Att 1. PWS Anchorage MHE_R1.pdf

PDF 350 KB Posted

Attached to
DLA DS_ANCHORAGE MHE MAINTENANCE SERVICES
Solicitation number
SP451027Q1005
Issued by

About this file

This is a Performance Work Statement (PWS) for Material Handling Equipment (MHE) maintenance services at the Defense Logistics Agency (DLA) Disposition Services facility in Anchorage, Alaska.

The contract is a Firm Fixed Price time and materials agreement covering one 12-month base period and two optional 12-month periods, not to exceed three years total. The Contractor must provide preventive maintenance (PM) and corrective maintenance (CM) services on various MHE items listed in Attachment 3, with the equipment list subject to change based on lifecycle management. PM services require a minimum of one service per equipment item, performed within ten business days of start and including lower-level maintenance checks per OEM manuals, load tests, limited technical inspections, lug nut torquing per OEM specifications, and sticker affixation with service details and next PM date. The Contractor must notify the Contracting Officer Representative (COR) two business days before arrival and complete a PM sheet within five business days of service completion. For CM services, the Contractor must assess and troubleshoot deficiencies within seven business days, provide written cost estimates within five business days containing specified information (parts, labor hours, warranty details, lead times, and expected completion dates), obtain COR approval pending funding availability, and complete repairs within seven business days of approval. All estimates are valid for 30 calendar days. The Contractor is responsible for providing all personnel, tools, test equipment, materials, supervision, PPE, and cleanup of spills caused by its employees; USG provides workspace and utilities. Services shall be performed primarily at the DLA facility during normal business hours except federal holidays. The contract includes Acceptable Performance Levels (APLs) with payment contingency for failures exceeding specified thresholds (generally no more than two failures per performance period for most deliverables). The contract minimum is $1,000 for the base period with no minimums for option periods; the maximum is 150 percent of the estimated contract value. Invoicing is monthly through the DoW Wide Area Workflow (WAWF) system with hourly billing rounded up to the next whole hour. The solicitation requires offerors to submit proposals in two volumes: Volume 1 containing certifications and the price schedule (Attachment 2), and Volume 2 containing past performance information with up to four project references, each with corresponding reference surveys independently submitted by references to the Contracting Officer. Past performance is significantly more important than price in the award decision, and the government may employ efficiency competition by evaluating only the most competitively priced proposals' past performance unless superiority would warrant additional price premium.

View the file

Other files

File Type Posted
Att 4. Past Performance Questionaire_Anchorage MHE.doc DOC document
Att 3. Equipment List_Anchorage MHE.xlsx XLSX spreadsheet
Att 2. Price Schedule_Anchorage MHE.xlsx XLSX spreadsheet
Att 6. WD_Anchorage MHE.pdf PDF
Att 5. DLA DS Anchorage Location.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

DEFENSE LOGISTICS AGENCY (DLA)

DISPOSITION SERVICES (DS)

ANCHORAGE

MATERIAL HANDLING EQUIPMENT (MHE)

MAINTENANCE SERVICES

TABLE OF CONTENTS

1. INTRODUCTION

2. PREVENTIVE MAINTENANCE (PM)

3. CORRECTIVE MAINTENANCE (CM)

4. PLACE OF PERFORMANCE OF SERVICES

5. FEDERAL HOLIDAYS

6. BASE ACCESS & SECURITY

7. USG FURNISHED PROPERTY, MATERIALS, EQUIPMENT, AND UTILITIES

(GFP/M/E/U)

8. CONTRACTOR FURNISHED PROPERTY, MATERIALS, EQUIPMENT, AND

SERVICES (CFP/M/E/S)

9. ACCEPTABLE PERFORMANCE LEVELS (APLs)

10. SPILL RESPONSIBILITY

11. INVOICING INFORMATION

12. CONTRACT MINIMUM/MAXIMUM

1. INTRODUCTION:

a. Defense Logistics Agency (DLA) Disposition Services (DS) is a Major Subordinate Command (MSC) of DLA with the responsibility of disposing and reutilizing the United States Government (USG) Department of War (DoW) excess and surplus property generated by the military services. This is accomplished through reutilization to other DoW activities, transfer to other Federal agencies, donation to authorized state and local organizations, sale to the public, or ultimate disposal through abandonment or destruction. The headquarters for DLA DS is located in Battle Creek, Michigan.

b. DLA DS Anchorage requires the use of various pieces of Material Handling Equipment (MHE) during daily operations in support of the military services.

Preventive Maintenance (PM) and Corrective Maintenance (CM) services for MHE within DLA DS Anchorage are critical to ensure MHE is always operational.

Without timely, efficient, and effective PM and CM services, the DLA DS Anchorage site will be impacted to a point where we are unable to support our customers.

c. This is a Firm Fixed Price (FFP) time and materials contract which consists of a performance period of one (1) 12-month base period and two (2) 12-month option periods. The total contract length shall not exceed three (3) years.

d. The equipment associated with this PWS is listed in Attachment 3 and is subject to change throughout the contract based on life cycle management of the equipment.

Should the equipment change, Attachment 3 - Equipment List_Anchorage MHE will be updated by the Contracting Officer (KO) and provided to the Contractor.

e. The Contractor shall provide all personnel, equipment, tools, electronic functional test equipment, materials, supervision, and quality control necessary to perform, PM, CM, Annual testing requirements, and other services as defined in this PWS.

f. Upon coordination with PM or CM services, the Contractor shall be required to report to requesting DLA DS location’s main office to sign in prior to conducting any services under this contract.

g. Any reference to Contractor throughout this PWS refers to the Contractor, or

Subcontractor, should one be utilized. The Contractor is solely responsible for all associated work to be completed In Accordance With (IAW) the PWS.

h. The Contractor shall use lock-out/tag-out procedures as necessary for any piece of equipment receiving any type of service. The Contractor shall verify and confirm proper clearing procedures prior to returning operational control of the piece of equipment to the USG.

i. This Contract includes electric powered equipment, the associated batteries, and charging stations are part of the required PM and CM maintenance activities.

2. PREVENTIVE MAINTENANCE (PM):

The Contractor shall:

a. Perform at a minimum; One (1) PM service per item listed on the equipment listing Attachment 3. When each initial Contract Line-Item Number (CLIN) is ordered per equipment item, the PM may require any or all of the following: all lower-level maintenance checks and services performed IAW the Original Equipment Manufacturer (OEM) manual, load test on all load carrying equipment (as applicable), a Limited Technical Inspection (LTI) and/or as specifically requested by the Contracting Officers Representative (COR). Additional PMs may be requested by the COR as required by the OEM Manuel.

i. The LTI shall include but is not limited to a thorough inspection of the electrical charging equipment and stations for electric powered equipment, engine, transmission, other major components, controls, mast, cables, chains, hoses, electrical, air, and hydraulic systems to determine the disposition of the equipment. The inspection shall include a check of all fluids and fittings and a chassis lube.

b. Ensure all PM services are completed IAW the OEM manual’s specifications. When pricing PM services on the Price Schedule (PS), the Contractor shall include the costs of the following items, but are not limited to: oil, grease/lubricants, Diesel Exhaust Fluid (DEF), antifreeze, battery fluid (water levels, testing, etc.), air filters, fuel filters, fittings, inspections and includes normal wear parts (light bulbs, windshield wipers, etc.) as requested with PM services. Electric equipment shall include battery and charging station checks (see OEM manual). Parts requiring replacement that were identified during/after PM will be charged utilizing CM.

c. Perform a fork inspection with each PM IAW the American National Standards

Institute/Industrial Trucks Standards Development Foundation (ANSI/ITSDF).

Standards can be located at the following link: www.itsdf.org.

d. Notify the Contracting Officer Representative (COR) two (2) business days prior to arrival with the date and time intended to arrive to perform PM services.

e. Start the PM service within five (5) business days of notification. Complete all PM services within ten (10) business days from the start of the PM service unless otherwise coordinated with the COR. If the service cannot be completed in this time frame the Contractor will submit a written justification on company letterhead with a timeline for completing the PM.

f. Perform PM service as appropriate on the associated battery, cables, and charging unit when a CLIN for an Electric item is ordered.

g. Affix a sticker or equivalent item to each piece of equipment upon completion of PM service. The sticker shall clearly indicate which PM service was completed, including the hour reading and the projected hours and date of the next required PM Service. Write legibly, in permanent ink (e.g., paint marker), in a visible location the date in which filters were changed on the exterior of the filter. The permanent ink chosen must be able to withstand the weather, oil, dirt, and other debris to prevent smudging or otherwise removing the date or making it non-legible.

h. Remove all replaced parts and trash. The Contractor will remove materials used in the drain and purge process and leave the workspace free of trash, old parts and removed fluids. However, the drained and purged HM will be left behind in approved shippable containers with a Hazardous Waste Profile Sheet (HWPS), notifying the DLA DS site Environmental Point of Contact (POC) and approved by the KO for disposal.

i. Perform lug nut torquing for all equipment in conjunction with PM service. Lug nuts shall be torqued IAW OEM specifications. Mark studs with painted line from stud to lug nut, to rim.

j. Complete a PM sheet on company letterhead with PM services checked and completed during service. Sheet will be turned into the COR no later than five (5) business days after services are complete.

k. Deficiencies or required repair parts discovered during PM services but not included in the scope of the PM service shall be considered CM and require a written estimate on company letterhead submitted to the COR within 5 (five) business days of the PM completion and prior to performing any repairs, IAW section three (3) below.

3. CORRECTIVE MAINTENANCE (CM):

The Contractor shall:

a. Assess, inspect, test, and troubleshoot all CM service requests within seven (7) business days of notification from the COR to determine the root cause of the deficiency.

b. Provide an estimate for the repair, in writing, on Contractor letterhead or similar documents, to the COR within five (5) business days of the assessment IAW paragraph 3. a. The written estimate must contain the following information, at a minimum:

i. Description of the deficiency.

ii. Parts necessary to correct the deficiency including the manufacturer and part number.

iii. Indicate on the estimate whether the replacement part comes with a manufacturer warranty and the length of manufacturer warranty.

iv. Cost of parts.

v. Quantity of parts necessary.

vi. Quantity of labor hours to repair the deficiency.

vii. Cost of Shipping for parts, if applicable.

viii. Cost of labor per hour.

ix. Total estimated cost of repair.

x. Estimated lead time for parts.

xi. Expected date of part delivery.

xii. Expected date repairs will be complete.

c. Provide all OEM recommended replacement parts and materials and may be examined when requested by the KO or COR prior to installation. No rebuilt parts shall be used.

d. Wait for approval by the KO pending determination of available funding and if the repair is economical.

e. Be compensated by the USG for all parts and materials furnished and provided for on the written estimate in coordination of CM services unless the part or repair is due to the Contractor’s negligence. Parts or components damaged by the Contractor shall be repaired or replaced at the expense of the Contractor to the satisfaction of the COR.

f. Will not mark up prices on parts or materials the Contractor uses. Upon request by the Agency, the Contractor shall provide their Supplier’s invoices for parts and materials being furnished to the Agency via the Contractors invoice in order for the Agency to ensure parts and materials are not being marked up.

g. Make all price estimates valid for a period of 30 calendar days to ensure adequate time for determination and approval by the COR. Should the 30 calendar days be exceeded, the Contractor shall be required to submit a new estimate. In the event required replacement parts are expected to have long delays when ordering, the Contractor shall coordinate with the COR to obtain parts via other local sources to minimize delays.

h. Upon approval of the CM service estimates, the Contractor shall have seven (7) business days to complete the necessary repairs to return the equipment to full operational status. The seven (7) business days will begin upon receipt of all the parts necessary to complete the CM. In the event the required repair will require longer than the seven (7) business days, the Contractor shall notify the KO and COR in writing for approval. The notification shall include the justification for the additional time and an estimated date of completion.

i. Provide a weekly status update by email on official company letterhead to the COR.

This update shall include details of pending or open repair actions, parts on order, estimated delivery dates, estimated completion dates, associated costs, and labor hours required for the repairs.

j. Perform a functional test (load test) IAW OEM specifications, Occupational Safety and Health Agency (OSHA) 29 CFR, or upon completion of any work in which the load bearing structure was removed, replaced, or repaired. Perform proper, documented, lug nut torquing, anytime the wheels are a part of the CM activity.

k. Perform CM services on USG premises to the maximum extent possible.

l. Return to reassess equipment within five (5) business days of notification if repairs do not correct the original deficiency at no additional cost to the USG.

m. Remove all replaced parts and trash. The Contractor will remove materials used in the drain and purge process and leave the workspace free of trash, old parts and removed fluids. However, the drained and purged HM will be left behind in approved shippable containers with a Hazardous Waste Profile Sheet (HWPS), notifying the Environmental POC and approved by the KO for disposal.

n. Provide appropriate conveyance and equipment to load, un-load, and transport the MHE to their maintenance facility if services cannot be provided on USG premises.

o. Prior to removal of any MHE from USG premises, the Contractor shall sign DoW

Form 1149, transferring liability of the equipment to the Contractor for the duration of the maintenance. Upon return of the MHE to USG premises, DLA Form 1311 will be signed by the COR accepting the equipment repair.

4. PLACE OF PERFORMANCE OF SERVICES:

The Contractor shall provide services at the DLA DS Anchorage facility to the maximum extent possible during normal business hours, except on recognized US federal holidays or when the USG facility/installation is closed due to local or national emergencies or holidays, administrative closings, or similar USG-directed facility/installation closings.

Performance shall be at the designated location specified by the COR. The Contractor shall maintain an adequate work force for the performance of all tasks defined within this PWS when the USG facility/installation is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the work force are essential. Adequate personnel are defined as a sufficient number of qualified personnel to successfully perform the duties required to be successful IAW the terms and conditions of the PWS.

5. FEDERAL HOLIDAYS:

The Contractor is not required to provide services on the 11 Federal Holidays observed by DLA unless approved by the KO or COR. When the legal holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When the legal holiday falls on a Saturday, the preceding Friday is observed as the holiday. The following holidays are observed:

New Year’s Day January 1st Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th

6. BASE ACCESS & SECURITY:

a. The Contractor shall coordinate base installation access for all their employees. The Contractor shall be familiar with and comply with all Base Command policies regarding security considerations for all Contractor employees.

b. Unscheduled gate closures by the installation security personnel may occur at any time causing all personnel entering or exiting a closed installation to experience a delay; this cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by Contractor personnel are subject to search pursuant to applicable regulations. Any violation of applicable motor vehicle regulation may result in the termination of the Contractor employee’s installation driving privileges.

c. Contractor employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety, and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All Contractor employees shall carry proper identification with them and shall be subject to checks as may be deemed necessary.

The Contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The USG reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of Contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

d. The Contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The Contractor and associated employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation security personnel. The Contractor shall ensure compliance with all personal identity verification requirements as directed by DoW and/or local policy.

Should the Force Protection Condition (FPCON) change, the USG may require changes in Contractor security matters or processes.

7. USG FURNISHED PROPERTY, MATERIALS, EQUIPMENT AND UTILITIES

(GFP/M/E/U)

The USG will provide the GFP/M/E/S listed below solely for the purpose of performance under this contract:

a. Property: The USG will furnish the necessary workspace for the Contractor to perform services as outlined in this PWS.

b. Materials: The USG will not provide materials.

c. Equipment: The USG will, at its sole discretion, and upon approval of the COR, provide MHE for the Contractor to assist with the performance of PM or CM of other

MHE.

d. Utilities: All utilities in the facility will be available for the Contactors use in the performance of this contract. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

8. CONTRACTOR FURNISHED PROPERTY, MATERIALS, EQUIPMENT, AND

SERVICES (CFP/M/E/S)

The Contractor shall provide the CFP/M/E/S listed below solely for the purpose of performance under this contract:

a. Property: Provide property if repairs cannot be done at USG facilities.

b. Materials: Provide all materials to conduct PM and CM services and to clean up spills caused by their employees during the performance of PM or CM services.

c. Equipment: Provide all Personal Protective Equipment (PPE) for employees IAW OSHA guidance.

d. Contacts: Provide the KO and COR with a POC and phone number to coordinate and schedule services.

e. Certifications: Provide the KO and COR with their employees Certified Forklift

Technician (CFT) certifications to perform maintenance on the MHE.

f. Services: Provide services listed throughout this PWS IAW OEM specifications.

9. ACCEPTABLE PERFORMANCE LEVELS (APLs):

a. APLs are the minimum performance levels of specific requirements which the Contractor must achieve or risk having the government consider performance unsatisfactory, which may result in monetary or other consideration from the Contractor.

b. If performance falls below the specified performance level, consideration may be taken at the USG’s discretion. Decisions will consider the impact on the USG because of the failure to meet the performance requirement and the number of times the failure occurred throughout the contract period.

c. Performance incentives for the Contractor will include, but are not necessarily limited to, favorable impact on option exercise decisions, future awards of the same requirement, and future awards of similar requirements by DLA DS as well as other government and non-government entities that may review performance of this

Deliverable Standard Time

Frame Clause Acceptable

Performance Level

Reduction for failed

APL

Method of Surveillance

Sign in on visitor log

Sign visitor log upon arrival for any service

Prior to commencing services on a scheduled day

PWS 1. f. No more than two (2) failures during each period of performance.

Payment may not be made until APL is achieved.

COR/

Customer

Timely and Complete PM

PM of all items under the appropriate CLINs

Within ten

(10) business days of start of work

PWS 2. e. No more than two (2) items maintained late per period of performance.

Payment may not be made until APL is achieved.

COR/

Customer

PM Sticker Affixed to all items receiving

PM

Sticker with hour reading, level of service and date the PM was completed and date of next PM.

Prior to departure on day of PM service.

PWS 2. g. No more than two (2) failures during each period of performance.

Payment may not be made until APL is achieved.

COR/

Customer

Fill out PM sheet for services completed

Complete a PM service sheet on company letterhead

Within five

(5) business days of PM service completion

PWS 2. j. No more than two (2) failures during each period of performance.

Payment may not be made until APL is achieved.

COR/

Customer

Report discrepancies needing CM services

Record of items inspected, and work performed for each piece of equipment receiving a PM service

Within five

(5) business days of PM service completion

PWS 2. k. No more than two (2) record sheets delivered late during period of performance.

Payment may not be made until APL is achieved

COR/

Customer

Corrective Maintenance Service

Assess, inspect, test, and/or troubleshoot all CM service requests

Within seven

(7) business days of notification.

PWS 3. a. No more than two (2) failures during each period of performance.

Payment may not be made until APL is achieved

COR/

Customer

Cost estimate for CM

Provide written estimate for all CM work with required information

Within four

(4) business days of assessment

IAW PWS 3.

a.

PWS 3. b. No more than two (2) estimates provided late during the period of performance

Payment may not be made until APL is achieved

COR/

Customer

Timely and complete CM

MHE

Operational in a timely manner

Within seven

(7) business days of COR approval of cost estimate and repair

PWS 3. h. No more than two (2) items were repaired exceeding the required timeframe.

Payment may not be made until APL is achieved

COR/

Customer

Provide weekly status for CM services

Weekly status for all equipment being serviced under the CM

CLIN

On first workday of the week.

PWS 3. i. No more than two (2) failures during each period of performance.

Payment may not be made until APL is achieved.

COR/

Customer

Perform functional test (load test)

Perform load test IAW

OEM

specifications

Upon completion of CM

PWS 3. j. No more than two (2) failures during each period of performance.

Payment may not be made until APL is achieved

COR/

Customer

Return to reassess equipment

Troubleshoot ineffective repairs

Within five

(5) business days of notification

PWS 3. l. No more than two (2) failures during each period of performance.

Payment may not be made until APL is achieved

COR/

Customer

10. SPILL RESPONSIBILITY:

The Contractor is solely responsible for all spills or leaks during the performance of this contract, which occur because of, or is contributed to by the actions of its agents, employees, or subcontractors. The Contractor shall clean up such spills or leaks to the satisfaction of the USG in a manner that complies with applicable federal, state, and local laws and regulations. The clean-up shall be at no cost to the USG. The Contractor shall report all such spills or leaks, regardless of their quantity, to the KO and COR immediately upon discovery. A written follow-up report shall be submitted to the KO and COR not later than 24 hours after the initial telephonic report. The written report shall be in narrative form, and as a minimum shall include the following:

i. Description of item spilled (including identity, quantity).

ii. Whether amount spilled is Environmental Protection Agency (EPA) or state reportable, and if so, whether it was reported. Exact time and location of spill including a description of the area involved.

iii. Containment procedures initiated.

iv. Summary of any communications Contractor has with press or USG officials other than the KO.

v. Description of clean-up procedures employed or to be employed at the site including disposal location of spill residue.

11. INVOICING INFORMATION:

a. The Contractor shall invoice monthly through the DoW Wide Area Workflow (WAWF) system. Invoices must be submitted through WAWF in accordance with DFARS 252.232-7003. Refer to https://wawf.eb.mil for additional information.

b. Hourly billing will be rounded up to the next whole hour.

12. CONTRACT MINIMUM/MAXIMUM:

The contract minimum shall be $1,000. The maximum shall be 150% of the estimated value of the contract. There is no contract minimum for any option period included in the

FAR 52.212-01 Fill-in coverage:

1.0 PROPOSAL SUBMISSION (FORMAT AND CONTENT): The following

describes the information that must be furnished as part of the proposal and the format which must be presented. Proposals which do not provide the required information in the prescribed format at the time of the initial submittal may be excluded from further consideration. Offers are strongly encouraged to read provisions.

FAR 52.212-1, “INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS”.

1.1 FORMAT: The offeror shall submit documentation (one original electronic form, standard Microsoft based Word and / or Excel, and or .PDF files) in response to this solicitation subject to the requirements in this provision. The offeror’s outline should demonstrate, in detail, how their organization, internal work processes and procedures meet the US Government’s requirements for performance under this solicitation.

1.2 PROPOSAL SUBMISSION: The following describes the information which must be furnished as part of the proposal and the format in which it must be presented.

Proposals which do not provide the required information in the prescribed format shall be excluded from further consideration. Offerors should not include extraneous information that is not required to be submitted by 1.4. All proposals shall be valid for 90 days.

(a) FORMAT: Proposals shall be submitted in distinctly severable parts consisting of the following volumes: Volume 1, Volume 2. Proposal submissions will consist of one original copy submitted electronically. If multiple electronic files are submitted, each electronic file shall identify it as part of Volume 1, 2.

• VOLUME 1: Proposal Certifications and Price Schedule. (i) FAR 52.212-1(b) Information, except (b)(10). (b)(10) Information shall be in Volume 2. The Price Schedule is Attachment 2.

• VOLUME 2: Past Performance Proposal. (See 1.4 below) (b) Submission of proposal via email to: june.lee@dla.mil. Emailed proposals must be sent to june.lee@dla.mil

1.3 Reserved

1.4 Past Performance Proposal:

(a) The offeror is required to provide any current relevant information regarding the level of performance, in terms of delivery and quality achieved under either US Government or commercial contracts for the same or similar services for performance in the same geographic area. The information provided should support a qualitative review of the offeror; and/or record of performance in the areas of conforming to specifications, adherence to contract schedules, history of reasonable and cooperative behavior, commitment to customer satisfaction, and business-like concern for the interest of your customer. Additionally, if performance deficiencies were identified, what they were and what corrective action was taken.

Relevant past performance shall be within the last 6 years.

(b) Offerors shall submit past performance data for their firm. For each reference provided below.

• Valid name

• Telephone number

• Contract number

• Contract type

• Dollar value

• Contract award

• Completion dates

• Point of contact

• Description of work performed

• E-mail address of point of contact

The description of work performed shall be in sufficient detail to explain how each reference relates to same or similar requirements of this solicitation including performance timeframes; experience in the same geographic area; MHE (Material Handling Equipment); and complexities of services performed in Alaska, USA

(c) Reference projects and corresponding reference surveys are limited to four (4) projects considered by the offeror to be the most relevant to the requirements of this solicitation. If more than four projects with reference surveys are received, the US Government will consider the first four projects received based upon the date and time the reference surveys are received.

(d) Attachment 4 contains a past performance survey that is used to evaluate an offeror’s past performance. The offeror shall provide the past performance survey in Attachment 4 to the past performance reference they identify in this part of the proposal for the offeror. The past performance reference shall independently submit the survey to the Contracting Officer prior to the closing date of the solicitation. Any completed past performance survey received after the date of closing or directly from the offeror will not be considered in the past performance evaluation. The US Government will not evaluate a reference listed in the past performance proposal if no corresponding survey is received from a reference for that contract. This will have the effect of the offeror being given a Neutral Confidence rating for that portion of their overall evaluation, regardless of the type of experience or its similarity to this requirement. Reference surveys must be received by the due date for receipt of proposals in order for the information to be considered. Offerors are cautioned that due to mail delivery times to the U.S., it is highly recommended that all contract references being asked to provide surveys be asked to scan the documents in Adobe .pdf format and email it to june.lee@dla.mil with a reference to the solicitation, SP4510-27-Q-1005 in the subject heading.

(e) The submission of a past performance volume is required. If an offeror does not have any past performance references, offerors must at least identify Volume 2 in their proposal and state they do not have any past performance to provide. If the US Government only receives a past performance survey from a past performance reference and there is no information in an offeror’s proposal regarding that reference (see paragraph above), the reference will not be considered. The offeror is responsible for ensuring references submit past performance surveys; the US Government will not be contacting references for purposes of obtaining the survey.

ADDENDUM TO 52.212-2 EVALUATION – COMMERCIAL ITEMS

1.5 Evaluation of Past Performance:

(1) The US Government will evaluate the quality of the offeror’s past performance. An assessment of the offeror’s past performance will be used as a means of evaluating the probability of success of the offeror. Thus, an offeror with a higher confidence assessment rating for past performance will have a higher probability of meeting the solicitation requirements than a firm with a lower confidence assessment rating.

(2) In investigating an offeror’s past performance, the US Government may consider information in the offeror’s proposal and information obtained from other sources, including past and present customers and their employees, other US Government agencies, including state and local agencies, consumer protection organizations and better business bureaus; former subcontractors; and others who may have useful information.

Failure by the offeror to provide evidence of relevant performance on contracts of a similar nature in terms of performance timeframes and complexities of services provided will be considered by the US Government to have no relevant past performance.

The offeror is responsible for ensuring references submit past performance surveys; the offeror’s reference must submit the past performance survey. The US Government will not accept past performance surveys submitted by the offeror or contact offeror references to obtain a completed survey. The US Government will evaluate past performance and experience in accordance with submission requirements of 1.4.

(3) Evaluation of past performance will be a subjective assessment based on a consideration of all relevant facts and circumstances. It will not be based on absolute standards of acceptable performance. The US Government is seeking to determine whether the offeror has consistently demonstrated a commitment to customer satisfaction and timely delivery of services. This is a matter of judgment. Offerors will be given an opportunity to address especially unfavorable reports of past performance, and the offeror’s response, or lack thereof, will be taken into consideration. Offerors lacking relevant past performance will not receive negative or positive consideration in the evaluation of this element as no meaningful confidence assessment rating can be reasonably assigned.

(4) Past performance will be rated on an adjectival scale. The US Government’s conclusions about the overall quality of the offeror’s past performance and experience will be a factor in determining the relative merits of the offeror’s proposal and in selecting the offeror whose proposal is considered the most advantageous to the US Government.

(5) By past performance, the US Government means how well the offeror conformed to specifications and to standards of good workmanship; the offeror’s adherence to contract schedules, including the administrative aspects of performance; the offeror’s history of reasonable and cooperative behavior and commitment to customer satisfaction; and the offeror’s business-like concern for the interests of the customer. By experience, the US Government means whether a contractor’s firm has performed similar work before.

DLA Disposition Services will also consider the offeror’s past performance and experience on the same or similar contracts in terms of the complexities of the services provided. Offerors with no past performance will be issued a Neutral rating for past performance.

(f) A written notice of the award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

Before the offer’s specified expiration time, the US Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

1.6 Evaluation Factors for Award:

a. The US Government will make award to the responsible offeror whose offer conforms to the solicitation and demonstrates the best value to the US Government in terms of their past performance and price.

b. The evaluation factors are listed below:

(i) Past Performance

(ii) Price

(iii) Past performance is significantly more important than price.

1.7 Evaluation of Price: The offered price will be used in conjunction with the other factors to determine the proposal, which represents the best value to the US Government.

Price will not be numerically scored, but it will be fully evaluated using price analysis techniques.

1.8 Efficiency Competition: Offerors are advised that the US Government may not evaluate the past performance proposals of all offerors under this RFP. The US Government will first review the total evaluated price of all proposals received. The past performance proposals of those offerors whose pricing is determined by the Contracting Officer to be most competitive may be reviewed prior to, or instead of, other past performance proposals received. Based on the initial review of these past performance proposals, the US Government may not evaluate the past performance proposals of other offerors, whose total evaluated pricing was higher than that of one already evaluated and already assigned the highest possible past performance rating. This would occur when the Contracting Officer determines that any possible past performance superiority of an unevaluated (and higher priced) past performance proposal, over (a lower priced) one that was already evaluated and assigned the highest possible past performance rating, would not warrant any additional price premium.

File details come from the government source that posted it. Updated .