Attachment_1_-_APL_Korea_IW.pdf
PDF 14 KB Posted
- Attached to
- Disposal of Industrial Waste Property for DLA Disposition Services, Korea (replaced SP4530-12-R-TBD0004)
- Solicitation number
- SP4530-13-R-0001
About this file
Attachment 1 - APL
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP SP4530-13-R-0001
IW KOREA
ATTACHMENT 1 – ACCEPTABLE PERFORMANCE LEVEL (APL)
A B C D E F G H Deliverable Phase Standard Time Frame Clause/Section Acceptable
Performance Level
Reduction for Failure
Method of Surveillance
1 Compliant Removal
Weighing Timely Submittal of weigh tickets
1 calendar day after completion of weighing
2.3 No more than
4 late submittals during a 12 month period of time
A disincentive fee of 3% shall be applied to each call order with late submittals after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed criteria in column F.
Collection Summary Reports.
Customer, COR input and CO review and input.
Compliant Removal
Removal Timely provision
Specified date and time established with
COR
8.1 No more than
4 late removals pickups during a twelve month period of time
A disincentive fee of 3% shall be applied to each call order with a late removal pickups after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed criteria in Column F.
Collection Summary Reports.
Customer, COR input and CO review and input.
RFP SP4530-13-R-0001
IW KOREA
ATTACHMENT 1 – ACCEPTABLE PERFORMANCE LEVEL (APL)
A B C D E F G H Deliverable Phase Standard Time Frame Clause/Section Acceptable
Performance Level
Reduction for Failure
Method of Surveillance
2 Compliant Disposal
Delivery of disposal certificates
Timely provision
3 calendar days after disposal
2.4 No more than
4 late removals during a twelve month period of time
A disincentive fee of 3% shall be applied to each call order with a late disposal certificate after the contractor exceeds the criteria stated in Column F until such time as performance again does not exceed criteria in Column F.
Collection Summary Reports, Customer COR input and CO input.
* The Government reserves the right to also conduct additional surveillance/review of final tracking information and/or delay all payments until after final tracking information is received if warranted by performance problems in this area.
File details come from the government source that posted it. Updated .