Sheet1
| ENGINEER'S COST ESTIMATE (FOUO) | |||||
| PROJECT | CSC-19718 | SHEET | 1 | OF | 9 |
| Project Title: Security Enhancements, FY19 | DATE PREPARED | ||||
| LOCATION | CLIN-0001 | ESTIMATOR | |||
| Building and/or Description: Installation of removable bollards at James Road ACP | CHECKED BY | ||||
| NARRATIVE / DATA SOURCE | [EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request. |
| BID ITEM | SUB CONTRACT COST | PRIME CONTRACT COST | TOTAL DIRECT COST | |||
| No. / Div. | Description | QTY. | Unit | |||
| 1 | General Requirements | 1 | LS | |||
| 2 | Existing Conditions | 1 | LS | |||
| 3 | Concrete | 1 | LS | |||
| 4 | Masonry | 1 | LS | |||
| 5 | Metals | 1 | LS | |||
| 6 | Wood, Plastics, and Composites | 1 | LS | |||
| 7 | Thermal and Moisture Protection | 1 | LS | |||
| 8 | Openings | 1 | LS | |||
| 9 | Finishes | 1 | LS | |||
| 10 | Specialties | 1 | LS | |||
| 11 | Equipment | 1 | LS | |||
| 12 | Furnishings | 1 | LS | |||
| 13 | Special Construction | 1 | LS | |||
| 14 | Conveying Equipment | 1 | LS | |||
| 21 | Fire Suppression | 1 | LS | |||
| 22 | Plumbing | 1 | LS | |||
| 23 | Heating, Ventilating, and Air Conditioning | 1 | LS | |||
| 26 | Electrical | 1 | LS | |||
| 27 | Communications | 1 | LS | |||
| 28 | Electronic Safety and Security | 1 | LS | |||
| 31 | Earthwork | 1 | LS | |||
| 32 | Exterior Improvements | 1 | LS | |||
| 33 | Utilities | 1 | LS | |||
| 34 | Transportation | 1 | LS | |||
| SUB-TOTAL COST | ||||||
| OVERHEAD | ||||||
| PROFIT | ||||||
| BOND | ||||||
| TOTAL COST |
| ENGINEER'S COST ESTIMATE (FOUO) | |||||
| PROJECT | CSC-19719 | SHEET | 2 | OF | 9 |
| Project Title: Security Enhancements, FY19 | DATE PREPARED | ||||
| LOCATION | CLIN-0002 | ESTIMATOR | |||
| Building and/or Description: Installation of Knox Boxes & KeySecure 5 Units, center wide. | CHECKED BY | ||||
| NARRATIVE / DATA SOURCE | [EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request. |
| BID ITEM | SUB CONTRACT COST | PRIME CONTRACT COST | TOTAL DIRECT COST | |||
| No. / Div. | Description | QTY. | Unit | |||
| 1 | General Requirements | 1 | LS | |||
| 2 | Existing Conditions | 1 | LS | |||
| 3 | Concrete | 1 | LS | |||
| 4 | Masonry | 1 | LS | |||
| 5 | Metals | 1 | LS | |||
| 6 | Wood, Plastics, and Composites | 1 | LS | |||
| 7 | Thermal and Moisture Protection | 1 | LS | |||
| 8 | Openings | 1 | LS | |||
| 9 | Finishes | 1 | LS | |||
| 10 | Specialties | 1 | LS | |||
| 11 | Equipment | 1 | LS | |||
| 12 | Furnishings | 1 | LS | |||
| 13 | Special Construction | 1 | LS | |||
| 14 | Conveying Equipment | 1 | LS | |||
| 21 | Fire Suppression | 1 | LS | |||
| 22 | Plumbing | 1 | LS | |||
| 23 | Heating, Ventilating, and Air Conditioning | 1 | LS | |||
| 26 | Electrical | 1 | LS | |||
| 27 | Communications | 1 | LS | |||
| 28 | Electronic Safety and Security | 1 | LS | |||
| 31 | Earthwork | 1 | LS | |||
| 32 | Exterior Improvements | 1 | LS | |||
| 33 | Utilities | 1 | LS | |||
| 34 | Transportation | 1 | LS | |||
| SUB-TOTAL COST | ||||||
| OVERHEAD | ||||||
| PROFIT | ||||||
| BOND | ||||||
| TOTAL COST |
| ENGINEER'S COST ESTIMATE (FOUO) | |||||
| PROJECT | CSC-19719 | SHEET | 3 | OF | 9 |
| Project Title: Security Enhancements, FY19 | DATE PREPARED | ||||
| LOCATION | CLIN-0003 | ESTIMATOR | |||
| Building and/or Description: Installation of Traffic Control Arms at the James Road ACP POV Lanes | CHECKED BY | ||||
| NARRATIVE / DATA SOURCE | [EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request. |
| BID ITEM | SUB CONTRACT COST | PRIME CONTRACT COST | TOTAL DIRECT COST | |||
| No. / Div. | Description | QTY. | Unit | |||
| 1 | General Requirements | 1 | LS | |||
| 2 | Existing Conditions | 1 | LS | |||
| 3 | Concrete | 1 | LS | |||
| 4 | Masonry | 1 | LS | |||
| 5 | Metals | 1 | LS | |||
| 6 | Wood, Plastics, and Composites | 1 | LS | |||
| 7 | Thermal and Moisture Protection | 1 | LS | |||
| 8 | Openings | 1 | LS | |||
| 9 | Finishes | 1 | LS | |||
| 10 | Specialties | 1 | LS | |||
| 11 | Equipment | 1 | LS | |||
| 12 | Furnishings | 1 | LS | |||
| 13 | Special Construction | 1 | LS | |||
| 14 | Conveying Equipment | 1 | LS | |||
| 21 | Fire Suppression | 1 | LS | |||
| 22 | Plumbing | 1 | LS | |||
| 23 | Heating, Ventilating, and Air Conditioning | 1 | LS | |||
| 26 | Electrical | 1 | LS | |||
| 27 | Communications | 1 | LS | |||
| 28 | Electronic Safety and Security | 1 | LS | |||
| 31 | Earthwork | 1 | LS | |||
| 32 | Exterior Improvements | 1 | LS | |||
| 33 | Utilities | 1 | LS | |||
| 34 | Transportation | 1 | LS | |||
| SUB-TOTAL COST | ||||||
| OVERHEAD | ||||||
| PROFIT | ||||||
| BOND | ||||||
| TOTAL COST |
| ENGINEER'S COST ESTIMATE (FOUO) | |||||
| PROJECT | CSC-19719 | SHEET | 4 | OF | 9 |
| Project Title: Security Enhancements, FY19 | DATE PREPARED | ||||
| LOCATION | CLIN-0004 | ESTIMATOR | |||
| Building and/or Description: Installation of Cameras at Substation of the Yearling Road ACP | CHECKED BY | ||||
| NARRATIVE / DATA SOURCE | [EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request. |
| BID ITEM | SUB CONTRACT COST | PRIME CONTRACT COST | TOTAL DIRECT COST | |||
| No. / Div. | Description | QTY. | Unit | |||
| 1 | General Requirements | 1 | LS | |||
| 2 | Existing Conditions | 1 | LS | |||
| 3 | Concrete | 1 | LS | |||
| 4 | Masonry | 1 | LS | |||
| 5 | Metals | 1 | LS | |||
| 6 | Wood, Plastics, and Composites | 1 | LS | |||
| 7 | Thermal and Moisture Protection | 1 | LS | |||
| 8 | Openings | 1 | LS | |||
| 9 | Finishes | 1 | LS | |||
| 10 | Specialties | 1 | LS | |||
| 11 | Equipment | 1 | LS | |||
| 12 | Furnishings | 1 | LS | |||
| 13 | Special Construction | 1 | LS | |||
| 14 | Conveying Equipment | 1 | LS | |||
| 21 | Fire Suppression | 1 | LS | |||
| 22 | Plumbing | 1 | LS | |||
| 23 | Heating, Ventilating, and Air Conditioning | 1 | LS | |||
| 26 | Electrical | 1 | LS | |||
| 27 | Communications | 1 | LS | |||
| 28 | Electronic Safety and Security | 1 | LS | |||
| 31 | Earthwork | 1 | LS | |||
| 32 | Exterior Improvements | 1 | LS | |||
| 33 | Utilities | 1 | LS | |||
| 34 | Transportation | 1 | LS | |||
| SUB-TOTAL COST | ||||||
| OVERHEAD | ||||||
| PROFIT | ||||||
| BOND | ||||||
| TOTAL COST |
| ENGINEER'S COST ESTIMATE (FOUO) | |||||
| PROJECT | CSC-19719 | SHEET | 5 | OF | 9 |
| Project Title: Security Enhancements, FY19 | DATE PREPARED | ||||
| LOCATION | CLIN-0005 | ESTIMATOR | |||
| Building and/or Description: Installation of Protective Walls for ACP FD Control Box at the Yearling Road ACP | CHECKED BY | ||||
| NARRATIVE / DATA SOURCE | [EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request. |
| BID ITEM | SUB CONTRACT COST | PRIME CONTRACT COST | TOTAL DIRECT COST | |||
| No. / Div. | Description | QTY. | Unit | |||
| 1 | General Requirements | 1 | LS | |||
| 2 | Existing Conditions | 1 | LS | |||
| 3 | Concrete | 1 | LS | |||
| 4 | Masonry | 1 | LS | |||
| 5 | Metals | 1 | LS | |||
| 6 | Wood, Plastics, and Composites | 1 | LS | |||
| 7 | Thermal and Moisture Protection | 1 | LS | |||
| 8 | Openings | 1 | LS | |||
| 9 | Finishes | 1 | LS | |||
| 10 | Specialties | 1 | LS | |||
| 11 | Equipment | 1 | LS | |||
| 12 | Furnishings | 1 | LS | |||
| 13 | Special Construction | 1 | LS | |||
| 14 | Conveying Equipment | 1 | LS | |||
| 21 | Fire Suppression | 1 | LS | |||
| 22 | Plumbing | 1 | LS | |||
| 23 | Heating, Ventilating, and Air Conditioning | 1 | LS | |||
| 26 | Electrical | 1 | LS | |||
| 27 | Communications | 1 | LS | |||
| 28 | Electronic Safety and Security | 1 | LS | |||
| 31 | Earthwork | 1 | LS | |||
| 32 | Exterior Improvements | 1 | LS | |||
| 33 | Utilities | 1 | LS | |||
| 34 | Transportation | 1 | LS | |||
| SUB-TOTAL COST | ||||||
| OVERHEAD | ||||||
| PROFIT | ||||||
| BOND | ||||||
| TOTAL COST |
| ENGINEER'S COST ESTIMATE (FOUO) | |||||
| PROJECT | CSC-19719 | SHEET | 6 | OF | 9 |
| Project Title: Security Enhancements, FY19 | DATE PREPARED | ||||
| LOCATION | CLIN-0006 | ESTIMATOR | |||
| Building and/or Description: Installation of Cameras in Building 17 | CHECKED BY | ||||
| NARRATIVE / DATA SOURCE | [EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request. |
| BID ITEM | SUB CONTRACT COST | PRIME CONTRACT COST | TOTAL DIRECT COST | |||
| No. / Div. | Description | QTY. | Unit | |||
| 1 | General Requirements | 1 | LS | |||
| 2 | Existing Conditions | 1 | LS | |||
| 3 | Concrete | 1 | LS | |||
| 4 | Masonry | 1 | LS | |||
| 5 | Metals | 1 | LS | |||
| 6 | Wood, Plastics, and Composites | 1 | LS | |||
| 7 | Thermal and Moisture Protection | 1 | LS | |||
| 8 | Openings | 1 | LS | |||
| 9 | Finishes | 1 | LS | |||
| 10 | Specialties | 1 | LS | |||
| 11 | Equipment | 1 | LS | |||
| 12 | Furnishings | 1 | LS | |||
| 13 | Special Construction | 1 | LS | |||
| 14 | Conveying Equipment | 1 | LS | |||
| 21 | Fire Suppression | 1 | LS | |||
| 22 | Plumbing | 1 | LS | |||
| 23 | Heating, Ventilating, and Air Conditioning | 1 | LS | |||
| 26 | Electrical | 1 | LS | |||
| 27 | Communications | 1 | LS | |||
| 28 | Electronic Safety and Security | 1 | LS | |||
| 31 | Earthwork | 1 | LS | |||
| 32 | Exterior Improvements | 1 | LS | |||
| 33 | Utilities | 1 | LS | |||
| 34 | Transportation | 1 | LS | |||
| SUB-TOTAL COST | ||||||
| OVERHEAD | ||||||
| PROFIT | ||||||
| BOND | ||||||
| TOTAL COST |
| ENGINEER'S COST ESTIMATE (FOUO) | |||||
| PROJECT | CSC-19719 | SHEET | 7 | OF | 9 |
| Project Title: Security Enhancements, FY19 | DATE PREPARED | ||||
| LOCATION | CLIN-0007 | ESTIMATOR | |||
| Building and/or Description: Installation of Digital Signs at Both ACPs | CHECKED BY | ||||
| NARRATIVE / DATA SOURCE | [EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request. |
| BID ITEM | SUB CONTRACT COST | PRIME CONTRACT COST | TOTAL DIRECT COST | |||
| No. / Div. | Description | QTY. | Unit | |||
| 1 | General Requirements | 1 | LS | |||
| 2 | Existing Conditions | 1 | LS | |||
| 3 | Concrete | 1 | LS | |||
| 4 | Masonry | 1 | LS | |||
| 5 | Metals | 1 | LS | |||
| 6 | Wood, Plastics, and Composites | 1 | LS | |||
| 7 | Thermal and Moisture Protection | 1 | LS | |||
| 8 | Openings | 1 | LS | |||
| 9 | Finishes | 1 | LS | |||
| 10 | Specialties | 1 | LS | |||
| 11 | Equipment | 1 | LS | |||
| 12 | Furnishings | 1 | LS | |||
| 13 | Special Construction | 1 | LS | |||
| 14 | Conveying Equipment | 1 | LS | |||
| 21 | Fire Suppression | 1 | LS | |||
| 22 | Plumbing | 1 | LS | |||
| 23 | Heating, Ventilating, and Air Conditioning | 1 | LS | |||
| 26 | Electrical | 1 | LS | |||
| 27 | Communications | 1 | LS | |||
| 28 | Electronic Safety and Security | 1 | LS | |||
| 31 | Earthwork | 1 | LS | |||
| 32 | Exterior Improvements | 1 | LS | |||
| 33 | Utilities | 1 | LS | |||
| 34 | Transportation | 1 | LS | |||
| SUB-TOTAL COST | ||||||
| OVERHEAD | ||||||
| PROFIT | ||||||
| BOND | ||||||
| TOTAL COST |
| ENGINEER'S COST ESTIMATE (FOUO) | |||||
| PROJECT | CSC-19719 | SHEET | 8 | OF | 9 |
| Project Title: Security Enhancements, FY19 | DATE PREPARED | ||||
| LOCATION | CLIN-0008 | ESTIMATOR | |||
| Building and/or Description: Installation of Shrubs & Trees at Bldg.22 for Vission Barriers | CHECKED BY | ||||
| NARRATIVE / DATA SOURCE | [EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request. |
| BID ITEM | SUB CONTRACT COST | PRIME CONTRACT COST | TOTAL DIRECT COST | |||
| No. / Div. | Description | QTY. | Unit | |||
| 1 | General Requirements | 1 | LS | |||
| 2 | Existing Conditions | 1 | LS | |||
| 3 | Concrete | 1 | LS | |||
| 4 | Masonry | 1 | LS | |||
| 5 | Metals | 1 | LS | |||
| 6 | Wood, Plastics, and Composites | 1 | LS | |||
| 7 | Thermal and Moisture Protection | 1 | LS | |||
| 8 | Openings | 1 | LS | |||
| 9 | Finishes | 1 | LS | |||
| 10 | Specialties | 1 | LS | |||
| 11 | Equipment | 1 | LS | |||
| 12 | Furnishings | 1 | LS | |||
| 13 | Special Construction | 1 | LS | |||
| 14 | Conveying Equipment | 1 | LS | |||
| 21 | Fire Suppression | 1 | LS | |||
| 22 | Plumbing | 1 | LS | |||
| 23 | Heating, Ventilating, and Air Conditioning | 1 | LS | |||
| 26 | Electrical | 1 | LS | |||
| 27 | Communications | 1 | LS | |||
| 28 | Electronic Safety and Security | 1 | LS | |||
| 31 | Earthwork | 1 | LS | |||
| 32 | Exterior Improvements | 1 | LS | |||
| 33 | Utilities | 1 | LS | |||
| 34 | Transportation | 1 | LS | |||
| SUB-TOTAL COST | ||||||
| OVERHEAD | ||||||
| PROFIT | ||||||
| BOND | ||||||
| TOTAL COST |
| ENGINEER'S COST ESTIMATE (FOUO) | |||||
| PROJECT | CSC-19719 | SHEET | 8 | OF | 9 |
| Project Title: Security Enhancements, FY19 | DATE PREPARED | ||||
| LOCATION | CLIN-0009 | ESTIMATOR | |||
| Building and/or Description: Installation of Shrubs & Trees at Bldg.23 for Vission Barriers | CHECKED BY | ||||
| NARRATIVE / DATA SOURCE | [EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request. |
| BID ITEM | SUB CONTRACT COST | PRIME CONTRACT COST | TOTAL DIRECT COST | |||
| No. / Div. | Description | QTY. | Unit | |||
| 1 | General Requirements | 1 | LS | |||
| 2 | Existing Conditions | 1 | LS | |||
| 3 | Concrete | 1 | LS | |||
| 4 | Masonry | 1 | LS | |||
| 5 | Metals | 1 | LS | |||
| 6 | Wood, Plastics, and Composites | 1 | LS | |||
| 7 | Thermal and Moisture Protection | 1 | LS | |||
| 8 | Openings | 1 | LS | |||
| 9 | Finishes | 1 | LS | |||
| 10 | Specialties | 1 | LS | |||
| 11 | Equipment | 1 | LS | |||
| 12 | Furnishings | 1 | LS | |||
| 13 | Special Construction | 1 | LS | |||
| 14 | Conveying Equipment | 1 | LS | |||
| 21 | Fire Suppression | 1 | LS | |||
| 22 | Plumbing | 1 | LS | |||
| 23 | Heating, Ventilating, and Air Conditioning | 1 | LS | |||
| 26 | Electrical | 1 | LS | |||
| 27 | Communications | 1 | LS | |||
| 28 | Electronic Safety and Security | 1 | LS | |||
| 31 | Earthwork | 1 | LS | |||
| 32 | Exterior Improvements | 1 | LS | |||
| 33 | Utilities | 1 | LS | |||
| 34 | Transportation | 1 | LS | |||
| SUB-TOTAL COST | ||||||
| OVERHEAD | ||||||
| PROFIT | ||||||
| BOND | ||||||
| TOTAL COST |
| ENGINEER'S COST ESTIMATE (FOUO) | |||||
| PROJECT | CSC-19719 | SHEET | 9 | OF | 9 |
| Project Title: Security Enhancements, FY19 | DATE PREPARED | ||||
| LOCATION | COST SUMMARY | ESTIMATOR | |||
| CHECKED BY | |||||
| NARRATIVE / DATA SOURCE | [EDIT AS NEEDED] Estimate was developed using RSMeans Online. Detailed cost breakdowns for labor, material, and equipment are available upon request. |
| BID ITEM | TOTAL COST FOR CLIN ITEM (from BID FORMS) | |||
| CLIN NO | Description | QTY. | Unit | |
| 1 | : Installation of removable bollards at James Road ACP | 1 | LS | |
| 2 | Installation of Knox Boxes & KeySecure 5 Units, center wide. | 1 | LS | |
| 3 | Installation of Traffic Control Arms at the James Road ACP POV Lanes | 1 | LS | |
| 4 | Installation of Cameras at Substation of the Yearling Road ACP | 1 | LS | |
| 5 | Installation of Protective Walls for ACP FD Control Box at the Yearling Road ACP | 1 | LS | |
| 6 | Installation of Cameras in Building 17 | 1 | LS | |
| 7 | Installation of Digital Signs at Both ACPs | 1 | LS | |
| 8 | Installation of Shrubs & Trees at Bldg.22 for Vission Barriers | 1 | LS | |
| 9 | Installation of Shrubs & Trees at Bldg.23 for Vission Barriers | 1 | LS |
SUB-TOTAL COST
TOTAL COST FOR THIS PROJECT