Question & Answers Project CSC-18719 M & R to Building 20, FY18 Solicitation SP4702-18-R-0529

Questions & Replies for M&R to 20 project

1. Plans Page (2 of 20) - The existing exterior doors to building 20 are monumental wide stile with a continuous hinge. The details do not show this, please advise.

Reply: Drawing sheet 2 of 20 is being revised. Exterior doors at Pod A & Pod C, location (c) are monumental wide stile 2" thick Aluminum Door cover with vision glasses & continuous hinges as shown on the attached revised sheet 2 of 20.

2. Plans Page (2-4) - The existing exterior doors are 2" thick, the plans call for 1-3/4" thick. Please advise on required door thickness.

Reply: Drawing sheets 2 & 4 of 20 are being revised. Exterior doors, Type B4 at Pod A & Pod C, location (c) are monumental wide stile 2" thick Aluminum Door cover with vision glasses & continuous hinges as shown on the revised sheets 2 & 4 of 20. All interior doors, Types B1 & B2 at (a) & (b) locations near stairs # 1, 2, 3 & 4 are 1-3/4" thick steel doors with hinges as shown on the attached revised sheet 2 of 20.

3. Plans Page (2-4 Door Schedule) the existing doors are aluminum, the door schedule states metal. Please advise.

Reply: Drawing sheet 2 of 20 is being revised. Exterior doors at Pod A & Pod C are Aluminum Doors & all interior doors near stairs # 1, 2, 3 & 4 are steel doors.

4. Please review the attached picture and let us know what the materials are around the roof drain.

Also attached is a picture of the thru-wall overflow. Confirm we are replacing this in the same mannor.

Reply: Drawing sheets 11, 12, 13 & 14 of 20 are being revised to clarify the roof drain question. EPDM Rubber material or same type of material as existing to be used around roof drain.

5. Benches on Plan Sheet 3-1668 Sht 8 of 20 Detail C8 shows a width dimension of 3'7" w. In Plan Sheet 3-1668 Sht 6 of 20 they are drawn at 4'0" wide. Which width should be quoted?

Reply: Please follow detail C/8 on sheet 8 of 20.

6. Bench height is shown at 2'7-1/4"h. Need to confirm as this is somewhat low for banquettes.?

Reply: Height to be same as existing booth’s height. Field verification is the responsibility of the contractor as specified in the general note no. 1 on the cover sheet.

7. Bench seat upholstery is specified as Leather. Need to confirm this is real leather versus a "leather look" vinyl more typical of cafeteria materials?

Reply: As specified under detail C/8. Leather mean real leather.

8. Are the benches to be secured or set in place loose? If secured, typical is securing to the floor. Is this acceptable?

Reply: Benches to be secured to the floor.

9. Do you have or can you provide more specific spec information regarding the wall dividers and restaurant booths? These are perhaps the only items we could bid but I will need more direction in order to respond appropriately.

Reply: As specified in the Specifications & as shown on the drawings. No other information is provided.