Questions and Answers for Solicitation SPE600-17-R-0403

1. Is it possible to price the gas off a more traditional three-tiered pricing approach as the examples listed below:

Baseload: Monthly volume projections priced at the local IF index

Swing: Volumes over baseload if any priced at GD Index

Turnback: Baseload volumes not used sold back to supplier at GD index

If this option is not available, would DLA Energy consider pricing the solicitation off the local GDA vs the local IF index?

Answer: The pricing requirements remain the same unless an amendment is issued to revise them. In accordance with L-0001 L705 INSTRUCTIONS TO OFFERORS, paragraph (a), the offeror shall submit all documents required by the terms and conditions of this RFP. As stated in Note 1 of the SF1449 continuation page, all exceptions to the solicitation must be received with the initial offer. Any exceptions should clearly indicate which term or condition is being referenced, any proposed alternate language and the reason for the requested change.

This should be done on a separate, individual document.

2. Can the SIP location of El Paso San Juan for Line Item 0003-Nellis AFB be changed?

Answer: DLA Energy will consider a change to the SIP location when it is in the Government’s best interest. In accordance with L-0001 L705 INSTRUCTIONS TO OFFERORS, paragraph (a), the offeror shall submit all documents required by the terms and conditions of this RFP. As stated in Note 1 of the SF1449 continuation page, all exceptions to the solicitation must be received with the initial offer. Any exceptions should clearly indicate which term or condition is being referenced, any proposed alternate language and the reason for the requested change. This should be done on a separate, individual document.

3. Can individual line items in Tied group 1 be bid individually?

Answer: The requirements under Tied Group #1 remain the same unless an amendment is issued to revise them.

In accordance with L-0001 L705 INSTRUCTIONS TO OFFERORS, paragraph (a), the offeror shall submit all documents required by the terms and conditions of this RFP. As stated in Note 1 of the SF1449 continuation page, all exceptions to the solicitation must be received with the initial offer. Any exceptions should clearly indicate which term or condition is being referenced, any proposed alternate language and the reason for the requested change. This should be done on a separate, individual document.