Attachment_2_-_Questions_and_Answers_SP7000-19-Q-1024.pdf
PDF 77 KB Posted
- Attached to
- Up to 60 Month Lease for 132 Multi-Functional Devices (MFDs) in Germany SP7000-19-Q-1024
- Solicitation number
- SP7000-19-Q-1024
- Issued by
-
Defense Logistics Agency
About this file
Attachment 2 - Questions and Answers SP7000-19-Q-1024
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP7000‐19‐Q‐1024, Amendment 1 Attachment 2 ‐ Questions and Answers Page 1 of 1
QUESTIONS AND ANSWERS
Solicitation# SP7000‐19‐Q‐1024
Up to 60 Month Lease – 132 MFDs in Germany
1. Respond to work stoppage situations in 2hrs (PWS 4.3)
Question: 2hr response time cannot be guaranteed in remote locations as it can take technicians 2.5hrs to arrive at copier location. Can the response time be adjusted?
Answer: PWS has been revised changing the work stoppage hours from 2 to 4 and non‐work stoppage hours from 4 to 8 response time.
2. Testing will be done in Pennsylvania, USA
Question: The devices used in Europe are not able to be used inside CONUS (Reason is Power
Supply and consumables). How will the test be done?
Answer: DLA normally gets the same device but with 110 voltage and test it. DLA has occasionally tested devices remotely but if the same device in 110 voltage can be obtained, that is what DLA tests in the lab.
3. Question: Will there be a reverse auction during the process?
Answer: No, there will not be a reverse auction.
4. Question: Are the volume bands (VB 2B, D, and 3 B, D) requested for the deal have a need for
Common Access card reader?
Answer: The CAC readers are not required
5. In "Attachment 2 ‐ Delivery Schedule" in the "CAC Reader Required" column it is stated that for all device the CAC reader is not required, whereas, in the "Attachment 2 Performance Work
Statement (PWS)" it is stated that CAC is required. Please confirm which statement we should take into account when proposing.
Response: The CAC reader is not required
6. Question: What will happen if the client exceed the estimated maximum volume in a certain month? Is there a way of recharging the cost of the supplies and consumables used to print these extra prints or the supplier will cover that with no recharging by the client?
Answer: The vendor would not be able to charge overages for devices where usage has exceeded the volume band limits. Other measures would need to be taken to control the situation such as adding another device to the location or ordering a device of a higher volume band.
7. Question: Is there a Common Criteria certification needed for the devices?
Answer: Yes, the devices do need to be common criteria certified.
File details come from the government source that posted it.