About this file

The document is an Invitation for Quotes (IFQ) issued by the Alaska Department of Transportation and Public Facilities (DOT&PF) Southcoast Region for Traffic Control Services for the Juneau Egan Drive and Yandukin Intersection Signalization project. The project involves providing traffic control services to support design phase geotechnical drilling work on Egan Drive in Juneau, Alaska. The work will include seventeen test holes across multiple work zones, with short-term lane closures and varying Temporary Traffic Control (TTC) Plans. The contract is planned to commence on or about May 26, 2025, with a completion date of December 31, 2025. A traffic control crew of at least three individuals is required, including one Traffic Control Supervisor/Work Zone Safety Specialist and two certified flaggers.

The total project cost estimate is under $100,000, with payment based on crew hours for traffic control. The bid includes three line items: Traffic Control Mobilization/Demobilization ($30,000), Modified TA - Traffic Control Crew Time for 3 personnel over 10 days ($60,000), and Traffic Control Plan Development/Speed Limit Order ($1,000), totaling $91,000. The project is federally funded and requires compliance with Equal Employment Opportunity regulations, including specific minority and female participation goals. Bidders must submit various required documents, including an Alaska Business License, Quote Submittal form, and potentially a Bid Bond. Work will be scheduled during off-peak hours (9:00 am to 3:30 pm and 6:00 pm to 10:00 pm), with weekend hours potentially required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF ALASKA

DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES

SOUTHCOAST REGION

MAINTENANCE & OPERATIONS

QUOTE DOCUMENTS

PROJECT: Juneau Egan Drive and Yandukin Intersection Signalization Traffic Control Services CONTRACT NO.: SFHWY00601/SPC25253-009

Up to date and additional information is available on the web at (http://dot.alaska.gov). Under the Section called “Find it Fast!,” select DOT&PF Public Notices. Look through the section called “Procurement” for the Invitation to Quotes

AS-ADVERTISED DATE: 04/18/2025

http://dot.alaska.gov/

TABLE OF CONTENTS

Juneau Egan Drive Yandukin Intersection Traffic Control Services Project No. SFHWY00601; SPC25253-009

BIDDING AND CONTRACT REQUIREMENTS

Form SPC-001 Invitation for Quotes for A Small Procurement

Special Notice to Bidders

Form 25A-301 Federal EEO Bid Conditions

Required Documents

Form SPC-002 Quote Submittal

Form SPC-003 Notice of Award

Form SPC 003a Notice to Proceed

Form SPC-008 Offeror’s Questionnaire

Form 25D-5 Subcontractor List

Form 25D-6 Bidder Registration

Form 25A-304 EEO-1 Certification

Form 25D-60 Non-Domestic Minimal Use & De Minimis Register

Form 25D-12 Payment Bond

Form 25D-13 Performance Bond

Form 25D-14 Bid Bond

Scope of Work, April 15, 2025 (2 Pages)

Example Traffic Control Set-Ups (7 Pages)

Form SPC-001 Page 1 of 2 Revised 3-2014

DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES

INVITATION FOR QUOTES FOR

A SMALL PROCUREMENT

(CONSTRUCTION RELATED)

[per AS 36.30.320(a)]

Project Name & No.: Juneau Egan Drive and Yandukin Intersection Traffic Control Services;

SFHWY00601/SPC25253-009

Location: Juneau, Alaska

Procurement Agency and Address:

State of Alaska, DOT&PF 6860 Glacier Highway, Juneau, AK 99801, or_ P.O. Box 112506 Juneau, AK 99811-2506

Procurement Officer: Christopher Goins, P.E. Date of Issuance: 04/18/2025

DESCRIPTION OF WORK, REQUIRED COMPLETION DATE, LISTING OF ATTACHMENT:

This Federally funded contract will perform traffic control services in support of preconstruction geotechnical drilling work as defined in the scope of work. This work is in support of gathering design data. Work is estimated to commence on or about May 26, 2025. See attached Scope of Work and Approved Traffic Control plan with Map reflecting the coring and testing location. Contract expiration date is December 31, 2025. A hard copy, original bid bond is required if Basic Bid is equal or greater than $100,000. Payment and Performance Bonds will be required from the apparent low bidder if the award amount is in excess of $100,000.

This is a Federal-Aid State Funded contract. The completion date for this work is December/31/2025

The Project cost estimate is: under $10,000 $10,000 - $50,000 $50,001 - $100,000 $100,001 - $200,0001,2

1. Quotes in excess of $200,000 will be deemed non-responsive. 2. Any project in excess of $100,000 must be bonded.

Davis-Bacon Wages (Title 36.05): are are not required on this project.

The following insurance coverages are required: Workers Comp General Liability Automobile

Bonding Requirements: Any project in excess of $100,000 must be bonded.

The undersigned proposes to furnish Payment Bond in the amount of 50% and Performance Bond in the amount of 50% (of the contract), as surety conditioned for the full, complete and faithful performance of this contract. (See Bid Bond Sheet 25D-14, Payment Bond SPC-005 and Performance Bond SPC-006 forms.)

Quotes for furnishing all labor, equipment and materials and performing all work for the above Project are invited. To be eligible for consideration, quotes must be received before 2:00 pm local time on the 9th day of May, 2025. Late quotes cannot be accepted.

Disadvantaged Business Enterprises (DBE's) may submit quotes and will not be discriminated against on the grounds of race, color, national origin or sex in consideration for an Award which results from this invitation. Any errors, omissions, or questions pertaining to solicitation procedures or Project requirements, requests for additional documents, or inquiries pertaining to site conditions or scheduled visits must be made to:

Name: Mitch McDonald , at: 6860 Glacier Highway, Juneau, AK 99801 Title: Regional Engineering Geologist , Telephone: (907) 487-4454; Fax: (907) 465-3506 Applicable provisions of AS 36.30 and 2 AAC 12 govern this solicitation.

SUBMITTAL OF QUOTES: Quotes for this Project must be submitted in the manner noted below. All Offerors must familiarize themselves with the Instructions to Offerors, page 2 of this form, prior to submitting their quote.

- VERBAL QUOTES SHALL BE GIVEN TO

AT THE ABOVE NOTED TELEPHONE NUMBER, PRIOR TO THE STATED DEADLINE. (See above Bonding Requirements.)

- WRITTEN QUOTES, INCLUDING AMENDMENTS OR WITHDRAWALS, MUST BE RECEIVED PRIOR

TO THE ABOVE NOTED DEADLINE. QUOTES MUST BE SUBMITTED ON FORM SPC-002, QUOTE SUBMITTAL, ATTACHED. (See above Bonding Requirements.)

Written quotes may be submitted by Fax, hand delivered, or mailed in a sealed envelope. Confidentiality is only assured for sealed quotes. Mailed quotes must allow time for delivery and the envelope must be marked as follows:

Quote for Project:

Name: Juneau Egan Yandukin Traffic Control Services Number: SFHWY00601/SPC25253-009 Attn: Michael Brown Contracts Officer__________ Fax: 907-465-4238______________________________ Email: srdotpfcontracts@alaska.gov

Procurement Agency Address:

State of Alaska, DOT & PF______________________ 6860 Glacier Highway__________________________ Juneau, AK 99801_____________________________

Quote amendments or withdrawals must be made in writing to the individual of the Procurement Agency receiving the quotes, and must be received prior to the time for quote submittal.

mailto:Michael.brown@alaska.gov

Form SPC-001 Page 2 of 2 Revised 3-2014

DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES

INVITATION FOR QUOTES FOR

A SMALL PROCUREMENT

(CONSTRUCTION RELATED)

The State of Alaska desires that all Offerors submitting quotes on construction contracts are given a fair and equal opportunity to compete. Offerors are required to follow these instructions:

REVIEW THE PROJECT DOCUMENTS: Most construction Projects in excess of $1,000 will have some type of written documentation prepared expressly for the Work. If you are asked to submit a quote and no written information has been provided, you should ask the procurement Agency for written documentation. If the scope of services have been described to you verbally, and you are selected for Contract Award, you must ensure that the information of the services to be performed (scope of work) is put in writing prior to accepting the Contract. When providing a Quote, carefully review and consider all materials related to the solicitation and work of the contract. By submitting a quote the Offeror warrants that they are familiar with the Project requirements, have visited or otherwise examined the site, and are aware of the conditions to be encountered. Offeror's can verify the contents and completeness of their quote documents by contacting the procurement Agency individual named on the front of this form.

SUBMITTING THE QUOTE: The Quote must be submitted in one of the following formats as called for in the Invitation:

1. ORALLY - if a verbal quote is solicited, the Offeror must provide, in addition to their quote amount and mailing address -- (1) their valid Alaska Business License number, (2) if applicable, a valid Contractor's Registration number, (3) their status as an Alaskan Bidder (Offeror), (4) their intended use of Alaskan products, (5) the carrier's name and policy number for their Workers' Comp Insurance (or a statement of sole proprietorship, if applicable), and (6) the Employer (Tax) Identification Number or Social Security Number. The Procurement Agency will enter this information on the quote schedule.

2. WRITTEN - if a written quote is solicited, the Offeror must complete, in ink or typewritten, the Small Procurement Quote Submittal, Form SPC-

002. Failure to acknowledge receipt of addenda or to execute the form correctly and completely may disqualify the quote.

NOTE: The Department of Labor requires an Offeror to be licensed and registered for the required type of work prior to submitting a quote. If the procurement Agency determines the Offeror is improperly registered or licensed, their quote may be deemed nonresponsive.

SUBCONTRACTOR LISTING: Subcontractors intended to be utilized on this contract must be listed in the response to the solicitation. Work shall not be awarded to any subcontractor without prior approval from the procurement Agency. Subcontractors may be added or removed only as approved by the procurement Agency.

DETERMINATION OF THE LOWEST RESPONSIBLE QUOTE AND CONTRACT AWARD: Following receipt and determination of all responsive oral, written or sealed quotes, the procurement Agency will compare the quotes and determine the lowest Offeror. If the procurement Agency discovers a discrepancy between the unit price amount and the extended amount; the unit price amount will prevail. Conditioned quotes, unless expressly requested, will not be considered. When the quote schedule is composed of a basic amount with alternates, the procurement Agency will base its determination of the low quote and the amount of the Contract Award solely upon those quotes, basic and alternates, that are priced within the extent of available construction funds. Alternates will be considered for Award in the order listed, except that if the order of Offerors is not affected, the Award may include any combination of funded alternates, or none, as may be in the best interest of the procurement Agency.

When determining the lowest quote, the procurement Agency will also give a 5% Alaska Offeror's preference and an appropriate Alaska Products preference to quotes designating the applicability of a preference. To qualify for the Offeror's preference (per AS 36.30.170) the Offeror must (1) hold a current Alaska Business License, (2) submit the quote under the name appearing on the license, (3) have staffed and maintained a place of business within Alaska for the previous six months and (4) be incorporated or qualified to do business under the laws of the State. In addition, if the Offeror is a partnership or joint venture, all parties must meet the criteria to be eligible for the preference. A booklet fully describing the Alaska Preferences (Bidder, Offeror, Product, Disabilities, Veteran) program is available at http://doa.alaska.gov/dgs/pdf/pref2.pdf. A detailed description of the Alaska Products Preference Program is available at http://www.commerce.state.ak.us/ded/dev/prodpref/prodpref.htm.

The procurement Agency will make a determination of responsibility as required by 2 AAC 12.500. If the lowest Offeror is declared responsible, the procurement Agency will execute the Notice of Award / Notice to Proceed, Form SPC-003, and send it to the Offeror for acknowledgement. If the lowest Offeror is found to be nonresponsible, this process will be repeated with the second lowest Offeror -- and so on until the lowest responsive and responsible Offeror is determined.

NOTICE OF AWARD AND PROTEST: A written notice will be provided on all Awards exceeding $ 25,000 (2 AAC 12.400(h)). All protests must be filed with the Commissioner of the procurement Agency (or designee) and copied to the Procurement Officer. Protest procedures are described in AS

36.30.560 and 2 AAC 12.695. The extent of the protest remedy is limited to quote preparation costs (AS 36.30.585).

http://doa.alaska.gov/dgs/pdf/pref2.pdf http://www.commerce.state.ak.us/ded/dev/prodpref/prodpref.htm

Department of Transportation and Public Facilities

SPECIAL NOTICE TO BIDDERS

1. Notice to all DOTPF contractors and consultants performing work for Facilities, Highway, and Airport projects:

a. COVID-19 Management Plan. “The Governor’s emergency declaration and mandates relating to COVID- 19 expired on February 14, 2021. However, contractors are encouraged to review COVID-19 Response and Recovery Health Advisories that can be accessed at:

https://covid19.alaska.gov/health-advisories/

b. Contractors will still be required to meet any applicable local ordinances or requirements currently in effect, and comply with any future federal, state or local declarations or mandates that might be adopted while work on the project is ongoing.

c. In accordance with the General Conditions of this contract, the Contractor will be responsible for paying all costs and expenses incurred to comply with any COVID-19 Health Mandates or Health Advisories in effect during times when the Contractor is performing project-related work activities. The Contractor will additionally be responsible for preparing any general or site-specific mitigation and response plans required for its forces, along with any attendant schedule delays or impacts.”

2. Offerors must have a Vendor ID or your quote may not be accepted. More information can be obtained at the following website: http://dot.alaska.gov/aashtoware/docs/AWP-Vendor-List-Guidance.pdf.

3. Contract Price Adjustment(s). The Department will not provide cost escalation or de-escalation price adjustment for this contract, except for specific items described in the bid package at the time of bid opening.

https://covid19.alaska.gov/health-advisories/ http://dot.alaska.gov/aashtoware/docs/AWP-Vendor-List-Guidance.pdf

Form 25A-301 (03/23) Page 1 of 5

DEPARTMENT OF TRANSPORTATION AND PUBLIC

FACILITIES

FEDERAL EEO BID CONDITIONS

NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT

OPPORTUNITY (EXECUTIVE ORDER 11246)

1. The Offeror's or Bidder’s attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein.

2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Economic Area Goals for minority participation in each trade

Goals for female participation in each trade

Anchorage Metropolitan Statistical Area 8.7%

6.9% Remainder of State 15.1%

These goals are applicable to all of the Contractor's construction work (whether or not it is Federal or federally-assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction.

The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects.

The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed.

3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed.

4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is the State of Alaska.

Form 25A-301 (03/23) Page 2 of 5

STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY CONSTRUCTION CONTRACT

SPECIFICATIONS FOR ALL NON-EXEMPT FEDERAL AND FEDERALLY-ASSISTED CONSTRUCTION

CONTRACTS TO BE AWARDED IN THE STATE OF ALASKA

1. Definitions. As used in these specifications:

a. “Covered area” means the geographical area described in the solicitation from which this contract resulted;

b. “Director” means Director, Office of Federal Contract Compliance Programs (OFCCP), U.S. Department of Labor, or any person to whom the Director delegates authority;

c. “Employer identification number” means the Federal social security number used on the Employer’s Quarterly Federal Tax Return, U.S. Treasury Department Form 941.

d. “Minority” includes:

(1) Black (all persons having origins in any of the Black African racial groups not of Hispanic origin);

(2) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American, or other Spanish culture or origin, regardless of race);

(3) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and

(4) American Indian or Alaska Native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification).

2. Whenever the Contractor, or any subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the Notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this contract resulted.

3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by the U.S.

Department of Labor in the covered area, either individually or through an association, its affirmative action obligations on all work in the Plan area (including goals and timetables) shall be in accordance with that Plan for those trades which have unions participating in the Plan. Contractors must be able to demonstrate their participation in and compliance with the provisions of any such Hometown Plan. Each Contractor or subcontractor participating in an approved Plan is individually required to comply with its obligations under the EEO clause, and to make a good faith effort to each goal under the Plan in each trade in which it has employees.

The overall good faith performance by other Contractors or subcontractors toward a goal in an approved Plan does not excuse any covered Contractor’s or subcontractor’s failure to take good faith efforts to achieve the Plan goals and timetables.

4. The Contractor shall implement the specific affirmative action standards provided in paragraphs 7a through 7p of these specifications. The goals set forth in the solicitation from which this contract resulted are expressed as percentages of the total hours of employment and training of minority and female utilization the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area.

Covered construction contractors performing construction work in a geographical areas where they do not have a Federal or federally assisted construction contract shall apply the minority and female goals established for the geographical area where the work is being performed. Goals are published periodically in the Federal Register in notice form, and such notices may be obtained from any Office of Federal Contract Compliance

Form 25A-301 (03/23) Page 3 of 5

Programs office or from Federal procurement contracting officers. The Contractor is expected to make substantially uniform progress in meeting its goals in each craft during the period specified.

5. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the

Contractor has a collective bargaining agreement, to refer to either minorities or women shall excuse the Contractor’s obligations under these specifications, Executive Order 11246, or the regulations promulgated pursuant thereto.

6. In order for the nonworking training hours of apprentices and trainees to be counted in meeting the goals, such apprentices and trainees must be employed by the Contractor during the training period, and the Contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor.

7. The Contractor shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the Contractor’s compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The Contractor shall document these efforts fully, and shall implement affirmative action steps at least as extensive as the following:

a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities at which the Contractor’s employees are assigned to work. The Contractor, where possible, will assign two or more women to each construction project. The Contractor shall specifically ensure that all foremen, superintendents, and other onsite supervisory personnel are aware of and carry out the Contractor’s obligation to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities.

b. Establish and maintain a current list of minority and female recruitment sources, provide written notification to minority and female recruitment sources and to community organizations when the Contractor or its unions have employment opportunities available, and maintain a record of the organizations’ responses.

c. Maintain a current file of the names, addresses and telephone numbers of each minority and female off-the-street applicant and minority or female referral from a union, a recruitment source or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the Contractor by the union or, if referred, not employed by the Contractor, this shall be documented in the file with the reason therefor, along with whatever additional actions the Contractor may have taken.

d. Provide immediate written notification to the Director when the union or unions with which the Contractor has a collective bargaining agreement has not referred to the Contractor a minority person or woman sent by the Contractor, or when the Contractor has other information that the union referral process has impeded the Contractor’s efforts to meet its obligations.

e. Develop on-the-job training opportunities and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor’s employment needs, especially those programs funded or approved by the Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under 7b above.

f. Disseminate the Contractor’s EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the Contractor in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; by publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with all management personnel and with all minority and female employees at least once a year; and by posting the company EEO policy on bulletin boards accessible to all employees at each location where construction work is performed.

Form 25A-301 (03/23) Page 4 of 5

g. Review, at least annually, the company’s EEO policy and affirmative action obligations under these specifications with all employees having any responsibility for hiring, assignment, layoff, termination or other employment decisions including specific review of these items with onsite supervisory personnel such as superintendents, general foreman, etc., prior to the initiation of construction work at any job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and dispositions of the subject matter.

h. Disseminate the Contractor’s EEO policy externally by including it in any advertising in the news media, specifically including minority and female news media, and providing written notification to and discussing the Contractor’s EEO policy with other Contractors and Subcontractors with whom the Contractor does or anticipates doing business.

i. Direct its recruitment efforts, both oral and written, to minority, female and community organizations, to schools with minority and female students and to minority and female recruitment and training organizations serving the Contractor’s recruitment area and employment needs. Not later than one month prior to the date for the acceptance of applications for apprenticeship or other training by any recruitment source, the Contractor shall send written notification to organizations such as the above, describing the openings, screening procedures, and tests to be used in the selection process.

j. Encourage present minority and female employees to recruit other minority persons and women and, where reasonable, provide after school, summer and vacation employment to minority and female youth both on the site and in other areas of a Contractor’s workforce.

k. Validate all tests and other selection requirements where there is an obligation to do so under 41 CFR

Part 60-3.

l. Conduct, at least annually, an inventory and evaluation of all minority and female personnel for promotional opportunities and encourage these employees to seek or to prepare for, through appropriate training, etc., such opportunities.

m. Ensure that seniority practices, job classifications, work assignments and other personnel practices do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the EEO policy and the Contractor’s obligations under these specifications are being carried out.

n. Ensure that all facilities and company activities are nonsegregated except that separate or single-user toilet and necessary changing facilities shall be provided to assure privacy between the sexes.

o. Document and maintain a record of all solicitations of offers for subcontractors from minority and female construction contractors and suppliers, including circulations of solicitations to minority and female contractor associations and other business associations.

p. Conduct a review, at least annually, of all supervisors’ adherence to and performance under the Contractor’s

EEO policies and affirmative action obligations.

8. Contractors are encouraged to participate in voluntary associations which assist in fulfilling one or more of their affirmative action obligations (7a through 7p). The efforts of a contractor association, joint contractor-union, contractor-community, or other similar group of which the Contractor is a member and participant, may be asserted as fulfilling any or more of its obligations under 7a through 7p of these specifications provided that the Contractor actively participates in the group, makes every effort to assure that the group has a positive impact on the employment of minorities and women in the industry, ensures that the concrete benefits of the program are reflected in the Contractor’s minority and female work force participation, makes a good faith effort to meet its individual goals and timetables, and can provide access to documentation which demonstrates the effectiveness of actions taken on behalf of the Contractor. The obligation to comply, however, is the Contractor’s and failure of such a group to fulfill an obligation shall not be a defense for the Contractor’s noncompliance.

Form 25A-301 (03/23) Page 5 of 5

9. A single goal for minorities and a separate single goal for women have been established. The Contractor, however, is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non-minority. Consequently, the Contractor may be in violation of the Executive Order if a particular group is employed in a substantially disparate manner (for example, even though the Contractor has achieved its goals for women generally, the Contractor may be in violation of the Executive Order if a specific minority group of women is underutilized).

10. The Contractor shall not use the goals and timetables or affirmative action standards to discriminate against any person because of race, color, religion, sex, sexual orientation, gender identity, or national origin.

11. The Contractor shall not enter into any subcontract with any person or firm debarred from Government contracts pursuant to Executive Order 11246.

12. The Contractor shall carry out such sanctions and penalties for violation of these specifications and of the Equal

Opportunity Clause, including suspension, termination, and cancellation of existing subcontracts as may be imposed or ordered pursuant to Executive Order 11246, as amended, and its implementing regulations, by the Office of Federal Contract Compliance Programs. Any contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Executive Order 11246, as amended.

13. The Contractor, in fulfilling its obligations under these specifications, shall implement specific affirmative action steps, at least as extensive as those standards prescribed in paragraph 7 of these specifications, so as to achieve maximum results from its efforts to ensure equal employment opportunity. If the Contractor fails to comply with the requirements of the Executive Order, the implementing regulations, or these specifications, the Director shall proceed in accordance with 41 CFR part 60-4.8.

14. The Contractor shall designate a responsible official to monitor all employment related activity to ensure that the company EEO policy is being carried out, to submit reports relating to the provisions hereof as may be required by the Government, and to keep records. Records shall at least include for each employee the name, address, telephone numbers, construction trade, union affiliation if any, employee identification number when assigned, social security number, race, sex, status (e.g., mechanic apprentice, trainees, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that the existing records satisfy this requirement, Contractors shall not be required to maintain separate records.

15. Nothing herein provided shall be construed as a limitation upon the application of other laws that establish different standards of compliance or upon the application of requirements for the hiring of local or other area residents (e.g., those under the Public Works Employment Act of 1977 and the Community Development Block Grant Programs).

REQUIRED DOCUMENTS

Required for Quote

Quotes will not be considered if the following documents are not completely filled out/signed and submitted at the time of bidding.

1. Quote Submittal - Bidder must sign form.

2. Alaska Business License – (AS 36.30.110) - To qualify as an Alaska bidder under AS 36.30.321, a bidder shall have a valid Alaska business license at the time of quote opening. (License information;

contact State of Alaska, Department of Commerce, Community and Economic Development) (http://www.commerce.state.ak.us/occ/home.htm)

3. Bid Bond – If Basic Bid is equal to, or greater than $100,000.00

Required After Notice of Apparent Low Bidder

The apparent low bidder is required to complete and submit the following document within 5 working days after receipt of written notification.

1. Subcontractor List – AS 36.30.115

Required for Award

In order to be awarded the contract, the successful bidder must completely fill out and submit the following documents within the time specified in the intent to award letter:

1. Construction Contract

2. Payment & Performance Bonds – Required if the award amount is in excess of $100,000.00

3. Certificate of Insurance - In accordance with Appendix B Indemnity & Insurance

4. Contractors License

5. Alaska Business License – (AS 36.30.110) - (License information; contact State of Alaska, Department of Commerce, Community and Economic Development) (http://www.commerce.state.ak.us/occ/home.htm) http://www.commerce.state.ak.us/occ/home.htm http://www.commerce.state.ak.us/occ/home.htm

Form SPC-002 Page 1 of 1 03/14

DEPARTMENT OF TRANSPORTATION AND PUBLIC FACILITIES

SMALL PROCUREMENT QUOTE SUBMITTAL

(CONSTRUCTION RELATED)

[per AS 36.30.320(a)]

Project Name: Juneau Egan Drive Yandukin Intersection Traffic Control Services

Project No.: SFHWY00601; SPC25253-009

Location: Juneau, AK

Procurement Agency and Address:

AK Dept. of Transportation & Public Facilities P.O. Box 112506 6860 Glacier Highway Juneau, AK 99519

Procurement Officer: Christopher Goins, P.E., Southcoast Regional Director Date of Issuance: April 18, 2025

Date and Hour Bids are DUE:

May 9, 2025 before 2:00 PM.

QUOTE: Offerors must read all attachments to this schedule.

I have reviewed the bid documents, with addenda , and understand the scope of services and conditions required for Project No. SFHWY009; SPC25252-009. I agree to furnish all necessary labor, materials, and equipment for the above amount(s). The Work shall be accomplished in a professional manner acceptable to the Procurement Officer.

Contractor Reg. No.

Title

EIN or SSN Phone #

Contractor

Authorized Signature

Address

Business License # Offe ror to C omp lete this Port ion

Procurement Officer:

Date of Receipt of Bid:

Item No. Item Unit Approx.

Qty.

Unit Price Amount

1 Traffic Control Mobilization/Demobilization Lump Sum

All Required

Lump Sum

2 Modified TA – Traffic Control Crew Time (3 personnel) Per Day 10

3 Traffic Control Plan Development/Speed Limit Order Lump Sum

All Required

Lump Sum

Total Basic Bid

Form SPC-003 Page 1 of 3 Revised 2/17

NOTICE OF AWARD (NOA)

SMALL PROCUREMENT CONTRACT

(CONSTRUCTION RELATED)

[per AS 36.30.320]

Project Name & No.: JNU Egan Drive Yandukin Intersection Traffic Control Services, SFHWY00601/SPC25253-009 Location: Juneau, Alaska

Procurement Agency and Address:

State of Alaska Department of Transportation & Public Facilities 6860 Glacier Highway Juneau, AK 99801 srdotpfcontracts@alaska.gov

Procurement Officer's Signature: Christopher Goins, P.E. Date of Issuance:

TO: FOR: The Contractor Must Submit:

Work related to Basic Bid of:

JNU Egan Drive Yandukin Intersection Traffic Control Services , including the basic quote and alternate quote item(s):

N/A

Insurance*

Bonding*

Certified Wages*

Dept. of Labor (Notice of Work)*

Subcontractor List*

* Comments as applicable:

Your quote in the amount of submitted on May 9, 2025 , is accepted for performance of the Work described in the attached Estimate and Scope of Work, which are a part of this Contract.

The Contractor must sign, date, and return this document to the procurement address shown above.

The Procurement Officer will then sign and return a copy to the Contractor, and the Award will be deemed made. The Work of this contract may not commence until the Notice to Proceed (NTP) is issued.

Contractor's Signature of Contract Award Acceptance: Date :

NOTICE TO UNSELECTED OFFERORS ON PROJECTS OVER $50,000

In accordance with the protest rights afforded under 2 AAC 12.400(d)(2)(B) & (3), a copy of this Notice of Award is hereby provided to those individuals and businesses who submitted a response to the initial solicitation on which this award is made.

mailto:srdotpfcontracts@alaska.gov

Form SPC-003 Page 2 of 3 Revised 2/17

NOTICE OF AWARD (NOA)

GENERAL CONDITIONS

[Construction Procurement under AS 36.30.320]

These terms, conditions and requirements apply to the Contract Documents describing the Work for the Project. If any provision of these Contract Documents is declared by a court to be illegal or in conflict with any law, the validity of the remaining provisions and the ensuing rights and obligations of the Parties to the contract shall not be affected.

Whenever used in these Contract Documents, the following terms shall have the indicated meaning. Any term not so defined shall have its ordinary meaning.

• Approved or Approval - means written approval by the Procurement Officer or authorized representative.

• Award - means the written acceptance of the lowest responsive and responsible quote by the Procurement Agency.

• Contract Documents - includes the Invitation for Quotes for a Small Procurement, Form SPC-001 (with Instructions - if issued), the Notice of

Award / Notice to Proceed, Form SPC-003, any addenda, written changes, or attachments as noted in the description of the Work.

• Procurement Officer - the person authorized to enter into and administer the contract on behalf of the Procurement Agency.

• Parties to the Contract - includes the Procurement Agency, the owner Agency representing the State of Alaska, and the Contractor, being the entity contracting with the owner Agency for performance of the Work.

• Project - the total construction, of which the Work performed under the Contract is the whole or part.

• Project Manager - the Procurement Officer's authorized representative, responsible for Contract administration.

• Work - is the act of, and the result from, performing services, furnishing labor, furnishing and incorporating materials and equipment into the Project and performing other duties and obligations, all as required by the Contract Documents.

1. The Procurement Officer (or authorized representative) has the authority to make findings, determinations and decisions with respect to the contract;

to Approve materials, Work and payment therefore; and to modify or terminate the contract on behalf of the Procurement Agency.

2. The Contractor shall have sole responsibility for the means, methods, sequences, or procedures of construction and safety precautions related to the

Project. The Contractor shall conduct all Work in such a manner that protects the public and State resources.

3. The Contractor must comply with all applicable laws, regulations, codes, ordinances and written directives issued by the Procurement Officer. In addition, the Contractor must obtain applicable licenses and permits; provide supervision, labor, tools, and new materials (except as may otherwise be provided by the Procurement Agency); and utilize Alaska Products and Wood Products when applicable (see AS 36.05.010 & AS 36.30.322).

4. The Contractor shall not award Work to any subcontractor without prior Approval from the Procurement Officer.

5. The Procurement Agency reserves the right to make written changes to the Contract Documents for modifications within the general scope of the

Work.

6. Any act or occurrence, be it a result of an emergency, differing site condition or change order, which may form the basis of a claim for a price or time adjustment must be reported immediately to the Procurement Officer.

7. The Department of Labor and Workforce Development, Wage and Hour Administration, must be notified in accordance with AS 36.05.010 and AS 36.05.030 if the resulting contract for repairs or construction exceeds $25,000. The Contractor must comply with the requirements noted within the Department of Labor packet entitled, "Laborers' & Mechanics' Minimum Rates of Pay." To obtain a copy of the referenced packet, contact the Procurement Agency or the Department of Labor.

8. The primary contractor working on public construction projects with an amount of $25,000 or more must file a Notice of Work and pay a one percent fee based on the estimated value of work performed by the prime contractor and one percent of the value of each subcontractor’s price, to the Department of Labor and Workforce Development, Wage and Hour Administration (DOLWD) The maximum fee is $5,000.00. The notice and fees must be filed with the DOLWD before work commences on the project.

Upon completing the construction project, the primary contractor must file a Notice of Completion (NOC) and make payment of any additional fees due to increases in the contract amounts due the primary contractor. The Notice of Work and Notice of Completion forms are available at:

http://www.labor.state.ak.us/lss/lssforms.htm

9. The Contractor shall indemnify, save harmless, and defend the Procurement Agency, its agents and its employees in accordance with Appendix B1 below. Furthermore, the Contractor shall, prior to the Award of the contract, provide proof of Workmen's Compensation, General Liability, and Automobile Insurance in amounts as applicable under Appendix B1. These coverages shall remain in force for the duration of the Contract.

10. The Contractor shall remedy all defects in materials or workmanship that develop within a period of one year from the date of final payment.

11. The Procurement Agency will make final payment to the Contractor following approval of completion of all Work and the Contractor's submittal of all releases, warranties, record documents, permits and invoices. Liens or other claims relating to the Project may be withheld from final payment if written notice is first given to the Contractor. Acceptance of the final payment will constitute the Contractor's waiver to future claims.

12. Any dispute arising out of this Contract, which cannot be satisfactorily remedied by the Parties to the Contract, shall be resolved under

AS 36.30.620 - 699.

http://www.labor.state.ak.us/lss/lssforms.htm

Form SPC-003 Page 3 of 3 Revised 2/17

APPENDIX

INDEMNITY AND INSURANCE

Article 1. Indemnification The Contractor shall indemnify, hold harmless, and defend the contracting agency from and against any claim of, or liability for error, omission or negligent act of the Contractor under this agreement. The Contractor shall not be required to indemnify the contracting agency for a claim of, or liability for, the independent negligence of the contracting agency. If there is a claim of, or liability for, the joint negligent error or omission of the Contractor and the independent negligence of the Contracting agency, the indemnification and hold harmless obligation shall be apportioned on a comparative fault basis. “Contractor” and “Contracting agency”, as used within this and the following article, include the employees, agents and other contractors who are directly responsible, respectively, to each. The term “independent negligence” is negligence other than in the Contracting agency’s selection, administration, monitoring, or controlling of the Contractor and in approving or accepting the Contractor’s work.

Article 2. Insurance Without limiting Contractor's indemnification, it is agreed that Contractor shall purchase at its own expense and maintain in force at all times during the performance of services under this agreement the following policies of insurance. Where specific limits are shown, it is understood that they shall be the minimum acceptable limits. If the Contractor's policy contains higher limits, the state shall be entitled to coverage to the extent of such higher limits. Certificates of Insurance must be furnished to the Contracting Officer prior to beginning work and must provide for a notice of cancellation, nonrenewal, or material change of conditions in accordance with policy provisions. Failure to furnish satisfactory evidence of insurance or lapse of the policy is a material breach of this contract and shall be grounds for termination of the Contractor's services. All insurance policies shall comply with, and be issued by insurers licensed to transact the business of insurance under AS 21.

2.1 Workers' Compensation Insurance: The Contractor shall provide and maintain, for all employees engaged in work under this contract, coverage as required by AS 23.30.045, and;

where applicable, any other statutory obligations including but not limited to Federal U.S.L. & H.

and Jones Act requirements. The policy must waive subrogation against the State.

2.2 Commercial General Liability Insurance: covering all business premises and operations used by the Contractor in the performance of services under this agreement with minimum coverage limits of $300,000 combined single limit per claim.

2.3 Commercial Automobile Liability Insurance: covering all vehicles used by the Contractor in the performance of services under this agreement with minimum coverage limits of $300,000 combined single limit per claim.

Form SPC-003a Page 1 of 1 08/03

NOTICE TO PROCEED (NTP)

[per AS 36.30.320]

Project Name & No.: JNU Egan Drive Yandukin Intersection Traffic Control Services, SFHWY00601/SPC25253-009 Location: Juneau, Alaska

Procurement Agency and Address:

State of Alaska Department of Transportation & Public Facilities 6860 Glacier Highway Juneau, AK 99801 srdotpfcontracts@alaska.gov

Procurement Officer's Signature: Christopher Goins, P.E. Date of Issuance:

TO:

You have successfully met the requirements for submittal of all contract documents to the Procurement Agency and Dept. of Labor and Workforce Development related to the subject Project.

Upon receipt of this document, the Contractor may begin work on the subject project, in accordance with the terms of the contract. The Work of this contract must commence within 10 calendar days following the date of signature by the Procurement Officer, shown above (i.e., the effective date of the Contract) and all Work of the Contract must be complete on or before December 31, 2025.

Contractor's Signature of Acknowledgment: Date :

mailto:srdotpfcontracts@alaska.gov

Form SPC-008 Page 1 of 2 03/14

SMALL PROCUREMENT

OFFEROR’S QUESTIONNAIRE

Project Number: SFHWY00601/SPC25253-009

Project Name:

Juneau Egan Yandukin Traffic Control Services

Project Location: Juneau, Alaska

A. FINANCIAL

1. Have you ever failed to complete a contract due to insufficient resources?

Yes ☐ No ☐ If yes, explain: __________________________

2. Describe any arrangements you would make to finance this work: ___________________

B. EQUIPMENT

1. Describe the equipment you have available and would use for this project.

ITEM QUAN. MAKE MODEL

SIZE/

CAPACITY

PRESENT

MARKET VALUE

Form SPC-008 Page 2 of 2 03/14

1. What percent of the total value of this contract would you subcontract?

2. Would you purchase any equipment for use on this project: Yes No If yes, describe type, quantity, and approximate cost:

3. Would you rent any equipment for this work? Yes No If yes, describe type, quantity, and approximate cost:

4. Is your proposal based on firm offers for all materials for this project? Yes No If no, please explain:

C. EXPERIENCE

1. Have you had previous construction contracts or subcontracts with the State of Alaska?

Yes No

Describe the most recent or current contract, its completion date, and scope of work:

2. List, as an attachment to this questionnaire, other construction projects you have completed;

the dates of completion, scope of work, and total contract amount for each project completed in the past 12 months.

I hereby certify that the above statements are true and complete.

Name of Respondent

Signature Date

Name and Title of Person Signing

Form 25D-5 (10/12) Page 1 of 2

SUBCONTRACTOR LIST

Juneau Egan Yandukin Traffic Control Services; SFHWY00601/SPC25253-009 Project Name and Number

The apparent low bidder shall complete this form and submit it so as to be received by the Contracting Officer prior to the close of business on the fifth working day after receipt of written notice from the Department.

Failure to submit this form with all required information by the due date will result in the bidder being declared nonresponsive and may result in the forfeiture of the Bid Security.

Scope of work must be clearly defined. If an item of work is to be performed by more than one firm, indicate the portion or percent of work to be done by each.

Check as applicable: [ ] All Work on the above-referenced project will be accomplished without subcontracts greater than ½ of 1% of the contract amount.

or [ ] Subcontractor List is as follows:

LIST FIRST TIER SUBCONTRACTORS ONLY

FIRM NAME,

ADDRESS,

PHONE NO.

AK BUSINESS LICENSE NO.,

CONTRACTOR'S

REGISTRATION NO.

SCOPE OF WORK TO

BE PERFORMED

CONTINUE SUBCONTRACTOR INFORMATION ON REVERSE

For projects with federal-aid funding, I hereby certify Alaska Business Licenses and Contractor registrations will be valid for all subcontractors prior to award of the subcontract. For projects without federal-aid funding (State funding only), I hereby certify the listed Alaska Business licenses and Contractor’s registrations were valid at the time bids were opened for this project.

Signature of Authorized Company Representative

Title

Company Name

Company Address (Street or PO Box, City, State, Zip)

Date Phone Number

Form 25D-5 (10/12) Page 2 of 2

FIRM NAME,

ADDRESS,

PHONE NO.

AK BUSINESS LICENSE NO.,

CONTRACTOR'S

REGISTRATION NO.

SCOPE OF WORK TO

BE PERFORMED

Form 25D-6 (06/22)

Civil Rights Office – DBE Program

BIDDER REGISTRATION

All firms are required to submit a Bidder’s Registration form before an Alaska Department of Transportation and Public Facilities (DOT&PF) project can be awarded.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .