "if required".
Page 12 of 38, par. 3.1.1, after "entirely" add the following: "For routine shade or physical testing of fabric lots, Government sampling is not required. The DD Form 1222 for routine shade or physical testing of fabric lots shall be signed and dated by the Supplier's Source Sampling Representative in Box 15."
Page 13 of 38, par. 3.1.2 "line 10, after "Government QAS" add the following: "or Supplier's Source Sampling Representative, as applicable," Page 14 of 38, par. 3.2.1 "line 4, delete "source QAS" and replace with "Supplier's Source Sampling Representative".
Page 14 of 38, par. 3.2.1.1 "cutting swatches, delete "DCMA QAS" and replace with "Supplier's Source Sampling Representative". After "single color rolls" 4'x 24' delete "QAS" and replace with "Supplier's Source Sampling Representative". After "multi-color camouflage" delete "QAS" and replace with "Supplier's Source Sampling Representative".
Page 14 of 38, par. 3.2.1.2 "line 3, delete "stamped,". Line 4, Delete "source QAS" and replace with "Supplier's Source Sampling Representative" Page 15 of 38, par. 3.2.1.4 "subpar. 2, delete "source QAS" and replace with "Supplier's Source Sampling Representative"
Page 15 of 38, par. 3.2.2 "Line 3, delete "stamped,", delete "source QAS" and replace with "Supplier's Source Sampling Representative". Line 4, delete "QAS" and replace with "Supplier's Source Sampling Representative".
Page 16 of 38, par. 3.3.1 "Line 2, after "(30)" add, "calendar". Line 3 and Line 6, after "QAS" add, "or Supplier's Source Sampling Representative" Page 16 of 38, par. 3.3.2 "Delete the paragraph in its entirety, including subparagraphs labeled "a" through "i", and replace with the following:
"3.3.2. Contractor Furnished Material (CFM). DLA Troop Support Clothing and Textiles contracts require source sampling of CFM at finishing plants. The following provisions apply to sample selection and lot acceptance.
(a) The samples shall be randomly selected by the Supplier's Source Sampling Representative.
(b) Upon presentation of a lot, the Supplier's Source Sampling Representative will draw samples and forward the samples to the contractor's laboratory specified in the contract for testing.
(c) Shipment of Component Lots from the source to the prime contractor need not be deferred except for Government Acceptance Testing (i.e., shade evaluation).
Commencement of production prior to receipt of a passing test report from the contractor's authorized laboratory is solely at the contractor's risk.
(d) The contractor will provide copies of Certificates of Compliance to the QAS.
(e) The contractor is required to ensure that a complete test report for all lots is furnished to the source's QAS and the appropriate DLA-PTC representative."
Pages 24, 25, 36 add to block 16: "By signing in box 15, I certify that the samples referenced above were randomly selected and represent the lot identified above."
**Special note: Contractors shall ensure that blocks 2 and 15 of the form DD1222 are updated to reflect the correct information. Historically, both blocks contained the information of the DCMA QAR and their stamp/signature. When contractor's representative samples, these blocks shall include the contractor's representative's information. Block 17 shall still include the DCMA QAR to receive the results of the report even though they may not be sampling the material to be tested.
[End of interim changes.] This modification will eliminate the requirement for DCMA to go to mills solely to pull swatches for routine Source Sampling (for Shade, Physical Testing, or nIR testing).
This places the responsibility for routine sampling of swatches on the fabric suppliers. This change will allow DCMA to continue to administer C&T Contracts with Delivery Order values above the $300,000 threshold, even if the contracts contain Shade or other Source Sampling requirements.
The Prime Contractors will still have the ultimate responsibility for conformance to Shade and other requirements in the end items they produce and furnish under DLA contracts.
THE CONTRACTOR SHALL STAMP LEGIBLY WITH INDELIBLE INK THE LOT NUMBER ON
EACH END ITEM AND OUTER CONTAINER IN THE LOT.
PACKAGING
COMMERCIAL PACKAGING IAW ASTM-D-3951
SHIPPING CONTAINER QUANTITY: 60 SHIRTS/BOX
GOV'T ASSIGNED UPC MUST BE PLACED ON ALL
SHIPPING CARTONS ON WHICH THE NSN APPEARS
MARKING IAW MIL-STD-129 & MIL-HDBK-129
MIL-STD-129R - DEPARTMENT OF DEFENSE STANDARD PRACTICE
MILITARY MARKING FOR SHIPMENT AND STORAGE
DATED 18 FEBRUARY 2014
INTERIM CHANGES:
OMISSION OF MARKINGS ON EXTERIOR SHIPPING CONTAINERS OF ITEMS
IN THE DLA TROOP SUPPORT CLOTHING AND TEXTILE (C&T) DIRECTORATE:
THE NOMENCLATURE AND MANUFACTURER'S NAME (WHEN THE NAME IDENTIFIES THE MATERIAL) SHALL
BE OMITTED FROM ALL EXTERIOR SHIPPING CONTAINERS OF DLA TROOP SUPPORT C&T ITEMS,
REGARDLESS OF MODE OF SHIPMENT.
IF THE MANUFACTURER'S NAME DOES NOT IDENTIFY THE MATERIAL AS BEING CLOTHING, IT MAY REMAIN. NSNS SHALL BE SHOWN ON ALL SHIPPING CONTAINERS OF C&T ITEMS, THE PACKING LIST SHALL BE PLACED INSIDE THE LAST CONTAINER TO BE LOADED FOR EACH SHIPMENT. THE WORDS
"PACKING LIST HERE" SHALL BE STENCILED, NOT HAND LETTERED, ON THE CONTAINER.
MIL-STD-147E
w/CHANGE 1 23 December 2013
SUPERSEDING
MIL-STD-147E
16 May 2008
DEPARTMENT OF DEFENSE
STANDARD PRACTICE
PALLETIZED UNIT LOADS
SIGNIFICANT NOTE - "PALLETIZATION IS REQUIRED FOR THESE SUPPLIES".
NOTE: THE FOLLOWING APPLIES TO ALL NON-MANUFACTURED WOOD PACKAGING MATERIALS:
"All Wood Packaging Material (WPM) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures (ISPM) 15, "Guidelines for Regulating Wood Packaging Materials in International Trade." DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo, or when wood is being acquired by DLA for future use as packaging material. WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD). All WPM shall comply with one of the following official quality control programs:
Heat Treatment (HT) or Kiln Dried Heat Treatment (KD HT) in accordance with American Lumber Standard Committee, Incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/; or
All WPM shall include certification/quality markings in accordance with the ALSC or NWPCA standards, as applicable. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible.
All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government."
PALLET SHALL BE 4 WAY ENTRY, WINGED TYPE. PALLETIZED LOAD DIMENSIONS SHALL NOT EXCEED
43 INCHES IN LENGTH, 52 INCHES IN WIDTH, AND 54 INCHES IN HEIGHT (INCLUDING THE
PALLET).
THE PALLETIZED LOAD SHALL BE BONDED USING APPROVED COMMERCIAL BONDING MATERIALS. THE
USE OF METAL BANDING, IN SECURING BOXES TO PALLETS, IS DISCOURAGED. PALLET LOADS
SHALL CONTAIN THE SAME NUMBER OF CARTONS, OF IDENTICAL QUANTITIES, OF ONE NSN, TO THE
MAXIMUM EXTENT POSSIBLE.
PALLET LOADS CONTAINING MORE THAN ONE NSN SHALL BE CLEARLY MARKED TO LIST ALL THE NSN'S CONTAINED IN THE LOAD. NO CARTON SHALL HAVE MORE THAN ONE NSN. AT THE END OF A SIZE RUN, NO MORE THAN ONE CARTON PER NSN MAY BE SHORT OR OVER THE SPECIFIED QUANTITY.
SAID CARTON SHALL BE CLEARLY MARKED "SHORT" OR "OVER".
MIL-STD-147 IS REFERENCED FOR PALLETIZED LOADS.
IN ADDITION TO REQUIREMENTS SPECIFIED ABOVE THE FOLLOWING CLAUSE ALSO APPLIES:
52.247-9012 - REQUIREMENTS FOR TREATEMENT OF WOOD PACKAGING MATERIALS (WPM) - (JULY 2006)
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO
OFFERORS:
Proposals will be evaluated for both technical merit and price reasonableness following the evaluation procedures in section “M” of this solicitation. The Attachment I has been formatted to assist you in preparing a complete technical proposal. In order to provide full consideration of your qualification for contract award, you are encouraged to ensure that the information furnished in support of your technical proposal is factual, accurate, and complete.
The Department of Defense (DoD) is committed to applying "Best Value" contracting as a means to rely on industry for timely delivery of quality products, while reducing the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .