Attachment 01 - APLs.pdf
PDF 17 KB Posted
- Attached to
- Removal, Transportation and Disposal of Various Hazardous Waste for DLA Disposition Services Guam
- Solicitation number
- SP4530-12-R-0003
About this file
Attachment 1 - Acceptable Performance Level (APL)
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP SP4530-12-R-0003
Attachment 1
Acceptable Performance Level (APL)
Acceptable Performance Level (APL) is the minimum performance of each requirement before the Government considers performance unsatisfactory. Specification of an acceptable performance level does not allow the contractor to knowingly provide defective service; it is recognition of the fact that defective performance may sometimes occur unintentionally. As long as the performance percentage does not fall below the specified acceptable performance level, the Government will not deduct for poor performance. However, the contractor shall be required to re- perform or correct the defective service or product at no additional cost to the Government.
The surveillance method shall be from Collection Summary Report(s) (CSR) furnished by the COR, customer feedback, and tracking of final disposal/recycling submittals. All negative and positive actions/performance shall be the basis for monetary deductions and/or past performance annotations.
Performance incentives for the contractor shall include, but are not necessarily limited to, favorable impact on option exercise decisions, future awards of the same requirement, and future awards of similar requirements by Disposition Services as well as other Government and non-Government entities that may review performance of this contract.
RFP SP4530-12-R-0003
Attachment 1
DELIVERABLE PHASE STANDARD TIME FRAME SECTION ACCEPTABLE
PERFORMANCE
LEVEL (APL)
REDUCTION FOR
FAILED APL
METHOD OF
SURVEILLANCE
Compliant Removal
Pre-Removal Submittal of shipping documentation is timely and accurate
1-5 days depending on removal time
1.1.2 100% timely, 95% accurate
25-100% consideration& past performance annotated
CSRs and other COR/customer feedback
Notifications timely and accurate
1-5 days… 1.1.3 Same as above Same as above Same as above
Removal Safe, compliant, timely removal and transportation service
1-45 days as required
1.2 100% timely, safe and accurate
Same as above Same as above
Post-Removal Compliant transportation, any interim storage, & shipment to initial qualified TSDF including return manifest
Return of manifest or applicable shipping paper within 40 CFR262.42(a)(2), state equivalent, or contract timeframe.
1.3 100% timely Same as above Same as above
Compliant Disposal (or Timely & proper 225 days all 2.0 100% timely and Same as above* CO, tracking, Disposal/ Recycling recycling) disposal/recycling as per waste regulatory/contract requirements items accurate for RCRA, PCB, CGCs and Demil required waste; 95% accurate for non-RCRA
BOSS
Compliant Special Services
Delivery of expedited removal or performance, analysis, high mercury surcharge, certificates of disposal and/or recycling, Poison Zone A surcharge, and spill response service
Timely, compliant, quality service
Typically 1-30 days depending on actual service
1.2.1,
2.0 as applicable
100% timely and compliant
Same as above COR, Customers, KO