Questions for B34 and B42 DWV System Smoke Testing.docx
DOCX document 17 KB Posted
- Solicitation number
- SP470327Q0003
- Issued by
-
Defense Logistics Agency
About this file
This file is a Questions and Answers document clarifying requirements for solicitation SP4703-27-Q-0003, a Defense Logistics Agency Request for Quotes for DWV System Smoke Testing and Hydro Jetting services at Buildings 34 and 42 located in Chesterfield County, Virginia. The government confirmed that CAD drawings are available for reference, though specific system quantities are not provided; contractors must inspect and jet the entire DWV and sanitary systems as accessible and document any inaccessible sections. Work hours are restricted to 6:00 PM – 5:30 AM for Building 34 and normal business hours for Building 42, with the government coordinating building access.
The Q&A addresses key compliance and deliverable requirements: contractors may use subcontractor experience to meet the three-year experience and five-project minimum requirements; a bid guarantee is not required; CCTV video recording is permitted without security approval; final inspection reports must include pipe locations, identified deficiencies, inaccessible section documentation, findings, recommendations, and supporting photos with all CCTV footage clearly labeled by building and location in PDF and MP4 formats respectively; no NASSCO PACP certification, Virginia contractor license, or confined-space entry certification is required; and pricing should be structured as a lump sum per building regardless of actual quantities. This is a small-business set-aside (100%) with a firm-fixed-price award and 60-day period of performance, requiring offerors to maintain a bona fide place of business within 120 miles of the Defense Supply Center Richmond.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 SP4703-27-Q-0003.pdf | ||
| B34B42Plumbing_Drawings.zip | ZIP file | |
| AddendumtoRFPOfferRequirements.pdf | ||
| SF1449_SP470327Q0003.pdf | ||
| DSCR-B34-B42-Smoke-Testing-SOW.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions for B34 and B42 DWV System Smoke Testing & Hydro Jetting:
1. Could you please provide available DWV plumbing drawings, building floor plans, sewer line layouts, pipe sizes, estimated pipe lengths, and cleanout/access locations for Buildings 34 and 42? The SOW appears to include only a site location map. CAD drawings attached.
2. Please confirm how inaccessible piping sections should be addressed and whether any estimated system quantities or existing inspection records are available. Any piping sections that are inaccessible shall be documented in the final inspection report, including locations and the reason access was not possible. We do not have any existing inspection records available.
3. The solicitation requires after-hours work. Please confirm the permitted working hours and whether weekend work is authorized. Building 34 the hours for work will be between the hours of 6:00 PM – 5:30 AM. Building 42 can be done during normal business hours.
4. Please confirm whether a bid guarantee is required with the quotation, the required performance and payment bond amounts, and the applicable insurance coverage limits.
5. May the prime contractor utilize a qualified subcontractor's experience and project references to satisfy the minimum three-year experience and five-project requirements? Additionally, which limitation-on-subcontracting percentage applies? Yes.
6. Please confirm which construction-specific requirements, including bonding, QC procedures, three-phase inspections, and the one-year warranty, apply to this inspection-only project where repairs are not authorized.
7. Please confirm whether CCTV video recording is permitted within the installation and whether any security approval or restrictions apply to the required video footage and USB submission. Yes. Security approval is not needed for this requirement.
8. Please clarify the required level of detail for the final inspection reports, including pipe-location documentation, footage labeling, and acceptance criteria. The final inspection report shall include the location of all piping inspected, identification of any deficiencies found, and documentation of inaccessible sections. All CCTV footage will be clearly labeled by building and pipe location. The report shall include findings, recommendations, and supporting photos.
9. The SOW scopes the "entire" DWV and sanitary systems but states no quantities. Please provide, per building: total linear feet of mains, branch lines, and stacks to be jetted/inspected; pipe diameter range; and number of cleanouts/access points — or confirm pricing is a single lump sum per building regardless of quantity. We do not have quantities of DWV systems. Inspect and jet and camera what can be done and document any sections that cannot be completed.
10. Licensing and certifications. Are any of the following required of the firm performing the work: a Virginia contractor license (and which class), NASSCO PACP certification for CCTV operators, or specific confined-space entry certification? No for the certification for CCTV operators. No, there’s zero confined spaces in both buildings.
11. Who coordinates building access and any drain-system shutdown windows for the required after-hours work? I will be coordinating building access.
12. What format is required for the CCTV inspection results and the system maps referenced in the notice (e.g., PACP-coded reports, specific software/format)? CCTV inspection results must be provided in PDF and all video recordings submitted in MP4 format.
File details come from the government source that posted it. Updated .