Attachment_4_APLs.docx

DOCX document 14 KB Posted

Attached to
Material Handling Equipment (MHE) Maintenance for DLA Disposition Services Kuwait
Solicitation number
SP451019R0001
Issued by

About this file

Attachment 4

View the file

Other files

File Type Posted
Attachments_1,_2,_3_Equipment_Lists.pdf PDF
Attachment_5_-_Past_Perf_Survey.doc DOC document
Attachment_7_-_Contractor_Instructions.pdf PDF
Attachment_6_CAC_Turn-In_Receipt.pdf PDF
Attachment_8_Bid_Schedule.xlsx XLSX spreadsheet
SF1449_SP451019R0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Acceptable Performance Levels (APLs) Attachment 4 Performance Objective

PWS
Performance Threshold
Method of Surveillance
Complying-Yes/

No. If no, explanation required.

1. Emergency vehicle repair within two hours, 24 hours a day, seven days a week until completed or unless otherwise approved by the COR.
25.1
No more than one (1) late service call in a six month period. Any deviation must first be coordinated through COR.
Upon incident occurrence
2. Contractor shall establish procedures to ensure on-call personnel shall report for duty within 60 minutes of notification.
3.5
No more than one (1) late service call in a six month period. Any deviation must first be coordinated through COR.
Upon incident occurrence
3. Contractor shall maintain all vehicles to OEM standards and specifications.
6.1

14.1

All parts must meet OEM specifications. Sources other than manufacturer/dealer are authorized as long as part meets or exceeds OEM specifications.
Inspection of work performed
5. Contractor shall be responsible for accomplishing minor repairs estimated at two hours or less within one day of submission of the vehicle for repair
10.2
No more than one (1) late service call in a six month period. Any deviation must first be coordinated through COR.
Reports, Monthly Inspections
6. Contractor repairs and maintenance will be inspected on completion of work
25.3.1
All repair and maintenance work will be inspected at completion unless designated by the CO/COR. Inspections must pass or be re-worked at no additional cost to USG.
Upon completion of work
7. If contractor removes any equipment from installation, the contractor will sign for it on a DD Form 1149 or letter for equipment removal.
24.2.2
All equipment removed from installation by contractor will require a signed DD1149 or signed letter for equipment removal.
Reports, Periodic Inspection

8. Contractor shall clean work area daily.

21.4
Work area is to be kept clean as possible at all times.
Observation
9. Comply with all local environmental laws and ASG-KU applicable policies, procedures and regulations
26.1
No “Notices of Violation” or major negative findings during the month.
Reports, Periodic Inspection

10. Loaner vehicle shall be available as needed.

17.3
No occurrences where loaner vehicle is not available in a 12 month period.
Observation
11. Contractor shall maintain all generators and light sets in an above average state of repair.
8.1
No more than five (5) generator light sets shall be in disrepair in a six month period.
Reports/Observation