M_&_R_TO_PAVEMENT,_FY19__OFFICIAL_BID_FORMS__03_15_2019.xls
XLS spreadsheet 103 KB Posted
- Attached to
- Project: CSC-19723 M&R Pavement
- Solicitation number
- SP4702-19-R-0013
About this file
Attachment # 05
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONSTRUCTION COST ESTIMATE | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| ARCHITECT/ENGINEER: | M. Rustam Ali | ESTIMATOR: | |||||||
| PRELIMINARY DESIGN | FINAL DESIGN | X | OTHER | ||||||
| LOCATION: Bldg. 20 South Parking Lot | CLIN #: 001 | ||||||||
| Basis of Estimate/DATA SOURCE: | |||||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: Bldg. 22 East Parking Lot | CLIN #: 002 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: Jackson Blvd. & Vicinity | CLIN #: 003 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | 1/26/19 | ||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: 18TH BLVD PAVEMENT | CLIN #: 004 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: Bldg. 47 North Driveway | CLIN #: 005 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: Bldg. 507 East Parking Lot | CLIN #: 006 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: Roosevelt Lane | CLIN #: 007 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: Bldg. 47 Drainage Improvements | CLIN #: 008 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: Bldg. 21 North & Bldg. 20 NW Parking Lots | CLIN #: 009 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: Disposition Services Storage Lot | CLIN #: 010 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: Bldgs. 20 &23 East Parking Lot | CLIN #: 011 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE (FOUO) | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| LOCATION: SW Corner of DSCC Drainage Improvements | CLIN #: 012 | ESTIMATOR: | |||||||
| Basis of Estimate/DATA SOURCE: | FINAL DESIGN | X | OTHER | ||||||
| Detail cost estimate shall be provided upon request. | |||||||||
| DIVISION / BID ITEM | TOTAL DIRECT COST | ||||||||
| QTY. | UNIT | SUB CONTRACT COST | PRIME CONTRACT COST | ||||||
| 1/ General Requirements | LS | ||||||||
| 2/Existing Conditions | LS | ||||||||
| 3/Concrete | LS | ||||||||
| 4/Masonry | LS | ||||||||
| 5/Metals | LS | ||||||||
| 6/ Wood, Plastics, and Composites | LS | ||||||||
| 7/Thermal and Moisture Protection | LS | ||||||||
| 8/Openings | LS | ||||||||
| 9/Finishes | LS | ||||||||
| 10/Specialties | LS | ||||||||
| 11/Equipment | LS | ||||||||
| 12/Furnishings | LS | ||||||||
| 13/Special Construction | LS | ||||||||
| 14/Conveying Equipment | LS | ||||||||
| 21/Fire Suppression | LS | ||||||||
| 22/Plumbing | LS | ||||||||
| 23/Heating, Ventilating, and Air Conditioning | LS | ||||||||
| 26/Electrical | LS | ||||||||
| 27/Communications | LS | ||||||||
| 28/Electronic Safety and Security | LS | ||||||||
| 31/Earthwork | LS | ||||||||
| 32/Exterior Improvements | LS | ||||||||
| 33/Utilities | LS | ||||||||
| 34/Transportation | LS | ||||||||
| SUB-TOTAL COST | |||||||||
| OVERHEAD | |||||||||
| PROFIT | |||||||||
| BOND | |||||||||
| TOTAL COST | |||||||||
| CONSTRUCTION COST ESTIMATE | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| ARCHITECT/ENGINEER: | M. Rustam Ali | ESTIMATOR: | |||||||
| PRELIMINARY DESIGN | FINAL DESIGN | X | OTHER | ||||||
| ESTIMATE DETAIL SUMMARY SHEET FOR DSCC PART | |||||||||
| ITEM | QUANTITY | SUBCONTRACTOR'S | PRIME CONTRACTOR'S BARE COST | PRIME CONTRAC-TOR'S OH, PROFIT & BOND COSTS | TOTAL COST | ||||
| NO. OF UNITS | UNIT OF MEASURE | COST INCL. OH & PROFIT | TOTAL DIRECT COST | ||||||
| CLIN # 001 | 1 | LS | |||||||
| CLIN # 002 | 1 | LS | |||||||
| CLIN # 003 | 1 | LS | |||||||
| CLIN # 004 | 1 | LS | |||||||
| CLIN # 005 | 1 | LS | |||||||
| CLIN # 006 | 1 | LS | |||||||
| CLIN # 007 | 1 | LS | |||||||
| CLIN # 008 | 1 | LS | |||||||
| CLIN # 009 | 1 | LS | |||||||
| CLIN # 011 | 1 | LS | |||||||
| CLIN # 012 | 1 | LS | |||||||
| $0.00 | |||||||||
| TOTAL ESTIMATED COST FOR DSCC PART, CLINS # 001 thru 009, 011 & 012 | 0 | 0 | 0 | TOTAL | |||||
| CONSTRUCTION COST ESTIMATE | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| ARCHITECT/ENGINEER: | M. Rustam Ali | ESTIMATOR: | |||||||
| PRELIMINARY DESIGN | FINAL DESIGN | X | OTHER | ||||||
| ESTIMATE DETAIL SUMMARY SHEET FOR DISPOSITION SERVICES PART | |||||||||
| ITEM | QUANTITY | SUBCONTRACTOR'S | PRIME CONTRACTOR'S BARE COST | PRIME CONTRAC-TOR'S OH, PROFIT & BOND COSTS | TOTAL COST | ||||
| NO. OF UNITS | UNIT OF MEASURE | COST INCL. OH & PROFIT | TOTAL DIRECT COST | ||||||
| CLIN # 010 | 1 | LS | |||||||
| TOTAL ESTIMATED COST FOR DISPOSITION SERVICES PART, CLIN # 010 | 0 | 0 | 0 | TOTAL | |||||
| CONSTRUCTION COST ESTIMATE | |||||||||
| PROJECT NO. | CSC-19723 | DRAWING NO. | 5-429 (20 Sheets) | DATE: | |||||
| PROJECT TITLE: | M & R TO PAVEMENT, FY19 | ||||||||
| ARCHITECT/ENGINEER: | M. Rustam Ali | ESTIMATOR: | |||||||
| PRELIMINARY DESIGN | FINAL DESIGN | X | OTHER | ||||||
| PROJECT ESTIMATE SUMMARY SHEET | |||||||||
| ITEM | QUANTITY | SUBCONTRACTOR'S | PRIME CONTRACTOR'S BARE COST | PRIME CONTRAC-TOR'S OH, PROFIT & BOND COSTS | TOTAL COST | ||||
| NO. OF UNITS | UNIT OF MEASURE | COST INCL. OH & PROFIT | TOTAL DIRECT COST | ||||||
| TOTAL ESTIMATED COST FOR DSCC PART, CLINS # 001 thru 009, 011 & 012 | 0 | 0 | 0 | ||||||
| TOTAL ESTIMATED COST FOR DISPOSITION SERVICES PART, CLIN # 010 | 0 | 0 | 0 | ||||||
| TOTAL ESTIMATED COST FOR THIS PROJECT | 0 | 0 | 0 | ||||||
| THIS PAGE INTENTIONALLY LEFT BLANK | |||||||||
| THIS PAGE INTENTIONALLY LEFT BLANK | |||||||||
| THIS PAGE INTENTIONALLY LEFT BLANK | |||||||||
| THIS PAGE INTENTIONALLY LEFT BLANK | |||||||||
| THIS PAGE INTENTIONALLY LEFT BLANK | |||||||||
| THIS PAGE INTENTIONALLY LEFT BLANK | |||||||||
| THIS PAGE INTENTIONALLY LEFT BLANK | |||||||||
| THIS PAGE INTENTIONALLY LEFT BLANK | |||||||||
| THIS PAGE INTENTIONALLY LEFT BLANK | |||||||||
| THIS PAGE INTENTIONALLY LEFT BLANK | |||||||||
| THIS PAGE INTENTIONALLY LEFT BLANK |
&L&"Arial,Bold"Defense Logistics Agency Confidential&C&12 &"Arial,Bold"BID FORM&R&"Arial,Bold"&KFF0000FOR OFFICIAL USE ONLY Page &P of &N
Sheet2
&C &"Arial,Bold"&20BID FORM&R&"Arial,Bold"&KFF0000FOR OFFICIAL USE ONLY Page &P of &N
Sheet3
File details come from the government source that posted it.