This document is a Performance Work Statement (PWS) for the removal and installation of warehouse racks at the Joint Forms Online (JFOL)/DLA Document Services facility located at Tinker AFB, OK.
The PWS requires the removal of 54 cross beams and 10 uprights, and the installation of 10 new uprights, 72 cross beams, and wire decking (shelving) on the bottom 2 rows. This is a one-time requirement that must be completed within 30 calendar days of being awarded. The required materials have already been purchased, so this PWS is only for the removal and installation services. This PWS is associated with a pre-solicitation (SP7000-24-RFI-1019) issued by the Defense Logistics Agency to find vendors interested in providing the required services at the Tinker AFB facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SP7000-24-RFI-1019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
JFOL/DLA DOCUMENT SERVICES
TINKER AFB, OK 73145
REMOVAL AND INSTALLATION OF WAREHOUSE RACKS
1. INTRODUCTION:
Joint Forms Online (JFOL) is a DLA run program located at Tinker AFB, OK. JFOL provides various forms, tags, and folders to the Navy and the Marine Corps. The program operates in BLDG. 1/Door 64, which is a warehouse se ng. JFOL is in need of altering our warehouse racking in order to be er perform our mission. DLA personnel will move material out of the way for be er access. The uprights, cross beams, and wire decking have already been purchased, this request is for removal and install only.
2. PERIOD OF PERFROMANCE
This will be a one- me requirement that must be completed within 30 calendar days of being awarded.
3. REMOVAL OF EXISTING RACKING
Request includes the following:
- Removing 54 cross beams and stacking for later use.
- Removing 10 uprights in the warehouse and stacking on a provided pallet outside.
4. INSTALLATION OF NEW RACKING
Request includes the following:
- Installing 10 new uprights following all manufacturer guidelines within the same footprint of the old uprights.
- Installing 72 cross beams mirroring the new setup that has already been established in row 1 of the warehouse.
- Installing wire decking (shelving) on bo om 2 rows (36 total).