This document is a comprehensive Responses to Questions and Comments file for a Defense Logistics Agency (DLA) solicitation (SP7000-26-R-1001) for leasing Multifunctional Devices (MFDs) in the Republic of Korea. The solicitation seeks up to three Multiple Award IDIQ contracts with a maximum program total of $26.2 Million, covering a 60-month lease period starting May 1, 2026. The procurement will support approximately 2,523 A3 MFDs across various locations in South Korea, with devices required to meet specific technical specifications including volume band requirements, network security standards (NIAP compliance), and Trade Agreements Act (TAA) regulations.

Key procurement details include a Lowest Price Technically Acceptable (LPTA) evaluation methodology, monthly billing, and strict technical requirements such as mandatory NIAP certification, disabled color printing options, and specific pages-per-minute (PPM) speed specifications. The solicitation is open until December 2, 2025, with Round 1 Questions due by November 4, 2025. Vendors must provide OEM parts, comply with TAA requirements, and be prepared to support base access procedures and potential network security connections across different military installations in South Korea.

View the file

Other files

File Type Posted
Attachment 2 - CLIN Structure (11.24.2025).xlsx XLSX spreadsheet
SP7000-26-R-1001-0002 (SF-30).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Document DescriptionPage NumberSection/ParagraphQuestion/CommentContracting ResponseEMS ResponseVendor Recommendation
PWS1I. AWhat are the respective durations of the **Lease Term** and the **Option Extention Period**?The total duration of this contract, including the exercise of any options under this clause, shall not exceed 60 Months. (see FAR 52.217-9 within SP7000-26-R-1001)
PWS1I. CIs the lease billed on a **Monthly/Quarterly/Annual** Basis?Monthly (see Attachment 2 - CLIN Structure)
PWS7VI. MaintenanceWhat are the standards regarding the **Maintenance Schedule** and **Response Time**?See PWS VI.A. 5 and 6.
PWS16XVI. Enterprise Management ToolHow is the equipment's **meter reading** cycle and method specified?The vendor would only offer the Enterprise Management Tool to the customers but would not be operating it.
PWS5IV. Delivery Of Ordered DevicesCould you provice information on the **Number of Units per Location**?The chart is for number of devices per contracting action, not by location. The number of devices requested for a particular location within korea will vary by task order, which will likely contain orders for multiple locations.
PWS5IV. Delivery Of Ordered DevicesWhat are the **Base Access Procedures** for insallations located **within a Restricted area on the base**?Base access requirements may vary between bases. It is the responsibility of the vendor to contact the installation to obtain base access instructions. DLA can provide contact information upon request.
PWS14XIV. TestingWhat are the **Acceptance Test** criterias upon equipment delivery? (e.g., whether sample output tests pass)DLA tests devices to meet DOD RMF and STIG compliance. Additional testing is required for devices ordered for Navy customers.
PWS7VI. MaintenanceWhat are the conditions for **equipment replacements or upgrades** during the lease period?See SECTION VI.A.9
PWS1I. CIs the evaluation based on **Lowest Price Technically Acceptable (LPTA)** or **Best Value Trade-Off**?In accordance with the RFP and RFP’s FAR 52.212-2 – Addendum, awards will be made on a lowest priced technically acceptable (LPTA) basis to the three (3) offerors that are determined to be lowest priced and technically acceptable. Performance Work Statement (PWS) paragraph I(C) only specifies that offeror submitted pricing, in response to the RFP, shall be all inclusive of the technical requirements stated in the RFP. This paragraph shall not be construed by the offerors as adding any best value award criteria. FAR 52.212-2 – Addendum specifies the LPTA evaluation criteria that will be utilized by the Government for evaluation purposes.”
PWS1IPlease clarify the evaulation criteria proportion weighing between **technical evaluation vs. price evaluation**?In accordance with the RFP and RFP’s FAR 52.212-2 – Addendum, awards will be made on a lowest priced technically acceptable (LPTA) basis to the three (3) offerors that are determined to be lowest priced and technically acceptable. Performance Work Statement (PWS) paragraph I(C) only specifies that offeror submitted pricing, in response to the RFP, shall be all inclusive of the technical requirements stated in the RFP. This paragraph shall not be construed by the offerors as adding any best value award criteria. FAR 52.212-2 – Addendum specifies the LPTA evaluation criteria that will be utilized by the Government for evaluation purposes.”
PWS12XIII. Network SecurityIs there a special approval process for connecting to **local communication networks or secure networks (DoD Network Connection)**?See XIV for more information. Local SOP for connection is different from post to post.
PWS6IV. Delivery Of Ordered DevicesIs there possibility of **additional orders** or a **follow-up contract**?See Section IV. 13. of Attachment 1 - Performance Work Statement
PWS11X. ReportsAre periodic submission of maintenance reports required?Maintenance related reports are only provided upon request and are not periodic.
PWSN/AGeneral QuestionsCan special equipment be proposed for departments where security is critically important?Nothing outside the CLINs can be ordered.
PWS1II. Devices and ConfigurationsDoes the **multifunction printer specifications** allow for "Brand Name or Equal" products?Only OEM parts and supplies should be provided.
SP7000_26_R_1001__10_28_202523. Estimated Period of PerformanceThe solicitation lists the estimated start date as May 1, 2025. Given that this date has passed, could you please provide the updated anticipated start date for the contract's 60-month period of performance?An amendment will reflect the updated estimated date to May 1, 2026.
SP7000_26_R_1001__10_28_202524. DeliveryWe seek clarification on the geographic scope of service. Does "various locations located throughout the Republic of Korea" imply the full extent of the peninsula, ranging from areas near Camp Casey (further north) down to sites like Pier #8 (near Jinhae/southern areas), requiring service across a wide geographic range in South Korea?It includes all of South Korea.
PWS7V.TRAININGLanguage Requirement: Could you please confirm if both the on-site training (V.D) and the online training (V.E) are required to be conducted exclusively in English, or if training materials and instruction can be provided in Korean?Yes
PWS7V.TRAININGDuration/Schedule: Is there a specified minimum or maximum duration requirement for the on-site end-user training sessions, beyond the established schedule coordination (V.B)?The training just covers the items listed under V.C. There are no training duration limits set for the completion of the topics.
PWS3III. Volume Band SpecifiationsVB1 – historically the PPM is 25 PPM. For some reason this IDIQ was changed to 30 PPM which

essentially rules out at least one OEMs product, which was designed based on the 25 PPM historical and industry accept print speed. Please change this to 25 PPM to match all historical

DLA opportunities.We will reduce the 30 PPM for VB1 to 25 PPM.
PWS5IV. A. 3.Please consider allowing color devices with color printing disabled for mono clins. The language

could be changed to, “if color equipment with disabled color printing is delivered on mono clins, the government and customer is not liable for any color printing that occurs”. This would protect the government while allowing the option to utilize one line of devices. One line of devices means less SKUs to maintain, better operational eiciency, more availability to adhere to fast timelines for when customers decide to upgrade to color, and more availability for standby machines or hard swaps, as needed. Allowing color disabled devices on for mono locations will save the tax payers money. This process has also been used for 5+ years, globally, without incident, very successfully. Because of the VB5 60 ppm requirement, a color device must be used for at least one OEM, who does not have a B&W device with those speeds. For that reason, this change to the

PWS would completely eliminate an entire OEM.This will not be changed.
PWS3III. Volume Band SpecifiationsThere is no VB5 60 ppm mono only device for an OEM. If a color disabled color device cannot be
used for this VB, please consider adjusting the VB5 to 55 ppm for competition.This will not be changed.
SP7000_26_R_1001__10_28_2025_2 of 453. Estimated Period of Performancethe estimated period of performance is stated as May 1, 2025 through April 30, 2030. Could you please confirm whether this period is correct or provide the accurate contract period if different?An amendment will reflect the updated estimated date to May 1, 2026.
SP7000_26_R_1001__10_28_2025_1 of 452. Requirement Descriptionthe total estimated number of MFDs is 2,523 units. However, upon reviewing Attachment #2 (CLIN Structure), the total number of MFDs appears to exceed 4,700 units. Could you please confirm the correct estimated quantity for this solicitation?The attachment has been fixed to show the correct estimated number.
Attachment_1___Performance_Work_Statement__PWS___09_17_2025_1 of 23II. Devices and Configurationsthe contract is subject to the Trade Agreements Act (TAA). To ensure compliance, we believe it would be appropriate to include a Certificate of Origin for the MFD units as part of the required proposal submission documents. Please confirm if this documentation is required or acceptable.That documentation is acceptable but not required. If a vendor states they will comply with the TAA requirement and it is later determined that they provided non-TAA devices, that contract would immediately be terminated.
Attachment_1___Performance_Work_Statement__PWS___11_07_202513XIII. Network SecurityIs NIAP comliant a mandatory requirement?Yes.
Attachment_1___Performance_Work_Statement__PWS___11_07_202513XIII. Network SecurityCompliance with NIAP and JISEC. Is it possible that obtaining a JISEC certification by itself is not acceptable?It is not. The National Information Assurance Partnership (NIAP) is a United States government initiative to meet the security testing needs of both information technology consumers and producers that is operated by the National Security Agency (NSA), and was originally a joint effort between NSA and the National Institute of Standards and Technology (NIST). All devices must be evaluated by a NIAP certified test lab. FUJIFILM can use the results from a JISEC certification. Please refer to NIAP Policy Letter 12 for acceptance requirements :https://www.niap-ccevs.org/Policy/policy-ltr-12-update5.pdf (https://www.niap-ccevs.org/policies) Please also refer to the NIAP FAQ’s (what is the process, how to sponsor, etc) any questions you would have internally for this process to NIAP via: https://www.niap-ccevs.org/faqs

Attachment 3 - Question and Comment Form &P