Amendment 0003 DR-GOES 05SEP25.pdf
PDF 5 MB Posted
- Attached to
- Domain Refined Grain Oriented Electrical Steel (DR-GOES) Federal contract opportunity
- Solicitation number
- SP8000-25-R-0018
- Issued by
- Defense Logistics Agency
About this file
This appears to be an Adobe PDF portfolio loading screen recommending users open the document using Acrobat X or Adobe Reader X (or later versions). The page displays the Adobe PDF logo, a recommendation to download Adobe Reader, and a gray "Get Adobe Reader Now!" button. The image is designed in red and white colors with a stylized document graphic featuring the Adobe PDF logo.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0003 Solicitation DR-GOES - SP8000-25-R-0018.pdf | ||
| Amend 0003 Attachment 3 - Redacted JA - DR-GOES_Redacted.pdf | ||
| Amend 0003 Attachment 2 - SOW_GOES.pdf | ||
| Amend 0003 Attachment 1 - Section B - DR-GOES.docx | DOCX document | |
| SF30 Amendment 0002 DR-GOES 26AUG25.pdf | ||
| SF30 Amendment 0001 DR-GOES 14AUG25.pdf | ||
| Attachment 3 - Redacted JA - DR-GOES.pdf | ||
| Attachment 2 - Statement of Work - DR-GOES.pdf | ||
| Attachment 1 - Section B - DR-GOES.pdf | ||
| Solicitation DR-GOES - SP8000-25-R-0018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Section B: Schedule of Supplies/Services
Domain Refined Grain Oriented Electrical Steel (DR-GOES)
B. SUPPLIES OR SERVICES AND PRICES/COSTS
ITEM DESCRIPTION: Domain Refined Grain Oriented Electrical Steel (DR-GOES) as described in Statement of Work (SOW) and below tables. In accordance with the SOW, the Contractor shall source, package, and deliver the awarded quantity of DR-GOES to the DLA Strategic Materials Depot in Hammond, Indiana. Pricing under this CLIN shall be reflective of all work to be performed under the SOW.
Table #1: Pricing
Schedule
CLIN
Material Code
Quanity
Unit of Issue
Unit Price
Year 1 (12-Months)
9640-N30000533
2,024 – 8,130
Net Ton
8,131 -10,331
Net Ton
10,332 - 15,282
Net Ton
Schedule
CLIN
Material Code
Quanity
Unit of Issue
Unit Price
Year 2 (12-Months)
9640-N30000533
2,024 – 8,130
Net Ton
8,131 -10,331
Net Ton
10,332 - 15,282
Net Ton
Schedule
CLIN
Material Code
Quanity
Unit of Issue
Unit Price
Year 3 (12-Months)
9640-N30000533
2,024 – 8,130
Net Ton
8,131 -10,331
Net Ton
10,332 - 15,282
Net Ton
Schedule
CLIN
Material Code
Quanity
Unit of Issue
Unit Price
Year 4 (12-Months)
9640-N30000533
2,024 – 8,130
Net Ton
8,131 -10,331
Net Ton
10,332 - 15,282
Net Ton
Schedule
CLIN
Material Code
Quanity
Unit of Issue
Unit Price
Year 5 (12-Months)
9640-N30000533
2,024 – 8,130
Net Ton
8,131 -10,331
Net Ton
10,332 - 15,282
Net Ton
Table #2: Estimated Annual Quantities (Net Tons)
Year 1
Year 2
Year 3
Year 4
Year 5
2,024
15,282
13,549
12,020
10,665
APPLICABLE TO ALL CLINS
1. Forecasted purchase volumes for the upcoming calendar year will be provided to the contractor no later than September 30th of the current calendar year.
2. The Government is permitted a volume variance of up to 10% below the confirmed annual volume, with no allowance exceeding the confirmed volume without the contractor’s written approval.
3. Delivery Order Pricing: The Unit Pricing in Table 1 will remain valid for all issued Delivery Orders.
4. The quantities in Table 2 are estimates and DO NOT reflect the quantity likely to be ordered. Additionally, these quantities will likely change throughout the life of the IDIQ ordering period. The Government is only required to meet the guaranteed minimum established under this IDIQ.
3. Price Reasonableness Determination: The Government will evaluate the contractor’s proposed pricing using appropriate price analysis techniquies, including but not limited to:
· Comparison to historical prices paid for similar items
· Comparison to Independent Goverment Cost Estimate (IGCE)
· Comparison to current market prices
· Detailed Cost Breakdowns with invoices if applicable
· Price Producer Index PCU33123312 will be used for negotiations
4. Additional Notes:
SUPPLIES/SERVICES: 9640- N30000533
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
FOB: DESTINATION
DELIVERY: 24 months after date of delivery order issuance
PREP FOR DELIVERY: Packaging and labeling shall be in accordance with Section 10 and Section 11 of the Statement of Work (SOW).
SB0844
DLA- STRATEGIC MATERIALS HAMMOND
3200 Sheffield Ave
HAMMOND IN 46327-1003
US
SOURCE SELECTION INFORMATION -- SEE FAR 2.101 AND 3.104 2
Statement of Work
High Permeability Domain-Refined Grain Oriented Electric Steel (DR-GOES/GOES)
1. INTRODUCTION
This is a supply contract to provide high-permeability, domain-refined grain-oriented electric steel (DR-GOES). DR-GOES, considered a type of silicon steel, is a very thin form of steel that is considered a specialty metal per DFARS 252.225-7009, due to the silicon content exceeding 0.60%. DR-GOES is primarily used as the core material of power transformers.
2. BACKGROUND
The Defense Logistics Agency (DLA) Strategic Materials received authority to procure DRGOES in the fiscal year (FY) 2024 Consolidated Appropriations Act and anticipates additional appropriations over the upcoming 5 years. The Government intends to store this material for an extended period; thus the material shall have a form and packaging conducive to long term storage in an enclosed Government warehouse.
3. SCOPE OF WORK
DLA Strategic Materials intends to purchase up to 53,450 Net Tons of DR-GOES with estimated quantities shown in Table 1 over the course of a five-year ordering period. The material is produced in very thin sheets and rolled into a coil not exceeding ~ 6 Net Tons at the supplier. Therefore, DR- GOES will be supplied by the contractor in coil form, fully tested per the contractor’s Sampling Plan, palletized, and packaged to prevent any environmental or handling damage.
Table 1: Estimated planned procurement quantities and schedule for DR-GOES Year Quantity (Net Tons)
CLIN 1: Year 1 (12 months) 2,024
CLIN 2: Year 2 (12 months) 15,282
CLIN 3: Year 3 (12 months) 13,549
CLIN 4: Year 4 (12 months) 12,020
CLIN 5: Year 5 (12 months) 10,665
TOTAL 53,540
*Total quantity +/- 1.0%
Source Selection Information -- See FAR 2.101 and 3.104 2
** The Table 1 quantities are estimates only, which may change throughout the life of the contract. The government is only bound to the guaranteed minimum established under the contract.
4. DELIVERY SCHEDULE
The delivery schedule will be in accordance with the timelines as stated in the Delivery Order
(DO).
5. REFERENCE
The following are incorporated by reference:
a) Harmonized Tariff Schedule, the Tariff Act of 1930, and the Trade Act of
b) United States (US) Customs and Border Protection (CBP) Form 7501
c) US CBP Form 6059, General Declaration
d) US CBP Form 5106 (Request for Importer Number, or Notification of Importer Number)
6. TECHNICAL REQUIREMENTS
DLA Strategic Materials shall be supplied a high permeability, domain-refined GOES grade that at a minimum, meets the requirements laid out in Table 2.
Table 2. DR-GOES Minimum Requirements.
Property Range Maximum Core Loss, 50 Hz, 1.5T (W/lb.) 0.280 Minimum Peak Permeability at 10 Oe (H10 Perm)
1.875
Minimum Stacking Factor (%) 93 Nominal Thickness (in.) 0.008-0.0098
6.1. The coils of DR-GOES provided shall have a minimum width of 35.5 inches
6.2. The coils of DR-GOES provided shall have a maximum inside diameter of 20 inches
6.3. The coils of DR-GOES provided shall have a protective coating that meets
ASTM A976 C-5.
6.4. The individual coils of DR-GOES provided shall be a maximum packed weight of 12,500 pounds, including all packaging material.
6.5. There will be a maximum of three (3) welds for the DR-GOES coils provided.
Source Selection Information -- See FAR 2.101 and 3.104 3
6.6. The total delivered weight of material shall have a maximum acceptable quantity variance of +/- 1% of the awarded material weight.
7. CERTIFICATES OF ANALYSIS:
7.1. The Contractor shall provide a Certificate of Analysis (COA) for each coil of
DR-GOES shipped.
7.2. The COA is a legal document, which attests that the material delivered by the
Contractor satisfies the requirements stated in the (Statement of Work) SOW.
The Government will determine based on the COA if the material should be accepted. The Contractor shall carefully sample and test the material to ensure the reliability of each submitted COA.
7.3. The COAs shall be provided by email in the Adobe Acrobat PDF (portable document format) format to the Quality Assurance Specialist (QAS) for review and acceptance prior to shipment of any coil(s) to the point of delivery. No other types of PDF formats will be accepted. The email address for submitting the COAs will be designated in the Contract.
7.4. The COA shall have a statement certifying that the material meets and or exceeds the material specifications of this SOW.
7.5. The Contractor shall send each COA to the QAS for review and acceptance prior to the shipment of each coil. The COA is a legal document which attests that the material delivered by the Contractor satisfies the specifications stated in the statement of work (SOW).
7.6. The Government will review every COA for each coil and advise the contractor if they are permitted to deliver the material. The QAS will notify the Contractor of the acceptability/unacceptability of each COA within fourteen (14) calendar days after receipt of each COA.
7.7. The Contractor shall not ship any coil of material prior to the review and acceptance of each submitted COA by the QAS.
7.8. The COA and all other documents the Contractor submits to the Government shall be in English.
7.9. The contractor shall submit a sample COA with their proposal.
7.10. The Contractor shall include, at a minimum, the following in each COA.
a) Heat number.
b) Weight and number of pieces the COA covers.
c) List of tests performed, and the methodology applied. Include significant assumptions, other than the standard instrumental/procedural assumptions, involved with the reported value as a footnote to the reported value. (i.e.
Material production process involves calcination of material.)
d) Numerical results and qualitative results.
e) Error ranges/limits for results.
Source Selection Information -- See FAR 2.101 and 3.104 4
f) Specifications/requirements.
g) Name of the company or name of the laboratory performing the analysis included on letterhead of the laboratory reporting the data.
h) Date analysis is performed.
i) Printed name and signature of the Quality Manager.
8. SAMPLING AND TESTING:
The Government will verify the material the Contractor intends to deliver, or delivers, to the Government meets the specifications set forth Section 6 – Technical Requirements of this SOW.
If the material does not meet the specifications set forth in Section 6 – Technical Requirements, the Government will reject the material as a non-compliant contract deliverable.
8.1. Sampling.
8.1.1. Performance of all samplings operations associated with this SOW shall occur within the Continental United States (CONUS). The Contractor shall ensure no Government material or samples of Government material leave CONUS.
8.1.2. The Contractor shall submit a Sampling Plan to the COR for approval no later than thirty (30) days prior to the start of sampling operations.
8.1.3. The Contractor shall not make any changes to their Sampling Plan without the explicit written approval of the KO. If the Contractor elects to make changes to its Sampling Plan, the Contractor shall submit a complete and revised proposed Sampling Plan to the COR no less than thirty (30) calendar days subsequent to the Contractor’s intent to employ the revised sampling operations. The KO will advise the Contractor whether or not the revised Sampling Plan is acceptable within seven
(7) calendar days of receipt of the revised Sampling Plan.
8.1.4. The Contractor’s Sampling Plan shall include, at a minimum, the following:
a) A detailed description of the sampling process (i.e. individual sampling collection process, preparation of aggregate sample, sample splitting, additional sample preparation (i.e. pulverization), estimated time for completing each coil’s sampling process, etc.);
b) Sample size;
c) Citation of national or international sampling standards the Contractor applies to their sampling processes and/or description of industry-accepted sampling processes.
8.1.5. The Contractor shall provide the QAS with written notice of the date(s) the Contractor intends to begin sampling operations of material it intends to deliver to the Government, a minimum of thirty (30) business days prior to that date.
8.1.6. To verify each sample set complies with the Contractor’s final Sampling Plan, the Government will witness the Contractor’s sampling operations for each coil that the Contractor intends to deliver to the Government. The Government may waive this requirement, temporarily or permanently, at
Source Selection Information -- See FAR 2.101 and 3.104 5 any time. The Contractor shall permit the Government full access to all areas where the Contractor’s sampling operations take place. The Government will reject material as a non-compliant deliverable if the Contractor does not comply with the Sampling Plan.
8.1.7. The Contractor shall only deliver coils of material to the Government where the Government has witnessed sampling operations (unless the Government waives this requirement temporarily or permanently), and the Government has determined the Contractor’s sampling operations comply with the Sampling Plan. The Government will advise the Contractor whether or not their sampling operations are in compliance with the Sampling Plan no later than seven (7) calendar days after witnessing the sampling operations.
8.1.8. The Contractor shall provide the Government with a set of samples for each coil of material the Contractor delivers to the Government – a government sample, an analytical sample, and a reserve sample (laboratory reserve).
The Contractor shall ensure each sample in the set of samples is equivalent in size and properties. The Contractor shall also ensure each coil’s sample set is representative of the coil of material in properties.
8.1.9. The Contractor shall maintain and document chain of custody of both the analytical and reserve samples for each coil of material. The Contractor shall also document any transfer of physical custody of either or both the analytical and reserve samples, while maintaining legal custody of both those samples. The Contractor shall supply all chain of custody documents to the Government within seventy-two (72 hours) of the Government’s request for chain of custody documents.
8.1.10. The Contractor shall ship the Government’s sample with each coil of material the Contractor delivers to the Government.
8.1.11. The Contractor shall be responsible for the final disposition of each coil’s analytical and reserve samples, if any remains and once the Government returns physical custody of both to the Contractor. The Contractor shall comply with all federal, state, and local laws, rules, and regulations concerning material disposal.
8.1.12. The Government reserves the right to employ a third-party entity to collect samples. The Contractor shall permit the Government’s third-party full access to all areas where the Contractor’s sampling operations take place.
The Government will reject material as a non-compliant deliverable if the Contractor does not comply with the Sampling Plan.
8.2. Testing.
8.2.1. Performance of all testing operations associated with this SOW shall occur within the Continental United States (CONUS). The Contractor shall ensure no Government material or samples of Government material leave CONUS.
8.2.2. The Contractor shall submit a Testing Plan to the COR for approval no later than thirty (30) days prior to the start of testing operations.
Source Selection Information -- See FAR 2.101 and 3.104 6
8.2.3. The Contractor shall not make any changes to their Testing Plan without the explicit written approval of the KO. If the Contractor elects to make changes to its Testing Plan, the Contractor shall submit a complete and revised proposed Testing Plan to the COR no less than thirty (30) calendar days subsequent to the Contractor’s intent to employ the revised testing operations. The KO will advise the Contractor whether or not the revised Testing Plan is acceptable within seven
(7) calendar days of receipt of the revised Testing Plan.
8.2.4. The Contractor’s Testing Plan shall include, at a minimum, the following:
a) Sample size for each test/analysis;
b) Sample preparation procedure;
c) Cite and describe each testing/analytical standard used in their analyses;
d) Brief description of each analytical method the Contractor employs in their Testing Plan.
8.2.5. The Contractor shall provide the QAS with written notice of the date(s) the Contractor intends to begin testing operations of material it intends to deliver to the Government, a minimum of thirty (30) business days prior to that date.
8.2.6. To verify Contractor’s compliance with the Testing Plan, the Government will witness the Contractor’s testing operations for each coil thatthe Contractor intends to deliver to the Government. The Government may waive this requirement, temporarily or permanently, at any time.
8.2.7. The Contractor shall permit the Government full access to all areas where the Contractor’s testing operations take place. The Government will reject material as a non-compliant deliverable if the contractor does not comply with the Testing Plan.
8.2.8. The Contractor shall test a sample that is representative of each coil, generating data that demonstrates the coil meets or exceeds the requirements set forth in Section 6 – Technical Requirements of this SOW, and report that data to the Government in its COA for each coil.
8.2.9. The Contractor shall only deliver material to the Government where the Government has witnessed testing operations (unless the Government waives this requirement temporarily or permanently) and the Government has determined the Contractor’s testing operations comply with the Testing Plan. The Government will advise the Contractor whether or not their testing operations are in compliance with the Testing Plan no later than seven (7) calendar days after witnessing the testing operations.
8.2.10. The Government reserves the right to employ a third-party entity to test the material the Contractor intends to deliver to the Government. The Government will reject material as a non-compliant deliverable if the results of the third-party demonstrate the Contractor’s material is non-compliant with Section 6 – Technical Requirements of this SOW.
Source Selection Information -- See FAR 2.101 and 3.104 7
9. ENVIRONMENTAL, SAFETY, AND OCCUPATIONAL HEALTH
REQUIREMENTS
9.1. Transporting, Handling, and Management
9.1.1. The Government shall ensure compliance with all federal, state, and local regulations (international laws, as applicable) for the use, transport, emergency response, and disposal of the acquired material.
9.1.2. The Contractor shall ensure compliance with the Department of Transportation (DOT) regulations by certifying hazardous materials are properly classified, described, packaged, marked, and labeled and are in a condition safe to transport the material. (49 CFR 173)
9.1.3. The Contractor shall ensure compliance with the Occupational Safety and Health Administration (OSHA) regulations regarding the proper management, handling, storage, transportation, and disposition of material.
(29 CFR 1910)
9.1.4. The Contractor shall communicate the hazards of the material by providing the Safety Data Sheet (SDS) in accordance with The United Nations Globally Harmonized System of Classification and Labeling of Chemicals
(GHS). (29 CFR 1910)
9.1.5. The Contractor shall ensure compliance with the Environmental Protection Agency (EPA) regulations for the characterizing waste to determine appropriate disposal of material and any associated packing and shipping material. (40 CFR 260)
9.1.6. The Contractor shall ensure compliance with Strategic Materials’ Environmental, Safety, and Occupational Health (ESOH) Depot Orientation Guide and ESOH Policy Statement available on Strategic Materials website:
https://www.dla.mil/Strategic-Materials/ .
10. PACKAGING
10.1. The Contractor shall submit a Packaging Plan to the QAS for approval no later than thirty (30) days prior to shipment of material.
10.2. The Contractor shall not make any changes to their Packaging Plan without the explicit written approval of the KO. No packaging shall be utilized that has not been pre-approved for use under this SOW by the Government in writing. If the Contractor elects to make changes to its Packing Plan, the Contractor shall submit a complete and revised proposed Packaging Plan to the QAS no less than sixty (60) calendar days subsequent to the Contractor’s intent to employ the revised packaging operations. The KO will advise the Contractor whether or not the revised Packaging Plan is acceptable within thirty (30) calendar days of receipt of the revised Packaging Plan.
10.3. The Contractor’s Packaging Plan shall satisfy and provide detailed descriptions, at a minimum, the following:
Source Selection Information -- See FAR 2.101 and 3.104 8
a) A moisture resistant barrier that fully encapsulates each coil of material shall be installed over each coil. This barrier shall resist the ability of moisture to come in contact with the coil of material contained within the barrier. Each coil of material will meet specifications at time of delivery.
Contractor does not guarantee that degradation will not occur during storage and recommends that this material be stored in a temperature and humidity-controlled environment in order to limit rust.
b) A visible moisture indicating mechanism/device shall be contained within the moisture resistant barrier. This mechanism/device shall indicate the level of moisture within the barrier and be located within the barrier in such a way as to be legible from outside of the barrier.
c) A moisture absorbing system (e.g. desiccant bags, etc.) shall be contained within the moisture resistant barrier that has the ability to absorb moisture within the barrier.
d) Banding and/or other components shall be installed to prevent the coil from unwinding.
e) Internal and external protective packaging materials shall be installed that protect the moisture resistant barrier and the coil of material from damage.
f) A pallet that satisfies the requirements of paragraph 12 of this SOW shall be used.
g) Labels/tags that satisfy the requirements of paragraph 13 of this SOW shall be used.
10.4. The total weight of all material, packaging, labeling and pallet shall not exceed 12,500 pounds per pallet.
10.5. The total height of all material, packaging, labeling and pallet shall not exceed 48” in height.
10.6. No packaging shall be utilized that has not been pre-approved for use under this SOW by the Government. The use of used, recycled, repaired, remanufactured and/or refurbished packaging will not be acceptable.
10.7. The Contractor shall package all material in accordance with the approved Packaging Plan. Upon delivery, all packaging shall be intact and shall be free of damage.
10.8. Coils of material shall be placed onto new undamaged pallets meeting the specifications listed below and be secured to the pallet and/or otherwise provided with protection to prevent coil movement during handling, transportation, or other operations where coils and/or personnel could be damaged and/or injured if the coils shift. The Contractor shall submit detailed design drawings and manufacturer’s certifications for all pallets proposed for use under this SOW for review and approval by the QAS prior to their utilization. No pallets shall be utilized that have not been pre-approved for use
Source Selection Information -- See FAR 2.101 and 3.104 9 under this SOW by the Government. The use of used, recycled, repaired, remanufactured and/or refurbished pallets will not be acceptable.
10.9. A pallet is defined as a wooden platform upon which material may be stored, packaged, and transferred/transported upon.
10.10. Wooden Pallet Design. All pallets shall:
a) Be 32", 37", 42", or 47" in size.
b) Contain two (2) full length, 4” X 6” solid stringers with 21” between.
c) Contain “top decking” boards. All decking boards shall be ¾ inches in thickness and be solid.
d) Be of a “two-way entry” configuration.
e) May be reversible in design.
f) Have a minimum rated load capacity of greater than 750 pounds per square foot.
10.11. Wooden Pallet Construction. All pallets shall:
a) Satisfy the requirements listed in ASTM D6199-18a.
b) Be constructed entirely (except fasteners) of high-density hardwood meeting the requirements of paragraph 6 of ASTM D6199-18a. Only high density hardwood species categorized in “Group IV” of ASTM D619918a shall be acceptable for pallet construction. The only acceptable high density hardwood species used for pallet construction are Beech, Birch, Hackberry, Hard Maple, Hickory, Oak (Eastern), Pecan, Rock Elm, American Elm, White Oak and Green Oak. Pallets may be constructed by mixing together or using different high density hardwood species listed above interchangeably.
c) Satisfy the requirements listed in ISPM-15 (International Standards for Phytosanitary Measures Number 15) (e.g., heat treated etc.).
d) Be constructed using only driven nails that are “helically” threaded, “Annularly” threaded or “fluted.” The fastener length shall be sufficient to provide a minimum penetration of 1 ¼ inches into the stringer.
10.12. A copy of the Safety Data Sheet (SDS) for all materials shall be provided external to the packed material with each coil delivery. In accordance with The Hazard Communication Standard (HCS) (29 CFR 1910.1200(g)), the SDS shall contain the chemical name and concentration or concentration range of all ingredients which are classified as health hazards and are: present above their cut-off/concentration limits or present a health risk below the cutoff/concentration limits. The SDS shall be in English.
Source Selection Information -- See FAR 2.101 and 3.104 10
11. LABELING
11.1. All packaged coils of material shall be identified with attached tags(s)/label(s) that satisfy the below requirements:
a) The font size utilized to enter the required information on each tag/label shall be of sufficient size to be legible by an unaided eye.
b) All information on tag(s)/label(s) shall be in English.
c) Any ink used to print tags/labels shall be indelible, permanent, and suitable for use in unheated warehouses where temperature extremes (both hot and cold) exist. The use of paint on tags/labels to enter the required information on each tag/label is not acceptable.
d) Embossment to enter the required information on each tag/label is an acceptable method. Each letter and number shall be completely, individually, and legibly embossed with the embossed surface raised a minimum of 0.005 inch above the flat obverse tag surface.
e) The tag/label material shall be durable and suitable for use in unheated warehouses where temperature extremes (both hot and cold) exist. The tag/label material shall not react with the commodity being tagged/labeled.
f) Tag/label material shall have an expected lifespan of a minimum of twenty
(20) years with no degradation.
g) All tags/labels shall be of sufficient size to permit the listing of all required information.
11.2. The information in items a) through j) below shall be listed on each tag/label.
The marking shall not include a security classification or anything indicating DLA Strategic Materials ownership other than the contract number, purchase specification number and date.
a) Commodity Name
b) Commodity Grade, Type, or Form
c) Country of Origin
d) Producer Name
e) Gross Weight in pounds
f) Net Weight in pounds
g) Heat Number
h) Coil Serial Number.
i) Government Contract Number
j) Manufacturer’s Specification, Name, Number and Date
Source Selection Information -- See FAR 2.101 and 3.104 11
11.3. The Contractor shall submit proposed tags/labels to the QAS for review and approval prior to their utilization. No tags/labels shall be utilized that have not been pre-approved for use under this SOW by the Government.
11.4. Tags/labels shall be attached to the exterior of each packaged coil in a permanent manner that prevents accidental detachment. The means of attachment shall be suitable for use in unheated warehouses where temperature extremes (both hot and cold) exist. Attachment by adhesive means (e.g., glue, adhesive backed tag/label etc.) is acceptable.
11.5. All packaged coils shall have tags/labels attached at three (3) locations on each individual packaged coil. A tag/label shall be attached to two (2) opposite sides on the exterior side of the packaging on each individual packaged coil. A third tag/label shall be attached to the top of the coil inside the moisture impermeable barrier of each individual packaged coil in such a way as to be legible from outside of the packaging.
11.6. If the material is considered hazardous as defined by OSHA 29 CFR 1910.1200 and/or the United Nations GHS, a label shall be prepared and affixed to the exterior packaging surface of each individual packaged coil in accordance with those requirements.
11.7. In accordance with The Hazard Communication Standard (HCS) (29 CFR 1910.1200(g)), the SDS shall contain the chemical name and concentration or concentration range of all ingredients which are classified as health hazards and are: present above their cut-off/concentration limits or present a health risk below the cut-off/concentration limits.
12. TRANSPORTATION
12.1. The Contractor shall be responsible for transport, as well as for Carrier and
Insurance Paid To (CIP) of the material to the delivery point: the Government Storage Depot in Hammond, Indiana. The transportation of this material shall comply with all relevant Federal, State, and Local laws, including the DoT Hazardous Materials Regulations (49 CFR 170-189) where appropriate, including SDS documentation inclusion in shipping requirements.
12.2. The Contractor, its agents, and employees shall comply with the Environmental, Safety, and Occupational Health (ESOH) Policy of DLA Strategic Materials as identified in the Hammond Depot ESOHMS Orientation Guide for Contractors and Visitors (see Attachment 4 for a copy of this guide) while in DLA Strategic Materials storage facility.
13. TARIFS
13.1. Exemption of Tariffs. This purchase of grain oriented electric steel by DLA
Strategic Materials is exempt from tariffs, according to the Harmonized Tariff Schedule, under the provisions of 19 U.S.C. 1202 (Line 9808.00.40, Strategic
Source Selection Information -- See FAR 2.101 and 3.104 12 and Critical Materials Stock Piling Act), 19 U.S.C. 2461, 19 U.S.C. 2463 and 19 U.S.C. 3007 from the Art. I, sec. 8, U.S. Const., as for a strategic and critical material.
13.2. Forms of Exemption. The exemption forms shall be filed by the Contractor and executed on the CBP Form 7501 (Entry Summary), where the code (9808.00.40, plus additional code entries) shall be entered on the form with the notation that the Duty and Internal Revenue Taxes are "0," along with the declaration (Form 6059, General Declaration). In addition, the Customs Service requires the Form 5106 (Request for Importer Number, or Notification of Importer Number), along with the invoice for the material, the packing list (if available or applicable), and shipping documents.
13.3. Signature of Certificate. The Form (along with its declarations/entries) shall be signed by an "Authorized Agent," who would be the same individual receiving the shipment.
14. DELIVERY
14.1. The Contractor shall deliver materials to the Delivery Point:
Defense Logistics Agency – Strategic Materials Hammond Depot 3200 Sheffield Avenue Hammond, Indiana 46327-1003 Telephone: -219-937-5383 Site Manager: Nathaniel Walsko
Shipping/Receiving hours: 7:00 am to 2:30 pm (Central Time) Monday through Friday (exceptions of federal, state, and local holidays and days of closure due to inclement weather and/or other emergencies)
Accessibility: Truck and rail.
14.2. The Contractor shall submit a COA for each coil to the QAS for review and acceptance prior to shipment of each coil.
14.3. The QAS will review each COA submitted to determine acceptability and compliance with the requirements stated in the SOW. The QAS will notify the Contractor of the acceptability/unacceptability of each COA within twenty (20) business days after receipt of each COA.
14.4. The Contractor shall be free to schedule each delivery with the QAS ONLY after the COA is accepted by the QAS. The Contractor shall schedule in writing with the QAS all deliveries a minimum of twenty (20) business days in advance of their delivery and receive written acceptance of the proposed delivery schedule from the QAS prior to any shipping.
14.5. The Contractor shall deliver materials to the Government Storage Depot (delivery point in Hammond, Indiana) within the shipping hours of 7:00 am to 2:30 pm (Central Time) Monday through Friday (exceptions of federal, state, Source Selection Information -- See FAR 2.101 and 3.104 13 and local holidays and days of closure due to inclement weather and/or other emergencies.
14.6. All material deliveries shall be accomplished within the prescribed period of performance in this SOW and/or the associated contract.
14.7. The Contractor shall abide by the rules, laws, and regulations when accessing/delivering the material to the Government Storage Depot (delivery point in Hammond, Indiana as identified in the Hammond Depot ESOHMS Orientation Guide for Contractors and Visitors (see Attachment 2 for a copy of this guide) while in DLA Strategic Materials storage facility.
15. INSPECTION and ACCCEPTANCE
15.1. The Contractor shall submit written documentation to the Contracting Officer
(KO) and the Quality Assurance Specialist (QAS) that identifies their intentions regarding the following at a minimum:
a) Total net weight of material to be delivered.
b) Total net weight of each coil of material to be delivered.
c) Total net weight of material contained in each package.
d) Total number of sub-packaging units contained inside each package if applicable.
e) Total number of packages
f) Quantity of packages on each pallet.
g) Pallet size (e.g. 48” x 48”)
h) Total number of truck loads to be delivered each month.
i) Total number of coils contained in each truckload (e.g., one coil per truckload, two coils per truckload, etc.)
j) Type of truck planned for transporting the material to the delivery point (e.g., enclosed van truck, overseas container etc.)
k) This written documentation shall be submitted to the Contracting Officer (KO) and the Quality Assurance Specialist (QAS) within forty-five (45) calendar days of contract award. The Contractor shall not ship any material to the delivery point before a minimum of thirty (30) calendar days has passed from the date they submitted this written documentation to the Contracting Officer (KO) and the Quality Assurance Specialist (QAS).
l) The Contractor shall submit written documentation that identifies the intended material delivery schedule for the duration of the contract to the KO and the QAS within thirty (30) calendar days of contract award. This material delivery schedule shall include intended individual delivery dates and the total net weight of each intended delivery per day.
Source Selection Information -- See FAR 2.101 and 3.104 14
15.2. The material inspection and acceptance location will be at the delivery point in Hammond, Indiana.
15.3. The Government will perform visual inspections of all material upon receipt at the delivery point to verify conformance with the requirements stated in this SOW that can be verified visually. The material shall be uniform in quality and be free from visible impurities, foreign matter or other defects and be packaged and labeled in accordance with the requirements listed in this SOW.
15.4. The QAS will provide written notification of the acceptance/rejection of delivered material to the Contractor within twenty (20) calendar days of delivery. The Contractor shall not submit an invoice until the QAS has issued a notification of Acceptance for the delivery.
15.5. If any delivered material does not conform to the requirements stated in the SOW or is not the same as that indicated on the COA, the QAS will reject the nonconforming material. The Contractor shall be responsible for removal and replacement of rejected material, including all attendant costs, within ninety
(90) calendar days of the final delivery.
Source Selection Information -- See FAR 2.101 and 3.104 15
APPENDIX 1: List of Abbreviations/Acronyms A Amperes ASTM American Society for Testing and Materials
CFR Code of Federal Regulations
CIP Carrier and Insurance Paid To
CLIN Contract line item number
COA Certificate of Analysis
DFARS Defense Federal Acquisition Regulation Supplement
DLA Defense Logistics Agency
DOT Department of Transportation
DR-GOES Domain Refined Grain Oriented Electric Steel
EPA Environmental Protection Agency
ESOH Environmental, Safety, and Occupational Health g Grams
FAR Federal Acquisition Regulation
FY Fiscal Year
GHS Globally Harmonized System of Classification and Labelling of Chemicals
IAW In Accordance With
KO Contracting Officer
MT Metric Tons
NDAA National Defense Authorization Act
NRC Nuclear Regulatory Commission
OSHA Occupational Safety & Health Administration
QAS Quality Assurance Specialist
SDS Safety Data Sheet
SOW Statement of Work
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER
2025 AUG 06
6. SOLICITATION ISSUE
DATE
Allison Douglewicz, Contracting Specialist EMAIL: Allison.Douglewicz@dla.mil
a. NAME b. TELEPHONE NUMBER (No Collect calls)
2025 SEP 05
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY CODE SP8000
DCSO COLUMBUS DIVISION #3
3990 EAST BROAD STREET
COLUMBUS OH 43218
USA
Local Admin: Allison Douglewicz
10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
8 (A)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
NAICS: 331110
SIZE STANDARD:
11. DELIVERYFOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/ CODE
OFFEROR
FACILITY
CODE
TELEPHONE NO.
18a. PAYMENT WILL BE MADE BY CODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
See Schedule
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF. OFFER
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
SEE SCHEDULE
02:00 PM EST
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE ADDENDUM
EDWOSB
X
1,500 Employees
N/A
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104
SP8000
SP8000-25-R-0018
32a. QUANTITY IN COLUMN 21 HAS BEEN
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED
COMPLETE PARTIAL FINAL
STANDARD FORM 1449 (REV. 2/2012) BACK
36. PAYMENT
PARTIAL FINAL
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY
42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42b. RECEIVED AT (Location)
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104
Domain Refined Grain Oriented Electrical Steel (DR-GOES) for the National Defense Stockpile
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104 Page 3
Indefinite Delivery and Indefinite Quantity (IDIQ) Solicitation for
Domain Refined Grain Oriented Electrical Steel (DR-GOES) for the National Defense Stockpile (NDS)
The solicitation/contract is organized into sections as follows:
Section A: Standard Form (SF) 1449
Section B: Continuation of SF 1449
Section C: Contract Clauses
Section D: Attachments
Section E: Solicitation Provisions
E.1 Instructions to Offerors
E.2 Evaluation Criteria for Award
E.3 Offeror Representations and Certifications
E.4 Provisions
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104 Page 4
SECTION B: CONTINUATION OF SF1449
B.1. SF 1449 Supplemental Information
B.1.1 Introduction
The Vendor must assure of complete understanding of the requirements set forth in the solicitation and all attached documents. Offerors are requested to submit complete proposals for all requirements as specified in this solicitation.
B.2. Administrative Summary
B.2.1. This procurement supports the National Defense Stockpile Rapid Acquisition (NDS-RA). This is a solicitation for the acquisition of commercial items with additional information included in this notice and file attachments.
B.2.2. DLA Contracting Services Office intends to award and administer a single Firm-Fixed Price (FFP) contract.
B.2.3. Offerors must be registered in the System for Award Management (SAM) with the applicable NAICS code 331110, to be considered for award. The web site for registration is https://SAM.gov.
B.2.4. This solicitation document and incorporated provisions and clauses are those in effect through the—
• Federal Acquisition Circular 2025-03, effective January 17, 2025.
• Defense Federal Acquisition Regulation Supplement (DFARS) effective January 17, 2025.
• Defense Logistics Acquisition Directive (DLAD) PROCLTR 2025-20, effective June 26, 2025.
The complete text of any of the clauses, provisions, and DLAD notes may be accessed in full at https://www.acquisition.gov/ and http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx.
B.2.5. This acquisition is Unrestricted. The applicable NAICS code is 331110 – Iron and Steel Mills and Ferroalloy Manufacturing – with a size standard of 1,500 employees.
B.2.6. The Defense Logistics Agency (DLA) intends to award a contract for up to 53,450 Net Tons of Domain Refined Grain Oriented Electrical Steel (DR-GOES). The Government reserves the right to award for less than the maximum quantity. All DR-GOES to be delivered under any resulting contract shall be packaged and delivered per the Statement of Work (SOW). This procurement will additionally require sampling of DR-GOES. Any eventual contract award will require the vendor to deliver the material to the Government Storage Depot in Hammond, Indiana.
B.2.7. Delivery will be due within 24 months after date of delivery order issuance.
B.2.8. The provision at FAR 52.212-1, Instructions to Offerors--Commercial Products and Commercial Services, and its Addendum, applies to this acquisition.
https://sam.gov/ https://www.acquisition.gov/ http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
GPP5392
Highlight
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104 Page 5
B.2.9. The provision at 52.212-2, Evaluation--Commercial Products and Commercial Services, applies to this acquisition. The evaluation factors are: Overall Technical Acceptability and Price.
B.2.10. A completed copy of FAR 52.212-3, Offeror Representations and Certifications--Commercial Products and Commercial Services, applies to this acquisition and shall be submitted with your proposal if not available through SAM at https://www.sam.gov.
B.2.11. The clause at FAR 52.212-4, Contract Terms and Conditions--Commercial Products and Commercial Services, applies to this acquisition.
B.2.12. The clause at FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Products and Commercial Services, applies to this acquisition.
B.2.13. Payment Terms: Net 30
B.2.14. SOLICITATION INSTRUCTIONS:
B.2.14.1 Questions or clarifications in response to the solicitation must be submitted no later than (NLT) August 26, 2025, at 12:00 PM EST. Questions received after August 21, 2025, may not receive a response. Please submit all questions to Allison Douglewicz at Allison.Douglewicz@dla.mil (and carbon copy Christopher Moore at Christopher.M.Moore@dla.mil) with "DR-GOES Solicitation Clarification Request" in the subject line.
B.2.14.2. The Offeror shall mark each page of its proposal with the legend “Source Selection Information
– See FAR 2.101 and 3.104.” This includes the cover page and every page that may contain source selection information. Note that the Offeror has an independent requirement to mark anything deemed to be bid or proposal information, protected proprietary information, or other information that is to be protected from disclosure to ensure that the information is protected.
B.2.14.3. Proposal Content and Volumes. The Offeror shall submit their proposals using the breakout below.
Volume 1: Introduction
a. Cover Page
i. Proposal Title
ii. Offeror's Name and Address
iii. Principle Point of Contact Name, E-mail Address and Phone Number
iv. Offeror's CAGE / Unique Entity Identification (UEID) Numbers
b. SF1449 and Amendments
i. The completed and signed SF1449. If applicable, the proposal shall also include signed acknowledgments of any amendments.
mailto:Allison.Douglewicz@dla.mil mailto:Christopher.M.Moore@dla.mil
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104 Page 6
Volume 2: Proposed Pricing
Submit proposed pricing by following the instructions within Section B of this solicitation and completing all requested CLIN fields. This shall be the only volume where any reference to proposed pricing is made. Ensure all pricing includes the marking “Source Selection Information – See FAR 2.101 and 3.104.”
B.2.14.4. Offerors shall submit their proposals via e-mail to Allison Douglewicz at Allison.Douglewicz@dla.mil, and carbon copy Christopher Moore at Christopher.M.Moore@dla.mil with “DR-GOES Proposal” in the subject line by closing date. Offerors are strongly encouraged to confirm receipt of their proposals after submission. Alternatively, proposals may be submitted via DoD SAFE (https://safe.apps.mil/) to Allison Douglewicz at Allison.Douglewicz@dla.mil and Christopher Moore at Christopher.M.Moore@dla.mil. Proposals submitted via US mail will not be accepted.
B.2.14.5. In accordance with FAR 15.208(a), Offerors are responsible for submitting proposals, and any revisions and modifications, so as to reach the Government office designated in the solicitation by the time specified in the solicitation.
B.2.15. CONTACT INFORMATION
Contracting Office Address:
Defense Logistics Agency DLA Contracting Services Office – Columbus Division 3 3990 East Broad Street Columbus, Ohio 43218-3990
Primary Point of Contact:
Allison Douglewicz, Contracting Specialist E-mail: Allison.Douglewicz@dla.mil
Secondary Point of Contact:
Christopher Moore, Contracting Officer E-mail: Christopher.M.Moore@dla.mil https://safe.apps.mil/
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104 Page 7
B.3 Scope of Work
Scope of Work for IDIQ:
DLA Strategic Materials intends to purchase up to 53,450 Net Tons of DR-GOES with estimated quantities shown in Table 1 over the course of a five-year ordering period. The material is produced in very thin sheets and rolled into a coil not exceeding ~ 6 Net Tons at the supplier. Therefore, DR- GOES will be supplied by the contractor in coil form, fully tested per the contractor’s Sampling Plan, palletized, and packaged to prevent any environmental or handling damage.
Table 1: Estimated planned procurement quantities and schedule for DR-GOES
Year Quantity (Net Tons)
CLIN 1: Year 1 (12 months) 2,024
CLIN 2: Year 2 (12 months) 15,282
CLIN 3: Year 3 (12 months) 13,549
CLIN 4: Year 4 (12 months) 12,020
CLIN 5: Year 5 (12 months) 10,665
TOTAL 53,450*
* The Table 1 quantities are estimates only, which may change throughout the life of the contract. The Government is only bound to the guaranteed minimum established under the contract.
B.4 Contract Type
The Government intends to award a firm fixed price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract.
Maximum Contract Dollar Value: The total amount of all orders placed against the IDIQ contract resulting from this solicitation must not exceed $400 million over a five (5) year contract period.
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104 Page 8
Guaranteed Minimum: The guaranteed minimum amount is $2,000,000.00 for the entire IDIQ performance period.
B.5 Ordering Period
The resultant IDIQ will include a five-year ordering period. Delivery Orders issued against this IDIQ contract must have a delivery period not to exceed twenty-four (24) months. The Ordering Period of the IDIQ begins the same date as the first Delivery Order issuance, expected to be around September 2025.
The vendor should use this date for the development of their pricing proposal.
B.6 Schedule of Supplies and Services
Below table is for the IDIQ contract CLIN structure only. This is not for pricing proposal submission.
ORDERING PERIOD
CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE
0001 DR-GOES 1 NET TON
B.7 Commercial Products
This is a commercial product acquisition in accordance with the regulatory authority of Federal Acquisition Regulation (FAR) Part 12.
B.8 Source Selection Procedure The proposed estimated procurement value is over $100M. Source Selection Procedures / Source Selection Plan is not required as there is only one responsible source of supply that meets the criteria for the DR-GOES. The Government will evaluate the proposal for technical acceptability and then price reasonableness. Technical acceptability will be evaluated based on the vendor’s proposal addressing all aspects of the Statement of Work (SOW) to include all aspects being sufficiently addressed and all required documents submitted.
B.9 Invoice Instructions
Invoices must be submitted through Wide Area Workflow (WAWF) in accordance with Defense…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .