Instructions
| Instructions for Completion of Pricing Matrices. |
| Introduction: |
| -Each of ten tabs herein labeled "Months *-* Matrix" represents a 12-month ordering period price matrix, |
| requiring offeror entry of pricing for supplies/services. The calculations resulting from the prices entered |
| on each matrix will generate totals that will flow to the "Contract Total" tab. |
| -The first 5 Tabs covering months 1-60 will flow to clins 0001 through 0013 in the basic ordering period, |
| which includes purchase of devices, components, maintenance, software, overages and device removal. |
| -The remaining 5 tabs covering months 61-120 will flow to clins 1008 through 1012 in the option 1 |
| ordering period, which includes only maintenance and overages. |
| -Offerors can track their "Estimated Contract Total With Option" in cell G65 of the "Contract Total" tab. |
| This will be the total used for price analysis among offers. |
| Pricing: | |
| -Pricing for each supply/service is separated by usage bands; 8,9,10,11,12,13, except for the following: | |
| 1) Additional equipment/software purchased; 2) Additional add-on component maintenance; | |
| 3) Additional equipment/software maintenance. | |
| Offeror Pricing will be entered as follows: | |
| -Offerors will only type entries in column "E" of each tab, colored in BLUE. The Government wishes all | |
| items to be priced, regardless of the number indicated in the "Estimated Quantity" column. | |
| (A) First 5 tabs covering the basic 60 month ordering period (Months 1-60): | |
| 1. Equipment Purchase- | --(Ref. E-1 thru E-5 on matrices) A single unit price corresponding to each basic |
| device that was detailed in offerors response to attachment 1a. | |
| --A single price for each component or configuration option listed. | |
| 2. Add'l Equip/Software | --(Ref. E-7 on matrix) A single unit price for document scanners & PC/workstation |
| (PC/workstation price should include next business day maintenance for 5 years.) | |
| 3. Basic Maintenance | --(Ref. M-1 on matrix) A single monthly price for each Maintenance option listed. |
| --(Ref. M-2 on matrix) A single monthly price for maintenance on document | |
| scanners and additional add-on components, if applicable. | |
| 4. Add'l Equip/Software | --(Ref. M-3 on matrix) A single annual maint price per document software license. |
| Maintenance | |
| 5. Extended Hours Maintenance | --(Ref. M-4 on matrix) Weekly extended hours maintenance prices as detailed |
| for a 2nd and 3rd shift; and weekend units priced as 'each'. | |
| 6. Overages | --(Ref. O-1 on matrix) A single unit price for each overage click past the monthly |
| allowance for all devices in each of their respective usage bands. |
Contract Total
| Schedule of Supplies/Services | ||||||||||
| CLIN | DESCRIPTION | EST. QTY | U/I | U/P | ESTIMATED TOTAL PRICE | 1-12 | 13-24 | 25-36 | 37-48 | 49-60 |
| BASIC ORDERING PERIOD - MONTHS 1-60 | ||||||||||
| EQUIPMENT PURCHASE with Components | ||||||||||
| See attachment 1a- [Equipment Specification Requirements], for a description of requirements for each usage band. | ||||||||||
| See attachment 1b- [Configuration Options] for a list of possible configurations. | ||||||||||
| USAGE BAND 8 |
Typical Monthly Volume Range 100K to 200K
| 0001 | Estimated Purchase of Usage Band 8 Machines with components | |||||||||
| (See Ref. E-1 on applicable "Months __-__Matrix" for a breakdown of this clin.) | 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| USAGE BAND 9 |
Typical Monthly Volume Range 200K to 300K
| 0002 | Estimated Purchase of Usage Band 9 Machines with components | |||||||||
| (See Ref. E-2 on applicable "Months __-__Matrix" for a breakdown of this clin.) | 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| USAGE BAND 10 |
Typical Monthly Volume Range 300K to 400K
| 0003 | Estimated Purchase of Usage Band 10 Machines with components | |||||||||
| (See Ref. E-3 on applicable "Months __-__Matrix" for a breakdown of this clin.) | 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| USAGE BAND 11 |
Typical Monthly Volume Range 400K to 500K
| 0004 | Estimated Purchase of Usage Band 11 Machines with components | |||||||||
| (See Ref. E-4 on applicable "Months __-__Matrix" for a breakdown of this clin.) | 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| USAGE BAND 12 |
Typical Monthly Volume Range 500K to 800K
| 0005 | Estimated Purchase of Usage Band 12 Machines with components | |||||||||
| (See Ref. E-5 on applicable "Months __-__ Matrix" for a breakdown of this clin.) | 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| USAGE BAND 13 |
Typical Monthly Volume Range 800K to 1M
| 0006 | Estimated Purchase of Usage Band 13 Machines with components | |||||||||||
| (See Ref. E-6 on applicable "Months __-__ Matrix" for a breakdown of this clin.) | 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| Total Estimated equipment purchase with components. | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Additional Equipment/Software Purchase | ||||||||||||
| See attachment 1a- [Equipment Specification Requirements], for a description of requirements that make up this CLIN. Items are not tied to a specific usage band. | ||||||||||||
| 0007 | Document Scanner, PC/Work Station, Document Software | |||||||||||
| (See Ref. E-7 on applicable "Months __-__ Matrix" for a breakdown of this clin.) | 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Overall Total Estimated Equipment/Software Purchase. $0
| MAINTENANCE PURCHASE | |
| BASIC MAINTENANCE | |
| Basic Maintenance; all Usage Bands, all Machines | |
| 0008 | Estimated Purchase of Maintenance Services for all Usage Bands, all Machines. |
(See Ref. M-1 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)
| 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Basic Maintenance; all Additional Add-on Components | |||||||||
| 0009 | Estimated Purchase of Maintenance Services for Additional Add-on Components |
(See Ref. M-2 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)
| 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Additional Software Maintenance | ||||||||||
| 0010 | Estimated Document Software Maintenance. | |||||||||
| (See Ref. M-3 on applicable "Months __-__ Matrix" for a breakdown of this clin.) | 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Extended Hours Maintenance | ||||||||||
| Extended Hours Maintenance, all Usage Bands, all Machines | ||||||||||
| 0011 | Estimated Purchase of Extended Hours Maintenance Services for all Machines | |||||||||
| (See Ref. M-4 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.) | 1 | LO | $0 | $0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Total Estimated Maintenance Purchase | $0 |
| OVERAGES | |
| OVERAGE CLICK CHARGES, ALL USAGE BANDS | |
| 0012 | Estimated Purchase of Overage Charges for All Usage Bands, All Machines |
(See Ref. O-1 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)
1 LO $0 $0 $0.00 $0.00 $0.00 $0.00 $0.00
Estimated Basic Contract Total - Months 1-60 $0
Schedule of Supplies/Services Page &Pof &N
SA4705-10-R-0130 &D
Months 1-12 Matrix
| PRICE MATRIX | |||||||
| Ref. | Description | Estimated Quantity | U/I | Unit Price (without trade-in | Unit Price (with trade-in) | Estimated | |
| Total Price (Without trade-in) | Estimated |
Total Price (with trade-in) Ordering Period - Months 1-12
| Equipment Purchase | |
| E-1 | USAGE BAND 8 |
Typical Monthly Volume Range 100K to 200K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 8 Machine, Basic Configuration | |||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 20 | EA | $0.00 | $0.00 | 20 | ||||
| Components configured with a Usage Band 8 machine | |||||||||
| Purchase of Removable Hard Drives option for usage band 8 machine. | |||||||||
| 3 | EA | $0.00 | $0.00 | 3 | |||||
| Purchase of Booklet Maker add-on to usage band 8 machine. | |||||||||
| 20 | EA | $0.00 | $0.00 | 20 | |||||
| Purchase of Hole Punch add-on to usage band 8 machine. | |||||||||
| 1 | EA | $0.00 | $0.00 | 1 | |||||
| Purchase of Folder add-on to usage band 8 machine. | |||||||||
| 1 | EA | $0.00 | $0.00 | 1 | |||||
| Purchase of Oversize Capacity paper feed add-on to usage band 8 machine.. | |||||||||
| 2 | EA | $0.00 | $0.00 | 2 | |||||
| Purchase of High Capacity paper feed add-on to usage band 8 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of High Capacity Stacker add-on to usage band 8 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Total estimated Usage Band 8 equipment purchase with components. | |||||||||
| (Carried over to clin 0001 on basic contract.) | $0.00 | $0.00 |
E-2 USAGE BAND 9
Typical Monthly Volume Range 200K to 300K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 9 Machine, Basic Configuration | |||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 15 | EA | $0.00 | $0.00 | 15 |
| Components configured with a Usage Band 9 machine |
(see attachment 1b- [Configuration Specifications] for a list of possible configurations)
| Purchase of Removable Hard Drives option for usage band 9 machine. | |||||||||
| 2 | EA | $0.00 | $0.00 | 2 | |||||
| Purchase of Booklet Maker add-on to usage band 9 machine. | |||||||||
| 15 | EA | $0.00 | $0.00 | 15 | |||||
| Purchase of Hole Punch add-on to usage band 9 machine. | |||||||||
| 1 | EA | $0.00 | $0.00 | 1 | |||||
| Purchase of Folder add-on to usage band 9 machine. | |||||||||
| 1 | EA | $0.00 | $0.00 | 1 | |||||
| Purchase of Oversize Capacity paper feed add-on to band 9 machine. | |||||||||
| 4 | EA | $0.00 | $0.00 | 4 | |||||
| Purchase of High Capacity paper feed add-on to usage band 9 machine. | |||||||||
| 1 | EA | $0.00 | $0.00 | 1 | |||||
| Purchase of High Capacity Stacker add-on to usage band 9 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Total estimated Usage Band 9 equipment purchase with components. | |||||||||
| (Carried over to clin 0002 on basic contract.) | $0.00 | $0.00 |
E-3 USAGE BAND 10
Typical Monthly Volume Range 300K to 400K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 10 Machine, Basic Configuration | |||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 10 | EA | $0.00 | $0.00 | 10 | ||||
| Components configured with a Usage Band 10 machine | |||||||||
| Purchase of Removable Hard Drives option for usage band 10 machine. | |||||||||
| 3 | EA | $0.00 | $0.00 | 3 | |||||
| Purchase of Booklet Maker add-on to usage band 10 machine. | |||||||||
| 10 | EA | $0.00 | $0.00 | 10 | |||||
| Purchase of Hole Punch add-on to usage band 10 machine.GBC Advance Punch | |||||||||
| 1 | EA | $0.00 | $0.00 | 1 | |||||
| Purchase of Folder add-on to usage band 10 machine. | |||||||||
| 1 | EA | $0.00 | $0.00 | 1 | |||||
| Purchase of Oversize Capacity paper feed add-on to usage band 10 machine. | |||||||||
| 4 | EA | $0.00 | $0.00 | 4 | |||||
| Purchase of Perfect Bind add-on to usage band 10 machine. | |||||||||
| 0 | EA | $0.00 | $0.00 | 0 | |||||
| Purchase of High Capacity paper feed add-on to usage band 10 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of High Capacity Stacker add-on to usage band 10 machine. | 4 | EA | $0.00 | $0.00 | 4 | ||||
| Total estimated Usage Band 10 equipment purchase with components. | |||||||||
| (Carried over to clin 0003 on basic contract.) | $0.00 | $0.00 |
E-4 USAGE BAND 11
Typical Monthly Volume Range 400K to 500K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 11 Machine, Basic Configuration | |||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 10 | EA | $0.00 | $0.00 | 10 | ||||
| Components configured with a Usage Band 11 machine | |||||||||
| Purchase of Removable Hard Drives option for usage band 11 machine. | 2 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of Booklet Maker add-on to usage band 11 machine. | 10 | EA | $0.00 | $0.00 | 10 | ||||
| Purchase of Hole Punch add-on to usage band 11 machine.GBC Advance Punch | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Folder add-on to usage band 11 machine. | 0 | EA | $0.00 | $0.00 | 0 | ||||
| Purchase of Oversize Capacity paper feed add-on to usage band 11 machine.. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Perfect Bind add-on to usage band 11 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of High Capacity paper feed add-on to usage band 11 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of High Capacity Stacker add-on to usage band 11 machine. | 5 | EA | $0.00 | $0.00 | 5 | ||||
| Total estimated Usage Band 11 equipment purchase with components. | |||||||||
| (Carried over to clin 0004 on basic contract.) | $0.00 | $0.00 |
E-5 USAGE BAND 12
Typical Monthly Volume Range 500K to 800K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 12 Machine, Basic Configuration | |||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 2 | EA | $0.00 | $0.00 | 2 | ||||
| Components configured with a Usage Band 12 machine | |||||||||
| Purchase of Removable Hard Drives option for usage band 12 machine. | 2 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of Booklet Maker add-on to usage band 12 machine. | 2 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of Hole Punch add-on to usage band 12 machine.GBC Advance Punch | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Folder add-on to usage band 12 machine. | 0 | EA | $0.00 | $0.00 | 0 | ||||
| Purchase of Oversize Capacity paper feed add-on to usage band 12 machine. | 2 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of Perfect Bind add-on to usage band 12 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of High Capacity paper feed add-on to usage band 12 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of High Capacity Stacker add-on to usage band 12 machine. | 2 | EA | $0.00 | $0.00 | 2 | ||||
| Total estimated Usage Band 12 equipment purchase with components. | |||||||||
| (Carried over to clin 0005 on basic contract.) | $0.00 | $0.00 |
E-6 USAGE BAND 13
Typical Monthly Volume Range 800K to 1M per month See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 13 Machine, Basic Configuration | |||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Components configured with a Usage Band 13 machine | |||||||||
| Purchase of Removable Hard Drives option for usage band 13 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Booklet Maker add-on to usage band 13 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Hole Punch add-on to usage band 13 machine.GBC Advance Punch | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Folder add-on to usage band 13 machine. | 0 | EA | $0.00 | $0.00 | 0 | ||||
| Purchase of Oversize Capacity paper feed add-on to usage band 13 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Perfect Bind add-on to usage band 13 machine. | 0 | EA | $0.00 | $0.00 | 0 | ||||
| Purchase of High Capacity paper feed add-on to usage band 13 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of High Capacity Stacker add-on to usage band 13 machine. | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Total estimated Usage Band 13 equipment purchase with components. | |||||||||
| (Carried over to clin 0006 on basic contract.) | $0.00 | $0.00 | |||||||
| Total Estimated Equipment Purchase with Components. | $0.00 | $0.00 |
| Additional Equipment /Software Purchase | |||||||||
| E-7 | See attachment 1a- [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band. | ||||||||
| Additional Training Session | 1 | EA | $0.00 | $0.00 | 1 | ||||
| Flatbed Document Scanner | 10 | EA | $0.00 | $0.00 | 10 | ||||
| PC Work Station (price includes equipment and next business day onsite maintenance for 5 years) | 10 | EA | $0.00 | $0.00 | 10 | ||||
| PC/Work Station Removable Hard Drive Kit | 3 | EA | $0.00 | $0.00 | 3 | ||||
| Document Management Software (per license fee) | 20 | EA | $0.00 | $0.00 | 20 | ||||
| Total Estimated Additional Equipment/Software Purchase. | |||||||||
| (Carried over to clin 0007 on Basic contract.) | $0.00 | $0.00 |
| Maintenance | |
| M-1 | BASIC MAINTENANCE (8am-5pm, Mon-Fri). |
| (Includes All Consumable Supplies Except Paper) |
(see attachment 1b- [Configuration Options] for Basic configuration Description)
| Usage Band 8 Machines | machines in service | Type only in tan column | ||||||
| Basic Maint., Basic configuration of Usage Band 8 machine. | ||||||||
| 100,000 pgs/month Allowance. (# of machines ( 13 ) x 12 mo) = Est. Quantity of Months. | 156 | MO | $0.00 | $0.00 | 32 | 20 | ||
| Basic Maint., Basic configuration of Usage Band 8 machine. | ||||||||
| 200,000 pgs/month Allowance. (# of machines ( 7 ) x 12 mo) = Est. Quantity of Months. | 84 | MO | $0.00 | $0.00 | 2 | |||
| Total Estimated Usage Band 8 maintenance. | $0.00 | $0.00 | 34 | |||||
| Usage Band 9 Machines | machines in service | |||||||
| Basic Maint., Basic configuration of Usage Band 9 machine. | ||||||||
| 200,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months. | 72 | MO | $0.00 | $0.00 | 15 | 15 | ||
| Basic Maint., Basic configuration of Usage Band 9 machine. | ||||||||
| 300,000 pgs/month Allowance. (# of machines ( 3 ) x 12 mo) = Est. Quantity of Months. | 36 | MO | $0.00 | $0.00 | 2 | |||
| Total Estimated Usage Band 9 maintenance. | $0.00 | $0.00 | 17 | |||||
| Usage Band 10 Machines | machines in service | |||||||
| Basic Maint., Basic configuration of Usage Band 10 machine. | ||||||||
| 300,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months. | 72 | MO | $0.00 | $0.00 | 29 | 10 | ||
| Basic Maint., Basic configuration of Usage Band 10 machine. | ||||||||
| 400,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months. | 48 | MO | $0.00 | $0.00 | 4 | |||
| Total Estimated Usage Band 10 maintenance. | $0.00 | $0.00 | 33 | |||||
| Usage Band 11 Machines | machines in service | |||||||
| Basic Maint., Basic configuration of Usage Band 11 machine. | ||||||||
| 400,000 pgs/month Allowance. (# of machines ( 8 ) x 12 mo) = Est. Quantity of Months. | 96 | MO | $0.00 | $0.00 | 7 | 10 | ||
| Basic Maint., Basic configuration of Usage Band 11 machine. | ||||||||
| 500,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months. | 24 | MO | $0.00 | $0.00 | 2 | |||
| Total Estimated Usage Band 11 maintenance. | $0.00 | $0.00 | 9 | |||||
| Usage Band 12 Machines | machines in service | |||||||
| Basic Maint., Basic configuration of Usage Band 12 machine. | ||||||||
| 500,000 pgs/month Allowance. (# of machines ( 1 ) x 12 mo) = Est. Quantity of Months. | 12 | MO | $0.00 | $0.00 | 4 | 2 | ||
| Basic Maint., Basic configuration of Usage Band 12 machine. | ||||||||
| 800,000 pgs/month Allowance. (# of machines (1 ) x 12 mo) = Est. Quantity of Months. | 12 | MO | $0.00 | $0.00 | 1 | |||
| Total Estimated Usage Band 12 maintenance. | $0.00 | $0.00 | 5 | |||||
| Usage Band 13 Machines | machines in service | |||||||
| Basic Maint., Basic configuration of Usage Band 13 machine. | ||||||||
| 800,000 pgs/month Allowance. (# of machines ( 1 ) x 12 mo) = Est. Quantity of Months. | 12 | MO | $0.00 | $0.00 | 1 | 1 | ||
| Basic Maint., Basic configuration of Usage Band 13 machine. | ||||||||
| 1,000,000 pgs/month Allowance. (# of machines ( 0 ) x 12 mo) = Est. Quantity of Months. | - 0 | MO | $0.00 | $0.00 | 1 | |||
| Total Estimated Usage Band 13 maintenance. | $0.00 | $0.00 | 2 | |||||
| Total Estimated Basic Maintenance, all Usage Bands, all Machines. (Carried over to clin 0008 on Basic contract.) | $0.00 | $0.00 | 100 |
| M-2 | Basic Maintenance; Additional Add-on Components | |||||||
| Enter a single monthly maintenance price for each component, if applicable. | ||||||||
| Maintenance for Document Scanner | ||||||||
| (Qty of components ( 10 ) x 12 months) = Estimated Quantity of Months. | 120 | MO | $0.00 | $0.00 | 11 | |||
| Maintenance for Booklet Maker add-on. | ||||||||
| (Qty of components ( 58 ) x 12 months) = Estimated Quantity of Months. | 696 | MO | $0.00 | $0.00 | 58 | |||
| Maintenance for Hole Punch add-on. | ||||||||
| (Qty of components ( 6 ) x 12 months) = Estimated Quantity of Months. | 72 | MO | $0.00 | $0.00 | 6 | |||
| Maintenance for Folder add-on. | ||||||||
| (Qty of components ( 3 ) x 12 months) = Estimated Quantity of Months. | 36 | MO | $0.00 | $0.00 | 3 | |||
| Maintenance for High and Oversize Capacity paper feed add-on. | ||||||||
| (Qty of components ( 20 ) x 12 months) = Estimated Quantity of Months. | 240 | MO | $0.00 | $0.00 | 14 | |||
| Maintenance for Perfect Bind add-on. | ||||||||
| (Qty of components ( 2 ) x 12 months) = Estimated Quantity of Months. | 24 | MO | $0.00 | $0.00 | 4 | |||
| Maintenance for High Capacity Stacker add-on. (Qty of components ( 14 ) x 12 months) = Estimated Quantity of Months. | 168 | MO | $0.00 | $0.00 | ||||
| Total Estimated Basic Maintenance, all additional add-on Components | ||||||||
| (Carried over to clin 0009 on Basic contract.) | $0.00 | $0.00 | 85 |
| Additional Software Maintenance | |||||||||
| M-3 | See attachment 1a- [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band. | ||||||||
| Maintenance- Document Management Software (per license fee) | 30 | YR | $0.00 | $0.00 | 20 | ||||
| Total Estimated Additional Software Maintenance. | |||||||||
| (Carried over to clin 0010 on Basic contract.) | $0.00 | $0.00 |
| M-4 | EXTENDED HOURS MAINTENANCE |
| Extended Hours Maintenance; Usage Band 8 | |
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 8 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 8 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 8 machine.
| 15 | EA | $0.00 | $0.00 | ||
| Total Estimated Usage Band 8 Extended Hours maintenance. | $0.00 | $0.00 | |||
| Extended Hours Maintenance; Usage Band 9 | |||||
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 9 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 9 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 9 machine.
| 15 | EA | $0.00 | $0.00 | ||
| Total Estimated Usage Band 9 Extended Hours maintenance. | $0.00 | $0.00 | |||
| Extended Hours Maintenance; Usage Band 10 | |||||
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 10 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 10 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 10 machine.
| 15 | EA | $0.00 | $0.00 | ||
| Total Estimated Usage Band 10 Extended Hours maintenance. | $0.00 | $0.00 | |||
| Extended Hours Maintenance; Usage Band 11 | |||||
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 11 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 11 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 11 machine.
| 15 | EA | $0.00 | $0.00 | ||
| Total Estimated Usage Band 11 Extended Hours maintenance. | $0.00 | $0.00 | |||
| Extended Hours Maintenance; Usage Band 12 | |||||
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 12 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 12machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 12 machine.
| 15 | EA | $0.00 | $0.00 | ||
| Total Estimated Usage Band 12 Extended Hours maintenance. | $0.00 | $0.00 | |||
| Extended Hours Maintenance; Usage Band 13 | |||||
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 13 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 13 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 13 machine.
| 15 | EA | $0.00 | $0.00 | |||
| Total Estimated Usage Band 13 Extended Hours maintenance. | $0.00 | $0.00 | ||||
| Total Estimated Extended Hours Maintenance, all Usage Bands | ||||||
| (Carried over to clin 0011 on Basic contract.) | $0.00 | $0.00 |
O-1 Overage Click Charges (see instructions tab for pricing instructions)
| Usage Band 8 | |||||
| Overage click Charges for all Usage Band 8 machines, all Copy Allowances. | |||||
| Estimated Quantity for the Year. | 75,000,000 | EA | $0.00 | $0.00 | 20 |
| Usage Band 9 | |||||
| Overage click Charges for all Usage Band 9 machines, all Copy Allowances. | |||||
| Estimated Quantity for the Year. | 50,000,000 | EA | $0.00 | $0.00 | 15 |
| Usage Band 10 | |||||
| Overage click Charges for all Usage Band 10 machines, all Copy Allowances. | |||||
| Estimated Quantity for the Year. | 50,000,000 | EA | $0.00 | $0.00 | 10 |
| Usage Band 11 | |||||
| Overage click Charges for all Usage Band 11 machines, all Copy Allowances. | |||||
| Estimated Quantity for the Year. | 50,000,000 | EA | $0.00 | $0.00 | 10 |
| Usage Band 12 | |||||
| Overage click Charges for all Usage Band 12 machines, all Copy Allowances. | |||||
| Estimated Quantity for the Year. | 20,000,000 | EA | $0.00 | $0.00 | 2 |
| Usage Band 13 | |||||
| Overage click Charges for all Usage Band 13 machines, all Copy Allowances. | |||||
| Estimated Quantity for the Year. | 15,000,000 | EA | $0.00 | $0.00 | 1 |
| Total Estimated Overage Click Charges, all Usage Bands | |||||
| (Carried over to clin 0012 on Basic contract.) | $0.00 | $0.00 | 58 |
Schedule of Supplies/Services Page &Pof &N
SA4705-10-R-0130 &D
Months 13-24 Matrix
| PRICE MATRIX | |||||||
| Ref. | Description | Estimated Quantity | U/I | Unit Price (without trade-in | Unit Price (with trade-in) | Estimated | |
| Total Price (Without trade-in) | Estimated |
Total Price (with trade-in) Ordering Period - Months 13-24
| Equipment Purchase | |
| E-1 | USAGE BAND 8 |
Typical Monthly Volume Range 100K to 200K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 8 Machine, Basic Configuration | ||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 16 | EA | $0.00 | $0.00 | 36 | |||
| Components configured with a Usage Band 8 machine | ||||||||
| Purchase of Removable Hard Drives option for usage band 8 machine. | ||||||||
| 2 | EA | $0.00 | $0.00 | 5 | ||||
| Purchase of Booklet Maker add-on to usage band 8 machine. | ||||||||
| 16 | EA | $0.00 | $0.00 | 36 | ||||
| Purchase of Hole Punch add-on to usage band 8 machine. | ||||||||
| 0 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Folder add-on to usage band 8 machine. | ||||||||
| 2 | EA | $0.00 | $0.00 | 3 | ||||
| Purchase of Oversize Capacity paper feed add-on to usage band 8 machine. | ||||||||
| 2 | EA | $0.00 | $0.00 | 4 | ||||
| Purchase of High Capacity paper feed add-on to usage band 8 machine. | ||||||||
| 0 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of High Capacity Stacker add-on to usage band 8 machine. | 3 | EA | $0.00 | $0.00 | ||||
| Total estimated Usage Band 8 equipment purchase with components. | ||||||||
| (Carried over to clin 0001 on basic contract.) | $0.00 | $0.00 |
E-2 USAGE BAND 9
Typical Monthly Volume Range 200K to 300K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 9 Machine, Basic Configuration | |||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 5 | EA | $0.00 | $0.00 | 20 |
| Components configured with a Usage Band 9 machine |
(see attachment 1b- [Configuration Specifications] for a list of possible configurations)
| Purchase of Removable Hard Drives option for usage band 9 machine. | ||||||||
| 2 | EA | $0.00 | $0.00 | 4 | ||||
| Purchase of Booklet Maker add-on to usage band 9 machine. | ||||||||
| 5 | EA | $0.00 | $0.00 | 20 | ||||
| Purchase of Hole Punch add-on to usage band 9 machine. | ||||||||
| 0 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Folder add-on to usage band 9 machine. | ||||||||
| 1 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of Oversize Capacity paper feed add-on to usage band 9 machine. | ||||||||
| 3 | EA | $0.00 | $0.00 | 7 | ||||
| Purchase of High Capacity paper feed add-on to usage band 9 machine. | ||||||||
| 2 | EA | $0.00 | $0.00 | 3 | ||||
| Purchase of High Capacity Stacker add-on to usage band 9 machine. | 4 | EA | $0.00 | $0.00 | ||||
| Total estimated Usage Band 9 equipment purchase with components. | ||||||||
| (Carried over to clin 0002 on basic contract.) | $0.00 | $0.00 |
E-3 USAGE BAND 10
Typical Monthly Volume Range 300K to 400K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 10 Machine, Basic Configuration | |||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 5 | EA | $0.00 | $0.00 | 15 | ||||
| Components configured with a Usage Band 10 machine | |||||||||
| Purchase of Removable Hard Drives option for usage band 10 machine. | |||||||||
| 2 | EA | $0.00 | $0.00 | 5 | |||||
| Purchase of Booklet Maker add-on to usage band 10 machine. | |||||||||
| 5 | EA | $0.00 | $0.00 | 15 | |||||
| Purchase of Hole Punch add-on to usage band 10 machine. | |||||||||
| 2 | EA | $0.00 | $0.00 | 3 | |||||
| Purchase of Folder add-on to usage band 10 machine. | |||||||||
| 1 | EA | $0.00 | $0.00 | 2 | |||||
| Purchase of Oversize Capacity paper feed add-on to usage band 10 machine. | |||||||||
| 3 | EA | $0.00 | $0.00 | 7 | |||||
| Purchase of Perfect Bind add-on to usage band 10 machine. | |||||||||
| 1 | EA | $0.00 | $0.00 | 1 | |||||
| Purchase of High Capacity paper feed add-on to usage band 10 machine. | 2 | EA | $0.00 | $0.00 | 3 | ||||
| Purchase of High Capacity Stacker add-on to usage band 10 machine. | 3 | EA | $0.00 | $0.00 | |||||
| Total estimated Usage Band 10 equipment purchase with components. | |||||||||
| (Carried over to clin 0003 on basic contract.) | $0.00 | $0.00 |
E-4 USAGE BAND 11
Typical Monthly Volume Range 400K to 500K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 11 Machine, Basic Configuration | |||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 5 | EA | $0.00 | $0.00 | 15 | ||||
| Components configured with a Usage Band 11 machine | |||||||||
| Purchase of Removable Hard Drives option for usage band 11 machine. | 2 | EA | $0.00 | $0.00 | 4 | ||||
| Purchase of Booklet Maker add-on to usage band 11 machine. | 5 | EA | $0.00 | $0.00 | 15 | ||||
| Purchase of Hole Punch add-on to usage band 11 machine. | 1 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of Folder add-on to usage band 11 machine. | 0 | EA | $0.00 | $0.00 | 0 | ||||
| Purchase of Oversize Capacity paper feed add-on to usage band 11 machine. | 3 | EA | $0.00 | $0.00 | 4 | ||||
| Purchase of Perfect Bind add-on to usage band 11 machine. | 1 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of High Capacity paper feed add-on to usage band 11 machine. | 3 | EA | $0.00 | $0.00 | 4 | ||||
| Purchase of High Capacity Stacker add-on to usage band 11 machine. | 3 | EA | $0.00 | $0.00 | |||||
| Total estimated Usage Band 11 equipment purchase with components. | |||||||||
| (Carried over to clin 0004 on basic contract.) | $0.00 | $0.00 |
E-5 USAGE BAND 12
Typical Monthly Volume Range 500K to 800K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 12 Machine, Basic Configuration | |||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 1 | EA | $0.00 | $0.00 | 3 | ||||
| Components configured with a Usage Band 12 machine | |||||||||
| Purchase of Removable Hard Drives option for usage band 12 machine. | 1 | EA | $0.00 | $0.00 | 3 | ||||
| Purchase of Booklet Maker add-on to usage band 12 machine. | 1 | EA | $0.00 | $0.00 | 3 | ||||
| Purchase of Hole Punch add-on to usage band 12 machine. | 1 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of Folder add-on to usage band 12 machine. | 0 | EA | $0.00 | $0.00 | 0 | ||||
| Purchase of Oversize Capacity paper feed add-on to usage band 12 machine. | 1 | EA | $0.00 | $0.00 | 3 | ||||
| Purchase of Perfect Bind add-on to usage band 12 machine. | 1 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of High Capacity paper feed add-on to usage band 12 machine. | 1 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of High Capacity Stacker add-on to usage band 12 machine. | 1 | EA | $0.00 | $0.00 | |||||
| Total estimated Usage Band 12 equipment purchase with components. | |||||||||
| (Carried over to clin 0005 on basic contract.) | $0.00 | $0.00 |
E-6 USAGE BAND 13
Typical Monthly Volume Range 800K to 1M per month See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 13 Machine, Basic Configuration | |||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 0 | EA | $0.00 | $0.00 | 1 | ||||
| Components configured with a Usage Band 13 machine | |||||||||
| Purchase of Removable Hard Drives option for usage band 13 machine. | 0 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Booklet Maker add-on to usage band 13 machine. | 0 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Hole Punch add-on to usage band 13 machine. | 0 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Folder add-on to usage band 13 machine. | 0 | EA | $0.00 | $0.00 | 0 | ||||
| Purchase of Oversize Capacity paper feed add-on to usage band 13 machine. | 0 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Perfect Bind add-on to usage band 13 machine. | 0 | EA | $0.00 | $0.00 | 0 | ||||
| Purchase of High Capacity paper feed add-on to usage band 13 machine. | 0 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of High Capacity Stacker add-on to usage band 13 machine. | 0 | EA | $0.00 | $0.00 | |||||
| Total estimated Usage Band 13 equipment purchase with components. | |||||||||
| (Carried over to clin 0006 on basic contract.) | $0.00 | $0.00 | |||||||
| Total Estimated Equipment Purchase with Components. | $0.00 | $0.00 |
| Additional Equipment /Software Purchase | |||||||||
| E-7 | See attachment 1a- [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band. | ||||||||
| Additional Training Session | 1 | EA | $0.00 | $0.00 | 2 | ||||
| Flatbed Document Scanner | 10 | EA | $0.00 | $0.00 | 20 | ||||
| PC/Work Station (price includes equipment and next business day onsite maintenance for 5 years) | 10 | EA | $0.00 | $0.00 | 20 | ||||
| PC/Work Station Removable Hard Drive Kit | 4 | EA | $0.00 | $0.00 | 7 | ||||
| Document Management Software (per license fee) | 32 | EA | $0.00 | $0.00 | 52 | ||||
| Total Estimated Additional Equipment/Software Purchase. | |||||||||
| (Carried over to clin 0007 on Basic contract.) | $0.00 | $0.00 |
| Maintenance | ||
| M-1 | BASIC MAINTENANCE (8am-5pm, Mon-Fri). | Type only in tan column |
| (Includes All Consumable Supplies Except Paper) |
(see attachment 1b- [Configuration Options] for Basic configuration Description)
| Usage Band 8 Machines | Cum. # machines in svc | current buy break down | current buy total | ||||||
| Basic Maint., Basic configuration of Usage Band 8 machine. | |||||||||
| 100,000 pgs/month Allowance. (# of machines ( 12 ) x 12 mo) = Est. Quantity of Months. | 144 | EA | $0.00 | $0.00 | 51 | 19 | 16 | ||
| Basic Maint., Basic configuration of Usage Band 8 machine. | |||||||||
| 200,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months. | 48 | EA | $0.00 | $0.00 | 6 | 4 | |||
| Total Estimated Usage Band 8 maintenance. | $0.00 | $0.00 | 57 | ||||||
| Usage Band 9 Machines | machines in service | ||||||||
| Basic Maint., Basic configuration of Usage Band 9 machine. | |||||||||
| 200,000 pgs/month Allowance. (# of machines ( 3 ) x 12 mo) = Est. Quantity of Months. | 36 | EA | $0.00 | $0.00 | 24 | 9 | 5 | ||
| Basic Maint., Basic configuration of Usage Band 9 machine. | |||||||||
| 300,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months. | 24 | EA | $0.00 | $0.00 | 4 | 2 | |||
| Total Estimated Usage Band 9 maintenance. | $0.00 | $0.00 | 28 | ||||||
| Usage Band 10 Machines | machines in service | ||||||||
| Basic Maint., Basic configuration of Usage Band 10 machine. | |||||||||
| 300,000 pgs/month Allowance. (# of machines ( 3 ) x 12 mo) = Est. Quantity of Months. | 36 | EA | $0.00 | $0.00 | 47 | 18 | 5 | ||
| Basic Maint., Basic configuration of Usage Band 10 machine. | |||||||||
| 400,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months. | 24 | EA | $0.00 | $0.00 | 8 | 4 | |||
| Total Estimated Usage Band 10 maintenance. | $0.00 | $0.00 | 55 | ||||||
| Usage Band 11 Machines | machines in service | ||||||||
| Basic Maint., Basic configuration of Usage Band 11 machine. | |||||||||
| 400,000 pgs/month Allowance. (# of machines ( 4) x 12 mo) = Est. Quantity of Months. | 48 | EA | $0.00 | $0.00 | 12 | 5 | 5 | ||
| Basic Maint., Basic configuration of Usage Band 11 machine. | |||||||||
| 500,000 pgs/month Allowance. (# of machines (1 ) x 12 mo) = Est. Quantity of Months. | 12 | EA | $0.00 | $0.00 | 3 | 1 | |||
| Total Estimated Usage Band 11 maintenance. | $0.00 | $0.00 | 15 | ||||||
| Usage Band 12 Machines | machines in service | ||||||||
| Basic Maint., Basic configuration of Usage Band 12 machine. | |||||||||
| 500,000 pgs/month Allowance. (# of machines ( 1 ) x 12 mo) = Est. Quantity of Months. | 12 | EA | $0.00 | $0.00 | 6 | 2 | 1 | ||
| Basic Maint., Basic configuration of Usage Band 12 machine. | |||||||||
| 800,000 pgs/month Allowance. (# of machines (0 ) x 12 mo) = Est. Quantity of Months. | - 0 | EA | $0.00 | $0.00 | 2 | 1 | |||
| Total Estimated Usage Band 12 maintenance. | $0.00 | $0.00 | 8 | ||||||
| Usage Band 13 Machines | machines in service | ||||||||
| Basic Maint., Basic configuration of Usage Band 13 machine. | |||||||||
| 800,000 pgs/month Allowance. (# of machines ( 0 ) x 12 mo) = Est. Quantity of Months. | - 0 | EA | $0.00 | $0.00 | 2 | 1 | 0 | ||
| Basic Maint., Basic configuration of Usage Band 13 machine. | |||||||||
| 1,000,000 pgs/month Allowance. (# of machines ( 0 ) x 12 mo) = Est. Quantity of Months. | - 0 | EA | $0.00 | $0.00 | 1 | 0 | |||
| Total Estimated Usage Band 13 maintenance. | $0.00 | $0.00 | 3 | ||||||
| Total Estimated Basic Maintenance, all Usage Bands, all Machines. (Carried over to clin 0008 on Basic contract.) | $0.00 | $0.00 | 166 |
| M-2 | Basic Maintenance; Additional Add-on Components | |||||||
| Enter a single monthly maintenance price for each component, if applicable. | ||||||||
| Maintenance for Document Scanner add-on. | ||||||||
| (Qty of components ( 10 ) x 12 months) = Estimated Quantity of Months. | 120 | MO | $0.00 | $0.00 | 22 | |||
| Maintenance for Booklet Maker add-on. | ||||||||
| (Qty of components ( 32 ) x 12 months) = Estimated Quantity of Months. | 384 | EA | $0.00 | $0.00 | 90 | |||
| Maintenance for Hole Punch add-on. | ||||||||
| (Qty of components ( 4 ) x 12 months) = Estimated Quantity of Months. | 48 | EA | $0.00 | $0.00 | 10 | |||
| Maintenance for Folder add-on. | ||||||||
| (Qty of components ( 4 ) x 12 months) = Estimated Quantity of Months. | 48 | EA | $0.00 | $0.00 | 7 | |||
| Maintenance for High and Oversize Capacity paper feed add-on. | ||||||||
| (Qty of components ( 20 ) x 12 months) = Estimated Quantity of Months. | 240 | EA | $0.00 | $0.00 | 26 | |||
| Maintenance for Perfect Bind add-on. | ||||||||
| (Qty of components ( 3 ) x 12 months) = Estimated Quantity of Months. | 36 | EA | $0.00 | $0.00 | 9 | |||
| Maintenance for High Capacity Stacker add-on. (Qty of components ( 14 ) x 12 months) = Estimated Quantity of Months. | 168 | EA | $0.00 | $0.00 | ||||
| Total Estimated Basic Maintenance, all additional add-on Components | ||||||||
| (Carried over to clin 0009 on Basic contract.) | $0.00 | $0.00 | 142 |
| Additional Software Maintenance | |||||||||
| M-3 | See attachment 1a- [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band. | ||||||||
| Maintenance- Document Management Software (per license fee) | 10 | YR | $0.00 | $0.00 | 52 | ||||
| Total Estimated Additional Software Maintenance. | |||||||||
| (Carried over to clin 0010 on Basic contract.) | $0.00 | $0.00 |
| M-4 | EXTENDED HOURS MAINTENANCE |
| Extended Hours Maintenance; Usage Band 8 | |
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 8 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 8 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 8 machine.
| 15 | EA | $0.00 | $0.00 | ||
| Total Estimated Usage Band 8 Extended Hours maintenance. | $0.00 | $0.00 | |||
| Extended Hours Maintenance; Usage Band 9 | |||||
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 9 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 9 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 9 machine.
| 15 | EA | $0.00 | $0.00 | ||
| Total Estimated Usage Band 9 Extended Hours maintenance. | $0.00 | $0.00 | |||
| Extended Hours Maintenance; Usage Band 10 | |||||
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 10 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 10 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 10 machine.
| 15 | EA | $0.00 | $0.00 | ||
| Total Estimated Usage Band 10 Extended Hours maintenance. | $0.00 | $0.00 | |||
| Extended Hours Maintenance; Usage Band 11 | |||||
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 11 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 11 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 11 machine.
| 15 | EA | $0.00 | $0.00 | ||
| Total Estimated Usage Band 11 Extended Hours maintenance. | $0.00 | $0.00 | |||
| Extended Hours Maintenance; Usage Band 12 | |||||
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 12 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 12machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 12 machine.
| 15 | EA | $0.00 | $0.00 | ||
| Total Estimated Usage Band 12 Extended Hours maintenance. | $0.00 | $0.00 | |||
| Extended Hours Maintenance; Usage Band 13 | |||||
| Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday. |
(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 13 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday. |
(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).
To be priced/purchased by the week, as needed, per UB 13 machine.
| 15 | WK | $0.00 | $0.00 |
| Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am) |
Assignment information to be indicated in the task order.
Price for "EA" = a single (48hr) weekend unit, as needed, per UB 13 machine.
| 15 | EA | $0.00 | $0.00 | |||
| Total Estimated Usage Band 13 Extended Hours maintenance. | $0.00 | $0.00 | ||||
| Total Estimated Extended Hours Maintenance, all Usage Bands | ||||||
| (Carried over to clin 0011 on Basic contract.) | $0.00 | $0.00 |
O-1 Overage Click Charges
| Usage Band 8 | |||||||||
| Overage click Charges for all Usage Band 8 machines, all Copy Allowances. Estimated Quantity for the Year. | 100,000,000 | EA | $0.00 | $0.00 | 36 | ||||
| Usage Band 9 | |||||||||
| Overage click Charges for all Usage Band 9 machines, all Copy Allowances. | |||||||||
| Estimated Quantity for the Year. | 55,000,000 | EA | $0.00 | $0.00 | 20 | ||||
| Usage Band 10 | |||||||||
| Overage click Charges for all Usage Band 10 machines, all Copy Allowances. | |||||||||
| Estimated Quantity for the Year. | 45,000,000 | EA | $0.00 | $0.00 | 15 | ||||
| Usage Band 11 | |||||||||
| Overage click Charges for all Usage Band 11 machines, all Copy Allowances. | |||||||||
| Estimated Quantity for the Year. | 55,000,000 | EA | $0.00 | $0.00 | 15 | ||||
| Usage Band 12 | |||||||||
| Overage click Charges for all Usage Band 12 machines, all Copy Allowances. | |||||||||
| Estimated Quantity for the Year. | 30,000,000 | EA | $0.00 | $0.00 | 3 | ||||
| Usage Band 13 | |||||||||
| Overage click Charges for all Usage Band 13 machines, all Copy Allowances. | |||||||||
| Estimated Quantity for the Year. | 22,000,000 | EA | $0.00 | $0.00 | 1 | ||||
| Total Estimated Overage Click Charges, all Usage Bands | |||||||||
| (Carried over to clin 0012 on Basic contract.) | $0.00 | $0.00 | 90 |
Schedule of Supplies/Services Page &Pof &N
SA4705-10-R-0130 &D
Months 25-36 Matrix
| PRICE MATRIX | |||||||
| Ref. | Description | Estimated Quantity | U/I | Unit Price (without trade-in | Unit Price (with trade-in) | Estimated | |
| Total Price (Without trade-in) | Estimated |
Total Price (with trade-in) Ordering Period - Months 25-36
| Equipment Purchase | |
| E-1 | USAGE BAND 8 |
Typical Monthly Volume Range 100K to 200K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 8 Machine, Basic Configuration | ||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 13 | EA | $0.00 | $0.00 | 49 | |||
| Components configured with a Usage Band 8 machine | ||||||||
| Purchase of Removable Hard Drives option for usage band 8 machine. | ||||||||
| 2 | EA | $0.00 | $0.00 | 7 | ||||
| Purchase of Booklet Maker add-on to usage band 8 machine. | ||||||||
| 13 | EA | $0.00 | $0.00 | 49 | ||||
| Purchase of Hole Punch add-on to usage band 8 machine. | ||||||||
| 0 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of Folder add-on to usage band 8 machine. | ||||||||
| 2 | EA | $0.00 | $0.00 | 5 | ||||
| Purchase of Oversize Capacity paper feed add-on to usage band 8 machine. | ||||||||
| 2 | EA | $0.00 | $0.00 | 6 | ||||
| Purchase of High Capacity paper feed add-on to usage band 8 machine. | ||||||||
| 0 | EA | $0.00 | $0.00 | 1 | ||||
| Purchase of High Capacity Stacker add-on to usage band 8 machine. | 3 | EA | $0.00 | $0.00 | ||||
| Total estimated Usage Band 8 equipment purchase with components. | ||||||||
| (Carried over to clin 0001 on basic contract.) | $0.00 | $0.00 |
E-2 USAGE BAND 9
Typical Monthly Volume Range 200K to 300K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 9 Machine, Basic Configuration | |||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 10 | EA | $0.00 | $0.00 | 30 |
| Components configured with a Usage Band 9 machine |
(see attachment 1b- [Configuration Specifications] for a list of possible configurations)
| Purchase of Removable Hard Drives option for usage band 9 machine. | ||||||||
| 2 | EA | $0.00 | $0.00 | 6 | ||||
| Purchase of Booklet Maker add-on to usage band 9 machine. | ||||||||
| 10 | EA | $0.00 | $0.00 | 30 | ||||
| Purchase of Hole Punch add-on to usage band 9 machine. | ||||||||
| 1 | EA | $0.00 | $0.00 | 2 | ||||
| Purchase of Folder add-on to usage band 9 machine. | ||||||||
| 1 | EA | $0.00 | $0.00 | 3 | ||||
| Purchase of Oversize Capacity paper feed add-on to usage band 9 machine. | ||||||||
| 3 | EA | $0.00 | $0.00 | 10 | ||||
| Purchase of High Capacity paper feed add-on to usage band 9 machine. | ||||||||
| 0 | EA | $0.00 | $0.00 | 3 | ||||
| Purchase of High Capacity Stacker add-on to usage band 9 machine. | 2 | EA | $0.00 | $0.00 | ||||
| Total estimated Usage Band 9 equipment purchase with components. | ||||||||
| (Carried over to clin 0002 on basic contract.) | $0.00 | $0.00 |
E-3 USAGE BAND 10
Typical Monthly Volume Range 300K to 400K See attachment 1a- [Equipment Specification Requirements], for a description of requirements for this usage band.
| Purchase of Usage Band 10 Machine, Basic Configuration | |||||||||
| (see attachment 1b- [Configuration Options] for Basic configuration Description) | 5 | EA | $0.00 | $0.00 | 20 | ||||
| Components configured with a Usage Band 10 machine | |||||||||
| Purchase of Removable Hard Drives option for usage band 10 machine. | |||||||||
| 2 | EA | $0.00 | $0.00 | 7 | |||||
| Purchase of Booklet Maker add-on to usage band 10 machine. | |||||||||
| 5 | EA | $0.00 | $0.00 | 20 | |||||
| Purchase of Hole Punch add-on to usage band 10 machine. | |||||||||
| 1 | EA | $0.00 | $0.00 | 4 | |||||
| Purchase of Folder add-on to usage band 10 machine. | |||||||||
| 0 | EA | $0.00 | $0.00 | 2 | |||||
| Purchase of Oversize Capacity paper feed add-on to usage band 10 machine. | |||||||||
| 2 | EA | $0.00 | $0.00 | 9 | |||||
| Purchase of Perfect Bind add-on to usage band 10 machine. | |||||||||
| 1 | EA | $0.00 | $0.00 | 2 | |||||
| Purchase of High Capacity paper feed add-on to usage band 10 machine. | 2 | EA | $0.00 | $0.00 | 5 | ||||
| Purchase of High Capacity Stacker add-on to usage band 10 machine. | 3 | EA | $0.00 | $0.00 | |||||
| Total estimated Usage Band 10 equipment purchase with components. | |||||||||
| (Carried over to clin 0003 on basic contract.) | $0.00 | $0.00 |
E-4 USAGE BAND 11
Typical Monthly Volume Range 400K to 500K See…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .