SP4702-17-R-0027 Page 1 of 3

Attachment # 3

PROJECT NO. DATE:

PROJECT TITLE:

PRELIMINARY DESIGN X OTHER

NO. OF UNITS

UNIT OF

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTAL

ROOSEVELT AND FOYLE LIFSTATION

Removal of existing door cover & store it for reinstallation.

SET

Saw Cutting and removal of concrete to install structural steel framing under existing top slab JOB

Installation of new structural steel platform framing under existing concrete pad and paint exposed steel framing by corrosion resistant paint

JOB

Installation of new Stainless Steel serrated grating platform on new steel framing systems. JOB

Installation of new concrete mortar, 5,000 psi over new steel framing around opening JOB

Reinstallation of existing door cover over existing door framing. SET

Professional Registered Engineer's structural calculation, design, & submittal of fabrication shop drawings for the platform support system & grating plate as required.

JOB

CSC-16731

CONSTRUCTION COST ESTIMATE

ITEM TOTAL COST

DRAWING NO.

LIFT STATION IMPROVEMENTS FOYLE AVE AND "A" STREET

ARCHITECT/ENGINEER:

QUANTITY MATERIAL LABOR

4-570

FINAL DESIGN

EQUIP COST

ESTIMATOR:

SP4702-17-R-0027 Page 2 of 3

NO. OF UNITS

UNIT OF

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTALITEM TOTAL COSTQUANTITY MATERIAL LABOR EQUIP COST

"A" STREET LIFSTATION

Removal of existing door cover & store it for reinstallation. SET

Saw Cutting and removal of concrete to install structural steel framing under existing top slab JOB

Hand excavation of common earth and saw cut concrete wall of the lift wel as required . JOB

Installation of new structural steel platform framing under existing concrete pad and paint exposed steel framing by corrosion resistant paint

JOB

Installation of new Stainless Steel serrated grating platform on new steel framing systems. JOB

Installation of new concrete mortar, 5,000 psi over new steel framing around opening JOB

Reinstallation of existing door cover over existing door framing. JOB

Professional Registered Engineer's structural calculation, design, & submittal of fabrication shop drawings for the platform support system & grating plate as required.

JOB

"A" STREET LIFSTATION PUMP

REPLACEMENT

Vacuum Truck Rental MO

Sump Cleaning/Inspection LS

SP4702-17-R-0027 Page 3 of 3

NO. OF UNITS

UNIT OF

MEASURE

PER UNIT TOTAL UNIT MANHOUR

TOTAL

MANHOURS

RATE PER

HOUR

TOTAL UNIT RATE TOTALITEM TOTAL COSTQUANTITY MATERIAL LABOR EQUIP COST

System Start Up and Testing LS

Sewage Pump Demo ea

Pipe Demo LF

Sewage Shredder Pump EA

Stainless Steel Guide Rail System LF

10" Ductile Iron Piping LF

10" Check Valves EA

10" Gate Valves EA

10" 90 Elbows EA

10" Tee EA

Electrical Work Including Motor Contactors LS

SUBTOTAL

OH

Profit

Bond

Total