SP4702-17-R-0027 Page 1 of 3
Attachment # 3
PROJECT NO. DATE:
PROJECT TITLE:
PRELIMINARY DESIGN X OTHER
NO. OF UNITS
UNIT OF
MEASURE
PER UNIT TOTAL UNIT MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTAL
ROOSEVELT AND FOYLE LIFSTATION
Removal of existing door cover & store it for reinstallation.
SET
Saw Cutting and removal of concrete to install structural steel framing under existing top slab JOB
Installation of new structural steel platform framing under existing concrete pad and paint exposed steel framing by corrosion resistant paint
JOB
Installation of new Stainless Steel serrated grating platform on new steel framing systems. JOB
Installation of new concrete mortar, 5,000 psi over new steel framing around opening JOB
Reinstallation of existing door cover over existing door framing. SET
Professional Registered Engineer's structural calculation, design, & submittal of fabrication shop drawings for the platform support system & grating plate as required.
JOB
CSC-16731
CONSTRUCTION COST ESTIMATE
ITEM TOTAL COST
DRAWING NO.
LIFT STATION IMPROVEMENTS FOYLE AVE AND "A" STREET
ARCHITECT/ENGINEER:
QUANTITY MATERIAL LABOR
4-570
FINAL DESIGN
EQUIP COST
ESTIMATOR:
SP4702-17-R-0027 Page 2 of 3
NO. OF UNITS
UNIT OF
MEASURE
PER UNIT TOTAL UNIT MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTALITEM TOTAL COSTQUANTITY MATERIAL LABOR EQUIP COST
"A" STREET LIFSTATION
Removal of existing door cover & store it for reinstallation. SET
Saw Cutting and removal of concrete to install structural steel framing under existing top slab JOB
Hand excavation of common earth and saw cut concrete wall of the lift wel as required . JOB
Installation of new structural steel platform framing under existing concrete pad and paint exposed steel framing by corrosion resistant paint
JOB
Installation of new Stainless Steel serrated grating platform on new steel framing systems. JOB
Installation of new concrete mortar, 5,000 psi over new steel framing around opening JOB
Reinstallation of existing door cover over existing door framing. JOB
Professional Registered Engineer's structural calculation, design, & submittal of fabrication shop drawings for the platform support system & grating plate as required.
JOB
"A" STREET LIFSTATION PUMP
REPLACEMENT
Vacuum Truck Rental MO
Sump Cleaning/Inspection LS
SP4702-17-R-0027 Page 3 of 3
NO. OF UNITS
UNIT OF
MEASURE
PER UNIT TOTAL UNIT MANHOUR
TOTAL
MANHOURS
RATE PER
HOUR
TOTAL UNIT RATE TOTALITEM TOTAL COSTQUANTITY MATERIAL LABOR EQUIP COST
System Start Up and Testing LS
Sewage Pump Demo ea
Pipe Demo LF
Sewage Shredder Pump EA
Stainless Steel Guide Rail System LF
10" Ductile Iron Piping LF
10" Check Valves EA
10" Gate Valves EA
10" 90 Elbows EA
10" Tee EA
Electrical Work Including Motor Contactors LS
SUBTOTAL
OH
Profit
Bond
Total