This is a solicitation for construction services to demolish an implant office at the Defense Supply Center Richmond facility. The contractor will be required to demolish the entire 59E implant office, remove electrical wiring, data cables, flooring, and all other fixtures. Additional requirements include filling cracks in the concrete floor, removing expansion joints, capping water and fire sprinkler lines, removing concrete around drains, disposing of all remaining materials, and patching and painting the floor. Inspections will take place on Tuesdays through Thursdays. The acquisition is set aside for small businesses with a size standard of $19 million. The period of performance is 90 days from notice to proceed. Quotes are due by March 2, 2024 and award will be made to the lowest priced technically acceptable offeror.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. TYPE OF SOLICITATION
NEGOTIATED (RFP)
3. DATE ISSUED1. SOLICITATION NUMBER
SOLICITATION, OFFER,
AND AWARD
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
6. PROJECT NUMBER5. REQUISITION/PURCHASE REQUEST NUMBER4. CONTRACT NUMBER
8. ADDRESS OFFER TO 7. ISSUED BY CODE
9. FOR INFORMATION
CALL:
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)a. NAME
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
11. The contractor shall begin performance calendar days and complete it within calendar days after receiving
(See ).notice to proceed. This performance period isaward, mandatory negotiable.
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12b).
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by
NOYES
(hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes
b. An offer guarantee
STANDARD FORM 1442 (REV 9-16)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
NSN 7540-01-155-3212
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) is, is not required.
SEALED BID (IFB)
SP4703-24-Q-0021 2024 FEB 03
7005797371
SP4703
DCSO RICHMOND DIVISION #1
6090 STRATHMORE RD.
RICHMOND VA 23237
USA
DCSO RICHMOND DIVISION #1
6090 STRATHMORE RD.
RICHMOND VA 23237
USA
Robert Moragues DRM0132 (804) 279-5309
See Continuation Page(s)
10 90
1 03:00 PM
2024 MAR 01
X
(Construction, Alteration, or Repair)
FACILITY CODECODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirementby the Government in writing within
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or Print) 20b. SIGNATURE 20c OFFER DATE.
AWARD (To be completed by Government)
22. AMOUNT
21. ITEMS ACCEPTED:
23. ACCOUNTING AND APPROPRIATION DATA
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
)10 U.S.C.2304(c) ( )41 U.S.C.3304(a) (
27. PAYMENT WILL BE MADE BY26. ADMINISTERED BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 1442 (REV 9-16) BACK
31b. UNITED STATES OF AMERICA 31c. DATE
BY
30b. SIGNATURE 30c. DATE
(4 copies unless otherwise specified)
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 3 OF 26 PAGES
SP4703-24-Q-0021
Defense Supply Center Richmond(DSCR) Building 59E Implant Office Demolition
This is a solicitation for construction prepared in accordance with the format in FAR Part 36, as supplemented with additional information included in this notice. The solicitation number SP4703-24-Q-0021 is issued as a request for quote (RFQ). The resulting contract will be a firm-fixed price award with an expected Period of Performance of 90 days after issuance of the Notice to Proceed (NTP). This acquisition is set-aside for 100% small businesses. The North American Industry Classification System (NAICS) Code is 238910 (Site Preparation Contractors). The small business size standard is $19M. Department of Labor Wage Determination based on location of the service provided (Chesterfield County, VA). Partial proposals will not be accepted.
For an offer to be considered for award, the contractor must be within a commutable driving distance to the DSCR facility. A 120-mile radius from DSCR is considered the commutable radius.
SPECIFIC REQUIREMENTS
-The contractor shall demolish the entire 59E implant office.
-Remove all electrical wiring and conduit back to the panels.
-Remove all data, cable etc. back to the switch. Will need to coordinate with J6 to access COMM closet. Provide 5 business days’ notice to access the comm closet. Remove the cable tray to the highest point.
-Remove all flooring down to bare concrete.
-Fill up to 200LF of cracks in the concrete floor. Grind out the cracks ¼” deep and wide. Clean and fill with an approved concrete crack filler per manufacturers recommendations. Prior to filling cracks an inspection is required.
Provide 2 business days’ notice for this inspection.
-Remove the expansion joint in the floor completely. Fill the expansion joint with an approved expansion joint sealant per manufacturers recommendations. Prior to filling the expansion joint an inspection is required. Provide 2 business days’ notice for this inspection.
-On the exterior of this implant (but inside the warehouse) there are water lines that went to a hot water heater. The HW heater has been removed but the copper water lines remain. Cap off the old water lines that went to the water heater as high as possible along the North wall.
-Remove and cap off the fire sprinkler system. Remove all fire alarm devices. Remove the vertical pipe to the highest level to meet the horizontal pipe.
-Demo the concrete around all drains so a plug/cap can be installed on all the drain lines to seal off gases. Place concrete over the plugged/capped a minimum of 4” thick. Bagged concrete may be used. Prior to placing concrete an inspection is required. Provide 2 business days’ notice for this inspection.
-Remove and dispose of all materials, furniture and any other items left in this office.
-Remove all equipment mounted to the wall including any associated conduit. Patch all holes left by removing these items.
-The concrete floor in the footprint of the implant office needs to match the surrounding area in smoothness. Polish the footprint to a minimum image clarity of level 1 (flat). All glue, adhesives etc. need to be removed. The floor needs to be free of protrusions.
- Prime/paint the floor to match the surroundings area using a minimum of two coats. Take a sample of the surrounding floor paint to match. Use a paint with low VOC and that allows vapors to pass through.
- Move all lockers or other items on the outside of the office that may be in the way of demolition.
- Remove and save the access card reader at the main doors. Provide to PM.
- Remove and save all the fire alarm notification appliances. Provide to PM.
-Reinstall one of the existing notification appliances on the east wall of the bay, approximately 25 ft. from the north wall of the bay. The appliance should be adjusted to the 110-candela setting. Install and test per NFPA.
-All inspections for this project must take place on Tuesdays, Wednesdays, or Thursdays regardless of when notification is provided.
-A dumpster can be placed very close to this implant outside the warehouse.
-Provide a portable toilet.
-Any other items not listed in this SOW shall be considered part of this demolition project.
-The specific location of 59E is shown in red on the map at the end of this document.
The height of the office is about 12’. The height of the warehouse roof is approximately 35’. If the contractor would like to look at the top of the office, they need to provide their own correctly sized ladder. No one will be allowed to walk on the office top for pre-bid investigation.
Award will be made to the lowest priced, technically acceptable (LPTA) offeror that meets the requirements stated in the Statement of Work and the solicitation. Also refer to clauses and provisions includes in this notice. Past performance will be considered a part of Technical Acceptability, and the Contracting Officer will pull contractor data from CPARS and SPRS.
The contractor must be registered in the System for Award Management (SAM) prior to award. If not already registered in SAM, go to the SAM website www.sam.gov to register prior to submitting your quote.
All inquiries must be submitted no later than 7 business days prior to closing date. Acceptable method of quote submission is Email to Robert.Moragues@dla.mil.
Questions are due on February 29, 2024, end of day. Submit questions via email to Robert.Moragues@dla.mil.
Quotes are due on March 02, 2024, end of day.
A site visit will be held at 1030 on February 22, 2024. A map which details the location of the site visit can be found on p.42 of the Statement of Work(SOW). Visitors must contact the Project Manager/Sponsor, Mike OConnor (via email only at Michael.OConnor@dla.mil) 72 hours prior to the site visit and confirm plan to attend.
Access to Defense Supply Center Richmond is dictated by the language at the following location:
https://www.dla.mil/Aviation/Installation/Visitors-and-ID-Office/
The points of contact (POC) for this requirement is Robert “Lee” Moragues (Robert.Moragues@dla.mil).
PAGE 4 OF 26 PAGES
Reference Attachment 1 - Statement of Work (SOW) for additional work scope, details, and DSCR map.
Period of Performance:90 days from NTP
**********************************Submission Requirements*****************************************************
Instructions:
Instructions contained herein are to serve as a guide in preparation of offers for this solicitation and are not intended to be all inclusive. These instructions generally describe the type and extent of information that should be provided in the offer and emphasize several areas that are generally considered significant. The offeror is expected to completely examine and analyze all aspects of the technical areas to be addressed and to include information in its offer that will enable the evaluators to determine the offerors’ understanding of the requirements.
Offers submitted shall be contained in two separate volumes as follows:
Volume I – Technical Submission:
The Technical Submission should consist of two elements:
(1) A description of the vendors’ understanding of the work to be performed as described in the Statement of Work.
The description should demonstrate an understanding of the requirement and include a plan for satisfying the Government’s minimum needs. The description should outline the actual work as specifically as possible.
(2) Past Performance: The vendor shall document past performance and experience working with projects similar to the one described in the SOW. Documentation shall include relevant contract numbers, a brief description of the scope and magnitude of the work, information pertaining to when the work was completed, and a customer POC with contact information. Past performance and experience should demonstrate relevancy to the solicited projects, and document customer satisfaction and quality level achieved on prior projects.
Total Page Limit for Volume I: Five (5) pages.
Volume II – Pricing:
By way of a fully executed/signed (including Section B) SF 1442, a firm fixed price quotation shall be provided for this requirement. Additional pricing information may be requested and/or provided separately as necessary. The Contractor is responsible for providing adequate documentation to enable a thorough evaluation of the offer and may choose to supplement the lump sum pricing stipulated on the SF 1442 with a formal quote and/or price breakdown on company letterhead, if desired.
*****************************************Evaluation Criteria********************************************************
The offer will be evaluated on the basis of the following criteria:
Factor 1 - Technical Acceptability In evaluation of this factor, offers will be evaluated to ensure:
1. The Vendor possesses an adequate understanding of the work as well as a process for ensuring quality and timeliness.
2. The Government has an acceptable level of confidence that the vendor can adequately perform the work described in the SOW.
Based on the Government’s evaluation of the respective vendor’s technical submission, each vendor shall be assigned an overall Technical Rating in accordance with the definitions below:
Technically Acceptable: Offer meets the requirements of the solicitation and based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Technically Unacceptable: Offer does not meet the requirements of the solicitation and/or based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
Factor 2- Price
Proposed price will be evaluated to determine reasonableness and completeness. The total firm-fixed price will be evaluated.
***************************************Standard DSCR Visitor Information************************
A new system was implemented on 3 January 2023 to screen visitors and contractors for installation access at DSCR. The new system is designed to increase efficiencies, enhance the protection of personal information during the vetting process and eliminate the use of hard copy DLA Form 1815s. The new screening system will require visitors and contractors to pre-enroll in DBIDS (Defense Biometric Identification System). To begin the process, visitors and contractors will complete registration through the preenrollment website:
https://dbids-global-enroll.dmdc.mil.
Upon entry of their information, visiting personnel will be provided an electronic form to download, which will have an individualized barcode and alpha numeric code. The codes will be electronically sent to the visiting person’s
PAGE 5 OF 26 PAGES
SP4703-24-Q-0021
sponsor. Once in receipt of the barcode, the sponsor will email Security and Emergency Services and provide the barcode and sponsorship information.
Once the visitor/contractor is vetted and approved for installation access, Security & Emergency Services will notify the sponsor that the visitor/contractor can go to the DSCR Visitor Center to obtain his/her pass.
At the Visitor Center, the visitor provides the barcode and code provided earlier in the process and completes the credentialing process. Visitors should arrive at the visitor center at least 45 minutes prior to their meeting time to receive visitor badges.
PAGE 6 OF 26 PAGES
SP4703-24-Q-0021
SECTION B
SUPPLIES/SERVICES: P400-V00007521
ITEM DESCRIPTION:
See Attached Statement of Work.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .
0001 P400-V00007521 1.000 JB $ ________________ $ ________________
DEMOLITION OF
IMPLANT OFFICE
PRICING TERMS: Firm Fixed Price
PREP FOR DELIVERY:
See Attached Statement of Work.
PERIOD OF PERFORMANCE: 03/16/2024 - 06/16/2024
SC0400
DLA AVIATION
6090 STRATHMORE ROAD
BUSINESS OPERATIONS
RICHMOND VA 23237
US
SC0400
DLA AVIATION
6090 STRATHMORE ROAD
BUSINESS OPERATIONS
RICHMOND VA 23237
US
GOVT USE
External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .
0001 7005797371 0001 N/A N/A N/A 12/20/2023
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 7 OF 26 PAGES
SECTION A - SOLICITATION/CONTRACT FORM
TECHNICAL REQUIREMENTS
THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN `R' OR AN `I' NUMBER IN SECTION B) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE
WEB AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-
ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020) FAR
SECTION C - SPECIFICATIONS/SOW/SOO/ORD
C03 CONTRACTOR RETENTION OF SUPPLY CHAIN TRACEABILITY DOCUMENTATION (MAR 2023)
SECTION E - INSPECTION AND ACCEPTANCE
E07 EVALUATION FACTOR FOR ORIGIN INSPECTION (JAN 2018)
52.246-2 INSPECTION OF SUPPLIES FIXED PRICE (AUG 1996) FAR
52.246-13 INSPECTION-DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996) FAR
SECTION F - DELIVERIES OR PERFORMANCE
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) FAR
As prescribed in 11.404(b), insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90.* The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES --- CONSTRUCTION (SEP 2000) FAR
As prescribed in 11.503(b), insert the following clause in solicitations and contracts:
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.242-14 SUSPENSION OF WORK (APR 1984) FAR
52.242-15 STOP-WORK ORDER (AUG 1989) FAR
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984) FAR
52.247-34 F.O.B. DESTINATION (NOV 1991) FAR
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 8 OF 26 PAGES
SP4703-24-Q-0021
SECTION H - SPECIAL CONTRACT REQUIREMENTS (CONTINUED)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H14 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS (DEC 2021)
H16 OPERATIONS SECURITY (OPSEC) FOR ON-SITE CONTRACTORS (DEC 2021)
H17 RESTRICTION ON FSC 5962, ELECTRONIC MICROCIRCUITS (JUL 2022)
252.223-7001 HAZARD WARNING LABELS (DEC 1991) DFARS
(a) “Hazardous material,” as used in this clause, is defined in the Hazardous Material Identification and Material Safety Data clause of this contract.
(b) The Contractor shall label the item package (unit container) of any hazardous material to be delivered under this contract in accordance with the Hazard Communication Standard (29 CFR 1910.1200 et seq). The Standard requires that the hazard warning label conform to the requirements of the standard unless the material is otherwise subject to the labelling requirements of one of the following statutes:
(1) Federal Insecticide, Fungicide and Rodenticide Act;
(2) Federal Food, Drug and Cosmetics Act;
(3) Consumer Product Safety Act;
(4) Federal Hazardous Substances Act; or
(5) Federal Alcohol Administration Act.
(c) The Offeror shall list which hazardous material listed in the Hazardous Material Identification and Material Safety Data clause of this contract will be labelled in accordance with one of the Acts in paragraphs (b)(1) through (5) of this clause instead of the Hazard Communication Standard. Any hazardous material not listed will be interpreted to mean that a label is required in accordance with the Hazard Communication Standard.
MATERIAL
(If None, Insert “None.”) ACT
(d) The apparently successful Offeror agrees to submit, before award, a copy of the hazard warning label for all hazardous materials not listed in paragraph
(c) of this clause. The Offeror shall submit the label with the Material Safety Data Sheet being furnished under the Hazardous Material Identification and Material Safety Data clause of this contract.
(e) The Contractor shall also comply with MIL-STD-129, Marking for Shipment and Storage (including revisions adopted during the term of this contract).
SECTION I - CONTRACT CLAUSES
52.203-18 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS-REPRESENTATION (JAN 2017) FAR
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS (JAN 2017)
FAR
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) DFARS
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (DEC 2022) DFARS
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011) FAR
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018) FAR
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016) FAR
52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR INDEFINITE-DELIVERY CONTRACTS (OCT 2016) FAR
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 9 OF 26 PAGES
SECTION I - CONTRACT CLAUSES (CONTINUED)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020) FAR
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) FAR
52.204-20 PREDECESSOR OF OFFEROR (AUG 2020) FAR
As prescribed in 4.1804(d), insert the following provision:
(a) Definitions. As used in this provision -- Commercial and Government Entity (CAGE) code means --
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
Predecessor means an entity that is replaced by a successor and includes any predecessors of the predecessor.
Successor means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). The term “successor” does not include new offices/divisions of the same company or a company that only changes its name.
The extent of the responsibility of the successor for the liabilities of the predecessor may vary, depending on State law and specific circumstances.
(b) The Offeror represents that it [ ] is or [ ] is not a successor to a predecessor that held a Federal contract or grant within the last three years.
(c) If the Offeror has indicated “is” in paragraph (b) of this provision, enter the following information for all predecessors that held a Federal contract or grant within the last three years (if more than one predecessor, list in reverse chronological order):
Predecessor CAGE code: (or mark “Unknown”).
Predecessor legal name: .
(Do not use a “doing business as” name).
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) FAR
252.204-7000 DISCLOSURE OF INFORMATION (OCT 2016) DFARS
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992) DFARS
252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN 2023) DFARS
252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR REPORTED CYBER INCIDENT
INFORMATION (JAN 2023) DFARS
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING (JAN 2023) DFARS
252.204-7014 LIMITATIONS ON THE USE OR DISCLOSURE OF INFORMATION BY LITIGATION SUPPORT CONTRACTORS (JAN
2023) DFARS
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT (JAN 2023) DFARS
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (NOV 2021) FAR
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (NOV 2015) FAR
52.211-5 MATERIAL REQUIREMENTS (AUG 2000) FAR
52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997) FAR
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020) FAR
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 26 PAGES
SP4703-24-Q-0021
SECTION I - CONTRACT CLAUSES (CONTINUED)
52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2023) FAR
As prescribed in 19.309(c)(1), insert the following clause:
(a) Definitions. As used in this clause - Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern -
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause.
(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts -
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, when the Contracting Officer explicitly requires it for an order issued under a multiple-award contract.
(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.
(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees if the acquisition -
(1) Was set aside for small business and has a value above the simplified acquisition threshold;
(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or
(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraph (b) and (c) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.
(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.
(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [] is, [] is not a small business concern under NAICS Code assigned to contract number ZF_219_28_04&.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [] is, [] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [] is, [] is not a women-owned small business concern.
(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [] is, [] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: .]
(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [] is, [] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: .]
(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [] is, [] is not a veteran-owned small business concern.
(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [] is, [] is not a service-disabled veteran-owned small business concern.
(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that -
(i) It [] is, [] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 11 OF 26 PAGES
SP4703-24-Q-0021
SECTION I - CONTRACT CLAUSES (CONTINUED)
(ii) It [] is, [] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.
[Contractor to sign and date and insert authorized signer's name and title.]
52.219-28 POST AWARD SMALL BUSINESS PROGRAM REREPRESENTATION -- ALTERNATE I (MAR 2020) FAR Alternate I. As prescribed in 19.309(c)(2), substitute the following paragraph (h)(1) for paragraph (h)(1) of the basic clause:
(h)(1) The Contractor represents its small business size status for each one of the NAICS codes assigned to this contract.
NAICS CODE
SMALL BUSINESS
CONCERN
(YES/NO)
252.219-7000 ADVANCING SMALL BUSINESS GROWTH (JUN 2023) FAR
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) FAR
52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES (DEC 2022) FAR
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015) FAR
52.222-26 EQUAL OPPORTUNITY (SEP 2016) FAR
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (APR 2015) FAR
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) FAR
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES---ALTERNATE I (JUL 2014) FAR Alternate I. As prescribed in 22.1408(b), add the following as a preamble to the clause:
Notice: The following term(s) of this clause are waived for this contract: .
52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021) FAR
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (JAN 2022) FAR
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (FEB 2021) FAR
(a) “Hazardous material,” as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).
(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.
Material (If none, insert None)
Identification No.
(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 12 OF 26 PAGES
SP4703-24-Q-0021
SECTION I - CONTRACT CLAUSES (CONTINUED)
contract is hazardous.
(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.
(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.
(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.
(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.
(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:
(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to --
(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;
(ii) Obtain medical treatment for those affected by the material; and
(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.
(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.
(3) The Government is not precluded from using similar or identical data acquired from other sources.
(End of Clause)
52.223-7 NOTICE OF RADIOACTIVE MATERIALS (JAN 1997) FAR
(a) The Contractor shall notify the Contracting Officer or designee, in writing, * days prior to the delivery of, or prior to completion of any servicing required by this contract of, items containing either
(1) radioactive material requiring specific licensing under the regulations issued pursuant to the Atomic Energy Act of 1954, as amended, as set forth in Title 10 of the Code of Federal Regulations, in effect on the date of this contract, or
(2) other radioactive material not requiring specific licensing in which the specific activity is greater than 0.002 microcuries per gram or the activity per item equals or exceeds 0.01 microcuries.
Such notice shall specify the part or parts of the items which contain radioactive materials, a description of the materials, the name and activity of the isotope, the manufacturer of the materials, and any other information known to the Contractor which will put users of the items on notice as to the hazards involved (OMB No. 9000-0107).
* The Contracting Officer shall insert the number of days required in advance of delivery of the item or completion of the servicing to assure that required licenses are obtained and appropriate personnel are notified to institute any necessary safety and health precautions. See FAR 23.601(d).
(b) If there has been no change affecting the quantity of activity, or the characteristics and composition of the radioactive material from deliveries under this contract or prior contracts, the Contractor may request that the Contracting Officer or designee waive the notice requirement in paragraph (a) of this clause.
Any such request shall --
(1) Be submitted in writing;
(2) State that the quantity of activity, characteristics, and composition of the radioactive material have not changed; and
(3) Cite the contract number on which the prior notification was submitted and the contracting office to which it was submitted.
(c) All items, parts, or subassemblies which contain radioactive materials in which the specific activity is greater than 0.002 microcuries per gram or activity per item equals or exceeds 0.01 microcuries, and all containers in which such items, parts or subassemblies are delivered to the Government shall be clearly marked and labeled as required by the latest revision of MIL-STD 129 in effect on the date of the contract.
(d) This clause, including this paragraph (d), shall be inserted in all subcontracts for radioactive materials meeting the criteria in paragraph (a) of this clause.
(End of Clause)
52.223-11 OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARNING POTENTIAL HYDROFLUOROCARBONS (JUN 2016)
As prescribed in 23.804(a)(1), insert the following clause:
(a) Definition. As used in this clause - “Global warming potential” means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide's global warming potential is defined as 1.0.
“High global warming potential hydrofluorocarbons” means any hydrofluorocarbons in a particular end use for which EPA's Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR Part 82 subpart G with supplemental tables of alternatives available at (http://www.epa.gov/snap/).
“Hydrofluorocarbons” means compounds that only contain hydrogen, fluorine, and carbon.
“Ozone-depleting substance,” means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as -
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 13 OF 26 PAGES
SP4703-24-Q-0021
SECTION I - CONTRACT CLAUSES (CONTINUED)
(2) Class II, including, but not limited to, hydrochlorofluorocarbons.
(b) The Contractor shall label products that contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.
C. 7671j (b), (c), (d), and (e) and 40 CFR part 82, subpart E, as follows:
WARNING
Contains (or manufactured with, if applicable) * , a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.
* The Contractor shall insert the name of the substance(s).
(c) Reporting. For equipment and appliances that normally each contain 50 or more pounds of hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons, the Contractor shall -
(1) Track on an annual basis, between October 1 and September 30, the amount in pounds of hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons contained in the equipment and appliances delivered to the Government under this contract by -
(i) Type of hydrofluorocarbon (e.g., HFC-134a, HFC-125, R-410A, R-404A, etc.);
(ii) Contract number; and
(iii) Equipment/appliance;
(2) Report that information to the Contracting Officer for FY16 and to www.sam.gov, for FY17 and after -
(i) Annually by November 30 of each year during contract performance; and
(ii) At the end of contract performance.
(d) The Contractor shall refer to EPA's SNAP program (available at http://www.epa.gov/snap) to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82 subpart G with supplemental tables available at http://www.epa.gov/snap.
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (JUN 2020) FAR
52.223-20 AEROSOLS (JUN 2016) FAR
52.223-21 FOAMS (JUN 2016) FAR
252.223-7006 PROHIBITION ON STORAGE, TREATMENT, AND DISPOSAL OF TOXIC OR HAZARDOUS MATERIALS - BASIC (SEP
2014) DFARS
252.223-7006 PROHIBITION ON STORAGE, TREATMENT, AND DISPOSAL OF TOXIC OR HAZARDOUS MATERIALS - ALTERNATE I
(SEP 2014) DFARS
252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JAN 2023) DFARS
252.223-7009 PROHIBITION OF PROCUMENT OF FLOURINATED AQUEOUS FILM-FORMING FOAM FIRE-FIGHTING AGENT FOR
USE ON MILITARY INSTALLATIONS (OCT 2023) FAR
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) FAR
252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (MAR 2022) DFARS
252.225-7007 PROHIBITION ON ACQUISITION OF UNITED STATES MUNITIONS LIST ITEMS FROM COMMUNIST CHINESE MILITARY
COMPANIES (DEC 2018) DFARS
252.225-7008 RESTRICTION ON ACQUISITION OF SPECIALTY METALS (MAR 2013) DFARS
252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND TUNGSTEN (JAN 2023) DFARS
252.225-7054 PROHIBITION ON USE OF CERTAIN ENERGY SOURCED FROM INSIDE THE RUSSIAN FEDERATION (JAN 2023)
252.225-7055 REPRESENTATION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (MAY 2022) DFARS
252.225-7056 PROHIBITION REGARDING BUSINESS OPERATIONS WITH THE MADURO REGIME (JAN 2023) DFARS
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 14 OF 26 PAGES
252.225-7057 PREAWARD DISCLOSURE OF EMPLOYMENT OF INDIVIDUALS WHO WORK IN THE PEOPLE’S REPUBLIC OF CHINA
(AUG 2022) DFARS
252.225-7058 POSTAWARD DISCLOSURE OF EMPLOYMENT OF INDIVIDUALS WHO WORK IN THE PEOPLE’S REPUBLIC OF
CHINA (JAN 2023) DFARS
252.225-7062 RESTRICTION ON ACQUISITION OF LARGE MEDIUM-SPEED DIESEL ENGINES (JUL 2023) DFARS
52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) FAR
52.228-5 INSURANCE-WORK ON A GOVERNMENT INSTALLATION (JAN 1997) FAR
52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014) FAR
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014) FAR
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) FAR
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR AWARD MANAGEMENT (OCT 2018) FAR
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (MAR 2023) FAR
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018) DFARS
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) DFARS
As prescribed in 232.7004 (b), use the following clause:
(a) Definitions. As used in this clause - Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
Payment request and receiving report are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation System (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall -
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https:// wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items -
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
2 in 1 for services (Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 15 OF 26 PAGES
SP4703-24-Q-0021
SECTION I - CONTRACT CLAUSES (CONTINUED)
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table *
Field Name in WAWF Data to be entered in
WAWF
Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC
Inspect By DoDAAC Ship…