CONSTRUCTION COST ESTIMATE
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
ARCHITECT/ENGINEER:M. Rustam AliESTIMATOR:
PRELIMINARY DESIGNFINAL DESIGNXOTHER
LOCATION: Bldg. 20 South Parking LotCLIN #: 001
Basis of Estimate/DATA SOURCE:
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: Bldg. 22 East Parking LotCLIN #: 002ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: Jackson Blvd. & VicinityCLIN #: 003ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:1/26/19
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: 18TH BLVD PAVEMENTCLIN #: 004ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: Bldg. 47 North DrivewayCLIN #: 005ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: Bldg. 507 East Parking LotCLIN #: 006ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: Roosevelt LaneCLIN #: 007ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: Bldg. 47 Drainage ImprovementsCLIN #: 008ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: Bldg. 21 North & Bldg. 20 NW Parking LotsCLIN #: 009ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: Disposition Services Storage LotCLIN #: 010ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: Bldgs. 20 &23 East Parking LotCLIN #: 011ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE (FOUO)
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
LOCATION: SW Corner of DSCC Drainage ImprovementsCLIN #: 012ESTIMATOR:
Basis of Estimate/DATA SOURCE:FINAL DESIGNXOTHER
Detail cost estimate shall be provided upon request.
DIVISION / BID ITEMTOTAL DIRECT COST
QTY.UNITSUB CONTRACT COSTPRIME CONTRACT COST
1/ General RequirementsLS
2/Existing ConditionsLS
3/ConcreteLS
4/MasonryLS
5/MetalsLS
6/ Wood, Plastics, and CompositesLS
7/Thermal and Moisture ProtectionLS
8/OpeningsLS
9/FinishesLS
10/SpecialtiesLS
11/EquipmentLS
12/FurnishingsLS
13/Special ConstructionLS
14/Conveying EquipmentLS
21/Fire SuppressionLS
22/PlumbingLS
23/Heating, Ventilating, and Air ConditioningLS
26/ElectricalLS
27/CommunicationsLS
28/Electronic Safety and SecurityLS
31/EarthworkLS
32/Exterior ImprovementsLS
33/UtilitiesLS
34/TransportationLS
SUB-TOTAL COST
OVERHEAD
PROFIT
BOND
TOTAL COST
CONSTRUCTION COST ESTIMATE
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
ARCHITECT/ENGINEER:M. Rustam AliESTIMATOR:
PRELIMINARY DESIGNFINAL DESIGNXOTHER
ESTIMATE DETAIL SUMMARY SHEET FOR DSCC PART
ITEMQUANTITYSUBCONTRACTOR'SPRIME CONTRACTOR'S BARE COSTPRIME CONTRAC-TOR'S OH, PROFIT & BOND COSTSTOTAL COST
NO. OF UNITSUNIT OF MEASURECOST INCL. OH & PROFITTOTAL DIRECT COST
CLIN # 0011LS
CLIN # 0021LS
CLIN # 0031LS
CLIN # 0041LS
CLIN # 0051LS
CLIN # 0061LS
CLIN # 0071LS
CLIN # 0081LS
CLIN # 0091LS
CLIN # 0111LS
CLIN # 0121LS
$0.00
TOTAL ESTIMATED COST FOR DSCC PART, CLINS # 001 thru 009, 011 & 012000TOTAL
CONSTRUCTION COST ESTIMATE
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
ARCHITECT/ENGINEER:M. Rustam AliESTIMATOR:
PRELIMINARY DESIGNFINAL DESIGNXOTHER
ESTIMATE DETAIL SUMMARY SHEET FOR DISPOSITION SERVICES PART
ITEMQUANTITYSUBCONTRACTOR'SPRIME CONTRACTOR'S BARE COSTPRIME CONTRAC-TOR'S OH, PROFIT & BOND COSTSTOTAL COST
NO. OF UNITSUNIT OF MEASURECOST INCL. OH & PROFITTOTAL DIRECT COST
CLIN # 0101LS
TOTAL ESTIMATED COST FOR DISPOSITION SERVICES PART, CLIN # 010000TOTAL
CONSTRUCTION COST ESTIMATE
PROJECT NO.CSC-19723DRAWING NO.5-429 (20 Sheets)DATE:
PROJECT TITLE:M & R TO PAVEMENT, FY19
ARCHITECT/ENGINEER:M. Rustam AliESTIMATOR:
PRELIMINARY DESIGNFINAL DESIGNXOTHER
PROJECT ESTIMATE SUMMARY SHEET
ITEMQUANTITYSUBCONTRACTOR'SPRIME CONTRACTOR'S BARE COSTPRIME CONTRAC-TOR'S OH, PROFIT & BOND COSTSTOTAL COST
NO. OF UNITSUNIT OF MEASURECOST INCL. OH & PROFITTOTAL DIRECT COST
TOTAL ESTIMATED COST FOR DSCC PART, CLINS # 001 thru 009, 011 & 012000
TOTAL ESTIMATED COST FOR DISPOSITION SERVICES PART, CLIN # 010000
TOTAL ESTIMATED COST FOR THIS PROJECT000
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK
THIS PAGE INTENTIONALLY LEFT BLANK

&L&"Arial,Bold"Defense Logistics Agency Confidential&C&12 &"Arial,Bold"BID FORM&R&"Arial,Bold"&KFF0000FOR OFFICIAL USE ONLY Page &P of &N

Sheet2

&C &"Arial,Bold"&20BID FORM&R&"Arial,Bold"&KFF0000FOR OFFICIAL USE ONLY Page &P of &N

Sheet3

File details come from the government source that posted it.